Construction Following Positions will be relocated. As a result, net cost remains the same. Car Inspector -- See Chart 1 Car Cleaner-- See Chart 1 Total coverage required during VD Yard construction 2010 Char t 1 FBA Temporary Manpower 212.41% Total -Direct Total Cost w/ Overhead Car Inspector Relocated fromVDYard Relocated fromVDYard Electrician $0 $0 Gang Foreman $0 $0 Car Cleaners Relocated fromVDYard Relocated fromVDYard Drill Crew $0 $0 Total Manpower $0 $0 Char t 2 HMC Temporary Manpower Total -Direct Total Cost w/ Overhead Car Inspector $163,752 $479,958 Electrician $0 $0 Gang Foreman $88,335 $258,910 Car Cleaners $97,455 $285,641 Drill Crew $167,472 $490,862 Total Manpower $517,015 $1,515,370 Char t 3 Jamaica Temporary Total -Direct Total Cost w/ Overhead Car Inspector $81,876 $239,979 Electrician $0 $0 Gang Foreman $0 $0 Car Cleaners $0 $0 Drill Crew $167,472 $490,862 Total Manpower $249,349 $730,841 Char t 4 Project Management Transportation $41,295 $131,814 Service Planning $0 $0 M-of-E $75,172 $239,949 Total Manpower $116,467 $371,763 Char t 5 Additional Crew Cost 9 Hours Overtime Associated to Full Train Crew (per day) $364,636 $897,492 Char t 6 Project Manpower Cost FBA Temp $0 $0 HMC Temp $517,015 $1,515,370 Jamaica Temp $249,349 $730,841 Project Management $116,467 $371,763 Crew Cost $364,636 $897,492 Total Temp Cost $1,247,467 $3,515,466 Char t 7 Traction Power Energy Cost Round Trip FBA to Hillside 24 Cars X 22 Miles 528 .90 Cents per Car Mile 1.04 Total Traction Power (Annual -- Weekdays) $143,003 Char t 8 Toilet Service--3rd Party Contract 3rd Party Contractor Annual Cost $97,125 Char t 9 Switch Tender Switch Tender*@ $68,579 $205,240 Switch Tender O.T. $46,759 $115,089 * Switch Tender Calculation is based on the assumption that this position can be filled at straight time for 8 hrs and overtime for 4 hrs for 5 days a week Switch Tender is not required until the 43 month. Total (Charts 1 thru 8) -- Annual $1,487,594.78 $3,755,593.52 Total (Charts 1 thru 8) -- Monthly $123,966.23 $312,966.13 Total (Charts 1 thru 9) -- Annual $1,602,932.91 $4,075,921.79 Total (Charts 1 thru 9) -- Monthly $133,577.74 $339,660.15 In accordance with J anuary 26, 2007 Letter Agreement between FCR and MTA/LIRR, Developer's responsibility for LIRR's incremental operating costs continues "through the date of Substantial Completion of the Permanent Yard and the implementation of a revised service plan that permits the use of the Permanent Yard" All rates based upon J anuary 2010 OH and wages. All rates subject to actual increases incurred in year. Copy of VD Yard Manpower cost excel 2007-2009 and 2010 - Exhibit M 12/21/2009