Professional Documents
Culture Documents
Country: U.S.A.
Location of Port:
ENLARGE MAP
COVE POINT
Number of berths: --
Confirm all heights and depths are referenced to port datum: ----------
Off-Shore
Berths
Submarine
Tunnel
E mail: ----------
Address: ----------
E mail: ----------
1 2 3 4 5 6 7
Liquid or Vapour L L V/LN2 L L
Fuel Oil or Diesel
Other
PERC fitted No No No No No
QC/DC fitted No No No No No
Nominal Diameter (ins) 16 16 16/3 16 16
Flange standard ANSI ANSI ANSI ANSI ANSI
150 150 150 150 150
1 2 3 4 5 6 7
Liquid or Vapour L L V/LN2 L L
Fuel Oil or Diesel
Other
PERC fitted No No No No No
QC/DC fitted No No No No No
Nominal Diameter (ins) 16 16 16/3 16 16
Flange standard ANSI ANSI ANSI ANSI ANSI
150 150 150 150 150
Manufacturer/Supplier: ----------
Distance between centre line of gangway and vapour return arm: 107.3 m
Landing area required: -- m2
Gangway width: 915 mm
Position of
Please indicate position vapour return
of vapour return arm
Mooring Dolphins # 1 2 3 4 5 6 7 8
Number of Hooks 1 1 1 1 1 1
Rating (tonnes) 100 75 75 75 75 100
Height above datum (m) 9.1 9.1 9.1 9.1 9.1 9.1
Distance from vapour return (m)
Distance from berth face (m)
Breasting Dolphins # 5 6 1 2 3 4
Number of Hooks 2 2 2 2 2 2
Rating (tonnes) 60 60 60 60 60 60
Height above datum (m) 7.6 7.6 7.6 7.6 7.6 7.6
Distance from vapour return (m)
Distance from berth face (m)
Breasting Vapour
Return
7.6 m 7.6 m Dolphins 7.6 m 7.6 m 7.6 m 7.6 m
Unloading Platform
ROTATE 90°
South Berth
Service Platform
Tunnel to shore
N
Submarine
Service Platform
North Berth
Unloading Platform
Tugboats:
Weather Restrictions
Range of tides: 9m
Currents:
Wind Information
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Predominant
Direction NW NW NW NW SW S SW SW SW SW N N
Windspeed less than
20 knot Av. days 11 11 11 11 8 7 6 5 7 8 8 8
Windspeed above
20 knot Av. days
Port Closure
– Av. days
Drypowder Yes
Water curtain No
Gas Detection System Yes
Oil fence around ship No
Buoy markers No
Standby vessels Yes
Firefighting support vessel No
Other No
ROTATE 90°
* S = Summer Draft
A = Arrival Draft
Please enter brief details of any approved projects due to be completed within the next
three years:
Other None