Introduction:
The 9 km tunnel, which will bypass snow and landslide-prone Kud, Patnitop and
Highway 44. Batote on National
This marks significant road building in India, including an unprecedented stress on uset safety.
The 9 km long road tunnel that bores through the belly of the lower Himalayas between Chenani in
Udhampur district and Nashri in Ramban district is an achievement of engineering
The tunnel incorporates India's first fully integraled mechanism to
externally control everything from
the movemenl of vehicles to the inlow and outtlow air and even the evacuation of
of passehgers or
vehicles in distress.
It will reduce the travel time on National Highway 44 between Jammu and Srinagar by about2 hours
by shortening the distance between the cities by 30 km.
It will altogether bypass Kud, Patnilop and Batote locations where the highway is
blocked by snow and landslides.
prone to being
it will help save 27 lakhs worth fuel between the two areas
1
13-05-2022
Project Location:
Slale Apial
Cooye
Project Brief:
Parlicilsr Details
Semi-Annuity Amou 52 Cr
Name of Authority National Highways Authority of India
Independent Engineer (Dunng Execution) M/s Euroestudios S.L. in asociation with Seynicntal Consulting
and Support Services Pvt Lid
Independent Engneer (During O&M) TPF GETINSA EUROSTUDIOS SL in association with Rodic
Consultants Pvt Lid
2
13-05
Project Brief:
Paricular
Detnile
Total Project Cost
Rs 2519 00 Crs
Total Capital Cost
Rs 3720 00 Crs
Anurty
317.52 Crs
Date of Signing of Concession
Agreement October 28, 2010
Appointed Date
May 23,2011
Concession Penod
20 Yrs (Incl Construction Period)
Construction Period SYrs (1825 Days)
Provisional Certificate March 8, 2017
Line Diagram:
MTU
13-05-2022
Project Features:
irticular
Detafls
ain Tunnel
9 00 Kms
Project Features:
Detnils
Particuls
118 Nos(at every 150 mtrs)
sOS Boxes
2 Hours
Reduction in Journey Time
Rs 27 Lakhs Per day
Fuel Saving
New Austrian Tunneling Method
Tunneling Method
After every 75 mtrs
CCTV
After every 1800 mirs
AVS
Afler every 600 mtrs
CO-Opacity Sensors
13-05-2022