Professional Documents
Culture Documents
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
SHIPS CONSTRUCTION
1. Provide the following information for each ship that is referenced in this
report :
a. Name of ship
b. Steam ship company
c. Type of ship
d. MARAD classification (if any) if non to state
e. Date ship was built
f. Name and location of buildaer
g. Hull number
h. Number off sister ship
Answer :
2. Define of the following term and using the trim and stability manual,
curses of form, load line certificate of classification document and your
text give value of each for your yes a appropriate.
a. Length over all (LOA)
b. Length between perpendiculars (LBP)
c. Length of the load water line (LWL)
d. Length on design water line
e. Extreame breadth
f. Breadth molded
g. Baseline
h. Depth
i. Load draft
j. Scantling draft
k. Dead rise
l. Bilge radius
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
m. Sheer
n. Camber
o. Flare
p. Tumblehome
q. Summer free board
Answer :
n. Camber :
o. Flare :
p. Tumblehome :
q. Summer freeboard : 4.190 meters
3. Define each of the following terms and using the trim and stability manua,
or curves of the from or your text give the value of each for your vessel of
the design water line draft.
a. Block coefficient
b. Midship section coefficient
c. Prismatic coefficient
d. Water plane coefficient bouyancy
e. Metacentric coefficient
f. Tons per inch immersion
g. Venical center of bouyancy
h. Moment to Trim one Inches
i. Longitudinal center of
j. Displacement
Answer :
b. ration area at the rimerse portion of the mid ship section to the product of
the breadth and draught
c. ration volume of displacement to the product ofthe length and the area of
the immerse portion of midship section
d. ratio volume area of the water plan to the product of the length on breadth
e. since both KG and bin depand on draught lne valve for any ships may be
calculated for number of different draught kb is the distance of the senter
off bouyancy above keel and may befond byane methods show previously
Bm = u x 99/ v
f.
4. Define each of the following terms and give the value of each for your
vessel:
a. Lightship
b. Deadweight
Answer :
a. ..
5. Define deadweight. Dead weight is made up off the various items carved
by the vessel. Using the ship information. Find the capacity of the
following in long or metric tons
a. Fuel
b. Fresh water
c. Ballast water
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer :
a. Fuel
e. Lube Oil
f. Cargo
Answer :
a. Gross tonnage
Answer :
list and briefly define the important mechanical of ship building Steil on
deck ,
disavantsges:
- easy corrosion
- on maintenance need more attention
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Location will expect hight strength steel – lube used at all water tight door
on upper deck
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer :
advantages using aluminium the weight very light compare steel not easy
corrosion disadvantages using alumunium the price more expensive from
steel
c. What type of ships would you expect to see allumunium used? Why?
Answer :
cavitation corrosion
Hull plating exterior surface are protected from corrosion with method
catchodic protection system interior surface protected from corrosion
with method using paint apposed to corrosion
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
c. Obtain the painting or coating schedule (or drawing) and describe the
preparation for and application of the protection system(s) on your ship
i your own words.
Schedule painting on my ship look situation and condition painting
again
Preparation
First time chief officer will make plan about painting activity
if the dissimilar metals are impressed in and electrolte the metal lowers
ton the electrochemical scala becomes, the anode the remaining two
being cathhodes this is cooper and iron immersed in sea water they
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Surface preparation
- will scale
- wathering
- picking
- flame cleaning
Answer :
fouling is aplant small card the pacth of body a Ship alunder line
water fouling can devolep possible the part ship at underline water
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
always or long time in water can cause the fouling pacth and
develop
1) Can cause ship decrease on the average
2) The ship must be dry dock and then the part ship atunder line
water must scraping and must be clean from fouling
11. The shell palting of a ship has a number of functions of fulfill. (STCW
CONTENT)
a. List each function along with a short explanation. How is plating
supported? What forces act on the plating and its support’
b. Attach a freehand sketch in the transverse plane showing plating.
The supporting structure. And the various forces the plating resist.
Answer :
Answer :
Answer :
12. Locate the ship’s structural drawings. Find the one entitled. “shell
expansion” or the structural drawings for the ship near the midship section.
a. Defind the terms. Sheer Strake. Bilge Strage. Keel Plate.
b. Determine the amidships shell plating thickness. (i.e..20.4= or
30.6= etc., or .8-5 in., 17.5mm. etc) for the deck at the side. The
side shell and bottom plate intermediate beetween each. For your
ship. Wich the these shell plate is the heaviest? Why”
c. Examine teh drawings near a major hull penetration such as for
“Sea Chest” or “Overboard Dischange”. Openings. Compare the
thickness near, this openings and surrounding plates. Wich the
thickest”? how much so? Why would you expect the plate
thickness to increase near hull penetration?
d. Describe how your ship’s shell plating is arranged. What is the
most common methods of joining this plates”, hull welds in the
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer :
every ship certain sheer stroke, bilge strake and keel plate
Answer:
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
c. Examine teh drawings near a major hull penetration such as for :sea
chest”or overboard discharge”. Openings compare the thickness near,
these openings and surrounding plates. Which is the thickets”? how
much so? Why would you expect the plate thickness to increase near
hul penetraetions?
Answer:
d. Describe how your ship’s shell plating is arranged. What is the most
common methods of joining these pates”’ Hull weldsin the middle
body of the ship are requires to be what types of weld? Why? Make a
dimesioned skecth of a welding detail in the transverse plane. Showing
how two (2) adjoining sections of hull.side shell plating on your ship
are joined ( include though plate thickness. Edge preparations, root
gap)
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer:
every side shell welded with transverse every side shell welded
with transverse must take to devide to slide of frame
Answer:
3. Deck stiffeners
4. Tripping bracket
c. Attach a freehand sketch showing deck plating. The supporting
structure. And the various forces the plating resists.
Answer :
a. List each function along with a short explanation. How is the plating
supported? What forces act on the plating and its support”.
Answer :
Answer :
2) Deck griders are required to from port of the hatch coaming the
flanged grider of a mounding to prevent chaping ofroper
symetrical girder such as are more efficient but can’t from port of
a hatch side coaming such grider must be fifted at board of the
hatch side the griders are broched to the transverese heads and are
supported at the hatch and griders extanding right across the ship
4) Triping bracket the form flat bass on plates on deck griders beams
of stiffeners toprevent their flanges from being defermed
compression
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer :
Answer :
Answer :
b. How is your ship framed? How can you tell the difference with
respect to your ship”
Answer :
c. Explain briefly the main functions of ship side shell framing. For
your ship. What is the spacing of stiffener (vertical and or
horizontal) in the side shell and bottom of you ship?
Answer :
Answer :
Answer:
Answer:
They devided they ship into water tight comparetments and this restric
the volume of water which may either the ship if the shell plating is
dammged the transferse strength of the ship is increases by the
bulkheads which have much the same effectif as the end of a box
Answer:
The ship used welded water tight bulk head cause water tight bulk
head are terned by plates which are that head tothe shell, deck tank top
by welding since water pressure increases with the hand and the
bulkheads is to designed to will stand such are force, it may be that the
plating on the lower port of the bulkhead is thicker than that at the top.
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
16. Examine the ships structure beneath (i.e. above and below the deck platig)
a piece of heavy deck machinery. Such as a warping windlass the anchor
windless, etc.
a. Make a dimensioned sketch in the transverse and longitudinal
plane of the structure that froms the foundation and structural
support for this place of equipment.
b. Describe this structure. The obove and underdeck members
composing the foundation and structural support for this piece of
equipment.
c. Draw a freehand sketch showing how weigth of the machinery is
transmited to the ships structure.
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer :
Answer:
Answer:
17. Describe the possible shape and farming systems that can be used in the
stern section of a vessel. (STCW CONTENT)
a. Make a freehand sketch of each time of system.
b. Which type system does your ship use include reference to the
location, appearance, and connections of any frames and or beams
that are canted for use in supporting the stern plating and structural
arrangements needed to meet the special requirements or
equipment at the stern.
c. Make detailed profile drawing to the stern section of your vessel to
the main deck. Extending from the stern to the after collision
bulkhead label the following:
1. After peak tanks with floors, stringers, etc.
2. All decks and flats.
3. Shaft alley escape trunks.
4. Acces to tanks and other compartments.
5. Stern frame and stern tube.
Answer :
b. Which type system doe your ship use include refrence to the location,
appearance, and connections of any frames and beams that are canted for
use in supporting the stern plating and structural arrangements needed to
meet the special requirements or equipments at the stern
Answer:
i don’t know that system but i make or put the attachment in the
behind of the paper we use that bearing for supporting the stern
plating and special shape requirments at the stern
c. Make detailed profile drawing to the stern section of your vessel to the
main deck. Extending from the stern to the after collision bulkhead label
the
following :
1. after peak tanks with floors, stringers,etc.
2. all decks and flats
3. shaft alley escape trunks
4. stern frame and stern tube
Answer:
After peak tank : to filling fresh water all deck and plate to put
container
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer :
Answer:
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer:
Answer:
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
19. Make a detailed drawing of the starboard side midship structural section of
tyour ship, looking forward and showing the structural members listed
below. Reference ship’s plan used. Give the spacing of the structural
elements and thern scantilings. (i.e dimensions. Label as appriopriate the
following items:
(STCW CONTENT)
a. Main deck (including the main deck stringer plate)
b. Interior deck(s)(or platform decks.side stringers)
c. Deck beam(s) and side frame (if transversely framed)
d. Side shell (including the sheer strake)
e. Web frame (and side shell longitudinal)
f. Bottom shell
g. Inner bottom (tank top)
h. Side girders and longitudinal (bottom and tank top)
Answer :
All data about contructions i can’t for explain because i only explain data
from engine and then data for contruction deck disapear
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
20. Make a detailed profil drawing of the bow section of your ship extending
from the stern to the forward collision bulkhead. Label the following:
(STCR’ CONTENT)
a. Fore peak tank with floors, breast hooks, etc.
b. Chain locker, chain pipes cofferdam below chain locker.
c. All decks and flats
d. Hawse pipes
e. Bulwarks
f. Stem
Answer :
Answer:
Answer:
Answer:
d. Hawde pipes
Answer:
e. Bulwarks
Answer:
f. Stern
Answer:
21. Make a dimensioned drawing of the entire stem tube rube and tail shaft
arrangement, showing the stern tube, the stem shaft, the bearings, the seals
or glands, the tail shaftand the propeller. Indicate the propeller, indicate
the propeller in place. If you are on a twin screw vessel, include a sketch
of the strucbearing, external shaft coupling and other special features of
the instalation.
Answer :
Answer :
A bilge keel used to reduce the hulls tendency to rool bilge keel are
employed in parts (one for each ship) a ship may have more than
bilge keel, perside but this is cares bilge keelincrease, hydrodinatic
resistance to rathing, manin the ship roll less, bilge keel are is the
from a stroke, small keel or running a long which of the length
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
hull, they are tyical title oneon each side low down on the side of
the hull so asnot to increase the draft of the vessel
a. Stringer plate
b. Mooring bitts
c. Freeing ports
d. Chocks-open and closed
e. Hawse pipes
f. Bulwarks and railings
Answer :
a. Stringer plate
Answer:
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Stranger plate located in oil deck or deck machinery and can used to
support
b. Mooring bitts
Answer:
where the mooring rope have to keep high when ship in port
c. Freeing ports
Answer:
Answer:
e. Hawse pipes
Answer:
Stern frame where the anchor installed onboard ship and anchor not com
in all into chain locker
Answer:
To break the wind the ship on sea passage and use be safety operation
24. Hull equipment is the anchor, chan and other mooring systems on the ship.
From the midship section drawing, or the classification certificates list all
data applicable to location and size of ship’s hull equipment.
Answer :
Mooring 2 unit 30
winch (fwd) Independent tonagge
Mooring Mitsubishi 2 unit 30 ton
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
winch (aft)
Mooringwinc Hydraulic 2 unit 20 ton
h (center)
Anchor Jls 1 unit 6700 kg
(stbd)
Anchor Jls 1 unit 6700 kg
(port sd)
Anchor Jls 1 unit 6700 kg
(spare)
25. Contruct a sketch of the tank vent and sounding pipe system for one of the
double bottom tanks in your ship. (show both an inboard profile and a plan
view).
a. Explain the purpose of this sytem
b. Indicate the size of piping involved
c. Examine the bell installed at the termination of a tank vent on the
weather deck. Sketch a cross-section view of this fining. Expalin
the purpose of the various part compirising this fitting.
Answer :
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
The diameter of piping diferent each container 3,6 cm, 3,8 cm, 3,0 cm,
4 cm, 4,5 cm
Also we have alarm of cargo hold vessel when the cargo have problem
alarm will be automatically signed
Answer :
Answer:
the rudder is used for moving the ship from starboard side to port side with
stering gear
Answer:
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
27. Explain using first principles how the shear and bending moment curves
are produced for a ship given shape and loading.
Answer :
- controll stability of ship
- controll trim of ship
- in loading tank is not fully loading or contrellable in each tank
- check of flow rotes of the container
- if necessary looking the mooring
2) Rudder horn
3) Pintles and gudgeoons (if any)
4) Rudder head which leads to steering engine
5) Anodes (sacrificial or impressed current)
Answer :
Answer:
the rudder is used for moving the ship from starboard side
to port side with stering gear
29. Explain using first principles how the shear and bending moment curves
are produced for a ship given shape and loading
Answer :
- controll stability of ship
- controll trim of ship
- in loading tank is not fully loading or contrellable in each tank
- check of flow rotes of the container
- if necessary looking the mooring
30. Ask the chief mate to explain the ‘trimand stability,manual’ . sometimes
called the ‘loading manual’ (typically kept on or near the bridge ). Using
the trimand stability book manual.explain in your own words the
instructions on how to safety loadthe ship include information for both
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer :
In my ship, MV TANTO SURYA using the ballast tank system and don’t
use program computer but we checking manual operation
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
ONBOARD
1) In your notebook you are the submit a describtion of each on the system listed
below. You are to number them arrange them in the order that they are show
above after each describtion you are to include the teo skecthes of that system
(one finished and one rough – done in the engine room while tracing the
system). The describtion of each ystem must include the purpose of the system
and the purpose of each maior component. You shall includeas much detail as
you can obtain about the systems. Auch as line sizes. Pump capacity and head.
Motor horse power heat exchanger duty etc, this information can be obtain
from equipment name plte. Valves or fittings
Type : v6-30
No : 1 set
Capacity x piss head cm3/HxM= 30m3 /HA 30kg/cm3
Rpm: 455
Maker : taiko nishisba
Continue answer no 1
c. Destiling plant system (include the distiling plant and its system in detail).
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer:
d. Portable water system (include portable water tanks pump pressure tank
hot and cold water systems).
Answer:
No :2
Type : mss
Rpm : 3435
Kw : 2.2
Maker : keiko
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
a. The procedures for bunkering your ship. Pay particular attention o and
describe what is covered in pre-bunkering meeting. The planning done
ahead of time. If any fuel is transferred before bunkering starts. The levels
in the settler at start of bunkering. There over flow, oil will go ifit accurs.
Any alarms or automatic shutdown devices. And all information that is
recorded during the bunkering operation and why etc. How are levels
determined and checked?
Answer:
procedure for bunkering
Before bunkering C/E will trained crew members beforeas follows about
receiving bunker
- before entering a port educate instruction a relavant to the
prevention of marine pollution
- education for danger of explosion of marine pollution
- the ship’s all transfer procedures and pipeloading plan
- how L.O perform topping off
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Time bunkering
- all drain pipes and all deck suppors has to be plunged and
cemensed by carpenter
- C/C should prepare a bunkering plan indicating
- fuel oil tank to be fileed
- quantity of fuel to be loaded in each tank
- sequince of loading
- name,rank and duties of the engine crew invieted in the retuling
operations
- chief mate should see to it that the no smpking sign are placed in
the areas
- 3/E place portable fire extingusher and connected fire house to the
respective five there hydrants
- third officer (3/10) hoist internasional flag “B” durring day time
and red light at right
- while loading the officer on wacth should make a continous round
of the ship
- first engineer (C/E) should in inspectand see to the over head
discharge and W.B.T suction valves connected to F.O double
bottoms tanks are locked position
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Yes , my ship automatic shutdown devices if oil over flow and all
information will recorded.
In order that all crew know all event when bunkering
Continue answer no 2
c. The oil record book. Describe, has is entered in the oil record book and
why. (Competency 20.1.’.1)
Answer:
in oil record book to record each removal waste oil on board in order that
offien find out cut how much removal waste oil on board and when
removal waste oil on board
Continue answr no 2
f. The procedures for taking aoil fresh water from shore (competency
RFPEW-1IF)
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer:
the procedurs talking frsh water from shore
- when the master recieve nitification that the arrangements are
complate he must can form the proper arrangement through the
agent or a local office before entering port of supply
- third engineer will connecting hose from shore to ship and will
write from meter water at shore before start in order that obtain
know how much transfer water from shore now.
These operation are listed on the performance vertification sheet at the end
of this section. You will be required to witness and participate at least once
in the operations listed in the performence vertification sheet and have the
sheet signed by a licensed officer
3) Describe in detailed equipment listed on board your vessel for the detection
of fires. Include drawing of the fire detection system or systems.
Answer:
the equipment isntalled my onboard for detection offires using 3 type
1. heat detector
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
1. heat detector
4) Describe in detail the equipment installed on board your vssel for the
extinguishing of fires. This description is to include the following :
a. Description of how the CO2 and or Halon system works. Include in the
warning tie for the system and how the warning works. Even if electricity
is not available
Answer:
the equipment installed on board my vessel for extingushing of fire
have 5 types:
1. CO2 fire extingusher prtable
2. CO2 fire extingusher semi portable
3. foam fire extingusher portable
4. foam fire extingusher semi portable
5. CO2 fire extingusher fixed type
b. Lis in a table format the n-pe. Sizes and location of all portable, semi
portable, and fixed fire extingusishing devices installed in the engine
room.
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
Answer:
c. Describe the procedure for starting a fire pump and charging the fire main
(competency 20.1.6.1.c.1)
Answer:
1. turn pump shaft by hand and confirm smoothly turning at fire
emergency pump room
2. push starting button at control panel
3. check inlet valve for vaccum pumpand adjusment
4. close valve of vaccum pump in normal operation
6) Describe how a fire and boat drill is conducted aboard your vessel.be sure to
include description of all emergency and safety equipment test.
Answer:
fire drills and boat drill are curved out regulary on ships to ensure that
the crew understand and are drilled in the duties , assigned titham in
the event of fire and abondan ship or emergency at the fires drills and
board drill each member of the crew shall be required to demonsirate
his familary with the arrangment and facilities of the ship his duties
and any equipment he may be called uppon to use. For this purpose an
out break of fire would be assumed to have accurel in some part of the
ship and atacck made CA seapurer upon joining a ship should get
acorainted with the various alarm signals and his master station the ear
list opporiamys
Safety equipments to fire and boat drills
-fire pump
-fire hydrant
-fire house
-nozzle and coupling
-fused instalation
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020
-fireman outfit
-braething apparatus
-life jacket
-life boat
-life craft
-life ring
7) Describe what precaution you would take before entering any empty tank to
conduct an ispection. Your description should include the use of detection and
safety equipment actually available on your sheet
Answer:
No one should enter closed spaces (empty tank) as mentioned early with out
the permission to do so free are responsibleofficer who has ascerlained
immediatly before entry the atmospher there is in all respect sart factory
forentry the after responsible should ensure that
a. Effective ventilation is maintened continously while men are in the
compartment
b. A responsible member of the crew is in constand atandance outside the
compratment and knows how toraise the alarm in emergency
c. Life lines and harness are ready for immediate
NAME : IBNU FATAH
REG.NUMBER : 5 60 17 9338
MAJOR : TECHNICAL DEPARTEMENT
SUBJECT : CONTROLLING THE OPERATION OF THE
SHIP AND CARE FOR PERSON ON BOARD
AT THE OPERATIONAL LEVEL
COMPANY : PT.TANTO INTIM LINE
SHIP’S NAME : MV.TANTO PERMAI
SHIP’S TYPE : CONTAINER
YEAR OF SEA PROJECT : 2019 – 2020