10.0 GALVANIZING
For surfaces where galvanizing is specified, all galvanizing shall be carried out by the hot dip
process, and unless otherwise specified shall conform in all respects to BS 729.
The detailed design of members shall be in accordance with BS 4479.
Prefabrication
Prime coat:
Intermediate coat
Epoxy polyamide
Dry film thickness 80 microns.
Finish coat:
Prime coat:
Epoxy zinc
Dry film thickness 80 microns
Intermediate coat
Epoxy polyamide
Dry film thickness 80 microns.
Finish coat:
Note:
When airless spray application is not possible, 2 coats of epoxy polyamide cured finish can be
applied by roller or brush to achieve specified thickness.
12
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Rev. C
11.2 System No.2 : Carbon Steel Surfaces up to 120 oC, internal exposure
Carbon steel surfaces, not insulated, indoors, such as air ducts, pipes, condensers, tanks and
vessels' exterior surfaces, valves and fittings.
Temperature up to 120 oC
At Works
Surface preparation:
Prefabrication
Prime coat:
Intermediate coat
Finish coat:
Prime coat:
Intermediate coat
Finish coat:
Note:
When airless spray application is not possible, 2 coats of epoxy polyamide cured finish can be
applied by roller or brush to achieve specified thickness.
13
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Rev. C
11.3 System No.3 : Carbon Steel Surfaces up to 120 oC, external exposure
Carbon steel surfaces not insulated, outdoors, such as airducts, pipes, condensers, tanks and
vessels' exterior surfaces, valves and fittings and other surfaces.
Temperature up to 120 oC
At Works
Surface preparation:
Prefabrication
Prime coat:
Single or two pack inorganic ethyl zinc silicate for steel structure
Dry film thickness 80 microns
Inorganic ethyl zinc silicate for others including equipment
Dry film thickness 75 microns
Intermediate coat
Finish coat
Prime coat:
Intermediate coat
Finish coat:
14
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Rev. C
Prefabrication
Prime coat:
Intermediate coat:
Finish coat:
Total system minimum dry film thickness 240 microns for steel structure & 125 microns for
others including equipment.
At Site
Pre-treatment:
Prime coat:
Intermediate coat
15
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Finish coat:
Rev. C
Prefabrication
Prime coat:
Intermediate coat:
Finish coat:
Total system minimum dry film thickness 240 microns for steel structure & 100 microns for
others including equipment.
At Site
Pre-treatment:
Prime coat:
16
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Intermediate coat
Rev. C
Finish coat:
At Works
Pre-treatment:
Finish coat:
Note:
For field erection tank, above painting system shall be applied at site.
The tank supplier can use a prefabrication with weldable inorganic ethyl zinc silicate / epoxy
shop-primer after blasting to Grade SA 2.5 at works.
Dry film thickness 20-25 microns.
Shop-primer must be sweep-blasted at site and welding seams must be blasted according to
ISO8501 / ASTM-D 2200 before applying the prime coat.
17
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Rev. C
Grade: SA 2.5
Finish coats:
Temperature up to 60 oC
At Works
Surface preparation:
Finish coat:
Modified epoxy
Dry film thickness 300 microns
At Site
18
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Pre-treatment:
Rev. C
Prime coat:
epoxy polyamide
Dry film thickness 50 microns
Finish coat:
aliphatic polyurethane
Dry film thickness 50 microns.
11.10 System No.10 : Aluminum and Stainless Steel Surfaces(No paint is applied, if otherwised)
Aluminum and stainless steel surfaces, requiring paint finish.
Temperature up to 120 oC
At Site
Pre-treatment:
Prime coat:
epoxy polyamide.
Dry film thickness 50 microns.
Finish coat:
aliphatic polyurethane
Dry film thickness 50 microns.
19
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Rev. C
Finish coat:
At Site
Pre-treatment:
Finish coat:
Finish coat:
20
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Acrylic emulsion
Dry film thickness 30 microns
Filler:
Intermediate coat:
Acrylic emulsion
Dry film thickness 30 microns
Finish coat
Acrylic emulsion
Dry film thickness 30 microns
Epoxy primer
Dry film thickness 50 microns
Filler:
Intermediate coat:
Polyamide epoxy
Dry film thickness 100 microns
Finish coat
Polyamide epoxy
Dry film thickness 50 microns
11.14 System No.14 : Bituminous Emulsion Coated Items Requiring Paint Finish
At Site
Surface preparation:
Primer:
Bituminous Emulsion
Dry film thickness 100 microns
21
Rev. C
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Intermediate coat
Bituminous Emulsion
Dry film thickness 35 microns
Finish:
Bituminous Emulsion
Dry film thickness 35 microns
Rev. C
11.15 System No.15 : Battery Rooms, Chemical store room, Oil handing room, Etc.
Battery rooms and Chemical store room, Oil handing room wall and ceiling where a chemical
oil resistant finish is required to plaster, concrete or brickwork.
At Site
Surface preparation:
Primer:
Epoxy primer
Dry film thickness 50 microns
Filler:
Intermediate coat:
Phenolic epoxy
Dry film thickness 125 microns
Finish:
Phenolic epoxy
Dry film thickness 125 microns
Finish coat:
22
MIRFA IWPP
General Technical Requirement for Painting and Corrosion Protection
Rev. C
Prime coat:
Finish coats:
Finish coat:
Prefabrication
Finish coat:
Silicon primer
Dry film thickness 25 microns
23