PROJEK : JALAN KEDAI BULOH - KUALA BESAR, KELANTAN

(FASA 4, DARI SIMPANG EMPAT KEDAI BULOH KE JALAN PENGKALAN CHEPA)


BILL NO. 1 - GENERAL ITEMS
ITEM
NO.

DESCRIPTION OF WORKS

1.1

CONTRACTUAL REQUIREMENTS

1.1.1

Performance Bond

UNIT

a) Banker's Guarantee
b) Performance Guarantee Sum*

sum
sum

Insurances
Insurance of the Works including Insurance Against
Personal Injuries and Damage to Properties

sum

1.1.2.2

SOCSO/ Workmen Compensation Insurance

sum

1.2

SO/PD'S REQUIREMENTS

1.2.1

Accommodation for the SO/PD's Staff

1.2.1.1

Establishment, maintenance and removal of office


including fittings and furnitures ans listed in Appendix `1F'
of the Specification
a) Alternative I - JKR Design Type E
b) Alternative II - Relocatable Type (new/used)*
c) Alternative III - Rental of shoplot*

sum
sum
sum

1.2.1.2

Establishment, maintenance and removal of laboratories

sum

1.2.2

Services for the SO/PD's Staff

1.2.2.1

Provision of suitable transport services as listed in


Appendix `1C' of the Specification
a) ___ no type ___ (___ vehicle months)#
b) ___ no type ___ (___ vehicle months)#

sum
sum

Operation and maintenance of vehicles


a) ___ no type ___ (___ vehicle months)#
b) ___ no type ___ (___ vehicle months)#

sum
sum

1.1.2
1.1.2.1

1.2.2.2

1.2.3

Equipments for use by the SO/PD's Staff

1.2.3.1

Provision and maintenance of laboratory equipments as


listed in Appendix `1D' of the Specification

sum

Provision and maintenance of office equipments as


listed in Appendix '`1E' of the Specification**
a) 1 no. computer

sum

1.2.3.2

Carried to Collection
b) 1 no. photocopy machine
c) 1 no. digital camera

* Tenderer to delete where not applicable


# Duration to be inserted by tenderer based on tendered period

sum
sum

BQ1/1

QTY

RATE

PROJEK : JALAN KEDAI BULOH - KUALA BESAR, KELANTAN


(FASA 4, DARI SIMPANG EMPAT KEDAI BULOH KE JALAN PENGKALAN CHEPA)
BILL NO. 1 - GENERAL ITEMS
ITEM
NO.

DESCRIPTION OF WORKS
d)
e)
f)
g)

1 no. fax
1 no. printer
___ no. scanner
___ no. _____

UNIT
sum
sum
sum
sum

1.2.4

Attendance for the SO/PD's staff

1.2.4.1

Drivers (____ man month)#

sum

1.2.4.2

Laboratory assistants (____ man month)#

sum

1.2.5

Setting out, levelling and checking of all Works

sum

1.2.6

Miscellaneous

1.2.6.1

Project sign boards (1 no.)

sum

1.2.6.2

Progress photograph (____ months)#

sum

1.2.6.3

Performance report comprising 8 sets of progress


report, project report and quality control report
(____ months)#

sum

Provide and update the Works Programme using Master


Programme to produce Critical Path Method (CPM) and
Works Breakdown Structure (WBS) etc. including supply
of software as specified in Appendix `1G'

sum

As-built drawing including periodic updating as specified


in Appendix `1H'

sum

1.2.6.6

Clearing up of site on completion

sum

1.2.7

License security services

sum

1.2.8

Quality Assurance Plans

sum

1.3

CONTRACTOR'S REQUIREMENTS

1.3.1

Establishment, maintenance and removal of


accommodation and buildings

1.3.1.1

Office

1.2.6.4

1.2.6.5

sum

Carried to Collection
1.3.1.2

Stores and workshops

sum

1.3.1.3

Workmen accommodations

sum

1.3.2

Temporary works

sum

* Tenderer to delete where not applicable


# Duration to be inserted by tenderer based on tendered period

BQ1/2

QTY

RATE

PROJEK : JALAN KEDAI BULOH - KUALA BESAR, KELANTAN


(FASA 4, DARI SIMPANG EMPAT KEDAI BULOH KE JALAN PENGKALAN CHEPA)
BILL NO. 1 - GENERAL ITEMS
ITEM
NO.

DESCRIPTION OF WORKS

UNIT

a) access and haul roads,


b) hoardings,
c) temporary drainage
1.3.3

Supervision (___man-months)#

sum

1.3.4

Mobilisation and demobilisation of construction plants


and equipments excluding piling and specialise plants

sum

1.4

OCCUPATIONAL SAFETY AND HEALTH


REQUIREMENT

1.4.1

Occupational safety and health officer (__ man month)#

sum

1.4.2

Personnel protective equipment as listed in Appendix `1J'

sum

1.4.3

Health and safety report (___month)#

sum

1.5

DESIGN AND BUILD ELEMENT**

1.5.1

Design fees

sum

1.5.2

Supervision fees (___ man-months)#

sum

1.5.3

Independent Checkers

1.5.3.1

Structural

sum

1.5.3.2

Geotechnical

sum

1.5.3.3

Road safety

sum

1.5.4

Data Collection

1.5.4.1

Detailed Engineering survey

sum

1.5.4.2

Traffic survey

sum

1.5.4.3

Soil investigation

sum

Carried to Collection

COLLECTION PAGE

BQ 1/1
BQ 1/2

* Tenderer to delete where not applicable


# Duration to be inserted by tenderer based on tendered period

BQ1/3

QTY

RATE

PROJEK : JALAN KEDAI BULOH - KUALA BESAR, KELANTAN


(FASA 4, DARI SIMPANG EMPAT KEDAI BULOH KE JALAN PENGKALAN CHEPA)
BILL NO. 1 - GENERAL ITEMS
ITEM
NO.

DESCRIPTION OF WORKS
BQ 1/3

TOTAL CARRIED TO SUMMARY

* Tenderer to delete where not applicable


# Duration to be inserted by tenderer based on tendered period

BQ1/4

UNIT

QTY

RATE

LL NO. 1 - GENERAL ITEMS


AMOUNT
RM
SEN

* Tenderer to delete where not applicable


# Duration to be inserted by tenderer based on tendered period

BQ1/5

LL NO. 1 - GENERAL ITEMS


AMOUNT
RM
SEN

* Tenderer to delete where not applicable


# Duration to be inserted by tenderer based on tendered period

BQ1/6

LL NO. 1 - GENERAL ITEMS


AMOUNT
RM
SEN

* Tenderer to delete where not applicable


# Duration to be inserted by tenderer based on tendered period

BQ1/7

LL NO. 1 - GENERAL ITEMS


AMOUNT
RM
SEN

* Tenderer to delete where not applicable


# Duration to be inserted by tenderer based on tendered period

BQ1/8