Professional Documents
Culture Documents
IPC #1-Aug'14
IPC #1-Aug'14
1
2
2
(Provisional Quantities)
ZONE A1
FLOOR BEAM,SLAB and MAIN LIFT LOBBY
Site :
] Yes
REVISED
] No
Workdone
%
1,285,719.84
Total
Remarks:
ADVANCE PAYMENT
1,285,719.84
Prepared by:
GRAND TOTAL(A):
less
i) Retention (5%) of grand total (A)
ii) site cleanliness (1%) grand total (A)
QS:
Nett Total:
PM:
Add Dayworks:
Accountant:
Nett Total:
Director:
Date:
Workdone
Amount
30,000.00
3,600.00
33,600.00
33,600.00
33,600.00
33,600.00
33,600.00
Item Description
Unit
Rate
Qty
Amount
Qty
WORKDONE
%
Amount
1
2
3
4
5
LS
M2
M2
M
M
16.00
16.00
3.50
3.50
6,933
300
-
1,650.00
110,928.00
4,800.00
rate only
rate only
0%
0%
0%
0%
0%
6
a.
b.
c.
d.
FRAME
LEVEL 1,2,3 & 4
Sawn fwk to flr.beams and curve on plan
1st Floor
2nd Floor
3rd Floor
4th Floor
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
24,459
-
391,344.00
-
0%
0%
0%
0%
LEVEL 5
7 Sawn fwk to flr.beams and curve on plan
M2
16.00
15,058
240,928.00
0%
M2
16.00
0%
UPPER FLOOR
LEVEL 1-4
Swn fwk to sus. Slabs
1st Floor
2nd Floor
3rd Floor
4th Floor
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
24,746
-
395,936.00
-
0%
0%
0%
0%
M2
16.00
6,542
104,672.00
0%
M
M
M
M
M
3.50
3.50
3.50
3.50
3.50
2,300
-
8,050.00
-
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
9
a.
b.
c.
d.
LEVEL 5
10 Swn fwk to soffit of sus. Slabs
______
11 Scupper drain, size 150mm w x 75mm dpt
a. 1st Floor
b. 2nd Floor
c. 3rd Floor
d. 4th Floor
rate only
12
a.
b.
c.
d.
M
M
M
M
M
3.50
3.50
3.50
3.50
3.50
rate only
13
a.
b.
c.
STAIRCASE
LEVEL GF 1,2,3,4 & 5
Swn fwk to side and soffit
Staircase 1 (main lift lobby)
Staircase 2
Staircase 3
M2
M2
M2
M2
16.00
16.00
16.00
16.00
306
-
4,896.00
-
0%
0%
0%
14
a.
b.
c.
M
M
M
M
2.72
2.72
2.72
2.72
572
-
1,555.84
-
0%
0%
0%
15
a.
b.
c.
d.
M2
M2
M2
M2
M2
16.00
16.00
16.00
16.00
16.00
863
-
13,808.00
-
0%
0%
0%
0%
M2
16.00
300
4,800.00
0%
SUNDRIES
17 Sawn fwk to 'R.C STEPS
M2
16.00
147
2,352.00
0%
Total
1,285,719.84
CADANGAN PEMBANGUNAN KEDIAMAN KOS SEDERHANA SKIM PRIMA YANG MENGANDUNGI:-BLOK A & B PENGSAPURI 19-43 TINGKAT (2074 UNIT),
-5 TINGKAT PODIUM TEMPAT LETAK KERETA,
-KEDAI/DEWAN KOMUNITI/ PEJABAT PENGURUSAN/ SURAU/ TADIKA/ TASKA/ GIMNASIUM & PENCAWANG TNB DI ATAS LOT 40955 & LOT 40962,
ALAM DAMAI, MUKIM PETALING, DAERAH KUALA LUMPUR
Variation Order no.1 - Labour Quarter
DESCRIPTION
BQ
REF.
UNIT
RATE
QTY.
AMOUNT
(RM)
(RM)
WORKDONE
QTY
Amount
Labour Quarter
a
NOS
180.00
3,600.00
3,600.00
12/2/2014
20
100%
3,600.00
3,600.00