0% found this document useful (0 votes)
95 views8 pages

Sewage Treatment Facility Report: ATS Dera Bassi

The inception report summarizes the findings from a site visit to evaluate the sewage treatment facility at an ATS project in Dera Bassi, Punjab. Key findings include: 1) The bar screens and aeration tanks were in place but required upgrades to pumps, diffusers, and media to meet design capacity and ensure proper oxygen transfer. 2) The chlorine contact tank was missing chlorine dosing equipment, preventing disinfection of treated wastewater. 3) The sludge handling system did not meet norms, requiring installation of sludge drying beds. 4) The filtration system lacked proper pumps and pressure gauges, compromising reliability of operations.

Uploaded by

dassagra
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views8 pages

Sewage Treatment Facility Report: ATS Dera Bassi

The inception report summarizes the findings from a site visit to evaluate the sewage treatment facility at an ATS project in Dera Bassi, Punjab. Key findings include: 1) The bar screens and aeration tanks were in place but required upgrades to pumps, diffusers, and media to meet design capacity and ensure proper oxygen transfer. 2) The chlorine contact tank was missing chlorine dosing equipment, preventing disinfection of treated wastewater. 3) The sludge handling system did not meet norms, requiring installation of sludge drying beds. 4) The filtration system lacked proper pumps and pressure gauges, compromising reliability of operations.

Uploaded by

dassagra
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Inception Report of Sewage Treatment facility at ATS projects At Dera Bassi, Punjab

Inception Report

2013

The undersigned visited the ATS meadows, Dera Bassi Punjab, site on 16 th Nov. 201 ., the visit was assisted b! "r. Nimrat Pa# Singh, Senior "anager$Pur%hase & Pro%urement ATS 'rou(. )o##owings are the *indings o* the same. Des%ri(tion o* s%heme+ Designed *or ,0 -.D based on "BB/ Ph!si%a# observation 0o#or o* water B#a%1ish gra! 2 (#ease re*er to Photo gra(h3 Sme## indi%ation T!(i%a# o* sewer Putre*a%tion .ess o* o4!gen in treatment

Rev. -0

`date 19-11-2013

Inception Report of Sewage Treatment facility at ATS projects At Dera Bassi, Punjab

2013

Location
Bar s%reen+ 1.

Fin ings
5n P#a%es Ni#

Impact

Reme y ! Action
Not re6uired

Status

Sum(

2. .

5n (#a%e Si7e 2.89 2.8 e**e%tive de(th 1., "

;4%eeding re6uirement

Not re6uired

8.

0a(a%it! :.68 0u " e6uiva#ent to more than 20 "in.

< & ' tra(

,.

5n P#a%e

Rev. -0

`date 19-11-2013

Inception Report of Sewage Treatment facility at ATS projects At Dera Bassi, Punjab
;6ua#i7ation Tan1 6. =. 5n P#a%e Si7e.6.098.0 9 8.0 " 20., " *ree board3 or >6 -. :. ?/T @ 6.,: ?r *or ,0 -.D *#ow rate >. "i4ing B! Air 5ntermittent o(eration shou#d be %onverted into %ontinuous o(eration mode <ut#et o* (um(s shou#d rea%h 0., m *rom the bottom o* aeration tan1 not on to( o* tan1 "eeting the ree6ui(ments *or e6ua#i7ation Pro(er (um(s are re6uired meeting *o##owing 18.6 -.Chr D 10 m head. Aith *#ow %ontro# %ir%uit.

2013

10. Pum( 2 Nos. 11. <(eration 1 A B 1S 12. 0a(a%it!+ )#ow rate un1nown 1 . <(eration + 5ntermittent 18. Dis%harge (oint at to( o* tan1

Rev. -0

`date 19-11-2013

Inception Report of Sewage Treatment facility at ATS projects At Dera Bassi, Punjab
Aeration Tan1 1,. 5n P#a%e 16. Si7e 6.098.0 9 8.0 " 20., " *ree board3 or >6 -. 1=. ?/T @ 6.,: ?r.*or ,0 -.D *#ow rate 0hambers+ Sing#e 1:. Air B#owers 2 Nos. 1>. <(eration 1 A B 1S 20. Aeration 0a(a%it! 00 0u "C ?r. 21. "edia + A((eared to #ess as (er the des%ri(tion o* o(erator. 22. Di**users+ Non retrieving t!(e insta##ation 2 . Tota# No. 0an not be ?eating o* the (i(e #ine shows that *u## air is not (assing thru the di**users thus head is bui#d u(, thus During the visit to store "BB/ media is *ound,whi%h %an be %a#%u#ated & use in the "BB/. Two se%tion o* tan1 %an be %reated b! (utting the SS wire$mesh & Air *#ow %ontro# s!stem, to Bubb#e si7e indi%ate that either *ew di**users are %ho1ed or burst. .arger bubb#e si7e is im(airing the o4!gen trans*er.thus redu%ing the e**i%ien%e. /edesign the di**user se%tion *or better trans*er o* <4!gen. Tota# no. <* 80 Di**users with 1 m .ength are to be used.

2013

The insta##ation shou#d have retrieving t!(e.

Rev. -0

`date 19-11-2013

Inception Report of Sewage Treatment facility at ATS projects At Dera Bassi, Punjab
%a#%u#ated as No dwg. was avai#ab#e at the site. 28. 5t is evident in Photogra(h Bubb#e si7e are bigger than 0., mm 2,. Air transmitting #ine is over heated Tube sett#er 26. 5n (#a%e 2=. Si7e " 2:. S#udge re%!%#ing is missing 0annot maintain re6uired ".SS during o(eration <ne s#udge re%!%#ing (i(e is re6uired with *#ow %ontro#. ., 9 .0 9 2.0, Si7e "eeting the re6uirement No a%tion re6uired. Aith (resent s!stem -ajd. nitrogen remova# is a tough (ro(osition in%reasing the tem(. a%hieve re6uired Nitri*i%ation $denitri*i%ation in (resent aeration tan1 on#!.

2013

Rev. -0

`date 19-11-2013

Inception Report of Sewage Treatment facility at ATS projects At Dera Bassi, Punjab

2013

0h#orine 0ontra%t Tan1

2>. 5n P#a%e 0. Si7e 2., 9 2., 9 2.,.0 " 20., " *ree board3 or 1,.62, -. 1. ?/T @ 1.0= ?r.*or ,0 -.D *#ow rate 2. 0h#orine & dosing s!stem is missing

Tan1 "eeting the re6uirement but no %h#orine thus no disin*e%tion %an %reate havo%

No disin*e%tion at (resent thus need immediate %orre%tion needed

Rev. -0

`date 19-11-2013

Inception Report of Sewage Treatment facility at ATS projects At Dera Bassi, Punjab
S#udge hand#ing . )i#ter bags are (rovided. Does not meet the norms Need s#udge dr!ing bed. S#udge dr!ing beds with 1., 9 1., 9 2 in three no are re6uired

2013

)i#tration

8. Sand & A0) does not have (ressure 'uage ,. )i#tration (um(s

Thus having ver! #ess re#iabi#it! o* o(eration Dosed not mat%h the re6uired *#ow rates

Pressure gauge needs to *itted

Pro(er (um(s are re6uired meeting *o##owing 18.6 -.Chr D 2, m head.

Rev. -0

`date 19-11-2013

Inception Report of Sewage Treatment facility at ATS projects At Dera Bassi, Punjab
As seen and ana#!7ed b!

2013

Din1ar Sa4ena Chartered Engineer (India); M/128465/1 M.I.E., C. Eng., FIPHE, PGDM, E.M. . !"dit#r (IEM!, $.%.)

Rev. -0

`date 19-11-2013