Professional Documents
Culture Documents
1 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
Development Team
Developer: Equity Partner: Architect: Landscape Architect: Land Use Counsel: Civil Engineer: Marine Engineer: Traffic & Parking: Acoustical Engineer: Archeological: Historian: EYA JBG Shalom Baranes Associates M. Paul Freidberg Partners McGuireWoods Bohler Moffat & Nichol Wells and Associates Polysonics Wetlands Studies & Solutions History Matters
2 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
AERIAL
March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
Land Area
Waterfront Actual/ Plan Proposed SiteArea(acres) Development (sqft) FAR Units 3.85 380,529 2.32 115 3.08 280,000 2.1 92
* * * * *
* Parcels being acquired by EYA * Parcels already transferred to City * Riparian rights acquired by EYA
4 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
Provide Active Public Uses Along the Waterfront Raise Site Elevation / Floodplain Extend Strand South and West to Union St Improve Pier Redevelop 2 Duke Street Contribute $9 / SqFt to Offsite Proffers to Fund the Waterfront Plan
5 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
Overall Density Types of Uses and Locations of Uses 50 Height Limit North / South Location of the Strand Preservation of 2 Duke St Location of Promenade Raise the Site and Remap the Floodplain
6 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
7 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
CONCEPTPLANGROUNDFLOORUSESANDBUILDINGENTRIES
LEGEND Building Entries
8 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
PEDESTRIANCONNECTIVITYANDMASSING
LEGEND Pedestrian Circulation Connectivity Fluid Pedestrian Connection to town, through the Strand the Promenade and Pier Pedestrianized Streets as Programmable Open Space
9 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
DIVERSITYOFPUBLICOPENSPACES
LEGEND
Promenade/Linear Open Space
10 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
PROMENADE
11 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
PASSIVEOPENSPACES
12 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
ACTIVEOPEN/COMMERCIALSPACES
13 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
PROGRAMMABLEOPENSPACES
14 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
15 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
Winter 2014/2015
*Ongoing process
16 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC
17 March 18, 2014 Waterfront Commission Draft Review M. Paul Friedberg and Partners / MPFP LLC