You are on page 1of 2

RFI Summary

(A) RFI's for Major Roads


Submission Date 27-Dec-2023
Inspection Date 28-Dec-2023
Sr. Chainage
RFI No. Time Road No. Work Particulars Side Remarks
No From To
1 ABD/Major/30909 3.00 Pm DMA 06 and 07 Chamber Construction -600 x 900 LHS Approved
2 ABD/Major/30910 11:00 AM DMA 06 and 07 Dismentling and Excavation in trenches for D.I. Line 250mm Dia LHS 40 60 Approved
3 ABD/Major/30911 04:00 PM DMA 06 and 07 Laying D.I.Pipe -250 mm dia LHS 40 60 Approved
4 ABD/Major/30912 11:30 AM DMA 06 and 07 Dismentling and Excavation in trenches for D.I. Line 350mm Dia LHS 60 80 Not Ready
5 ABD/Major/30913 05:00 PM DMA 06 and 07 Laying D.I.Pipe -350 mm dia LHS 60 80 Not Ready
6 ABD/Major/30914 02:00 PM DMA 06 and 07 Dismentling and Excavation in trenches for D.I. Line 250mm Dia LHS 22 44 Approved
7 ABD/Major/30915 06:00 PM DMA 06 and 07 Laying D.I.Pipe -250 mm dia LHS 22 44 Approved
8 ABD/Major/30916 02:00 PM DMA 06 and 07 Dismentling and Excavation in trenches for D.I. Line 150mm Dia LHS 40 60 Approved
9 ABD/Major/30917 06:00 PM DMA 06 and 07 Laying D.I.Pipe -150 mm dia LHS 40 60 Approved
10 ABD/Major/30918 5.00 Pm DMA 06 and 07 M 40 Concrete for reconstruction LHS 0 110 Approved
11 ABD/Major/30919 4.00 Pm DMA 06 and 07 Making Consumer connection LHS Approved
12 ABD/Major/30920 5.00 Pm DMA 06 and 07 P/F DI special fittings LHS Approved
13 ABD/Major/30921 8.00 Am R72 Laying GSB RHS Approved
14 ABD/Major/30922 9.00 Am R72 Laying PCC RHS Approved
15 ABD/Major/30923 10.00 Am R 52 Chamber Construction -600 x 900 for sluice valve RHS 115 Approved
Total 15
Approved 13
Not Ready 2
RFI Summary
(A) RFI's for Major Roads
Submission Date 28-Dec-2023
Inspection Date 29-Dec-2023
Sr. Chainage
RFI No. Time Road No. Work Particulars Side Remarks
No From To
1 ABD/Major/30924 3.00 Pm DMA 06 and 07 Chamber Construction -600 x 900 LHS
2 ABD/Major/30925 11:00 AM DMA 06 and 07 Dismentling and Excavation in trenches for D.I. Line 250mm Dia LHS 60 110
3 ABD/Major/30926 04:00 PM DMA 06 and 07 Laying D.I.Pipe -250 mm dia LHS 60 110
4 ABD/Major/30927 11:30 AM DMA 06 and 07 Dismentling and Excavation in trenches for D.I. Line 350mm Dia LHS 60 80
5 ABD/Major/30928 05:00 PM DMA 06 and 07 Laying D.I.Pipe -350 mm dia LHS 60 80
6 ABD/Major/30929 02:00 PM DMA 06 and 07 Dismentling and Excavation in trenches for D.I. Line 250mm Dia LHS 30 44
7 ABD/Major/30930 06:00 PM DMA 06 and 07 Laying D.I.Pipe -250 mm dia LHS 30 44
8 ABD/Major/30931 02:00 PM DMA 06 and 07 Dismentling and Excavation in trenches for D.I. Line 150mm Dia LHS 68 110
9 ABD/Major/30932 06:00 PM DMA 06 and 07 Laying D.I.Pipe -150 mm dia LHS 68 110
10 ABD/Major/30933 5.00 Pm DMA 06 and 07 M 40 Concrete for reconstruction LHS 50 70
11 ABD/Major/30934 4.00 Pm DMA 06 and 07 Making Consumer connection LHS
12 ABD/Major/30935 5.00 Pm DMA 06 and 07 P/F DI special fittings LHS
13 ABD/Major/30936 4.00 Pm DMA 06 and 07 Laying GSB for reconstruction LHS 0 80
14 ABD/Major/30937 5.00 Pm DMA 06 and 07 Laying PVC pipe 110mm for public sewer connection LHS 0 12
15 ABD/Major/30938 10.00 Am R 52 DI Cross connection 300x200 mm RHS 160