You are on page 1of 1

HEF1000, HES1305 & HET105 Professional Skills Component 2014

Report Plan - Group



Tutorial Group/Time: ___________________________________________ HEF1000 | HES1305 | HET105

Title of Engineering Case Study Project: ______________________________________________________

_________________________________________________________________________________________


Student Name Student ID Number

Topics











Report Plan (relevant headings, sub-headings, keywords; use point forms; include references; etc)




























Extend to next page if necessary. Submit Week 6
Tuesday 10:30
Liquied natural gas in Nigeria: Manufacturing
methodologies, Maintenance, Design & Occupational Health and Safety
Ibrahim Khalil Hussaini 4241606
Assen Aqthar Abdul Jabbar 4323927
x Manufacturing methodologies
x Maintenance
x Occupational Health and Safety
x Design
1 Introduction
2 Manufacturing methodologies
Acid gas removal unit (U1100)
Dehydration unit (U1200)
Mercury removal unit (U1300)
Liquefaction unit (U1400)
Fractionation unit (U1500)
Common fractionation unit (U2500)
Condensate stabilization unit (U2000)
3 Maintenance
Removal and Installation of Relief Valves
Smith lock repair
MOV greasing
ERS hose replacement
Mechanical seal replacement
4 Occupational Health and Safety
Hazardous wastes
Emissions to air
Noise measurements
Discharges to water
Sewage treatment & disposal
5 Design
Area A
Area B
Area C
Area D
Area E
6 Conclusion
Keywords:-
BOD - Basis of Design
BCOT - Bonny Crude Oil Terminal
LNG - Liqueed natural gas
HSE - Health, Safety And Environment
HRA - Health Risk Assessment
HIA - Health Impact Assessment
HFE - Human Factors Engineering
ESD - Emergency shutdown
EDP - Emergency depressurisation

You might also like