Horsepower Rating :
Work Description
Check the directional flow arrow on the pipes.
Check all gate valves if functioning properly.
Check for pump overheating.
Check the leak at packing seal.
Check the leaks at all gate valves.(Normally open/Normally closed.)
Grease and lubricate bearings.
Check all screws, holding, mounting nuts and bolts.
Check moving parts (bearing, etc.)
Inspect all electrical controllers and components .
Check the pipe painting.
Test and check for noise and vibration.
Hydrostatic Pressure Test.
Check the pressure gauges.
Voltage
:
Breaker Rating :
Status
Remark/s
L1:
L2:
L3:
L1-Ground :
L2-Ground :
L3-Ground :
Recorded by:
Contractor/Supplier
Witnessed and Certified by:
M / E Engineer
CMT Head
Senior MEPF-In-Charge
QA/BTO Head
JOCKEY PUMP
:
:
Phase :
Size of Wire :
Work Description
Horsepower Rating :
Breaker Rating :
Status
Remark/s
L1:
L2:
L3:
L1-Ground :
L2-Ground :
L3-Ground :
Recorded by:
Contractor/Supplier
Witnessed and Certified by:
M / E Engineer
CMT Head
Senior MEPF-In-Charge
QA/BTO Head
Remark/s
CMT Head
QA/BTO Head
Equipment/Facilities
Location
:
GENERATOR SET
Geneset No.
:
Capacity
:
FullLoad Current :
INDICATORS
Radiator Water Level
Radiator Water Temperature
Fuel Level
Engine Oil Level
Battery Charger
Battery Charge, Vdc
Battery Solution Level
Frequency Reading
Revolution Per Minute, RPM
Pilot Light Indicator
Ventilation
Voltmeter Reading
L1L2
L2L3
L3L1
Ammeter Reading
L1
L2
L3
Voltage :
Frequency:
RPM
:
STANDARD
Time
READINGS
Time
Time
REMARKS
Full
Full
Full or 3/4
Functional
24 - 27 Vdc
Full
60 Hz
1800
Functional
Recorded by:
Contractor/Supplier
Witnessed and Certified by:
M / E Engineer
CMT Head
Senior MEPF-In-Charge
QA/BTO Head
VRV No.:
Size of Wire :
High Pressure:
Horsepower Rating :
Voltage:
Breaker Rating:
Low Pressure :
Work Description
Check the system if has refrigerant leak.
Inspect contacts of starter, relays and ensure that these are clean.
Check lubrication of bearings, bushing of blower motor, fans of VRV and
FCU's
Check pulley al;ignment and conditions of belt and adjust tensions if
necessary.
Check for any unusual noise or vibration.
Check for any water leak around the VRV and drain pipes.
Check all panels and ensure that these are properly secured.
Frequency:
Compressor No.:
Capacity in TR :
Status
Phase :
Remark/s
L1:
L2:
L3:
L1-Ground :
L2-Ground :
L3-Ground :
Recorded by:
Contractor/Supplier
Witnessed and Certified by:
M / E Engineer
CMT Head
Senior MEPF-In-Charge
QA/BTO Head
Pump No.
Voltage
SUMP PUMP
:
:
Frequency :
Size of Wire :
Work Description
Check alignment of belt.
Check and clean fan blade.
Re-tension belt. (if necessary)
Check motor.
Check electrical control. Tighten terminals.
Check the directional flow arrow on the pipes.
Clean contacts of magnetic contactor.
Check all electrical controllers and components .
Check setscrews of circuit breakers and controls.
Phase :
Horsepower Rating :
Breaker Rating :
Status
Remark/s
L1:
L2:
L3:
L1-Ground :
L2-Ground :
L3-Ground :
Recorded by:
Contractor/Supplier
M / E Engineer
CMT Head
Senior MEPF-In-Charge
QA/BTO Head
Pump No.
Voltage
:
:
Frequency :
Size of Wire :
Work Description
Phase :
Horsepower Rating :
Breaker Rating :
Status
Remark/s
Check motor.
Check electrical control and terminals.
Check the canvas connector.
Check for vibration.
Check bearings.
Check for lose bolts.
Check airduct hangers.
Check the cleanliness of the area.
Get ampere and voltage reading of the motor.
L12:
Cut-In Pressure:
L23:
Cut-Out Pressure:
L31:
Test insulation resistance of the motors.
L1-L2:
L2-L3:
L3-L1:
L1:
L2:
L3:
L1-Ground :
L2-Ground :
L3-Ground :
Recorded by:
Contractor/Supplier
M / E Engineer
CMT Head
Senior MEPF-In-Charge
QA/BTO Head
Remark/s
CMT Head
QA/BTO Head
SWIMMING POOL
:
:
:
:
Work Description
PUMP and MOTOR - General Condition
Temperature
Sound
Control Panel
Pipes and Gate Valves
Return
Main Drain Valve
Skimmer Line
Check the directional flow arrow in the pipes.
Check the tagging of the installed lighting in the pool.
Check the proper tagging of valves.(normally open /normally close)
Status
Remark/s
FILTER TANK
Filter Element
Pressure
Result of Water Test
Pump Room Physical Apperance
Recorded by:
Contractor/Supplier
M / E Engineer
CMT Head
Senior MEPF-In-Charge
QA/BTO Head
NG/INSPECTION CHECKLIST
Remark/s
CMT Head
QA/BTO Head
Status
M / E Engineer
CMT Head
Senior MEPF-In-Charge
QA/BTO Head
NG/INSPECTION CHECKLIST
Status
CMT Head
QA/BTO Head
PARKING AREAS
Work Description
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Slot Parking Number
Directional Signage
Emergency Light
Elevetor Parking Lobby
Cleanliness of the area
Location
Status
Remark/s
Status
Remark/s
Status
Remark/s
Work Description
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Slot Parking Number
Directional Signage
Emergency Light
Elevetor Parking Lobby
Cleanliness of the area
Location
Work Description
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Slot Parking Number
Directional Signage
Emergency Light
Elevetor Parking Lobby
Cleanliness of the area
Recorded by:
Contractor
Site Engineer
CMT Head
QA/BTO Head
FIRE EXIT
Status
Remark/s
Status
Remark/s
Status
Remark/s
Recorded by:
Contractor
Site Engineer
CMT Head
QA/BTO Head
NG/INSPECTION CHECKLIST
Remark/s
Remark/s
Remark/s
QA/BTO Head
Status
Remark/s
Status
Remark/s
Status
Remark/s
Recorded by:
Contractor
Site Engineer
CMT Head
QA/BTO Head
PUMPS' ROOM
Status
Remark/s
Status
Remark/s
ROOFDECK
Recorded by:
Contractor
Site Engineer
CMT Head
QA/BTO Head
Status
Remark/s
Status
Remark/s
Function Room
Items For Inspection
Flooring (Physical Appearance)
Wall (Physical Appearance)
Ceiling (physical Appearance)
Illumination or Lighting System
Smoke Detector
Sprinkler heads
Ventilation / Air conditioning System
Furniture and decorative items
Equipment
Signage
Cleanliness of the area
Recorded by:
Contractor
CMT Head
QA/BTO Head
Others
Cleanliness of
the area
Emergency
Lights
Sprinkler Heads
Smoke
Detectors
Convenience
Outlet
Lighting System
Flooring, Wall
and Ceiling
Items For
Inspection
REMARKS
Gnd Flr
2nd Flr
3rd Flr
4th Flr
5th Flr
6th Flr
7th Flr
8th Flr
9th Flr
10th Flr
11th Flr
12th Flr
14th Flr
15th Flr
16th Flr
17th Flr
18th Flr
19th Flr
20th Flr
21st Flr
22nd Flr
23rd Flr
24th Flr
25th Flr
26th Flr
27th Flr
28th Flr
29th Flr
30th Flr
Recorded by:
Contractor
Witnessed and Certified by:
CMT Head
QA/BTO Head
Contractor :
Instrument Used:
Model
:
Test Voltage
:
Panel Name
:
Location
:
Circuit
No.
Date
Time
Weather
Description
Wire Size
L - L
L - L
L - L
Reading in Mega-Ohms, M
L - N L - N L - N L - G
L - G
:
:
:
L - G
N-G
Test
Time
Recorded by:
MEPF Engineer
CMT HEAD
Project-in-charge
QA/BTO Head
M/E Engineer
Remarks
Contractor :
Instrument Used:
Model
:
Type of Test
:
Location
:
Date
Time
Weather
Item
Initial Testing
Remarks
:
:
:
Final Testing
Remarks
Recorded by:
CMT Head
QA/BTO Head
Contractor :
Instrument Used:
Model
:
Type of Test
:
Location
:
Date
Time
Weather
Initial Testing
Final Testing
:
:
:
Pressure in PSI
Item
Design
Req't.
Remarks
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
Date of Initial Testing:
Remarks:
Recorded by:
Contractor
CMT Head
QA/BTO Head