Caltrans-Pdcategories & Work Streams
Caltrans-Pdcategories & Work Streams
PROJECT
PLANNING
STEPS
Designate Project
Manager (Chapter
8 Section 1)
Develop Project
Work Plan
(Chapter 8 Section
1)
Project
Development
Team (Chapter 8
Section 1)
Preliminary
Environmental
Evaluation
(Chapter 10
Section 2)
Project Initiation
Document
(Chapter 9)
Initial Public
Meeting (Chapter
10 Section 3 and
Chapter 22 Article
5)
Written Notice of
Studies (Chapter
10 Section 3 and
Chapter 22 Section
10)
Initiate Formal
Environmental
Studies (Chapter
10 Section 3) (EH)
Draft Project
Report (Chapter 10
Section 5)
Environmental
Document (EH)
Public Hearing
(Chapter 11)
Preferred
Alternative
Selection (Chapter
12 Section 2)
Project Approval
Document
(Chapter 12)
CTC Route
Adoption
(Chapters 13 and
23)
Freeway
Agreement
(Chapters 13 and
24)
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Formal
Formal
Formal
Informal
[1]
Informal
[1]
YES
YES
PSR or
[5]
PSR or
[5]
YES
YES
YES
YES
YES
Formal
Formal
NO
YES
YES
YES
YES
YES
YES
PSR
PSR
PSR
PSR
PSR
PSR
YES
YES
optional
optional
optional
only if
requested
NO
NO
YES
YES
YES
YES
YES
rarely [3]
NO
NO
YES
YES
normally [2]
normally
[2]
YES
YES
NO
NO
YES
YES
YES
YES
NO
NO
normally [2]
YES
YES
YES or
opportunity
YES or
opportunity
YES
YES
normally
[2]
normally
[2]
normally
[2] [4]
YES
YES
NO
NO
YES or
opportunity
rarely [4]
NO
NO
NO
NO
normally [3]
normally
[3]
normally
[3]
normally
[3]
normally [2]
YES [2] or
opportunity
PR
PR
PR
PR
PR
PR
PR or [6]
YES
YES
YES
NO
NO
NO
NO
NO
YES
NO
NO
YES
NO
NO
NO
NO
PR or
[6]
Footnotes
[1] Formal PDT not required. The determination of significance of environmental impacts and of Project Category
will be jointly made by District Project Management, Design, and Environmental Unit.
[2] Not applicable if Categorically or Statutorily Exempt , and/or Categorically Excluded.
[3] Required for projects that present alternatives in an Environmental Document (EIR/EIS or IS/EA).
[4] If no federal Environmental Document is involved, the Project Development Team evaluates and determines the
need for a Public Hearing.
[5] The following Project Initiation Documents are applicable, depending on project type or program:
Program
Type Of Project
Document
various
Combined PSR/PR
HA1
PSR
HA4S
Seismic Retrofit
PSSR-Seismic
HA21 / HA22
Bridge/Roadway
R&R PSSR
HA23
DAF
HA25 / HB32
HA28
PSSR-UFOPA
HB4N
PIR
HB5
PIR
HB6
PIR
HB311
NBSSR
Note: Minor A, Minor B, Capital Preventive Maintenance, and other maintenance projects do not require a Project
Initiation Document; therefore, a PR initiates a Minor A, a CAPM PR initiates Capital Preventive Maintenance
projects, and an EA PR initiates the Minor B and other non-CAPM maintenance projects.
[6] The following Project Approval Documents are applicable, depending on project type or program:
Program
Type Of Project
Document
PEER
various
EA PR
HA22
CAPM PR
HA25 / HB32
PR-HP&R
HA26 / HB33
PR-SRR
These Project Initiation Documents are equivalent to a PR if they have the following approved attachments:
Document
Attachments
NBSSR
Combined PSR/PR
Approved ED
PSSR
CE (or ND if necessary)
PSSR-Seismic
CE
PSSR-UFOPA
CE
DAF
CE
[7] Category 7 relates to local projects on local facilities only. (See Local Programs Manual)