Project: Schaeffler New Plant

Owner: Schaeffler Manufacturing Co. Ltd.


Design and project management Company: Wisit Engineering Consultants Ltd.

Owner Scope:
+ Present conceptual design
WE Scope:
+ Architectural and Structural Design
+ Soil Investigation
+ M&E Design
+ Conduct the bidding
+ Help the owner to evaluate bids and select a constructor.
+ Manage the project in the construction process.
Bidding process:
1. WE prepare a estimated cost, sample of Bidding documents, Cost beakdown
structure and Work Breakdown Structure, drawings.
2. WE sent out the invitation to potential companies to bid
3. WE help the owner to evaluate bids
4. We report the bidding evaluation to the owner and help them to select the
constructor.
The process to evaluate a bid:

Evaluate the responsbilities of each bidder

Evaluate the commercial proposal - double check the proposed price

(Stop here)
if every check is good - recomend the owner to select that constructor / if the
bidder does not meet the requirements, come back with next lowest bidder or
reject all bids and re-bid

(Start here)
Select the lowest bid

Evaluate the responsiveness of each bidder

Evaluate the responsiveness


+ A responsive bid is the one that meets all the terms, conditions and specification
of the bid. The bid must comply with the content requirements of the bidding
documents
Evaluate the responsibilities
+ A responsible bidder is one that has the overall capability to satisfactorily perform the
contract
In this project, a bid of SECCO Co., Ltd. Was found non-responsible due to following
reasons:
-

SECCO did not confirm acknowledgementof four addenda. Failure to acknowledge


the addenda may cause dispute during project execution.
The proposed project organization is inappropriate for construction with the nature of
Schaeffler Project.

Evaluation of commercial proposals of bidders:


-

BOQ of each bidders are compared with each other and with WEs estimate.
The commercial proposal of SECCO gave a lowest price which is less than WEs
estimate by 15%. However they did not win the bid as they was consider to be nonresponsible to complete the project.

The design process:


Design base on the building regulation, conceptual design and requirments of the owner.
To be countined

The Construction documents


The constructions documents consist of 2 major components: The project manual and the
drawings.
The project manual includes:

Invitation or Advertisement to bid (yes)


Instructions to Bidders 00100
o Provide the basic information of the project (name, owner, location)
o Outline of the work
o Provide bidding procedures
o Addenda
o Rejection of bids
o Interpretation: procedure for questions, and interpretation for the documents
o
Bid Forms 00300
General Conditions of the contact
Supplementary Conditions to the contract
Additional Information to bidders (such as Soil Reports) 00200
o Location of the project
o Description of site
o Topographic map
o Geotechnical and subsurface exploration
General Requirements (Division 1)
Technical Specifications (Division 2-16)
o Division 2 - Site Work
o Concrete
o Masonry
o Metals
o Wood and Plastic
o Thermal and moisture Protection
o Doors and windows
o Finishes
o Specialties
o Hydraulic dock levelers
o Floor mats and frames
o mechanical work
o Electrical work

Construction drawings include:

Architectural Drawings
Structural
Civil Work
Fire Protection
Plumbing
MVAC
Electrical system
Mechanical