For successful implementation of a pipeline project,
For successful implementation of a pipeline project,
the following steps are to be considered in general:
the following steps are to be considered in general:
1. Market survey
1. Market survey
-
-
Present & future demand
Present & future demand
2. MAOP & Design pressure
2. MAOP & Design pressure
3. Map of the preliminary selected pipeline route (L)
3. Map of the preliminary selected pipeline route (L)
4. Pipe Size (D)
4. Pipe Size (D)
5. Wall thickness (t)
5. Wall thickness (t)
Pipeline design ( contd.)
Pipeline design ( contd.)
6. Pipe specification / grade
6. Pipe specification / grade
7. Bill of materials
7. Bill of materials
8. Total cost estimate
8. Total cost estimate
9. Selection of ROW
9. Selection of ROW
10. Detailed survey and Preparation of alignment
10. Detailed survey and Preparation of alignment
drawings
drawings
Pipeline design ( contd.)
Pipeline design ( contd.)
Load consideration:
Load consideration:
Now
Now
-
-
a days, the use of natural gas increased
a days, the use of natural gas increased
tremendously. As a result the concept of pipeline
tremendously. As a result the concept of pipeline
design has also changed.
design has also changed.
Q
Q
mmscfd mmscfd
=0.00128084((P
=0.00128084((P
1 1
2 2
-
-
P
P
2 2
2 2
)/L
)/L
miles miles
)
)
0.51 0.51
D
D
2.53 2.53
where , P
where , P
1 1
=Upstream pressure, PSIA
=Upstream pressure, PSIA
P
P
2 2
=Downstream pressure, PSIA
=Downstream pressure, PSIA
D=Inside pipe
D=Inside pipe
dia
dia
, inch
, inch
Pipeline design (contd.)
Pipeline design (contd.)
t= DP/(2YFL JT)
t= DP/(2YFL JT)
where,
where,
t=Pipe wall thickness, mm
t=Pipe wall thickness, mm
P=design pressure ,psig
P=design pressure ,psig
D=outside
D=outside
dia
dia
of pipe in mm
of pipe in mm
Y=minimum yield strength, psig
Y=minimum yield strength, psig
F=design factor
F=design factor
L= Location factor based on class location
L= Location factor based on class location
J=welding joint factor
J=welding joint factor
T=Temp.
T=Temp.
derating
derating
factor
factor
Line
Line
Pipe
Pipe
: API 5L Grades
: API 5L Grades
Grade
Grade
Minimum yield
Minimum yield
strength(
strength(
MPa
MPa
)
)
Minimum Tensile
Minimum Tensile
strength(
strength(
MPa
MPa
)
)
B
B
241
241
413
413
X42
X42
289
289
413
413
X46
X46
317
317
434
434
X52
X52
358
358
455
455
X56
X56
386
386
489
489
X60
X60
413
413
517
517
X65
X65
448
448
530
530
X70
X70
482
482
565
565
X80
X80
551
551
620
620
Design
Design
and Location Factor
and Location Factor
DPP
DPP
Tender
Tender
Bid Evaluation
Bid Evaluation
Tender Award
Tender Award
Procurement
Procurement
Mobilization
Mobilization
Tie
Tie
-
-
in
in
Hydrostatic Testing
Hydrostatic Testing
Cleaning
Cleaning
Commissioning
Commissioning
Operation
Operation
Pre construction
Pre construction
Rocky areas
Rocky areas
Unstable soil
Unstable soil
Populated areas
Populated areas
Historical areas
Historical areas
Normally
Normally
10 m
10 m
wide strip along the proposed
wide strip along the proposed
pipeline route is to be acquisition and a
pipeline route is to be acquisition and a
15 m
15 m
wide
wide
strip on one side of the acquisition strip is to be
strip on one side of the acquisition strip is to be
requisition.
requisition.
Tender
Tender
-
-
Floating
Floating
-
-
Bid Receiving & Evaluation
Bid Receiving & Evaluation
-
-
Contract Award & Contract Management
Contract Award & Contract Management
Procurement
Procurement
Mobilization
Mobilization
Major steps for pipeline Construction
Major steps for pipeline Construction
Ditching / Trenching
Ditching / Trenching
Holiday test
Holiday test
Pigging
Pigging
Hydro Test
Hydro Test
Commissioning
Commissioning
Equipment used for Pipeline Construction:
Equipment used for Pipeline Construction:
Bulldozer
Bulldozer
-
-
Used to clearing & grading of ROW.
Used to clearing & grading of ROW.
Excavator
Excavator
-
-
Used to trenching , pipe lifting, pulling the
Used to trenching , pipe lifting, pulling the
welding machine etc.
welding machine etc.
Side boom
Side boom
-
-
Used to lift the pipe during welding and
Used to lift the pipe during welding and
lay the pipeline in the trench.
lay the pipeline in the trench.
Crane
Crane
Welding generator
Welding generator
Trailer/ Truck
Trailer/ Truck
-
-
used to carry the line pipe from store
used to carry the line pipe from store
yard to the working site.
yard to the working site.
Pipeline construction Equipment
Pipeline construction Equipment
Excavator Excavator
Side boom Side boom
ROW Clearing & Grading
ROW Clearing & Grading
Welders test
Welders test
-
-
an exam for the welders before
an exam for the welders before
going to production weld.
going to production weld.
Selection Criterion
Selection Criterion
-
-
Visual inspection & NDT (
Visual inspection & NDT (
API
API
1104)
1104)
Hot pass
Hot pass
Filling pass
Filling pass
Cap Pass
Cap Pass
Dye
Dye
penetrant
penetrant
test
test
Radiographic test
Radiographic test
Ultrasonic test
Ultrasonic test
Radiography Test
Radiography Test
o
o
Equipment
Equipment
o
o
Method
Method
o
o
Source
Source
o
o
Film examination as Per API 1104 Standard
Film examination as Per API 1104 Standard
NDT ( Non Destructive Test)
NDT ( Non Destructive Test)
Ultrasonic Test
Ultrasonic Test
o
o
Equipment
Equipment
o
o
Method
Method
o
o
Source
Source
o
o
Weld examination
Weld examination
Common welding defects
Common welding defects
Porosity
Porosity
Cluster porosity
Cluster porosity
Slag inclusion
Slag inclusion
Lack of fusion
Lack of fusion
Lack of penetration
Lack of penetration
Internal concavity
Internal concavity
Burn through
Burn through
Crack
Crack
Welding defects:
Welding defects:
Welding defects:
Welding defects:
Tie
Tie
-
-
in welds
in welds
NDT test.
NDT test.
Roads and Railway Crossing
Roads and Railway Crossing
Two different ways
Two different ways
3LPE coating
3LPE coating
-
-
Apply adhesive on clean pipe surface
Apply adhesive on clean pipe surface
-
-
Epoxy paint ( 40
Epoxy paint ( 40
-
-
100 micron)
100 micron)
-
-
Polyethylene coating
Polyethylene coating
Bare pipe
Bare pipe
Steel Pipe without coating
Steel Pipe without coating
3 LPE Coated Pipe
3 LPE Coated Pipe
Features:
Features:
-
-
Cleaning ( sand
Cleaning ( sand
Blasting)
Blasting)
-
-
Apply Adhesive
Apply Adhesive
-
-
Apply epoxy paint ( 40
Apply epoxy paint ( 40
-
-
100 micron thick)
100 micron thick)
-
-
Polyethylene coating
Polyethylene coating
Concrete Coated Pipe
Concrete Coated Pipe
Features:
Features:
-
-
Apply 3LPE Coating
Apply 3LPE Coating
-
-
Set wire mesh above 3LPE
Set wire mesh above 3LPE
Coating
Coating
-
-
Apply Concrete coating
Apply Concrete coating
-
-
Provide
Provide
Ve
Ve
buoyancy
buoyancy
force
force
-
-
Apply on ditch, canal ,
Apply on ditch, canal ,
pond,
pond,
khal
khal
, small river
, small river
Set
Set
-
-
on
on
-
-
Weight
Weight
Features:
Features:
-
-
Put on above 3LPE coated
Put on above 3LPE coated
pipe
pipe
-
-
one on each pipe
one on each pipe
-
-
Provide
Provide
Ve
Ve
buoyancy
buoyancy
force
force
-
-
Apply on marshy area
Apply on marshy area
Joint coating
Joint coating
Ditching
Ditching
Holyday test
Holyday test
-
-
Apply 10 KV on coated pipe surface
Apply 10 KV on coated pipe surface
-
-
Any coating defect will result an audible sound.
Any coating defect will result an audible sound.
Lowering
Lowering
-
-
Lay pipeline on Trench of approx. 1.2 m depth
Lay pipeline on Trench of approx. 1.2 m depth
-
-
Put
Put
Set
Set
-
-
on
on
-
-
weight
weight
on
on
burried
burried
pipe for anti
pipe for anti
-
-
buoyancy
buoyancy
force
force
Testing :
Testing :
Gauge pig
Gauge pig
-
-
To check pipe
To check pipe
ovality
ovality
Foam Pig
Foam Pig
-
-
To dry internal surface
To dry internal surface
Pig Receiver
Pig Receiver
API 6D (Valves)
API 6D (Valves)
ASME U
ASME U
-
-
Stamp ( Pig Traps & Launcher)
Stamp ( Pig Traps & Launcher)