,USN

Time: 3 hrs.
I a. Explain
b. Write a brief note on energy scenario in India.
c. Write a note on the objectives of energy conservation Act-2001.
flow model.
b. What do you understand by depreciation? Explain how depreciation
using : i) Sum of digits method; ii) Straight line method.
06EE763
(09 Marks)
(06 Marks)
(05lVlarks)
(06 Marks)
reserve is calculated
(06 Marks)
(08 Marks)
(08 Marks)
(06 Marks)
(06 Marks)
(06 Marks)
(08 Marks)
(06 lllarks)
seventh semester B.E. Degree Examination, June/July 2011
Energy Audit and Demand Side Management
Max- Marks:100
Note: Answer FIYEfull questions selecting
ot least TWO questions
from
each part.
PART
-
A
how energy sources are classified broadly? Give examples for each classification.
2 a. What is meant by life cycle cost analysis? Develop singie paynnent compound amount cash
c. A motor drive consumes 40000 units per annum. By upgrading to high efficiency spare parts
the consumption can be reduced by 5%. The additional cost of upgradation is Rs.35000i-.
Assr.rme energ-y charge of Rs.5 per unit and life of motors l5 years. Is the change justified?
Take rate of interest/return: 20Yo.TJse annual cost method.
3 a. Expiain in brief the types of energy audit and the outcome of the audit.
b. Expiain r.a.-ious measurements required in energy auditing.
c. Explain the steps in energy audit report generation.
4 a. \\'ith a \ ector diagram. explain various components of porver triangle.
b. \\'ith relevant diagram explain power flow from generating station to consumers.
c. \\'r:te a b'rief note on : i) Pay back analysis : ii) causes of depreciarion.
PART
_
B
5 a- Denr e a:r expression for most economical pou,er factor considering constant active po\\'er.
Dra* reler.ant vector diagram.
(0g Marks)
b. \ lt-,3ii r'i-{00 k\\'at 0.8 pf is takenb,v an industrial user. The tariffpian is :Rs.400&VA of
rla\lElturi demand pr anmrm + R.s-1.00 p". unit of energy consumed. The cost oi
instaiiatiorr oi capacitor bank for pf improvement is Rs.600 per kVAR and has an amual
hieresi ard depreciation of l l%. Find :
i t \'lost economrcal pf
;
ii) Rating of capacitor bank
ca.iculared io (i)
;
iii) Annuai saving in energy bill.
c. \\'n:e a note on availability based tariff.
(06lHarks)
(S8 Marris';
(il6 3t:. ks;
to increase power iactor to value
{08
Marksi
(0a Marks)
6 a. \tention the necessity of pf tariff. Explain various qvpes of power factor tariffs. (06 Marks)
b'. {n industrial undertaking has connected load of 100 kW. The maximum demand is 80 kW.
On an average the plant is in operation for 60% time. Find yearly bill on electricity if the
tariffis : Rs.6000 +
Rs.700 per kW of maximum demand peranmrm + Rs.1.g per unit of
energ-y consumed.
(06 Marks)
c. Explain the constructional changes needed to reaiize an energy effrcient motor. (08 Marks)
7 a With a flow diagram explain briefly DSM pla.'rning and implementation. (rCI Marlrs)
b. Expiain various DSM strategies from load curve objective view. Mention benefit of the
strategies.
(10 Marks)
8 a- Explain energyconservation
opportunity in agriculture sector.
b- Explain plant level management organization with relevant diagram.
c. Explain briefly the various tariff options far DSM.