The form will not be accepted if
any scratch or modification is
found. It will be preferable to
be automatically completed.
KINGDOM OF SAUDI ARABIA
MINISTRY OF MUNICIPAL & RURAL AFFAIRS
DEPUTY MINISTRY FOR
CONTRACTOR CLASSIFICATION
PROJECT QUESTIONNAIRE FORM
First: General Information
1-
The Project Owner
2-
The Contractor
3-
Project Title
4-
Contract No.
5-
Contract Value (SR):
8-
Project Period (in months):
10-
Project Start:
12-
Percentage of completed works:
13-
Brief description of the scope of work according to the contract:
14-
Contractors role in executing the Project:
Main Contractor
15-
6-
Value Increase
9-
/14
Value Decrease
Additional Period:
11-
% until
Active Partner
7-
Project End:
/14
/ /14 H
Sub Contractor
Names of the other contractors participating in executing the project with the contractor mentioned in (2) above.
Contractors Name
Role according to 14
Scope of Work
% of the Project
A statement for contractors participating in the project execution may be attached when required
Second: Contractors performance: Put (x) in the appropriate column (1 lowest, 5 highest)
Criterion
Mark
1
Project management (planning, organization and follow up).
Work quality & compliance with the specifications
Compliance with the time schedule
Project staff level (competence, experience, qualifications)
Availability of the necessary equipment & systems and extent of their efficiency
Application of the security & safety procedures
Job saudization and provision of the training programs
Notes:
Third: Scope of the Project Works
Divide the project into the main items (with respect to the contractor referred to in (2) as indicated
herein below in accordance with the percentages of cost, observing that the total shall be 100%.
Construction Fields
Operation & Maintenance Fields
Buildings
Maintenance Buildings
Roads
Maintenance Roads
Water & Sanitation Works
M & O of Water & Sanitation Works
Electrical Works
M & O of Electrical Works
Mechanical Works
M & O of Mechanical Works
Electronic Works
M & O of Electronic Works
Industrial Works
M & O of Industrial Works
Marine Works
M & O of Marine Works
Dams
M & O Dams
Landscaping
Maintenance of Landscaping
Slaughterhouses
M & O of Slaughterhouses
Well Drilling
City Cleaning & Wastes Disposal
Maintenance Health Centres
Catering for Medical Centres
Catering for Individuals
Another field (specify)
Another field (specify)
Principals Approval
Position
Name
Signature
Date
Official Stamp
Important instructions according to the Circular of H.R.H., the Minister, No.79379 dated 14/11/1429 H.
1. Completion of the form once the contractor applies for that with respect to any project so that the
classification procedures will not be delayed and the contractors interests will not be adversely affected.
2. Completion of the form according to the project situation and in any of its stages after the contract signature.
No specific stage is stipulated for its completion.
3. The form shall be completed by the direct principal of the project owner and shall be certified & stamped.
4. The form shall be handed over to the contractor inside an envelope and must be stamped by the owners
confidential stamp, to be submitted by the contractor to the Deputy Ministry for Contractors Classification,
together with the classification application documents & forms.