Simple Moving Average Forecast with N=3 (solution)

Days (t) Demand (Dt) Average (At) Forecast (Ft) Error (et)
1

401

380

411

397.3

415

402.0

397.3

-17.7

393

406.3

402.0

9.0

375

394.3

406.3

31.3

410

392.7

394.3

-15.7

395

393.3

392.7

-2.3

406

403.7

393.3

-12.7

10

424

408.3

403.7

-20.3

11

433

421.0

408.3

-24.7

12

391

416.0

421.0

30.0

13

396

406.7

416.0

20.0

14

417

401.3

406.7

-10.3

15

383

398.7

401.3

18.3

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Simple Moving Average Forecast with N=6 (solution)


Days (t) Demand (Dt) Average (At) Forecast (Ft) Error (et)
1

401

380

411

415

393

375

395.8

410

397.3

395.8

-14.2

395

399.8

397.3

2.3

406

399.0

399.8

-6.2

10

424

400.5

399.0

-25.0

11

433

407.2

400.5

-32.5

12

391

409.8

407.2

16.2

13

396

407.5

409.8

13.8

14

417

411.2

407.5

-9.5

15

383

407.3

411.2

28.2

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Weighted Moving Average Forecast with N=3


Days (t) Demand (Dt) Average (At) Forecast (Ft) Error (et)
1

401

380

411

403.8

415

410.7

403.8

-11.2

393

399.2

410.7

17.7

375

382.6

399.2

24.2

410

401.3

382.6

-27.4

395

396.0

401.3

6.3

406

404.2

396.0

-10.0

10

424

417.5

404.2

-19.8

11

433

428.5

417.5

-15.5

12

391

402.7

428.5

37.5

13

396

398.7

402.7

6.

14

417

410.2

398.7

-18.3

15

383

391.1

410.2

27.2

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Multi-Step forecast using Moving Average (MA)


How do we get multi-step ahead forecast using MA?
What is the two-step ahead forecast for periods 5 to 8 using N=3?

Ft+2 = At
At = (1/N)(Dt + Dt-1 + + Dt-N+1)
Days (t) Demand (Dt) Average (At) Forecast (Ft) Error (et)
1

401

380

411

397.3

415

402.0

393

406.3

397.3

4.3

375

394.3

402.0

27.0

410

392.7

406.3

-3.7

395

393.3

394.3

-0.7

406

403.7

392.7

13.3

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Exponential Smoothing Method Forecast with =0.1


Days (t) Demand (Dt) Average (At) Forecast (Ft) Error (et)
1

401

400.1

400

-1.0

380

398.1

400.1

20.1

411

399.4

398.1

-12.9

415

400.9

399.4

-15.6

393

400.1

400.9

7.9

375

397.6

400.1

25.1

410

398.9

397.6

-12.4

395

398.5

398.9

3.9

406

399.2

398.5

-7.5

10

424

401.7

399.2

-24.8

11

433

404.8

401.7

-31.3

12

391

403.5

404.8

13.8

13

396

402.7

403.5

7.5

14

417

404.1

402.7

-14.3

15

383

402.0

404.1

21.1

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Exponential Smoothing Method Forecast with =0.8


Days (t) Demand (Dt) Average (At) Forecast (Ft) Error (et)
1

401

400.8

400

380

384.2

400.8

20.8

411

405.6

384.2

-26.8

415

413.1

405.6

-9.4

393

397.0

413.1

20.1

375

379.4

397.0

22.0

410

403.9

379.4

-30.6

395

396.8

403.9

8.9

-1.0

406

404.2

396.8

-9.2

10

424

420.0

404.2

-19.8

11

433

430.4

420.0

-13.0

12

391

398.9

430.4

39.4

13

396

396.6

398.9

2.9

14

417

412.9

396.6

-20.4

15

383

389.0

412.9

29.9

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Double Exponential Smoothing with =0.3 and =0.2


Days (t) Demand (Dt) Average (At) Trend (Tt)

Forecast (Ft) Error (et)

401

403.8

4.8

405.0

4.0

380

399.9

3.1

408.6

28.6

411

405.3

3.5

403.0

-7.9

415

410.7

3.9

408.9

-6.1

393

408.2

2.6

414.7

21.7

375

400.0

0.4

410.7

35.7

410

403.3

1.0

400.5

-9.5

395

401.5

0.5

404.3

9.3

406

403.2

0.7

401.9

-4.0

10

424

409.9

1.9

403.9

-20.1

11

433

418.2

3.2

411.8

-21.2

12

391

412.3

1.4

421.4

30.4

13

396

408.3

0.3

413.6

17.6

14

417

411.1

0.8

408.6

-8.4

15

383

403.3

-0.9

411.9

28.9

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Linear Regression with n=10


x
1
2
3
4
5
6
7
8
9
10
55
5.5

y
401
380
411
415
393
375
410
395
406
424
4010
401

11
12
13
14
15

433
391
396
417
383

x^2
1
4
9
16
25
36
49
64
81
100
385
38.5

x*y
401
760
1233
1660
1965
2250
2870
3160
3654
4240
22193
2219.3

a
391.8

b
1.67273

Yhat
393.5
395.1
396.8
398.5
400.2
401.8
403.5
405.2
406.9
408.5

e
-7.5
15.1
-14.2
-16.5
7.2
26.8
-6.5
10.2
0.9
-15.5

410.2
411.9
413.5
415.2
416.9

-22.8
20.9
17.5
-1.8
33.9

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Linear Regression with n=10


y
401
380
411
415
393
375
410
395
406
424
433
391
396
417
383

Error
AbsError SquaredError
PercentageError
-7.5
7.53
56.66
1.88
-7.5
15.1
15.15
229.38
3.99
7.6
-14.2
14.18
201.12
3.45
-6.6
-16.5
16.51
272.55
3.98
-23.1
7.2
7.16
51.32
1.82
-15.9
26.8
26.84
720.19
7.16
10.9
-6.5
6.49
42.13
1.58
4.4
10.2
10.18
103.67
2.58
14.6
0.9
0.85
0.73
0.21
15.5
-15.5
15.47
239.41
3.65
0.0
-22.8
22.80
519.84
5.27
-22.8
20.9
20.87
435.67
5.34
-1.9
17.5
17.55
307.84
4.43
15.6
-1.8
1.78
3.17
0.43
13.8
33.9
33.89
1148.59
8.85
47.7
14.48
288.82
3.64
ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Linear Regression with n=10


y = 1.6727x + 391.8
2
R = 0.1075

Series1
Linear (Series1)

430
420
410
400
390
380
370
0

10

12

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Linear Regression with n=10


x

x^2

11
12
13
14
15
16
17
18
19
20
155
15.5

401
380
411
415
393
375
410
395
406
424
4010
401

21
22
23
24
25

433
391
396
417
383

x*y
121
144
169
196
225
256
289
324
361
400
2485
248.5

a
b
Yhat
e
4411 375.073 1.67273
393.5
4560
395.1
5343
396.8
5810
398.5
5895
400.2
6000
401.8
6970
403.5
7110
405.2
7714
406.9
8480
408.5
62293
6229.3
410.2
411.9
413.5
415.2
416.9

-7.5
15.1
-14.2
-16.5
7.2
26.8
-6.5
10.2
0.9
-15.5

-22.8
20.9
17.5
-1.8
33.9

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Linear Regression with n=10


y
401
380
411
415
393
375
410
395
406
424
433
391
396
417
383

Error
AbsError SquaredError
PercentageError
-7.5
7.53
56.66
1.88
-7.5
15.1
15.15
229.38
3.99
7.6
-14.2
14.18
201.12
3.45
-6.6
-16.5
16.51
272.55
3.98
-23.1
7.2
7.16
51.32
1.82
-15.9
26.8
26.84
720.19
7.16
10.9
-6.5
6.49
42.13
1.58
4.4
10.2
10.18
103.67
2.58
14.6
0.9
0.85
0.73
0.21
15.5
-15.5
15.47
239.41
3.65
0.0
-22.8
22.80
519.84
5.27
-22.8
20.9
20.87
435.67
5.34
-1.9
17.5
17.55
307.84
4.43
15.6
-1.8
1.78
3.17
0.43
13.8
33.9
33.89
1148.59
8.85
47.7
14.48
288.82
3.64
ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

Linear Regression with n=10


Series1

y = 1.6727x + 375.07
R2 = 0.1075

Linear (Series1)

430
420
410
400
390
380
370
10

12

14

16

18

20

22

ISyE 691: Supply Chain and Logistics: Design, Operation and Coordination

You might also like