T E N D E R D O C U ME N T (NATIONAL)
FOR THE PROCUREMENT OF WORKS
Construction of Residential Building for the Workers and
Labourers


Invitation for Tender No: !"#$%
I&&'ed on: ($
t)
A*ri+, -.(/0
Tender Pa12a3e No: a4r561e.%6%$#"!
Table of Contents
Section 1. Instructions to Tenderers........................................................................................1
A. General..........................................................................................................................1
(0 S1o*e of Tender.................................................................................................1
-0 Corr'*t, Fra'd'+ent, Co++'&ive or Coer1ive Pra1ti1e&............................1
/0 E+i3i4+e Tenderer&.............................................................................................1
B. Tender Document..........................................................................................................2
!0 C+arifi1ation of Tender Do1'5ent.................................................................2
0 Addend'5 to Tender Do1'5ent...................................................................2
C. Qualification Criteria...................................................................................................2
"0 7enera+.................................................................................................................2
#0 E8*erien1e Criteria...........................................................................................2
$0 Finan1ia+ Criteria...............................................................................................2
%0 S'41ontra1tor9&)...............................................................................................2
D. Tender Preparation......................................................................................................3
(.0 On+: one Tender................................................................................................3
((0 Lan3'a3e of Tender..........................................................................................3
(-0 Content& of Tender...........................................................................................3
(/0 Tender Pri1e&.....................................................................................................3
(!0 Tender C'rren1:................................................................................................3
(0 Do1'5ent& E&ta4+i&)in3 t)e Tenderer;& <'a+ifi1ation...........................4
("0 =a+idit: Period of Tender.................................................................................4
(#0 Tender Se1'rit:..................................................................................................4
($0 For5 of Tender Se1'rit:..................................................................................4
(%0 Forfeit're of Tender Se1'rit:.........................................................................4
E. Tender Submission.......................................................................................................
-.0 Sea+in3 > Mar2in3 of Tender..........................................................................5
-(0 Dead+ine for S'45i&&ion of Tender.............................................................5
--0 Modifi1ation, S'4&tit'tion or Wit)dra?a+ of Tender................................5
-/0 Tender Modifi1ation..........................................................................................5
-!0 Tender S'4&tit'tion..........................................................................................5
-0 Wit)dra?a+ of Tender.......................................................................................5
!. Tender "penin# $ E%aluation....................................................................................
-"0 Tender O*enin3.................................................................................................5
-#0 Eva+'ation of Tender&......................................................................................5
-$0 Pre+i5inar: E8a5ination.................................................................................6
-%0 Te1)ni1a+ E8a5ination > Re&*on&ivene&&................................................6
/.0 C+arifi1ation on Tender....................................................................................6
/(0 Corre1tion of Arit)5eti1a+ Error&.................................................................7
/-0 Finan1ia+ Eva+'ation.........................................................................................7
//0 Pri1e Co5*ari&on.............................................................................................7
/!0 Ne3otiation&.......................................................................................................7
/0 Po&t6@'a+ifi1ation..............................................................................................7
G. Contract A&ard............................................................................................................'
/"0 Notifi1ation of A?ard........................................................................................7
P a g e | 2
/#0 Perfor5an1e Se1'rity......................................................................................7
/$0 =a+idit: of Perfor5an1e Se1'rit:..................................................................8
/%0 A't)enti1it: of Perfor5an1e Se1'rit:.........................................................8
!.0 Contra1t Si3nin3...............................................................................................8
!(0 Ri3)t to Co5*+ain.............................................................................................8
Section 2. Tender Data Sheet..................................................................................................9
A. General.........................................................................................................................(
B. Tender Document.........................................................................................................(
C. Qualification Criteria..................................................................................................(
D. Tender Preparation...................................................................................................1)
E. Tender Submission.....................................................................................................1)
!. Tender "penin# and E%aluation...............................................................................1)
G. Contract A&ard.........................................................................................................1)
Section 3. General Conditions ! Contract...........................................................................11
A. General........................................................................................................................11
(0 Definition&.........................................................................................................11
-0 Corr'*t, Fra'd'+ent, Co++'&ive or Coer1ive Pra1ti1e&..........................13
/0 Do1'5ent& For5in3 t)e Contra1t and Priorit: of Do1'5ent&...........14
!0 E+i3i4i+it:............................................................................................................14
0 Po&&e&&ion of t)e Site...................................................................................14
"0 Pro1'rin3 Entit:;& Re&*on&i4i+itie&...........................................................14
#0 Contra1tor;& Re&*on&i4i+itie&......................................................................14
$0 Ta8e& and D'tie&.............................................................................................14
%0 Contra1tor;& Per&onne+.................................................................................15
B. Time Control..............................................................................................................1
(.0 Start Date...........................................................................................................15
((0 Intended Co5*+etion Date............................................................................15
(-0 Pro3ra55e of Wor2&.....................................................................................15
(/0 E8ten&ion of t)e intended 1o5*+etion ti5e.............................................15
C. Qualit* Control...........................................................................................................1
(!0 E8e1'tion of Wor2&........................................................................................15
(0 Identif:in3 Defe1t&..........................................................................................15
("0 Te&tin3................................................................................................................15
(#0 ReAe1tion of Wor2&.........................................................................................16
($0 Re5edia+ Wor2.................................................................................................16
(%0 Corre1tion of Defe1t&.....................................................................................17
D. Cost Control................................................................................................................1'
-.0 Contra1t Pri1e..................................................................................................17
-(0 Bi++ of <'antitie& 9BO<).................................................................................17
--0 C)an3e& in t)e <'antitie& and Unit Rate or Pri1e.................................17
-/0 =ariation&..........................................................................................................18
-!0 Co&tin3 of =ariation Order&..........................................................................18
-0 Pa:5ent Certifi1ate&......................................................................................19
-"0 Pa:5ent& to t)e Contra1tor.........................................................................19
-#0 Co5*en&ation Event&....................................................................................19
-$0 Retention Mone:.............................................................................................2"
-%0 Li@'idated Da5a3e&......................................................................................2"
/.0 Perfor5an1e Se1'rit:....................................................................................2"
E. Completion of Contract............................................................................................21
/(0 Co5*+etion........................................................................................................21
P a g e | 3
/-0 Co5*+etion Certifi1ate and Ta2in3 Over...................................................21
//0 A5end5ent to Contra1t................................................................................21
/!0 Fina+ A11o'nt...................................................................................................21
/0 Re+ea&e fro5 Perfor5an1e...........................................................................21
!. Termination and Settlement of Disputes..................................................................22
/"0 Ter5ination.......................................................................................................22
/#0 Pa:5ent '*on Ter5ination..........................................................................22
/$0 Pro*ert:.............................................................................................................22
G. Disputes and Arbitration...........................................................................................23
/%0 Sett+e5ent of Di&*'te&..................................................................................23
Section 4. #articular Conditions o! Contract.........................................................................24
Section 5. Tender $ Contract %or&s.....................................................................................26
Section 6. 'ill o! (uantities...................................................................................................34
Section 7. General S)eci!ications..........................................................................................38
Section 8. #articular S)eci!ications.......................................................................................39
Section 9. Dra*in+s..............................................................................................................4"
P a g e | 4
Se1tion (0 In&tr'1tion& to Tenderer&
A. General
(0 S1o*e of Tender 1.1 he Procuring !ntit"# as indicated in the ender $ata %heet 9TDS)
issues this ender $ocu&ent for the 'rocure&ent of Works and
associated %er(ices incidental thereto as s'ecified in the TDS and as
detailed in Se1tion ": Bi++ of <'antitie&. he na&e of the ender and
the nu&ber and identification of its constituent lot(s) are stated in the
TDS0
-0 Corr'*t,
Fra'd'+ent, Co++'&ive
or Coer1ive Pra1ti1e&
2.1 he *o(ern&ent re+uires that Procuring !ntities# as ,ell as enderers
and %u''liers shall# during the Procure&ent 'roceedings and the
e-ecution of Contracts under 'ublic funds# ensure.
(a) strict co&'liance ,ith the 'ro(isions of %ection /4 of the
Public Procure&ent 0ct 211/ (0ct 24 of 211/)2
,-. abiding b" the code of ethics as &entioned in the Rule123 of
the Public Procure&ent Rules# 21142
,c. that neither it5s an" officer nor an" staff or an" other agents or
inter&ediaries ,orking on its behalf engages in an" 'ractice
as detailed in the Rule 123.
2.2 6f corru't# fraudulent# collusi(e or coerci(e 'ractices of an" kind
deter&ined b" the Procuring !ntit" against an" enderer alleged to
ha(e carried out such 'ractices# the Procuring !ntit" shall 6
(a) e-clude the concerned enderer fro& further 'artici'ation in
the 'articular Procure&ent 'roceeding2 or
(b) re7ect an" reco&&endation for a,ard that had been 'ro'osed
for that concerned enderer2
or
(c) declare# at its discretion# the concerned enderer to be
ineligible to 'artici'ate in further Procure&ent 'roceedings#
either indefinitel" or for a s'ecific 'eriod of ti&e.
/0 E+i3i4+e
Tenderer&
3.1 6f so s'ecified in TDS# onl" !nlisted enderers of the categories
s'ecified in the TDS

are eligible to 'artici'ate in the ender under
Li5ited Tenderin3 Met)od.
3.2 6n case of O*en Tenderin3 Met)od# in(itation for enders is o'en to
all 'otential enderers.
3.3 he enderer shall ha(e the legal ca'acit" to enter into the Contract.
3.4 enderers and all 'arties constituting the enderer shall not ha(e a
conflict of interest 'ursuant to Rule 88 of the Public Procure&ent
Rules# 2114.
+ # a + e 5
3.5 he enderer in its o,n na&e or its other na&es or also in the case
of its Persons in different na&es# shall not be under a declaration of
ineligibilit" for corru't# fraudulent# collusi(e or coerci(e 'ractices as
stated under 6 Clause 2 .
3./ he enderer is sol(ent# e.g. the enderer is financiall" ca'able to
'erfor& the contract for the 'ro'osed Procure&ent.
3.3 he enderer shall ha(e fulfilled its obligations to 'a" ta-es under the
'ro(isions of la,s and regulations of Bangladesh.
B. Tender Document
!0 C+arifi1ation of
Tender Do1'5ent
4.1 0 'ros'ecti(e enderer re+uiring an" clarification of the ender
$ocu&ent shall contact the Procuring !ntit" in ,riting at the Procuring
!ntit"5s address indicated in the TDS before t,o.third of ti&e allo,ed
for 're'aration and sub&ission of ender ela'ses.
0 Addend'5 to
Tender Do1'5ent
5.1 0t an" ti&e 'rior to the deadline for sub&ission of enders# the
Procuring !ntit" on its o,n initiati(e or in res'onse to a clarification
re+uest in ,riting fro& a enderer# &a" re(ise the ender $ocu&ent b"
issuing an addendu& 'ursuant to Rule 98 of the Public Procure&ent
Rules# 2114.
C. Qualification Criteria
"0 7enera+ 6.1 enderer to be +ualified b" &eeting 'redefined# 'recise &ini&u&
re+uire&ents# ,hich entails setting 'ass:fail criteria# ,hich if not &et b"
the enderer# ,ill be considered as non.res'onsi(e.
6.2 o +ualif" for a &ulti'le nu&ber of lots in a 'ackage for ,hich enders
are in(ited in the in(itationfor enders# the enderers shall de&onstrate
ha(ing resource and e-'erience sufficient to &eet the aggregate of the
+ualif"ing criteria for indi(idual lots.
#0 E8*erien1e
Criteria
7.1 he enderer shall ha(e the construction e-'erience of
satisfactor" co&'letion of si&ilar ,orks of a &ini&u& (alue under a
single or &ulti'le nu&bers of contracts o(er a 'eriod# as s'ecified in
the TDS.
$0 Finan1ia+ Criteria
4.1 he enderer shall ha(e the follo,ing &ini&u& le(el of financial
ca'acit" to +ualif" for the 'erfor&ance of the Works under the Contract.
(a) the a(erage annual construction turno(er as s'ecified in the
TDS during the 'eriod s'ecified in the TDS
(b) a(ailabilit" of &ini&u& li+uid assets or ,orking ca'ital or
credit facilities fro& a Bank# as s'ecified in the TDS0
%0 S'41ontra1tor9&)
9.1 he successful enderer shall under no circu&stances assign the
Works or an" 'art of it to the %ubcontractor(s).
+ # a + e 6
D. Tender Preparation
(.0 On+: one Tender
11.1 he enderer ,ho sub&its or 'artici'ates in &ore than one (1) ender
in one (1) lot ,ill cause all the enders of that 'articular enderer to be
re7ected
((0 Lan3'a3e of
Tender
11.1 he ender shall be ,ritten in the !nglish language. Corres'ondences
and docu&ents relating to the ender &a" be ,ritten in !nglish or
Bangla.
(-0 Content& of
Tender
12.1 he ender 're'ared b" the enderer shall co&'rise the follo,ing;
(a) ender %ub&ission Letter (For5 PW-6()# ,hich shall be
co&'leted ,ithout an" alterations to its for&at# filling in all blank
s'aces ,ith the infor&ation re+uested# failing ,hich the ender
&a" be considered as non.res'onsi(e as being inco&'lete2
(b) enderer 6nfor&ation (For5 PW-6-)2
(c) he 'riced Bill of <uantities using the for&(s) furnished in
Se1tion ": Bi++ of <'antitie&C
(d) ender %ecurit" as stated under 6 Clauses (# > ($C
(e) =alid rade License2
(f) he original and co'" of the ender# signed b" the Person dul"
authori>ed to sign on behalf of the enderer. his authori>ation
shall consist of a ,ritten authori>ation and shall be attached to
the ender %ub&ission Letter (For5 PW-6()2
(g) an affida(it confir&ing that the enderer is not insol(ent as stated
under 6 %ub Clause 3./2
(h) a certificate# that the enderer is a a- 'a"er ha(ing (alid a-
6dentification ?u&ber(6?) and =0 registration nu&ber as a
'roof of fulfil&ent of ta-ation obligations as stated under 6 %ub
Clause 3.32
(i) $ocu&entar" e(idence as stated under 6 Clause 182 and
(7) an" other docu&ent as s'ecified in the TDS.
(/0 Tender Pri1e&
13.1 he enderer shall fill in unit rates or 'rices for all ite&s of the
Works both in figures and in ,ords as described in the BO<. he 'rice
to be +uoted in the ender %ub&ission Letter shall be the total 'rice of
the ender.
13.2 0ll a''licable ta-es# custo& duties# =0 and other le(ies 'a"able b"
the Contractor under the Contract shall be included in the unit rates#
'rices and the total ender 'rice sub&itted b" the enderer.
13.3 he ite&s +uantified in the BO< for ,hich no unit rates or 'rices ha(e
been +uoted b" the enderer ,ill not be 'aid for# b" the Procuring !ntit"
,hen e-ecuted and shall be dee&ed co(ered b" the a&ounts of other
rates or 'rices in the B@< and# it shall not be a reason to change the
ender 'rice.
13.4 he 'rice of a Contract shall be fi-ed in ,hich case the unit rates or
'rices &a" not be &odified in res'onse to changes in econo&ic or
co&&ercial conditions.
(!0 Tender C'rren1: 14.1 he enderer shall +uote all 'rices in the ender %ub&ission Letter and
in the Bill of <uantities in Bangladesh aka.
+ # a + e 7
(0 Do1'5ent&
E&ta4+i&)in3 t)e
Tenderer;&
<'a+ifi1ation
15.1 enderers shall co&'lete and sub&it the enderer 6nfor&ation (For5
PW-6-) and shall include docu&entar" e(idence# as a''licable to
satisf" the follo,ing;
(a) details of s'ecific e-'erience in construction ,orks of si&ilar
nature and si>e on case.b".case 'rocure&ent 'roceedings
'erfor&ed for each of the last "ears along ,ith the su&s#
dates and reci'ients2 'ublic or 'ri(ate as stated under 6
clause 3.
(b) details of a(erage annual construction turno(er for a 'eriod as
stated under 6 %ub Clause 4.1(a)2
(c) details of ade+uac" of ,orking ca'ital for this Contract i.e.
access to line(s) of credit and a(ailabilit" of other financial
resources as stated under 6 %ub Clause 4.1(b)2
(d) details of Procuring !ntities ,ho &a" be contacted# if
necessar"# b" this Procuring !ntit"2 and
(e) authorit" to seek references fro& the enderer5s bankers or
an" other sources.
("0 =a+idit: Period of
Tender
16.1 enders shall re&ain (alid for the 'eriod s'ecified in the TDS after the
date of ender sub&ission deadline 'rescribed b" the Procuring !ntit".
16.2 0 ender (alid for a 'eriod shorter than that s'ecified shall be
considered as non.res'onsi(e.
(#0 Tender Se1'rit:
13.1 ender %ecurit" as s'ecified is TDS0
($0 For5 of Tender
Se1'rit:
18.1 he ender %ecurit" shall be at the enderer5s o'tion# be either in the
for& of a bank draft or 'a" order.
18.2 he ender %ecurit" &a" be in the for& of an irre(ocable bank
guarantee issued b" a scheduled Bank of Bangladesh# in the for&at
9For5 PW-6/) furnished in %ection 8; ender and Contract Aor&s.
14.3 he ender %ecurit" shall re&ain (alid for at least t,ent" eight (24)
da"s be"ond the e-'ir" date of the ender =alidit".
14.4 ender not acco&'anied b" a (alid ender %ecurit" shall be considered
as non.res'onsi(e.
(%0 Forfeit're of
Tender Se1'rit:
19.1 he ender securit" 'ursuant to Rule 28 of the Public Procure&ent
Rules#2114 &a" be forfeited if a enderer;
(a) ,ithdra,s its ender after o'ening of enders but ,ithin the
(alidit" of the ender2 or
(b) refuses to acce't a ?otification of 0,ard 2 or
(c) fails to furnish 'erfor&ance securit"2 or
(d) refuses to sign the Contract 2 or
(e) does not acce't the correction of the ender 'rice follo,ing the
correction of arith&etic errors
E. Tender Submission
+ # a + e 8
-.0 Sea+in3 > Mar2in3
of Tender
2".1 he enderer shall 're'are one (1) original of the docu&ents
co&'rising the ender as described in 6 Clause 12 and clearl" &ark
it B@R6*6?0L.C 6n addition# the enderer shall 're'are one (1) co'" of
the tender# and clearl" &ark BC@PD.C 6n the e(ent of an" discre'anc"
bet,een the original and the co'"# the @R6*6?0L shall 're(ail.
-(0 Dead+ine for
S'45i&&ion of
Tender
21.1 enders shall be deli(ered b" hand or b" &ail# including courier
ser(ices at the address(s) as s'ecified in the TDS and no later than the
date and ti&e s'ecified in the TDS. Late sub&issions ,ill not be
considered.
--0 Modifi1ation,
S'4&tit'tion or
Wit)dra?a+ of
Tender
22.1 0 enderer &a" &odif"# substitute or ,ithdra, its ender after it has
been sub&itted b" sending a ,ritten notice dul" signed b" the
authori>ed signator" and 'ro'erl" sealed# and shall include a co'" of
the authori>ation2 'ro(ided that such ,ritten notice including the
affida(it is recei(ed b" the Procuring !ntit" 'rior to the deadline for
sub&ission of enders as stated under 6 Clause 21.
-/0 Tender
Modifi1ation
23.1 he enderer shall not be allo,ed to retrie(e its original ender# but shall
be allo,ed to sub&it corres'onding &odification to its original ender
&arked as BMODIFIFICATIOND0
-!0 Tender
S'4&tit'tion
24.1 he enderer shall not be allo,ed to retrie(e its original ender# but
shall be allo,ed to sub&it another ender &arked as
ESUBSTITUTIOND0
-0 Wit)dra?a+ of
Tender
25.1 he enderer shall be allo,ed to ,ithdra, its ender b" a Letter of
Withdra,al &arked as EWITHDRAWALC.
F. Tender Opening E!aluation
-"0 Tender O*enin3
2/.1 enders shall be o'ened 'ursuant to Rule 93 follo,ing ste's in Part $
of %chedule 6= of the Public Procure&ent Rules# 2114.
26.2 enders shall be o'ened i&&ediatel" after the deadline for sub&ission
of enders at the 'ri&ar" 'lace as s'ecified in the TDS but no later
than ONE HOUR after e-'ir" of the sub&ission deadline at the sa&e
'ri&ar" 'lace.
-#0 Eva+'ation of
Tender&
27.1 he ender !(aluation Co&&ittee (!C) &a" consider a ender as
res'onsi(e in the !(aluation# onl" if it is sub&itted in co&'liance ,ith
the &andator" re+uire&ents set out in the ender $ocu&ent. he
e(aluation 'rocess should begin i&&ediatel" after tender o'ening
follo,ing four broad ste's;
(a) Preli&inar" e-a&ination
(b) echnical e-a&ination and res'onsi(eness
(c) Ainancial e(aluation and 'rice co&'arison
(d) Post.+ualification of the lo,est e(aluated res'onsi(e ender.
+ # a + e 9
-$0 Pre+i5inar:
E8a5ination
28.1 he !C shall fir&t+: e-a&ine the enders to confir& that all
docu&entation re+uested in 6 Clause 12 has been 'ro(ided.
!-a&ination of the co&'liance# ade+uac" and authenticit" of the
docu&entar" e(idence &a" follo, the order belo,.
(a) (erification of the co&'leteness of the eligibilit" declarations in
the ender %ub&ission %heet 9For5 PW-6()2
(b) (erification of the rade License.
(c) (erification of the eligibilit" in ter&s of legal ca'acit" and
fulfil&ent of ta-ation obligations b" the enderer as stated under
6 Clause / > (-
(d) (erification of that the enderer is not insol(ent as stated under
6 Clause / > (-
(e) (erification of that the ,ritten authorisation confir&ing the
signator" of the enderer to co&&it the ender has been
attached ,ith the ender %ub&ission Letter (For5 PW-6().
(f) (erification of the (alidit" and authenticit" of the ender %ecurit"
as stated under 6 Clause (# > ($# if an"
24.2 he !C shall confir& that the abo(e docu&ents and infor&ation ha(e
been 'ro(ided in the ender and the co&'leteness of the docu&ents
and co&'liance of instructions gi(en in corres'onding 6 Clauses
shall be (erified# failing ,hich the tender shall be considered as non.
res'onsi(e.
-%0 Te1)ni1a+
E8a5ination >
Re&*on&ivene&&
29.1 @nl" those enders sur(i(ing 'reli&inar" e-a&ination need to be
e-a&ined in this 'hase
29.2 Se1ond+:# the !C ,ill e-a&ine the ade+uac" and authenticit" of the
docu&entar" e(idence as stated under 6 Clause 18.
29.3 he !C ,ill further e-a&ine the ter&s and conditions s'ecified in
%ection 3; *eneral %'ecifications and %ection 4; Particular
%'ecifications.
29.4 6f after the e-a&ination# !C deter&ines that the ender has co&'lied
the ter&s and conditions and the technical as'ects# set out in 6 %ub
Clause -%0- > -%0/, it shall be considered res'onsi(e.
/.0 C+arifi1ation on
Tender
3".1 he !C &a" ask enderers for clarifications of their enders# including
breakdo,ns of unit rates# in order to assist the e-a&ination and
e(aluation of the enders.
3".2 6f the lo,est !(aluated ender is not balanced or is front loaded in the
o'inion of the !C# the !C &a" re+uire the enderer to 'roduce
detailed breakdo,n of unit 'rice or rates for an" or all ite&s of the
B@<# to de&onstrate the internal consistenc" of those 'rices ,ith the
construction &ethods and schedule 'ro'osed.
31.3 6f a enderer does not 'ro(ide clarifications of its ender b" the date
and ti&e set in the !C5s ,ritten re+uest for clarification# its ender
shall not be considered in the e(aluation.
+ # a + e 1"
/(0 Corre1tion of
Arit)5eti1a+ Error&
31.1 he !C shall correct an" arith&etic errors that are disco(ered during
the e-a&ination of enders# and shall 'ro&'tl" notif" the concerned
enderer(s) of an" such correction(s) 'ursuant to Rule 94(11) of the
Public Procure&ent Rule# 2114.
31.2 0n" enderer that does not acce't the correction of the ender a&ount
follo,ing correction of arith&etic errors as deter&ined b" the
a''lication of 6 %ub.Clause 31.1 shall be considered as non.
res'onsi(e.
/-0 Finan1ia+
Eva+'ation
32.1 T)ird+: the !C# 'ursuant to Rule 94 of the Public Procure&ent
Rules# 2114# ,ill e(aluate each ender that has been deter&ined# u'
to this stage of the e(aluation# to be res'onsi(e to the &andator"
re+uire&ents set out in the ender $ocu&ent.
32.2 o e(aluate a ender# the !C ,ill consider the follo,ing;
(a) the ender 'rice as stated under 6 Clause 132
(b) ad7ust&ents for correction of arith&etical errors 'ursuant to
6 Clause 31 .
//0 Pri1e Co5*ari&on
33.1 he !C ,ill co&'are all res'onsi(e enders to deter&ine the lo,est.
e(aluated ender# in accordance ,ith 6 Clause 32.
/!0 Ne3otiation&
34.1 ?o negotiations shall be held during the ender e(aluation or a,ard
,ith the lo,est or an" other enderer 'ursuant to Rule 99 of the Public
Procure&ent Rules# 2114.
/0 Po&t6@'a+ifi1ation
35.1 0fter deter&ining the lo,est e(aluated res'onsi(e ender in
accordance ,ith 6 Clause 33# the Procuring !ntit"5s !C 'ursuant to
Rule 111 of the Public Procure&ent Rules# 2114# shall carr" out the
Post.+ualification of the enderer# using onl" the re+uire&ents s'ecified
in S'46&e1tion C: <'a+ifi1ation Criteria0
G. Contract A"ard
/"0 Notifi1ation of
A?ard
36.1 Prior to the e-'ir" of the ender =alidit" 'eriod and ,ithin se(en (3)
,orking da"s of recei't of the a''ro(al of the a,ard b" the 0''ro(ing
0uthorit"# the Procuring !ntit" 'ursuant to Rule 3/(4) (a) and 112 of the
Public Procure&ent Rules# 2114# shall issue the ?otification of 0,ard
(?@0) to the successful enderer.
/#0 Perfor5an1e
Se1'rity
37.1 he Perfor&ance %ecurit" shall be 'ro(ided b" the successful enderer
in the a&ount as s'ecified in the TDS.
33.2 Within %e(en (3) ,orking da"s fro& the date of acce'tance of the
?otification of 0,ard (?@0) but not later than the date s'ecified therein#
the successful enderer shall furnish the Perfor&ance %ecurit"
37.3 he Perfor&ance %ecurit" shall be in the for& of a Bank draft# 'a"
order or an irre(ocable Bank *uarantee in the for&at (Aor& PW2./)#
issued b" an" scheduled bank of Bangladesh acce'table to the
Procuring !ntit".
+ # a + e 11
37.4 he Procuring !ntit" &a" increase the a&ount of the Perfor&ance
%ecurit" abo(e the a&ounts as stated under 6 %ub Clause 33.1
'ursuant to Rule 23(2) E Rule 94(13) of the Public Procure&ent Rules#
2114 but not e-ceeding t,ent" (21) 'ercent of the Contract 'rice# if it is
found that the ender is unbalanced and:or front loaded as stated
under 6 %ub.Clause 31.2.
/$0 =a+idit: of
Perfor5an1e
Se1'rit:
38.1 he Perfor&ance %ecurit" shall be re+uired to be (alid until a date
t,ent" eight (24) da"s be"ond the 6ntended Co&'letion $ate as
s'ecified in ender $ocu&ent.
/%0 A't)enti1it: of
Perfor5an1e
Se1'rit:
39.1 he Procuring !ntit" shall (erif" the authenticit" of the Perfor&ance
%ecurit" sub&itted b" the successful enderer b" sending a ,ritten
re+uest to the branch of the bank issuing the Pa" @rder# Bank $raft or
irre(ocable Bank *uarantee in s'ecified for&at.
!.0 Contra1t Si3nin3
4".1 Within fourteen (14) ,orking da"s of issuance of the ?@0# the
successful enderer and the Procuring !ntit" shall sign the contract
'ro(ided that the Perfor&ance %ecurit" sub&itted b" the enderer is
found to be genuine.
!(0 Ri3)t to Co5*+ain
41.1 0n" enderer has the right to co&'lain if it has suffered or likel" to
suffer loss or da&age due to a failure of a dut" i&'osed on the
Procuring !ntit" to fulfil its obligations in accordance ,ith %ection 29 of
the Public Procure&ent 0ct 211/ and Part 12 of Cha'ter hree of the
Public Procure&ent Rules# 2114. .
+ # a + e 12
Se1tion -0 Tender Data S)eet
Instrutions !or om"leting #ender Data Sheet are "ro$ided in italis in "arenthesis !or the rele$ant I## lauses
ITT
C+a'&e
A5end5ent& of, and S'**+e5ent& to, C+a'&e& in t)e In&tr'1tion& to Tenderer&
A. General
ITT (0( he Procuring !ntit" is; Fanaging $irector# %%%0A *rou' of Co. Li&ited.
he ?a&e of the ender is; Construction of Residential Building.
itle of the Works; Construction of Residential Building.
ender Ref; C!.113:24.13:119:C$C
Lot ?o(s); %ingle Lot
ITT /0( endering Fethod; @'en endering Fethod
B. Tender Document
ITT !0( Aor 1+arifi1ation of Tender Do1'5ent *'r*o&e& onl"# the Procuring !ntit"5s address is ;
Fanaging $irector# %%%0A *rou' of Co. Li&ited# $han&ondi#$haka.
0ttention;
0ddress;$han&ondi# $haka.
ele'hone; 11/48333233.
Aa- ?o.; ///843
e.&ail address; sssafGceG19H"ahoo.co&
C. Qualification Criteria
ITT #0( 0 satisfactor" co&'letion of si&ilar ,orks of at least k 11 Lac under single nu&ber of contract(s)
o(er a 'eriod of one "ears shall be re+uired.
+ # a + e 13
ITT
$0(9a)
he re+uired a(erage annual construction turno(er shall be greater than k 21 Lac. o(er the last 1
"ear.
ITT
$0(94)
he &ini&u& a&ount of li+uid assets or ,orking ca'ital or credit facilities of the enderer shall be
k 11 lacs.
D. Tender Preparation
ITT
(-0(9A)
he enderer shall sub&it ,ith its ender# the follo,ing additional docu&ents;
ITT ("0( he ender =alidit" 'eriod shall be 91 da"s.
ITT (#0(
he a&ount of the ender %ecurit" shall be %i-t" housands aka.
E. Tender Submission
ITT
-(0(
Aor Tender &'45i&&ion *'r*o&e& onl"# the Procuring !ntit"5s address is;
0ttention; Fanaging $irector# %%%0A *rou' of Co. Li&ited.
0ddress; $han&ondi# $haka.
ele'hone; 11/48333233.
Aa- ?o.; ///843
e.&ail address; sssafGceG19H"ahoo.co&
he deadline for the ender sub&ission is;
i&e E $ate; 8 '&# 14
th
Fa"#2113.
F. Tender Opening and E!aluation
ITT -"0- he ender o'ening shall take 'lace at ;
0ddress; Fanaging $irector5s @ffice# %%%0A *rou' of Co. Li&ited.
0ddress; $han&ondi# $haka.
i&e E $ate; 9 a&# 19
th
Fa".
G. Contract A"ard
ITT/#0( he a&ount of Perfor&ance %ecurit" shall be en 'ercent of the Contract Price.

+ # a + e 14
Se1tion /0 7enera+ Condition& Of Contra1t
A. General
(0 Definition& 1.1 6n the Conditions of Contract# ,hich include Particular Conditions
and these *eneral Conditions# the follo,ing ,ords and e-'ressions
shall ha(e the &eaning hereb" assigned to the&. Boldface t"'e is
used to identif" the defined ter&s;
,a- A1t &eans he Public Procure&ent 0ct# 211/ (0ct 24 of
211/).
,b- A**rovin3 A't)orit: &eans the authorit" ,hich# in
accordance ,ith the $elegation of Ainancial Po,ers#
a''ro(es the a,ard of contract.
,c- Bi++ of <'antitie& (B@<) &eans the 'riced and
co&'leted Bill of <uantities for&ing 'art of the Contract
defined in *CC Clause 210
,d- Contra1tor &eans the Person under contract ,ith the
Procuring !ntit" for the e-ecution of Works under the
Rules and the 0ct as stated in the PCC.
,e- Co5*+etion Date is the actual date of co&'letion of the
Works and Ph"sical ser(ices certified b" the Pro7ect
Fanager# in accordance ,ith *CC Clause 31 E 32.
,f- Da: &eans calendar da" unless other,ise s'ecified as
,orking da"s.
,#- Defe1t is an" 'art of the ,ork not co&'leted in
accordance ,ith the Contract.
,.- E@'i*5ent is the Contractor5s a''aratus# &achiner"#
(ehicles and other things re+uired for the e-ecution and
co&'letion of the Works and re&ed"ing an" defects
e-cluding e&'orar" Works and the Procuring !ntit"5s
!+ui'&ent (if an" )# Plant# Faterials and an" other things
to for& or for&ing 'art of the Per&anent Works.
,i- For1e MaAe're &eans an e(ent or situation be"ond the
control of the Contractor that is not foreseeable# is
una(oidable# and its origins not due to negligence or lack
of care on the 'art of the Contractor2 such e(ents &a"
include# but not be li&ited to# acts of the *o(ern&ent in
its so(ereign ca'acit"# ,ars or re(olutions# fires# floods#
e'ide&ics# +uarantine restrictions# and freight
e&bargoes.
,/- 7ood& &ean the Contractor5s !+ui'&ent# Faterials#
Plant and e&'orar" Works# or an" of the& as
a''ro'riate
,0- 7CC &eans the *eneral Conditions of Contract.
,l- 7overn5ent &eans the *o(ern&ent of the Peo'le5s
Re'ublic of Bangladesh.
+ # a + e 15
,m- FHead of t)e Pro1'rin3 Entit:F &eans the %ecretar" of
a Finistr" or a $i(ision# the Iead of a *o(ern&ent
$e'art&ent or $irectorate2 or the Chief !-ecuti(e# b"
,hate(er designation called# of a local *o(ern&ent
agenc"# an autono&ous or se&i.autono&ous bod" or a
cor'oration# or a cor'orate bod" established under the
Co&'anies 0ct2
,n- Materia+& &eans things of all kinds other than Plant
intended to for& or for&ing 'art of the Per&anent Works#
including the su''l".onl" &aterials# if an"# to be su''lied
b" the Contractor under the Contract.
,o- Mont) &eans calendar &onth.
,p- Ori3ina+ Contra1t Pri1e is the Contract Price stated in
the Procuring !ntit"5s ?otification of 0,ard and further
clearl" deter&ined in the Contract.
,1- Per5anent ?or2& &eans the 'er&anent ,orks to be
e-ecuted b" the Contractor under the Contract.
,r- PCC &eans the Particular Conditions of Contract.
,s- P+ant &eans the a''aratus# &achiner" and other
e+ui'&ent intended to for& or for&ing 'art of the
Per&anent Works# including (ehicles 'urchased for the
Procuring !ntit" and relating to the construction of the
Works and Ph"sical ser(ices.
,t- Pro1'rin3 Entit: &eans a Procuring !ntit" ha(ing
ad&inistrati(e and financial 'o,ers to undertake
'rocure&ent of Works and Ph"sical ser(ices using 'ublic
funds and is as na&ed in the PCC ,ho e&'lo"s the
Contractor to carr" out the Works.
,u- ProAe1t Mana3er is the 'erson na&ed in the PCC or an"
other co&'etent 'erson a''ointed b" the Procuring !ntit"
and notified to the Contractor ,ho is res'onsible for
su'er(ising the e-ecution and co&'letion of the Works
and Ph"sical ser(ices and ad&inistering the Contract.
,%- Site &eans the 'laces ,here the Per&anent Works are to
be e-ecuted including storage and ,orking areas and to
,hich Plant and Faterials are to be deli(ered# and an"
other 'laces as &a" be s'ecified in the PCC as for&ing
'art of the %ite.
,&- Site Inve&ti3ation Re*ort& are those that ,ere included
in the ender $ocu&ent and are factual and inter'retati(e
re'orts about the surface and subsurface conditions at
the %ite.
,2- S*e1ifi1ation &eans the %'ecification of the Works
in1+'ded in the Contract and an" &odifications or
additions to the s'ecifications &ade or a''ro(ed b" the
Pro7ect Fanager in accordance ,ith the Contract.
,*- Te5*orar: Wor2& &eans all te&'orar" ,orks of e(er"
kind other than Contractor5s !+ui'&ent re+uired on the
%ite for the e-ecution and co&'letion of the Per&anent
Works and re&ed"ing of an" defects.
+ # a + e 16
,3- =ariation &eans an" change to the Works directl"
'rocured fro& the original Contractor under so&e s'ecific
conditions and circu&stances follo,ing a''ro(ed
'rocedures# ,hich is instructed as a =ariation under *CC
Clause 23 b" the Pro7ect Fanager that (aries the Works.
,aa- Wor2& &eans all ,orks associated ,ith the construction#
reconstruction# site 're'aration# de&olition# re'air#
&aintenance or reno(ation of rail,a"s# roads# high,a"s#
or a building# an infrastructure or structure or an
installation or an" construction ,ork relating to
e-ca(ation# installation of e+ui'&ent and &aterials#
decoration# as ,ell as 'h"sical ser(ices ancillar" to ,orks
as detailed in the PCC# if the (alue of those ser(ices does
not e-ceed that of the Works the&sel(es.
,bb- Writin3 &eans co&&unication ,ritten b" hand or
&achine dul" signed and includes 'ro'erl" authenticated
&essages b" facsi&ile or electronic &ail.
-0 Corr'*t, Fra'd'+ent,
Co++'&ive or Coer1ive
Pra1ti1e&
2.1 he *o(ern&ent re+uires that Procuring !ntities# as ,ell as
enderers and %u''liers shall# during the Procure&ent 'roceedings
and the e-ecution of Contracts under 'ublic funds# ensure.
(a) strict co&'liance ,ith the 'ro(isions of %ection /4 of the
Public Procure&ent 0ct 211/ (0ct 24 of 211/)2
(b) abiding b" the code of ethics as &entioned in the
Rule123 of the Public Procure&ent Rules# 21142
,c. that neither it5s an" officer nor an" staff or an" other
agents or inter&ediaries ,orking on its behalf engages in
an" 'ractice as detailed in the Rule 123.
2.2 6f corru't# fraudulent# collusi(e or coerci(e 'ractices of an" kind
deter&ined b" the Procuring !ntit" against an" enderer alleged to
ha(e carried out such 'ractices# the Procuring !ntit" shall 6
(a) e-clude the concerned enderer fro& further 'artici'ation
in the 'articular Procure&ent 'roceeding2 or
(b) re7ect an" reco&&endation for a,ard that had been
'ro'osed for that concerned enderer or2
(c) declare# at its discretion# the concerned enderer to be
ineligible to 'artici'ate in further Procure&ent
'roceedings# either indefinitel" or for a s'ecific 'eriod of
ti&e.
/0 Do1'5ent& For5in3
t)e Contra1t and
Priorit: of Do1'5ent&
3.1 he follo,ing docu&ents for&ing the Contract shall be inter'reted
in the follo,ing order of 'riorit";
(a) the signed Contract 0gree&ent (For5 PW-6)2
(b) the ?otification of 0,ard (PW-6!)2
(c) the co&'leted ender and the a''endi- to the ender2
(d) the Particular Conditions of Contract2
(e) the *eneral Conditions of Contract2
+ # a + e 17
(f) the echnical %'ecifications2
(g) the *eneral %'ecifications2
(h) the $ra,ings2
(i) the 'riced Bill of <uantities and the %chedules2 and
(7) an" other docu&ent listed in the PCC for&ing 'art of the
Contract.
!0 E+i3i4i+it: 4.1 he Contractor shall be a Bangladsehi national.
0 Po&&e&&ion of t)e Site 5.1 he Procuring !ntit" shall gi(e 'ossession of the to the Contractor
on the date stated in the PCC0
"0 Pro1'rin3 Entit:;&
Re&*on&i4i+itie&
/.1 he Procuring !ntit" shall 'a" the Contractor# in consideration of
the satisfactor" 'rogress of e-ecution and co&'letion of the Works
and Ph"sical ser(ices# and the re&ed"ing of defects therein# the
Contract 'rice or such other su& as &a" beco&e 'a"able under
the 'ro(isions of the Contract at the ti&es and in the &anner
'rescribed b" the Contract 0gree&ent.
#0 Contra1tor;&
Re&*on&i4i+itie&
3.1 he Contractor shall e-ecute and co&'lete the Works and re&ed"
an" defects therein in confor&it" in all res'ects ,ith the 'ro(isions
of the Contract 0gree&ent.
$0 Ta8e& and D'tie& 4.1 he Contractor shall be entirel" res'onsible for all ta-es# duties#
fees# and other such le(ies i&'osed inside and outside
Bangladesh.
%0 Contra1tor;&
Per&onne+
9.1 6f the Pro7ect Fanager asks the Contractor to re&o(e a 'articular
'erson ,ho is a &e&ber of the Contractor5s staff or ,ork force fro&
the %ite# he or she shall state the reasons# and the Contractor shall
ensure that the 'erson lea(es the %ite ,ithin three (3) da"s and has
no further connection ,ith the ,ork in the Contract.
B. Time Control
(.0 Start Date 1".1 %tart $ate is the date defined in the PCC and it is the last date
,hen the Contractor shall co&&ence e-ecution of the Works under
the Contract.
((0 Intended Co5*+etion
Date
11.1 6ntended Co&'letion $ate is the date calculated fro& the start $ate
as s'ecified in the PCC# on ,hich it is intended that the Contractor
shall co&'lete the Works and Ph"sical ser(ices as s'ecified in the
Contract and &a" be re(ised onl" b" the Pro7ect Fanager b"
issuing an e-tension of ti&e.
(-0 Pro3ra55e of Wor2& 12.1 Within the ti&e stated in the PCC# the Contractor shall sub&it to the
Pro7ect Fanager# for a''ro(al a Progra&&e sho,ing the general
&ethods# arrange&ents# order# and ti&ing for all the acti(ities in the
Works.
+ # a + e 18
(/0 E8ten&ion of t)e
intended 1o5*+etion
ti5e
13.1 he Contractor shall be entitled to an e-tension of the 6ntended
Co&'letion $ate# if and to the e-tent that co&'letion of the Works
or an" 'art thereof is or ,ill be dela"ed b" Co&'ensation !(ents or
a =ariation @rder.
13.2 he Procuring !ntit" &a" e8tend t)e Intended Co5*+etion Date
b" t,ent" (21) 'ercent of the original Contract ti&e as stated under
*CC %ub Clause 13.1
13.3 6n the case an e-tension of the 6ntended Co&'letion $ate re+uired
&ore than t,ent" (21) 'ercent of the original Contract ti&e#
a''ro(al of the Iead of the Procuring !ntit" for the sa&e shall be
re+uired to be obtained.
C. Qualit# Control
(!0 E8e1'tion of Wor2& 14.1 he Contractor shall construct# install and carr" out the Works and
Ph"sical ser(ices in accordance ,ith the %'ecifications and
$ra,ings as scheduled in *CC Clause 30
(0 Identif:in3 Defe1t& 18.1 he Pro7ect Fanager shall check the ,orks e-ecuted b" the
Contractor and notif" the Contractor of an" $efects found.
("0 Te&tin3 1/.1 he Contractor shall carr" out routine ests of &aterials and ,orks
based on the 'rogress of ,orks to ensure the +ualit" of co&'leted
,orks in accordance ,ith standard &ethods deter&ined b" the
Pro7ect Fanager.
16.2 6f the Pro7ect Fanager instructs the Contractor to carr" out a test not
s'ecified in the %'ecification to check ,hether an" ,ork has a
$efect and the test sho,s that it does# the Contractor shall 'a" for
the test and an" sa&'les.
(#0 ReAe1tion of Wor2& 13.1 6f# as a result of an e-a&ination# ins'ection# &easure&ent or
testing# of Works it is found to be defecti(e or other,ise not in
accordance ,ith the Contract# the Pro7ect Fanager &a" re7ect the
Works b" gi(ing notice to the Contractor# ,ith reasons. he
Contractor shall then 'ro&'tl" &ake good the defect and ensure
that the re7ected Works subse+uentl" co&'lies ,ith the Contract.
($0 Re5edia+ Wor2 14.1 ?ot,ithstanding an" test# the Pro7ect Fanager b" (isual ins'ection
or field tests &a" instruct the Contractor to;
(a) re&o(e fro& the %ite and re'lace an" Plant or Faterials
,hich is not in accordance ,ith the Contract#
(b) re&o(e and re.e-ecute an" other ,ork ,hich is not in
accordance ,ith the Contract# and
(c) e-ecute an" ,ork ,hich is urgentl" re+uired for the
safet" of the Works# ,hether because of an accident#
unforeseeable e(ent or other,ise.
+ # a + e 19
(%0 Corre1tion of Defe1t& 19.1 he Pro7ect Fanager shall issue a Defe1t& Lia4i+it: S1)ed'+e for
correction of $efects ,ithin thirt" (31) da"s fro& the Contractor5s
re+uest for Fina+ Pa:5ent stating the sco'e of corrections or
additions that are necessar".
19.2 he Pro7ect Fanager shall gi(e notice to the Contractor# ,ith a co'"
to the Procuring !ntit" and others concerned# of an" $efects before
the end of the Defe1t& Lia4i+it: Period# ,hich begins at
Co&'letion $ate# and is defined in the PCC. he $efects Liabilit"
Period shall be e-tended for as long as $efects re&ain to be
corrected.
D. Cost Control
-.0 Contra1t Pri1e 21.1 he Contract 'rice shall be agreed or deter&ined based on that the
Contractor shall 'a" all ta-es# duties and fees re+uired to be 'aid
b" hi& or her under the Contract 'ursuant to *CC Clause 4.1
21.2 he contract Price shall be s'ecified in the PCC.
-(0 Bi++ of <'antitie&
9BO<)
21.1 !-ce't as other,ise stated in the Contract and not,ithstanding an"
other 'ractice
(a) &easure&ent shall be &ade of the net actual +uantit"
of each ite& of the Per&anent Works # and
,-. the &ethod of &easure&ent shall be in accordance ,ith
the B@<.
21.2 6te&s of ,orks +uantified in the B@< for ,hich no rates or 'rices
ha(e been +uoted shall be dee&ed co(ered b" the a&ounts at
rates and 'rices of other ite&s in the Contract and shall not be
se'aratel" 'aid for.
--0 C)an3e& in t)e
<'antitie& and Unit
Rate or Pri1e

22.1 0 ne, rate or 'rice for ite&s included in the B@< shall# ho,e(er#
be a''ro'riate for an ite& of ,ork if;
(a) the final &easured +uantit" of the ,ork done for an"
'articular ite& in the B@< is increased or decreased b"
&ore than t,ent" fi(e (28) 'ercent fro& the +uantit" of
this ite& in the B@<#
'ro(ided that2 the cost resulting fro& such increase or
decrease in +uantit" of this 'articular ite& in the Bill of
<uantities &ulti'lied b" its s'ecified rate or 'rice is
e-ceeded b" one (1) 'ercent of the original Contract
'rice.
(b) this 'articular ite& is not s'ecified in the Contract as a
Bfi-ed rate ite&C2
(c) this 'articular ite& is not s'ecified in the Contract as for
,hich no rates or 'rices ha(e been +uoted and dee&ed
co(ered b" the a&ounts at rates and 'rices of other ite&s
in the Bill of <uantities stated under *CC %ub Clause
21.22 and
+ # a + e 2"
22.2 he ne, rate or 'rice for the 'articular ite& of ,ork included in the
Bill of <uantities described under *CC %ub Clause 22.1 shall be
deri(ed b" the Pro7ect Fanager fro& an" rele(ant rates or 'rices
,ithin the Contract b" taking into consideration the conte-t and
threshold of the =ariation Order as stated under *CC Clause 23.
-/0 =ariation& 23.1 he Procuring !ntit" &a" issue a =ariation @rder for Procure&ent
of Works and Ph"sical ser(ices in fa(our of the original Contractor
to co(er an" increase or decrease in +uantities# including the
introduction of ne, ,ork ite&s that are either due to change of
'lans# design or align&ent to suit actual field conditions# ,ithin the
3enera+ &1o*e and *):&i1a+ 4o'ndarie& of this Contract.
23.2 =ariations &a" include2
(a) changes to the +uantities of an" ite& of ,ork included in
the Bill of <uantities as stated under *CC %ub Clause
22.12 not necessaril" ho,e(er# shall al,a"s constitute a
=ariation until the algebraic su&&ation of costs resulting
fro& such increases or decreases in +uantities of
changing ite&s included in the Bill of <uantities under the
Contract e-ceeds one (1) 'ercent of the original Contract
'rice2
(b) changes to the +ualit" and other characteristics of an" ite&
of ,ork2
(c) changes to the le(els# 'ositions and:or di&ensions of an"
'art of the Works2
(d) o&issions of an" ,ork unless it is to be carried out b"
others2
(e) an" additional ,ork# Plant# Faterials# or ser(ices
necessar" for the 'er&anent ,orks# including an"
associated testing# boreholes and other testing and
e-'lorator" ,ork2 or
(f) changes to the se+uence or ti&ing of e-ecution of the
Works.
23.3 he Contractor shall# under no circu&stances# 'roceed to
co&&ence the ,orks under an" =ariation @rder unless it has been
a''ro(ed b" the A**rovin3 A't)orit:0
-!0 Co&tin3 of =ariation
Order&
24.1 he Contractor shall sub&it a +uotation for carr"ing out the
=ariation ,ithin 3 (se(en) da"s of being re+uested b" the Pro7ect
Fanager.
24.2 6f the ite&s of ,orks under =ariation @rder are e-actl" the sa&e or
si&ilar to those in the Bill of <uantities of the original Contract# the
a''licable unit rates or 'rices of those ,ork ite&s in the Bill of
<uantities of the original Contract shall be used for costing of those
additional ,ork ite&s.
24.3 6f not# the unit rates or 'rices of those ne, ,ork ite&s shall be
based on 2
(i) the direct unit costs used in the Bill of <uantities of
original Contract for other ite&s (e.g. unit cost of
+ # a + e 21
ce&ent# steel rebar# for&,ork# labour rate# e+ui'&ent
rental# etc) as indicated in the Contractor5s 'rice
breakdo,n of the cost esti&ate# if a(ailable2 or
(ii) fi-ed 'rices acce'table to both the Procuring !ntit" and
the Contractor based on &arket 'rices2 or
(iii) the direct cost of the ne, ,ork ite&s based on (i) and (ii)
abo(e shall then be co&bined ,ith the &ark.u' factor
(i.e. ta-es# o(erheads and 'rofit) used b" the Contractor
in his or her ender to deter&ine the unit rate or 'rice
of the ne, ,ork ite&.
24.4 6f the Contractor5s +uotation is found to be unreasonable# the
Pro7ect Fanager shall e-ercise his o,n 7udge&ent to fi- the Jnit
rate (s).
-0 Pa:5ent Certifi1ate& 28.1 he basis for 'a"&ent certificates shall be B@< used to deter&ine
the Contract 'rice.
28.2 he Contractor shall sub&it to the Pro7ect Fanager &onthl"
state&ents of the esti&ated (alue of the ,orks e-ecuted less the
cu&ulati(e a&ount certified 're(iousl".
28.3 he Pro7ect Fanager &a" in an" 'a"&ent certificate &ake an"
correction or &odification that should 'ro'erl" be &ade to an"
're(ious 'a"&ent certificate.
28.4 he Pro7ect Fanager &a" ,ithhold the cost of rectification or
re'lace&ent until such rectification or re'lace&ent has been
co&'leted# if an" thing su''lied or ,ork done b" the Contractor is
not in accordance ,ith the Contract.
-"0 Pa:5ent& to t)e
Contra1tor
2/.1 he Procuring !ntit" shall 'a" the Contractor in Bangladesh aka
currenc"# the a&ounts certified b" the Pro7ect Fanager after due
ad7ust&ents.
-#0 Co5*en&ation Event& 23.1 he follo,ing shall be Co&'ensation !(ents;
(a) he Procuring !ntit" does not gi(e access to or
'ossession of the %ite or 'art of the %ite b" the %ite
Possession $ate stated in the *CC %ub Clause 8.12
(b) *round conditions are substantiall" &ore ad(erse than
could reasonabl" ha(e been assu&ed before issuance of
the ?otification of 0,ard2
(c) @ther Contractors# 'ublic authorities# utilities# or the
Procuring !ntit" do not ,ork ,ithin the dates and other
constraints stated in the Contract# and the" cause dela"
or e-tra cost to the Contractor2
(d) he Pro7ect Fanager unreasonabl" dela"s issuing a
Co&'letion Certificate2
(e) he Pro7ect Fanager instructs the Contractor to unco(er
or to carr" out additional tests u'on ,ork# ,hich is then
found to ha(e no $efects2
(f) @ther Co&'ensation !(ents described in the Contract or
+ # a + e 22
deter&ined b" the Pro7ect Fanager in the PCC shall
a''l"
23.2 6f a Co&'ensation !(ent ,ould cause additional cost or ,ould
're(ent the ,ork being co&'leted before the 6ntended Co&'letion
$ate# the Contract 'rice shall be increased and:or the 6ntended
Co&'letion $ate shall be e-tended.
-$0 Retention Mone: 24.1 he Procuring !ntit" shall retain fro& each 'rogressi(e 'a"&ent
due to the Contractor at the 'ercentage s'ecified in the PCC until
co&'letion of the ,hole of the Works under the Contract.
24.2 @n co&'letion of the ,hole of the Works# the first half the total
a&ount retained under *CC %ub Clause 24.1 shall be re'aid to the
Contractor and the re&aining second half after the $efects Liabilit"
Period has 'assed.
24.3 6f the 'ro(ision of Retention Fone" is not included in this Contract
these %ub Clauses shall not a''l" e-ce't the rele(ant ones.
-%0 Li@'idated Da5a3e& 29.1 he Contractor shall be liable to 'a" Li+uidated $a&ages or in
other ,ords the $ela" $a&ages to the Procuring !ntit" at the rate
'er da" as s'ecified in the PCC for each da" of dela" fro& the
6ntended Co&'letion $ate# for the unco&'leted Works or for an"
'art thereof.
29.2 he total a&ount of Li+uidated $a&ages shall not e-ceed the
a&ount defined in the PCC.
29.3 Pa"&ent of Li+uidated $a&ages b" the Contractor shall not relie(e
the Contractor fro& its obligations.
/.0 Perfor5an1e Se1'rit: 31.1 he Perfor&ance %ecurit" furnished at the ti&e of signing of the
Contract 0gree&ent# shall be substituted b" a ne, %ecurit"
co(ering fift" (81) 'ercent of the a&ount of the Perfor&ance
%ecurit" to co(er the $efects Liabilit" Period.
31.2 he Procuring !ntit" &a" clai& against the securit" if an" of the
follo,ing e(ents occurs for fourteen (14) da"s or &ore.
(a) he Contractor is in breach of the Contract and the
Procuring !ntit" has dul" notified hi& or her 2 and
(b) he Contractor has not 'aid an a&ount due to the
Procuring !ntit" and the Procuring !ntit" has dul"
notified hi& or her.
31.3 6n the e(ent the Contractor is liable to 'a" co&'ensation under the
Contract a&ounting to the full (alue of the Perfor&ance %ecurit" or
&ore# the Procuring !ntit" &a" call the full a&ount of the
Perfor&ance %ecurit".
31.4 6f there is no reason to call the Perfor&ance %ecurit"# the
Perfor&ance %ecurit" shall be discharged b" the Procuring !ntit"
and returned to the Contractor not later than t,ent".eight (24) da"s
after the $efects Liabilit" Period has 'assed.
+ # a + e 23
E. Completion of Contract
/(0 Co5*+etion 31.1 he Contractor shall a''l" b" notice to the Pro7ect Fanager for
issuing a Co&'letion Certificate of the Works# and the Pro7ect
Fanager shall do so u'on deciding that the ,ork is co&'leted.
/-0 Co5*+etion Certifi1ate
and Ta2in3 Over
32.1 he Pro7ect Fanager shall# ,ithin fourteen (14) da"s after recei(ing
the Contractor5s a''lication stated under *CC %ub Clause 31.12
(a) issue the Co&'letion Certificate to the Contractor# stating
the date on ,hich the Works or 'art thereof ,ere
co&'leted in accordance ,ith the Contract# e-ce't for an"
&inor outstanding ,ork and defects ,hich &a" not
substantiall" affect the use of the Works or 'art thereof
for their intended 'ur'ose (either until or ,hilst this ,ork
is co&'leted and these defects are re&edied)2 or
(b) re7ect the a''lication# gi(ing reasons and s'ecif"ing the
,ork re+uired to be done b" the Contractor to enable the
Co&'letion Certificate to be issued. he Contractor shall
then co&'lete this ,ork before issuing a further notice
under this %ub Clause.
32.2 he Procuring !ntit" shall ake.@(er the %ite and the Works ,ithin
fifteen (18) da"s of the Pro7ect Fanager issuing a Co&'letion
Certificate under *CC %ub Clause 32.1 .
//0 A5end5ent to
Contra1t
33.1 he a&end&ent to Contract shall generall" include e-tension of
ti&e to the 6ntended Co&'letion $ate# increase or decrease in
original Contract 'rice and an" other changes acce'table under the
conditions of the Contract.
/!0 Fina+ A11o'nt 34.1 he Contractor shall sub&it ,ith a detailed account of the total
a&ount that the Contractor considers 'a"able under the Contract to
the Pro7ect Fanager before the end of the $efects Liabilit" Period.
34.2 he Pro7ect Fanager shall certif" the Fina+ Pa:5ent ,ithin thirt"
da"s (31) da"s of recei(ing the Contractor5s account if the 'a"able
a&ount clai&ed b" the Contractor is correct and the corres'onding
,orks are co&'leted.
34.3 6f it is not# the Pro7ect Fanager shall issue ,ithin thirt" (31) da"s a
Defe1t& Lia4i+it: S1)ed'+e under *CC %ub Clause 19.1 that
states the sco'e of the corrections or additions that are necessar".
/0 Re+ea&e fro5
Perfor5an1e
38.1 6f an" e(ent or circu&stance outside the control of the 'arties
(including# but not li&ited to# For1e MaAe're) arises ,hich &akes it
i&'ossible or unla,ful for either or both 'arties to fulfil its or their
contractual obligations or ,hich# under the la, go(erning the
Contract# entitles the 'arties to be released fro& further
'erfor&ance of the Contract# then u'on notice b" either 'art" to the
other 'art" of such e(ent or circu&stance;
,a. the 'arties shall be discharged fro& further 'erfor&ance#
,ithout 're7udice to the rights of either 'art" in res'ect of an"
're(ious breach of the Contract.
+ # a + e 24

F. Termination and Settlement of Disputes
/"0 Ter5ination 3/.1 Ter5ination for Defa'+t
(a) he Procuring !ntit" or the Contractor# ,ithout 're7udice
to an" other re&ed" for breach of Contract# b" gi(ing
t,ent" eight (24) da"s ,ritten notice of default to the
other 'art"# &a" ter&inate the Contract in ,hole or in
'art if the other 'art" causes a funda&ental breach of
Contract.
(b) Aunda&ental breaches of the Contract shall include# but
shall not be li&ited to# the follo,ing;
(i) the Contractor sto's ,ork for t,ent".eight (24)da"s
,hen no sto''age of ,ork is sho,n on the current
Progra&&e and the sto''age has not been
authori>ed b" the Pro7ect Fanager2
(ii) the Pro7ect Fanager gi(es ?otice that failure to
correct a 'articular $efect is a funda&ental breach
of Contract and the Contractor fails to correct it
,ithin a reasonable 'eriod of ti&e deter&ined b"
the Pro7ect Fanager2
(iii) the Contractor has dela"ed the co&'letion of the
Works b" the nu&ber of da"s for ,hich the
&a-i&u& a&ount of Li+uidated $a&ages can be
'aid# as s'ecified in *CC %ub Clause 29.22
(i() the Contractor has subcontracted the ,hole of the
Works or has assigned the Contract ,ithout the
re+uired agree&ent and ,ithout the a''ro(al of
the Pro7ect Fanager2
(() the Contractor# in the 7udg&ent of the Procuring
!ntit" has engaged in corru't or fraudulent
'ractices as defined in *CC Clause 2# in
co&'eting for or in e-ecuting the Contract.
/#0 Pa:5ent '*on
Ter5ination
33.1 6f the Contract is ter&inated because of a funda&ental breach of
Contract under *CC %ub Clause 3/.1.1 b" the Contractor# the
Pro7ect Fanager shall issue a certificate for the (alue of the Works
done and Plant and Faterials ordered less ad(ance 'a"&ents
recei(ed u' to the date of the issue of the certificate and less the
a&ount fro& 'ercentage to a''l" to the contract (alue of the ,orks
not co&'leted# as indicated in the PCC.
/$0 Pro*ert: 34.1 0ll Faterials on the %ite# Plant# !+ui'&ent# e&'orar" Works# and
Works shall be dee&ed to be the 'ro'ert" of the Procuring !ntit" if
the Contract is ter&inated because of the Contractor5s default. .
+ # a + e 25
G. Disputes and Arbitration
/%0 Sett+e5ent of Di&*'te& 39.1 A5i1a4+e &ett+e5ent
he 'rocuring !ntit" and the Contractor shall use their best
efforts to settle a&icabl" all 'ossible dis'utes arising out of or in
connection ,ith this Contract or its inter'retation.
39.2 Ar4itration
(a) 6f the 'arties are unable to reach a settle&ent as 'er *CC
Clause 39.1 ,ithin t,ent".eight (24) da"s of the first
,ritten corres'ondence on the &atter of disagree&ent#
then either 'art" &a" gi(e notice to the other 'art" of its
intention to co&&ence arbitration.
(b) he arbitration shall be conducted in accordance ,ith the
0rbitration 0ct (A1t No ( of -..() of Bangladesh as at
'resent in force and in the 'lace sho,n in the PCC.
+ # a + e 26
Se1tion !0 Parti1'+ar Condition& of Contra1t
Instrutions !or om"leting the Partiular Conditions o! Contrat are "ro$ided in italis in "arenthesis !or
the rele$ant GCC Clauses.
7CC C+a'&e
A5end5ent& of, and S'**+e5ent& to, C+a'&e& in t)e 7enera+ Condition& of
Contra1t
7CC (0(9d) he Contractor is
%&ame, address'
7CC (0(9t) he Procuring !ntit" is
Fanaging $irector# %%%0A *rou' of Co. Li&ited..
0ddress; $han&ondi# $haka.
7CC (0(9') he Pro7ect Fanager is
Chief !-ecuti(e !ngineer# %%%0A *rou' of Co. Li&ited..
0ddress; $han&ondi# $haka.
7CC (0(9v) he %ite is located at S$ar, Dhaka and is defined in dra,ings ?o;
(()
7CC (0(9aa) he Works consist of Construction of an one %toried Residential Building

7CC /0( 9A)
@ther docu&ents for&ing 'art of the Contract are2
1.R0KJL a''ro(ed construction ,ork licence
2.Photoco'" of 'a".checks of a si&ilar construction ,ork
7CC 0(
Possession of the %ite to the Contractor shall be gi(en on the follo,ing date; 14
th
Kune# 2113.
7CC (.0( he %tart $ate shall be; 21
th
Kul"#2113.
7CC ((0( he 6ntended Co&'letion $ate for the ,hole of the Works shall be ; 21
th

Kanuar"#2114.
7CC (-0( he Contractor shall sub&it a Progra&&e for the Works ,ithin 11 da"s of signing
the Contract.
7CC (%0- he $efects Liabilit" Period is *+ months.
7CC -.0- he Contract 'rice is; %insert the amount'
+ # a + e 27
7CC -#0(9f) he follo,ing additional e(ents shall also be the Co&'ensation !(ents; ?one.
7CC -$0( he 'ro'ortion of 'a"&ents to be retained is 11 'ercent.
7CC -%0( he a&ount of Li+uidated $a&ages or in other ,ords $ela" $a&ages is 1.18
'ercent of final Contract 'rice of the unco&'leted Works or an" 'art there of it;& 'er
da" of dela".
7CC -%0- he &a-i&u& a&ount of Li+uidated $a&ages for the unco&'leted Works or an"
'art thereof is 11 'ercent of the final Contract 'rice of the ,hole of the Works.
7CC /#0( he 'ercentage to a''l" to the contract (alue of the ,orks not co&'leted#
re'resenting the Procuring !ntit"5s additional cost for co&'leting the unco&'leted
Works# is *) 'ercent.
7CC /%0-94) he arbitration shall be conducted in the 'lace &entioned belo,2
Fanaging $irector5s @ffice# %%%0A *rou' of Co. Li&ited..
0ddress; $han&ondi# $haka
+ # a + e 28
Se1tion 0 Tender > Contra1t For5&
For5 Tit+e
Tender For5&
PW2 M 1 ender %ub&ission Letter
PW2 M 2 enderer5s 6nfor&ation
PW2 M 3 Bank *uarantee for ender %ecurit" (,hen this o"tion is hosen,
Contra1t For5&
PW2 M 4 ?otification of 0,ard
PW2 M 8 Contract 0gree&ent
PW2 M / Bank *uarantee for Perfor&ance %ecurit" (-hen this o"tion is
hosen)
Aor&s PW-6( to PW-6/ co&'rises 'art of the ender Aor&at and should be co&'leted as stated in 6
Clauses.12.1
Aor&s PW-6! to PW6" co&'rises 'art of the Contract as stated in *CC Clause 3.
+ # a + e 29
Tender S'45i&&ion Letter 9For5 PW-6()
%#his letter should .e om"leted and signed ./ the Authorised Signator/
"re!era.l/ on the Letter01ead Pad o! the #enderer'
6n
accordance ,ith 6 Clauses 13# the follo,ing 'rices a''l" to our ender;
he ender Price is;
(6 Clause 13)
#aka %state amount in !igures'
and #aka%state amount in -ords'
6n signing this letter# and in sub&itting our ender# ,e also confir& that;
(a) our ender shall be (alid for the 'eriod stated in the ender $ata %heet (6 %ub Clause 1/.1)
and it shall re&ain binding u'on us and &a" be acce'ted at an" ti&e before the e-'iration of
that 'eriod2
(b) a ender %ecurit" is attached in the for& of a %"a/ order2 .ank dra!t2 .ank guarantee' in the
a&ount stated in the ender $ata %heet (6 %ub Clause 13.1) and (alid for a 'eriod of t,ent"
eight (24) da"s be"ond the ender (alidit" date2
(c) if our ender is acce'ted# ,e co&&it to furnishing a Perfor&ance %ecurit" ,ithin the ti&e stated
under 6 %ub Clause 33.2 in the a&ount stated in the ender $ata %heet (6 %ub Clause 33.1)
and (alid for a 'eriod of t,ent" eight (24) da"s be"ond the date of issue of the Co&'letion
Certificate of the Works2
(d) ,e ha(e e-a&ined and ha(e no reser(ations to the ender $ocu&ent# issued b" "ou on
%insert date'3
(e) We# declare that ,e are eligible to 'artici'ate in this ender and &eet the eligibilit" criteria
s'ecified in the ender $ocu&ent (6 Clause 3)2
(f) further&ore# ,e are a,are of 6 Clause 2.2 concerning such 'ractices and 'ledge not to
indulge in such 'ractices in co&'eting for or in e-ecuting the Contract
(g) ,e are not 'artici'ating as enderers in &ore than one ender in this endering 'rocess. We
understand that "our ,ritten ?otification of 0,ard shall constitute the acce'tance of our ender
and shall beco&e a binding Contract bet,een us# until a for&al Contract is 're'ared and
e-ecuted2
%ignature;
%insert signature o! authorised re"resentati$e
o! the #enderer'
?a&e;
%insert !ull name o! signator/ -ith &ational ID
&um.er'
6n the ca'acit" of;
%insert a"ait/ o! signator/'
+ # a + e 3"
o; $ate ;
Fanaging $irector# %%%0A *rou' of Co. Li&ited..
0ddress; $han&ondi# $haka
6n(itation for ender ?o; C!.113:24.13:119:C$C ender Package ?o;?:0 Lot ?o; %ingle lot.
$ul" authorised to sign the ender for and on behalf of the enderer
Atta1)5ent (; Written confir&ation authorising the abo(e signator" (ies) to co&&it the enderer
N 6 %ub Clause 12.1 O
+ # a + e 31
Tenderer Infor5ation 9For5 PW-6-)
%#his Form should .e om"leted onl/ ./ the #enderer, "re!era.l/ on its Letter01ead Pad'
6n(itation for ender ?o; ender Package ?o; Lot ?o;
1. !ligibilit" 6nfor&ation of the enderer N6 MClauses 3 E 12O
1.1 enderer5s legal title
1.2 enderer5s registered address
1.3 enderer5s "ear of registration
1.4 (=0) ?u&ber
1.8 (6?) ?u&ber
2. <ualification 6nfor&ation of the enderer
2.1 %'ecific !-'erience in Construction Works of enderer N 6 M Clause 3.1 O
Co&'leted Contracts of si&ilar nature# co&'le-it" and &ethods:construction technolog"
Contract ?o

?a&e of Contract
N insert reference noO of N insert "earO
Ninsert na&eO
Role in Contract
%tik rele$ant .o4'.
Pri&e Contractor %ubcontractor Fanage&ent Contractor
0,ard date
Co&'letion date
otal Contract =alue
Ninsert dateO
Ninsert dateO
Ninsert a&ountO
Procuring !ntit"5s ?a&e
E
0ddress
2.2 0(erage annual construction turno(er N6 %ub Clause 4.1(a)O
% Certi!iate o! "a/ments reei$ed !or eah /ear o! -orks in "rogress or om"leted, at the
end o! the "eriod re"orted'
Dear 0&ount aka
2.3 Ainancial Resources a(ailable to &eet the construction cash flo, N6 %ub Clause 4.1(b)O
?o %ource of Ainancing 0&ount 0(ailable
6n order to confir& the abo(e state&ents the enderer shall sub&it # as a''licable# the docu&ents
&entioned in 6 %ub Clause 18.1(a)# (b) E (c).
2.4 Contact $etails N6 %ub Clause 18.1 (d) E (e)
?a&e# address# and other contact details of enderer5s Bankers and other Procuring
+ # a + e 32
!ntit"(s) that &a" 'ro(ide references# if contacted b" this Procuring !ntit"
Ban2 7'arantee for Tender Se1'rit: 9For5 PW-6/)
%#his is the !ormat !or the #ender Seurit/ to .e issued ./ a sheduled Bank o! Bangladesh in aordane -ith I##
Su. Clause *5.+ '
6n(itation for ender ?o; $ate;
ender Package : Lot ?o;
o;G?a&e and address of the Procuring
!ntit"H
TENDER 7UARANTEE No:
We ha(e been infor&ed that %name o! #enderer' (hereinafter called Bthe endererC) intends to sub&it
to "ou its ender dated %date o! #ender' (hereinafter called Bthe enderC) for the e-ecution of the
Works of %desri"tion o! -orks' under the abo(e 6n(itation for enders (hereinafter called Bthe 6AC).
Aurther&ore# ,e understand that# according to "our conditions# the ender &ust be su''orted b" a
Bank *uarantee for ender %ecurit".
0t the re+uest of the enderer# ,e %name o! .ank' hereb" irre(ocabl" undertake to 'a" "ou# ,ithout
ca(il or argu&ent# an" su& or su&s not e-ceeding in total an a&ount of k %insert amount in !igures
and -ords' u'on recei't b" us of "our first ,ritten de&and acco&'anied b" a ,ritten state&ent that
the enderer is in breach of its obligation(s) under the ender conditions# because the enderer;
a. has ,ithdra,n its ender after o'ening of enders but ,ithin the (alidit" of the ender
%ecurit"2 or
b. refused to acce't the ?otification of 0,ard (?@0) ,ithin the 'eriod as stated under 62 or
c. failed to furnish Perfor&ance %ecurit" ,ithin the 'eriod sti'ulated in the ?@02 or
d. refused to sign the Contract 0gree&ent b" the ti&e s'ecified in the ?@02 or
e. did not acce't the correction of the ender 'rice follo,ing the correction of the arith&etic
errors as stated under 6.
his guarantee ,ill e-'ire
6a, if the enderer is the successful enderer# u'on our recei't of a co'" of the Contract
0gree&ent signed b" the enderer or a co'" of the Perfor&ance %ecurit" issued to
"ou in accordance ,ith the 62 or
6., if the enderer is not the successful enderer# t,ent" eight (24) da"s after the e-'iration
of the enderer5s ender (alidit" 'eriod# being %date o! e4"iration o! the #ender $alidit/
"lus t-ent/ eight 6+5, da/s '.
Conse+uentl"# ,e &ust recei(e at the abo(e.&entioned office an" de&and for 'a"&ent under this
guarantee on or before that date.
+ # a + e 33
%ignature %ignature
+ # a + e 34
Notifi1ation of A?ard 9For5 PW-6!)
Contract ?o; $ate;
o;
%&ame o! Contrator'
his is to notif" "ou that "our ender dated %insert date' for the e-ecution of the Works for %name
o! "ro7et2Contrat' for the Contract Price of k %state amount in !igures and in -ords'# as
corrected and &odified in accordance ,ith the 6nstructions to enderers# has been a''ro(ed b"
%name o! Prouring 8ntit/'.
Dou are thus re+uested to take follo,ing actions;
i. acce't in ,riting the ?otification of 0,ard ,ithin se(en (3) ,orking da"s of its
issuance 'ursuant to 6 %ub Clause 3/.1
ii. furnish a Perfor&ance %ecurit" in the a&ount of k %state amount in !igures and
-ords' ,,ithin se(en (3) ,orking da"s of acce'tance of this ?otification of 0,ard
but not later than 6s"ei!/ date,, in accordance ,ith 6 Clause 33.2
iii. sign the Contract ,ithin fourteen (14) ,orking da"s of issuance of this
?otification of 0,ard but not later than 6s"ei!/ date,, in accordance ,ith 6
%ub Clause 41.1
Dou &a" 'roceed ,ith the e-ecution of the Works onl" u'on co&'letion of the abo(e tasks. Dou
&a" also 'lease note that this ?otification of 0,ard shall constitute the for&ation of this
Contract ,hich shall beco&e binding u'on "ou.
We attach the draft Contract and all other docu&ents for "our 'erusal and signature.
%igned
$ul" authorised to sign for and on behalf of
%name o! Prouring 8ntit/'
$ate;
+ # a + e 35
Contra1t A3ree5ent 9For5 PW-6)
I6% 0*R!!F!? &ade the (da") da" of bet,een %name and address o! Prouring 8ntit/'
(hereinafter called Bthe Procuring !ntit"C) of the one 'art and %name and address o! Contrator'
(hereinafter called Bthe ContractorC) of the other 'art;
WI!R!0% the Procuring !ntit" in(ited enders for certain ,orks# (i># %.rie! desri"tion o!
-orks' and has acce'ted a ender b" the Contractor for the e-ecution of those ,orks in the su&
of aka %Contrat "rie in !igures and in -ords' (hereinafter called Bthe Contract PriceC).
?@W I6% 0*R!!F!? W6?!%%!I 0% A@LL@W%;
1. 6n this 0gree&ent ,ords and e-'ressions shall ha(e the sa&e &eanings as are res'ecti(el"
assigned to the& in the *eneral Conditions of Contract hereafter referred to.
2. he docu&ents for&ing the Contract shall be inter'reted in the follo,ing order of 'riorit";
(a) the signed Contract 0gree&ent
(b) the ?otification of 0,ard
(c) the co&'leted ender and the a''endices to the ender
(d) the Particular Conditions of Contract
(e) the *eneral Conditions of Contract
(f) the echnical %'ecifications
(g) the *eneral %'ecifications
(h) the $ra,ings
(i) the 'riced Bill of <uantities and the %chedules
(7) an" other docu&ent listed in the PCC for&ing 'art of the Contract.
3. 6n consideration of the 'a"&ents to be &ade b" the Procuring !ntit" to the Contractor as
hereinafter &entioned# the Contractor hereb" co(enants ,ith the Procuring !ntit" to e-ecute
and co&'lete the ,orks and to re&ed" an" defects therein in confor&it" in all res'ects ,ith
the 'ro(isions of the Contract.
4. he Procuring !ntit" hereb" co(enants to 'a" the Contractor in consideration of the
e-ecution and co&'letion of the ,orks and the re&ed"ing of defects therein# the Contract
Price or such other su& as &a" beco&e 'a"able under the 'ro(isions of the Contract at the
ti&es and in the &anner 'rescribed b" the Contract.
6? W6?!%% ,hereof the 'arties hereto ha(e caused this 0gree&ent to be e-ecuted in accordance
,ith the la,s of Bangladesh on the da"# &onth and "ear first ,ritten abo(e.
Aor the Procuring !ntit" Aor the Contractor
%ignature
?a&e
?ational 6$ ?o.
itle
6n the 'resence of
?a&e
0ddress
+ # a + e 36
Ban2 7'arantee for Perfor5an1e Se1'rit: 9For5 PW-6")
%#his is the !ormat !or the Per!ormane Seurit/ to .e issued ./ a sheduled .ank o! Bangladesh in aordane -ith
I## Clauses 9), 95 : 9;'

Contract ?o; Ninsert reference nu&berO $ate; Ninsert dateO
o;
N insert ?a&e and address of Procuring !ntit"O
PERFORMANCE 7UARANTEE No:
We ha(e been infor&ed that %name o! Contrator' (hereinafter called Bthe ContractorC) has
undertaken# 'ursuant to Contract ?o %insert re!erene num.er o! Contrat' dated %insert date o!
Contrat' (hereinafter called Bthe ContractC)# the e-ecution of ,orks %desri"tion o! -orks' under the
Contract.
Aurther&ore# ,e understand that# according to "our conditions# the Contract &ust be su''orted b" a
Bank *uarantee for Perfor&ance %ecurit".
0t the re+uest of the Contractor# ,e %name o! .ank' hereb" irre(ocabl" undertake to 'a" "ou# ,ithout
ca(il or argu&ent# an" su& or su&s not e-ceeding in total an a&ount of k %insert amount in !igures
and in -ords' u'on recei't b" us of "our first ,ritten de&and acco&'anied b" a ,ritten state&ent
that the Contractor is in breach of its obligation(s) under the Contract conditions# ,ithout "ou
needing to 'ro(e or sho, grounds or reasons for "our de&and of the su& s'ecified therein.
his guarantee is (alid until %date o! $alidit/ o! guarantee'# conse+uentl"# ,e &ust recei(e at the
abo(e.&entioned office an" de&and for 'a"&ent under this guarantee on or before that date.
%ignature %ignature
+ # a + e 37
Se1tion "0 Bi++ of <'antitie&
7'idan1e Note& on t)e Bi++ of <'antitie&
O4Ae1tive&
he ob7ecti(es of the Bill of <uantities (B@<) are2
(a) to 'ro(ide sufficient infor&ation on the +uantities of Works to be 'erfor&ed to
enable enders to be 're'ared efficientl" and accuratel"2 and
(b) ,hen a Contract has been entered into# to 'ro(ide a 'riced B@< for
use in the 'eriodic (aluation of Works e-ecuted.
(c) a se'arate ite& for te&t& that &a" be re+uired to be carried out to ensure the
+ualit" of &aterials and ,orks.

6n order to attain these ob7ecti(es# the ite&s in the Bill of <uantities should be grou'ed into
sections to distinguish bet,een those 'arts of the Works that b" nature# location# access#
ti&ing# or an" other s'ecial characteristics &a" gi(e rise to different &ethods of
construction# 'hasing of the Works# or considerations of cost. *eneral ite&s co&&on to all
'arts of the Works &a" be grou'ed as a se'arate section in the Bill of <uantities.
Consistent ,ith these re+uire&ents# the la"out and content of the B@< should be as
si&'le and brief as 'ossible. <uantities should be co&'uted net fro& the $ra,ings#
unless directed other,ise in the Contract# and no allo,ance should be &ade for bulking#
shrinkage# or ,aste. <uantities should be rounded u' or do,n ,here a''ro'riate and
s'urious accurac" should be a(oided.
he +uantities gi(en in the Bill of <uantities are esti&ated and 'ro(isional# and are gi(en
to 'ro(ide a co&&on basis for endering. he basis of 'a"&ent ,ill be the actual
+uantities of ,ork ordered and carried out# as &easured b" the Contractor and (erified b"
the Pro7ect Fanager and (alued at the rates or 'rices +uoted in the 'riced Bill of
<uantities# ,here a''licable# and other,ise at such rates or 'rices as the Pro7ect Fanager
&a" fi- ,ithin the ter&s and conditions of the Contract.
he &ethod of &easure&ents of co&'leted ,orks for 'a"&ent shall be based on &etric
s"ste& unless other,ise una(oidable.
0 sa&'le for&at has been suggested.
+ # a + e 38
Corre1tion of Error&
6f in 're'aring Bill of <uantities of its ender# the enderer has &ade errors in the unit rates
or 'rices or the total 'rice# and ,ishes to correct such errors 'rior to sub&ission of its
ender# it &a" do so# but shall ensure that each correction of error is 'ro'erl" initialled b"
the authorised 'erson of the enderer and that a state&ent shall be &ade as to the total
nu&ber of such corrections &ade# at the end of the 'riced Bill of <uantities.
he Procuring !ntit" shall ensure that the follo,ing note is added at the end of each 'age
of the Bill of <uantities.
Bhis Bill of <uantities contains %state num.er' corrections dul" initialled and signed b" the
authorised 'erson of the endererC.
I6% *J6$0?C! ?@!% A@R PR!P0R6?* 0 B6LL @A <J0?66!% 0R! 6?!?$!$