Vessel Name: MV MARIA Client Name:

IMO Nr.: 9917828 Client Rep.:


Vessel Location: Safinah Group Rep.: PERO BAKICA
Starting Date: 5/29/2023 Finish Date:

Contract ID Ref. No.: 1234


Report prepared by: PERO BAKICA Position: Coating Supervisor
Report reviewed by: Position:

MV MARIA
COT COATING CONDITION REPORT

Safinah Group Registered Office 4 The Staithes, The Watermark, Gateshead, Tyne & Wear, NE11 9SN, UK GT 3.01
enquiries@safinah-group.com | +44 (0)1670 519 900 | M95
MV MARIA
COT COATING CONDITION REPORT

CONTENT

INTRODUCTION..............................................................................................................................................................................
ACRONYMS AND ABBREVIATIONS..................................................................................................................................................
SCOPE............................................................................................................................................................................................
EXECUTIVE SUMMARY...................................................................................................................................................................
CONDITION SURVEY FINDINGS OVERVIEW....................................................................................................................................4
EXISTING COATING SPECIFICATION (JOTUN PAINTS).................................................................................................................5
ONBOARD MAINTENANCE (OBM) COATING SPECIFICATION (JOTUN PAINTS)..........................................................................5
REPAIR RECOMMENDATION SCOPE PER TANK..............................................................................................................................5
COT COATING CONDITION..............................................................................................................................................................
COT 10 PORT.................................................................................................................................................................................. 7
PHOTO REFERENCE - COT 10 PORT............................................................................................................................................8
COT 10 STB................................................................................................................................................................................... 14
PHOTO REFERENCE.................................................................................................................................................................. 15
COT 1 STARBOARD....................................................................................................................................................................... 21
PHOTO REFERENCE.................................................................................................................................................................. 22
COT 2 PORT.................................................................................................................................................................................. 27
PHOTO REFERENCE.................................................................................................................................................................. 28
COT 3 STARBOARD....................................................................................................................................................................... 32
PHOTO REFERENCE.................................................................................................................................................................. 34
COT 4 STARBOARD...................................................................................................................................................................... 38
PHOTO REFERENCE.................................................................................................................................................................. 39
COT 5 PORT.................................................................................................................................................................................. 44
PHOTO REFERENCE.................................................................................................................................................................. 45
COT 6 STARBOARD....................................................................................................................................................................... 50
PHOTO REFERENCE.................................................................................................................................................................. 51
CT 8 PORT.....................................................................................................................................................................................59
PHOTO REFERENCE.................................................................................................................................................................. 61
COT 8 STARBOARD....................................................................................................................................................................... 66
PHOTO REFERENCE.................................................................................................................................................................. 67
COT 9 PORT.................................................................................................................................................................................. 72
PHOTO REFERENCE.................................................................................................................................................................. 74
SLOP STARBOARD........................................................................................................................................................................ 80
PHOTO REFERENCE - COT SLOP STB........................................................................................................................................81

SG | TS Ref.: 200515 Page 1 of 87


MV MARIA
COT COATING CONDITION REPORT

INTRODUCTION

MV MARIA (IMO: 9917828) is a Chemical/Oil Tanker which entered into service after her construction at
the HYUNDAI MIPO DOCKYARD, Ulsan South Korea, in 2022 with the following particulars:
− Deadweight (DWT) : 55202 tons
− Gross Tonnage (GRT) : 33817 tons
− Length Overall (LOA) : 183 m
− Breadth : 35
m

Currently the vessel is sailing under the flag of the Kingdom of Saudi Arabia (KSA).

This cargo tank coating condition survey was requested by the owner to assess the current coating
condition and integrity of the cargo tanks in order to plan the possible coating upgrade or refurbishment
scope of work for the next scheduled drydocking.

The survey was carried out during her voyage through Suez Canal on the 29 th May 2023 after the
completion of the cargo discharging and cleaning operations of the tanks.

ACRONYMS AND ABBREVIATIONS

AC Anticorrosive AF Antifouling
BT Boottop DFT Dry Film Thickness
FB Flatbottom FC Full Coat
FWD Forward HPFW High Pressure Freshwater Washing
NDFT Nominal Dry Film Thickness Rep Representative
SC Stripe Coat Supt Superintendent
SRM Ship Repair Manager TU Touch-up
TS Top Sides VS Vertical Sides
VM Vessel Manager WFT Wet Film Thickness

SCOPE

The purpose of this report is to document the current coating condition of each inspected Cargo Tank (CT)
and estimate the extent of any visible coating breakdown, corrosion, and type of coating defects, as well
as to recommend a suitable repair method and/or preventative measures if required.
Photographic reference is provided to support the observations made during this cargo tank survey.

EXECUTIVE SUMMARY

The following cargo tanks were inspected during her voyage through Suez Canal on 29 th May 2023:
− Cargo Tank 1 Starboard
− Cargo Tank 2 Port
− Cargo Tank 3 Starboard
− Cargo Tank 4 Starboard
− Cargo Tank 5 Port

SG | TS Ref.: 200515 Page 2 of 87


MV MARIA
COT COATING CONDITION REPORT

− Cargo Tank 6 Starboard


− Cargo Tanks 8 Port/Starboard
− Cargo Tank 9 Port
− Cargo Tanks 10 Port/Starboard
− Slop tank Starboard

All cargo tanks were inspected from the tanktop and access ladder areas, hence only the tanktops,
lower stools/hoppers (up to approx. 2 metre height), and areas close to the access ladders in way of the
forward bulkheads were closely examined. All other upper areas i.e., upper bulkheads and deckheads
were visually assessed from distance. The inspections were conducted using a hand-held torch,
calibrated dry film thickness (DFT) gauge, scraper, penknife and a small ruler for measurement and
reference.
All available Cargo Tanks (CT) were subject to a thorough cleaning process prior to this survey, and all
tanks were confirmed as gas free and safe to enter prior to each inspection.

General findings:
During this current coating condition survey, it was observed that the following cargo tanks were subject
to significant coating defects, such as heavy areas of coating breakdown, corrosion, and blistering and as
such generally recommended for full coating refurbishment (excluding under deck areas).
10 Port
10 Starboard

The following cargo tanks also have larger areas of general coating breakdown and corrosion, but to a
lesser extent that above tanks and thus call for partial tank refurbishment scope.
6 Starboard

Remaining tanks also all have some smaller coating breakdown areas and repair needs.

The coating condition of each inspected cargo tank is provided in the section ‘Individual Cargo Tank
Coating Condition’ hereafter. However, below is an overview of the type and coating breakdown and
patterns observed:

SG | TS Ref.: 200515 Page 3 of 87


MV MARIA
COT COATING CONDITION REPORT

Corrosion:
All cargo tanks were affected by corrosion to some extent. Both scattered and localised areas of corrosion
was observed and noted in each tank.
Scattered and localised corrosion spots were noted mostly in way of the bulkheads and tanktops. Most of
these areas of corrosion were the result of the coatings breaking down, broken blisters and detachment
of the coatings down to the substrate.
Cracking:
There was no cracking noted during the survey-
Blistering:
Both scattered and localized areas of intact blisters were observed in all inspected tanks. However,
broken blisters have been noticed too but in much lesser extent.
The most affected areas are in way of the lower areas of the tanks i.e., lower stools, tanktop and lower
bulkhead areas, in some tanks the blistering was extensive . The size varies from 2mm to 1 cm in diametar
Note: When scraped, the most of blisters contain liquid, however, some blisters were very brittle and dry
and when scraped contain no liquid.

Detachment:
There was a mix of scattered and localised spots of coating detachment observed. Most areas of
detachment were down to the substrate resulting in exposed corrosion. The most affected areas are in
way of the bulkheads, including the hoppers and lower stool areas of the bulkheads. However, it was also
observed on the tanktops but to a lesser extent. Some areas with Topcoat detachment have been noticed
too, the most affected areas are in way of the Tanktops and Lower stools/Hopper bulkheads.

Dry-film thickness (DFT) readings were conducted in all cargo tanks where access allowed. This was in way
of the tanktop and lower bulkhead/reachable areas only. These readings are recorded in this report.
Note: DFT measurements were taken with a DeFelsko PosiTector 6000 DFT Gauge with the following serial number:
403861.

CONDITION SURVEY FINDINGS OVERVIEW


Cracks Blisters Detachm Repair
Location Area Rust (m²) Pitting
(m²) (m²) ent (m²) Extent (m²)
CT 1 STB 2171 2 76 16 159
CT 2 PORT SIDE 2997 0.5 54 109
CT 3 STB SIDE 3612 0.3 0.5 1.6
CT 4 STB SIDE 3681 0.5 30 61
CT 5 PORT SIDE 3683 1 54 2 118
CT 6 STB SIDE 3683 16.5 110 10 228.5
CT 8 PORT SIDE 3680 4 37 82
CT 8 STB SIDE 3683 1.8 48.5 100.6
CT 9 PORT SIDE 3683 1 8 18
CT 10 PORT SIDE 3680 38.5 100.5 16 290.5
CT 10 STB SIDE 3683 11.5 59 135.5
SLOP TANK STB 1097 0.2 2.5 5.8
Totals: 45745 m² Totals: 77.8 580 28 1309.5

SG | TS Ref.: 200515 Page 4 of 87


MV MARIA
COT COATING CONDITION REPORT

Area: Cargo Tanks (CT)

EXISTING COATING SPECIFICATION (JOTUN PAINTS)


Coat No. Product Shade NDFT (µm)
1 TANKGUARD FLEXLINE GREY 100
2 TANKGUARD FLEXLINE RED 100
3 TANKGUARD FLEXLINE GREY 100

ONBOARD MAINTENANCE (OBM) COATING SPECIFICATION (JOTUN PAINTS)


Coat No. Product Shade NDFT (µm)
1 TANKGUARD FLEXLINE GREY 100
2 TANKGUARD FLEXLINE RED 100
3 TANKGUARD FLEXLINE GREY 100

REPAIR RECOMMENDATION SCOPE PER TANK


Based on detailed inspections and findings, scattered corrosion was noted on specific sections in specific
tanks as described below in report.

(a). Repair scope in reference to the widespread and distribution of observed coating breakdown:
CT 10 Port:
 Full Blast Sa2½ on entire Inboard bulkhead, Forward bulkhead , Aft bulkhead, lower hopper/stool and
Tank top.

CT 10 Starboard:
 Full Blast Sa2½ on entire Inboard bulkhead, Aft bulkhead ,lower hopper/stool and Tank top.

CT 1 Starboard:
 Full Blast on tank top and lower hopper/stool.

CT 2 Port:
 Full Blast Sa2½ on tank top and lower stools/Hopper.

CT 3 Starboard:
 Spot power tooling to St3 on Tank top.

CT 4 Starboard:
 Full blast Sa2½ on Tanktop.

CT 5 Port:
 Spot powertooling to St3 on tank top and lower hopper/stool.

CT 6 Starboard:
 Full Blast Sa2½ on tank top and lower stools/Hopper.

SG | TS Ref.: 200515 Page 5 of 87


MV MARIA
COT COATING CONDITION REPORT

CT 8 Port:
 Full blast Sa2½ on Tanktop.

CT 8 Starboard:
 Full Blast Sa2½ on tank top and lower stools/Hopper.

CT 9 Port:
 Full blast Sa2½ on Tanktop.

SLOP Starboard
 Spot powertooling to St3 on tank top and lower hopper/stool.

SG | TS Ref.: 200515 Page 6 of 87


MV MARIA
COT COATING CONDITION REPORT

COT COATING CONDITION

COT 10 PORT
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING
BULKHEAD FWD 7 20 51
BULKHEAD AFT 5.5 19 46.5
BULKHEAD PORT
BULKHEAD STB 16 15 54
LOWER STOOLS/HOPPER 9 6.5 27
TANKTOP 1 40 16 112

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
433 192 706

SG | TS Ref.: 200515 Page 7 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 10 PORT

Key:
Lower hopper/stool demarkation
Bulkhead
b b
b b b

b b
Bulkhead b Fwd Bulkhead

b b
b b b
b b b
b b
b b d b d b
d b d b b b

Tank-top Aft
Legend: b b
b
- Minor Corrosion Spot (< 2.25 cm ² )
- Bigger Corrosion Spot (> 2.25 cm ²) b Bulkhead
- Assuming paint cracking b b b

b - Blistering b b
c - Cracking b b
d - Detachment Aft

Deckhead

Fwd
Comments:
PHOTO REFERENCE - COT 10 PORT

SG | TS Ref.: 200515 Page 8 of 87


MV MARIA
COT COATING CONDITION REPORT

SG | TS Ref.: 200515 Page 9 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Deckhead general cond.

003 Deckhead general cond. 004 Transv. upper stool bulkh. General cond.

005 Transv. upper stool Bulkh. Fwd general cond. 006 Long. upper stool bulkh. general cond.

007 Aft bulkh. general cond. 008 Massive intact blistrering in waz of the Aft bulkh.

009 Massive corrosion in way of the Aft bulkh. 010 Massive blistering & corrosion in way of the Aft bulkh.

SG | TS Ref.: 200515 Page 10 of 87


MV MARIA
COT COATING CONDITION REPORT

011 Fwd. bulkh. general cond. 012 Massive corrosion in way of the Fwd bulkh.

013 Inboard bulkh. general cond. 014 Massive corrosion in way of the Inboard bulkh.

015 Massive corrosion in way of the Inboard bulkh. 016 Outboard bulkh. general cond.

017 Long. lower stool bulkh. general cond. 018 Massive blistering & corrosion in way of the Long. Lower
stool bulkh.

SG | TS Ref.: 200515 Page 11 of 87


MV MARIA
COT COATING CONDITION REPORT

018 Massive corrosion in way of the Long. lower stool 019 Massive corrosion in way of the Long. lower stool bulkh.
Tanktop

020 Transv lower stool Fwd bulkh. general cond. 021 Spot corr and intact blisteri ng in way of Transv. Lower
stool Fwd bulkh.

022 Transv. lower stool Aft bulkh. general cond. 023 Spot corr. & blistering i n way of the Transv. Lower stool
Aft bulkh.

SG | TS Ref.: 200515 Page 12 of 87


MV MARIA
COT COATING CONDITION REPORT

024 Intact blistering in way of the Transv. stool Aft bulkh. 025 Massive corrosion in way of the Transv lower stool
tanktop

026 Hopper bulkh. general cond. 027 Spot corr. & Intact blistering in waz of the Hopper bulkh.

028 Topcoat delamination in way of the Hopper bulkh. 029 Tanktop general cond..JPG

030 Spot corr. & Topcoat delamination in way of the Tanktop 031 Massive Top coat blistering & delamination in way of the
Tanktop

SG | TS Ref.: 200515 Page 13 of 87


MV MARIA
COT COATING CONDITION REPORT

032 Massive Topcoat blistering in way of the Tanktop

SG | TS Ref.: 200515 Page 14 of 87


MV MARIA
COT COATING CONDITION REPORT

COT 10 STB
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING
BULKHEAD FWD 3 4.5
BULKHEAD AFT 4 18 42
BULKHEAD PORT 4 8 22
BULKHEAD STB
LOWER STOOLS/HOPPER 10 20
TANKTOP 0.5 23 47

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
416 298 574

SG | TS Ref.: 200515 Page 15 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 10 STB

Key:
Lower hopper/stool demarkation
Bulkhead

b b b
Bulkhead Fwd Bulkhead

b b b b
b b b
b b b b
b b b
b b
b b b b b
b

Tank-top Aft
Legend: b
b b
- Minor Corrosion Spot (< 2.25 cm ² ) b b
- Bigger Corrosion Spot (> 2.25 cm ²) b b b Bulkhead
- Assuming paint cracking b b

b - Blistering b b
c - Cracking
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE

SG | TS Ref.: 200515 Page 16 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Transv. Upper stool bulkh. General cond.

003 Long. upper stool bulkh. general cond. 004 Inboard bulkh. upper section general cond.

005 Transv. upper stool Aft bulkh. general cond. 006 Aft bulkh. general cond..JPG

006 Transv upper. stool Aft bulkh. general cond. 007 Massive Intact blistering in way of the Aft bulkh.

SG | TS Ref.: 200515 Page 17 of 87


MV MARIA
COT COATING CONDITION REPORT

008 Massive corr. in way of the Aft bulkh. 009 Massive corr. in way of the Aft bulkh.

010 Massive Intact blistering in way of the Aft bulkh. 011 Fwd bulkh. general cond.

012 Massive corr. in way of the Fwd bulkh. 013 Inboard bulkh. general cond..

014 Massive Intact blistering in way of the Inboard bulkh. 015 Massive corrosion in way of the Inboard bulkh.

SG | TS Ref.: 200515 Page 18 of 87


MV MARIA
COT COATING CONDITION REPORT

016 Outboard bulkh. general cond. 017 Transv. lower stool Fwd bulkh. General cond.

018 Scattered intact blistering in way of the Transv. lower 019 Transv. lower stool Aft bulkh. general cond.
stool Fwd bulkh.

020 Localized Intact blistering in way of the Transv. lower 021 Localised Intact blistering in way of the Transv. lower
stool Aft bulkh stool Aft bulkh

022 Long. lower stool bulkh. general cond. 023 Massive Intact blistering in way of the Long. Lower stool

SG | TS Ref.: 200515 Page 19 of 87


MV MARIA
COT COATING CONDITION REPORT

bulkh.

024 Hopper bulkh. general cond. 025 Scattered intact blistering in way of the Hopper bulkh.

026 Tanktop general cond. 027 Spot corr. in way of the Tanktop

028 Both Intact & broken blisters in way of the Tanktop 029 Intact blistering in way of the Tanktop close up.

030 Massive Intact blistering in way of the Tanktop

SG | TS Ref.: 200515 Page 20 of 87


MV MARIA
COT COATING CONDITION REPORT

SG | TS Ref.: 200515 Page 21 of 87


MV MARIA
COT COATING CONDITION REPORT

COT 1 STARBOAR D
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING 4 8
BULKHEAD FWD 4 8
BULKHEAD AFT 12 24
BULKHEAD STB
BULKHEAD PORT 12 24
LOWER STOOLS/HOPPER 26 52
TANKTOP 2 20 43

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
444 314 622

SG | TS Ref.: 200515 Page 22 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 1 STB

Key:
Lower hopper/stool demarkation
b Bulkhead
b
b

Fwd
Bulkhead b Bulkhead

b b b b b
b b b b b
b b b b b
b b b b b
b b b b b b
b b b b
b
b Aft
Tank-top
Legend: b

- Minor Corrosion Spot (< 2.25 cm ² )


- Bigger Corrosion Spot (> 2.25 cm ²) b Bulkhead
- Assuming paint cracking

b - Blistering b
c - Cracking
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE

SG | TS Ref.: 200515 Page 23 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Long. Upper stool general cond.

003 Fwd bulkh. upper section general cond. 004 Outboard bulkh. upper section general cond.

005 Transv. upper stool Aft bulkh. general cond. 006 Massive intact blistering in way of the Transv. Upper
stool

007 Aft bulkh. general cond. 007 Deckhead general cond.

SG | TS Ref.: 200515 Page 24 of 87


MV MARIA
COT COATING CONDITION REPORT

008 Minor intact blistering in way of the Aftr bulkh. 009 Inboard bulkh. general cond.

010 Minor intact bliistering in way of the Inboard bulkh. 012 Outboard bulkh. general cond..

013 Fwd bulkh. General cond. 014 Massive intact blistering in way of the Fwd bulkh.

015 Ttransv. lower stool Aft bulkh. general cond. 016 Scattered Intact blistering in way of the Transv. Lower
stool Aft bulkh.

SG | TS Ref.: 200515 Page 25 of 87


MV MARIA
COT COATING CONDITION REPORT

017 Localised intact blistering in way of the Transv. lower 018 Fwd bulkh. lower section general cond.
stool Aft bulkh.

019 Scattered intact blistering in way of the Fwd bulkh. lower 020 Hopper bulkh. general cond.
section

021 Massive intact blistering in way of the Hopper bulkh. 022 Massive intact blistering in way of the Hopper bulkh.

023 Tanktop general cond. 024 Massive corrosion in way of the Tanktop

SG | TS Ref.: 200515 Page 26 of 87


MV MARIA
COT COATING CONDITION REPORT

025 Massive Intact blistering in way of the Tanktop 026 Both intact & broken blisters in way of the Tanktop

027 Blisters contain liquid in way of the Tanktop close up 028 Massive detachment in way of the Tanktop close up.

SG | TS Ref.: 200515 Page 27 of 87


MV MARIA
COT COATING CONDITION REPORT

COT 2 PORT
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING
BULKHEAD FWD
BULKHEAD AFT
BULKHEAD STB
BULKHEAD PORT 14 28
LOWER STOOLS/HOPPER 10 20
TANKTOP 0.5 30 61

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
455 310 606

SG | TS Ref.: 200515 Page 28 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 2 PORT

Key:
Lower hopper/stool demarkation
Bulkhead

b b b
Bulkhead Fwd Bulkhead

b b b b
b b b b
b b b b b
b b b
b b b b
b b b
b b

Tank-top Aft
Legend:

- Minor Corrosion Spot (< 2.25 cm ² )


- Bigger Corrosion Spot (> 2.25 cm ²) Bulkhead
- Assuming paint cracking

b - Blistering
c - Cracking
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE

SG | TS Ref.: 200515 Page 29 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Transv. Uper stool general cond.

003 Deckhead general cond. 004 Transv. upper stool Aft general cond.

005 Transv. upper stool Aft bulkh. genrral cond. 006 Outboard bulkh. upper section general cond.

007 Long. upper stool bulkh. general cond. 008 Aft bulkh general cond.

SG | TS Ref.: 200515 Page 30 of 87


MV MARIA
COT COATING CONDITION REPORT

009 Inboard bulkh. general cond. 010 Outboard bulkh. general cond.

011 Scattered intact blistering in way of the Outboard bulkh. 012 Fwd bulkh. general cond.

013 Transv. lower stool Fwd bulkh. general cond. 014 Scattered intact blistering in way of the Transv lower
stool bulkh.

015 Long. lower stool bulkh. general cond. 016 Scattered intact blistering in way of the Long. Lower stool
bulkh.

SG | TS Ref.: 200515 Page 31 of 87


MV MARIA
COT COATING CONDITION REPORT

017 Hopper bulkh. general cond. 017 Scattered intact blistering in way of the Hopper bulkh.

018 Transv. lower stool Aft bulkh. general cond. 019 Scattered intact blistering in way of the Transv. Lower
stool Aft bulkh.

020 Tanktop general cond. 021 Spot corr. as result of broken blisters

022 Both Intact and Broken blisters in way of the Tanktop 023 Massive Intact blistering in way of the Tanktop.

SG | TS Ref.: 200515 Page 32 of 87


MV MARIA
COT COATING CONDITION REPORT

SG | TS Ref.: 200515 Page 33 of 87


MV MARIA
COT COATING CONDITION REPORT

COT 3 STARBOAR D
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING
BULKHEAD FWD
BULKHEAD AFT
BULKHEAD STB
BULKHEAD PORT
LOWER STOOLS/HOPPER
TANKTOP 0.3 0.5 1.6

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
413 274 596

SG | TS Ref.: 200515 Page 34 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 3 STB

Key:
Lower hopper/stool demarkation
Bulkhead

Bulkhead Aft Bulkhead

b
b

Tank-top Fwd
Legend:

- Minor Corrosion Spot (< 2.25 cm ² )


- Bigger Corrosion Spot (> 2.25 cm ²) Bulkhead
- Assuming paint cracking

b - Blistering
c - Cracking
d - Detachment Aft

Deckhead

Fwd

SG | TS Ref.: 200515 Page 35 of 87


MV MARIA
COT COATING CONDITION REPORT

PHOTO REFERENCE

001 Tank entry 002 Desktop general cond.

003 Long. upper stool bulkh. general cond. 004 Transv. upper stool Fwd Bulkh. General cond.

005 Outboard bulkh. upper section general cond. 006 Transv. upper stool Aft bulkh. general cond

SG | TS Ref.: 200515 Page 36 of 87


MV MARIA
COT COATING CONDITION REPORT

007 Aft bulkh. general cond. 008 Fwd bulkh. general cond

009 Fwd bulkh. general cond. 010 Inboard bulkh. general cond.

011 Inboard bulkh. general cond. 012 Outboard bulkh. general cond

013 Outboard bulkh. general cond. 014 Hopper bulkh. general cond..J

015 Hopper bulkh. general cond. 016 Long. lower stool bulkh. General coind.

SG | TS Ref.: 200515 Page 37 of 87


MV MARIA
COT COATING CONDITION REPORT

017 Long. lower stool general cond. 018 Transv. lower stool Fwd bulkh. General cond.

019 Transv. lower stool Fwd general cond. 020 Transv. lower stool Aft general cond.

021 Transv. lower stool Aft general cond. 022 Tanktop general cond.

023 Tanktoop general cond. 024 Minoir blistering corr. In way of the |Tanktop

SG | TS Ref.: 200515 Page 38 of 87


MV MARIA
COT COATING CONDITION REPORT

025 Minor blistering corr. in way of the Tanktop 026 Tanktop general cond.

SG | TS Ref.: 200515 Page 39 of 87


MV MARIA
COT COATING CONDITION REPORT

COT 4 STARBOARD
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING
BULKHEAD FWD
BULKHEAD AFT
BULKHEAD STB
BULKHEAD PORT
LOWER STOOLS/HOPPER
TANKTOP 0.5 30 61

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
411 284 602

SG | TS Ref.: 200515 Page 40 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 4 STB

Key:
Lower hopper/stool demarkation
Bulkhead

Bulkhead Aft Bulkhead


b b b
b b b b
b b b
b b b b
b b b
b b b
b b b

Tank-top Fwd
Legend:

- Minor Corrosion Spot (< 2.25 cm ² )


- Bigger Corrosion Spot (> 2.25 cm ²) Bulkhead
- Assuming paint cracking

b - Blistering
c - Cracking
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE

SG | TS Ref.: 200515 Page 41 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Long. Upper stool bulkh. General cond.

003 Transv. upper stool bulkh. general cond. 004 Outboard bulkh. upper section general cond.

005 Transv. upper stool Aft bulkh. general cond. 006 Transv. upper stool Aft bulkh. general cond.

007 Deckhead general cond. 008 Aft bulkh. general cond.

SG | TS Ref.: 200515 Page 42 of 87


MV MARIA
COT COATING CONDITION REPORT

009 Aft bulkh. general cond. 010 Fwd bulkh. general cond.

011 Fwd bulkh. general cond. 012 Outboard bulkh. general cond

013 Outboard bulkh. general cond. 014 Long. lower stool bulkh. General cond.

015 Long. lower stool bulkh. general cond. 016 Hopper bulkh. general cond.

SG | TS Ref.: 200515 Page 43 of 87


MV MARIA
COT COATING CONDITION REPORT

017 Hopper bulkh. general cond. 018 Transv. lower stool Aft bulkh. General cond.

019 Transv. lower stool Fwd bulkh. general cond. 020 Tanktop general cond.

021 Tanktop general cond. 022 Minor spot corr. in waz of the Tanktop

023 Both Intact & Broken blisters in way of the Tanktop 024 Massive intact blistering in way of the Tanktop

SG | TS Ref.: 200515 Page 44 of 87


MV MARIA
COT COATING CONDITION REPORT

025 Scattered Intact blistering in way of the Tanktop

SG | TS Ref.: 200515 Page 45 of 87


MV MARIA
COT COATING CONDITION REPORT

COT 5 PORT
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING
BULKHEAD FWD 0.5 1
BULKHEAD AFT 3 6
BULKHEAD STB
BULKHEAD PORT 0.5 1
LOWER STOOLS/HOPPER 3 2 10
TANKTOP 1 49 100

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
456 332 576

SG | TS Ref.: 200515 Page 46 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 5 PORT

Key: d
Lower hopper/stool demarkation
Bulkhead

d d
Bulkhead Fwd Bulkhead
b b b
b b b b b
b b b b
b b b b b
b b b b
b b b b b
b b b b d d
b b b b

Tank-top Aft
Legend:
b
- Minor Corrosion Spot (< 225 cm ² )
- Bigger Corrosion Spot (> 225 cm ²) b Bulkhead
- Assuming paint cracking
b b
b - Blistering
c - Cracking
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE

SG | TS Ref.: 200515 Page 47 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Deckhead general cond.

003 Transv. upper stool Aft bulkh. general cond. 004 Transv. upper stool Bulkh. Aft general cond.

005 Outboard bulkh. upper section general cond. 006 Long upper stool bulkh. general cond.

007 Transv. upper stool Fwd bulkh. general cond. 008 Aft bulkh. general cond.

SG | TS Ref.: 200515 Page 48 of 87


MV MARIA
COT COATING CONDITION REPORT

009 Aft bulkh. general cond. 010 Localised Intact blistering in way of the Aft bulkh.

011 Fwd bulkh. general cond. 012 Heat affected coat in way of the Fwd bulkh.

013 Inboard bulkh. general cond. 014 Heat affected coat in way of the Inboard bulkh.

015 Outboard bulkh. general cond. 016 Hopper bulkh. general cond.

SG | TS Ref.: 200515 Page 49 of 87


MV MARIA
COT COATING CONDITION REPORT

017 Massive Intact blistering in way oif the Hopper bulkh. 018 Topcoat delamination in way of the Hopper bulkh.

019 Long. lower stool Bulkh. general cond. 020 Long. lowert stool bulkh. general cond

021 Transv. lower stool Fwd Bulkh. general cond. 022 Topcoat delamination in way of the Transv. Lower stool
Fwd bulkh.

023 Transv. lower stool Aft bulkh. general cond. 024 Transv. lower stool Aft bulkh. general cond.

SG | TS Ref.: 200515 Page 50 of 87


MV MARIA
COT COATING CONDITION REPORT

025 Intact blistering in way of the transv lower stool Aft 026 Tanktop general cond..JPG
Tanktop

027 Tanktop general cond. 028 Massive both Intact & broken blisters in way of the
Tanktop

029 Spot corr. as result of broken blisters in way of the 030 Massive Intact blistering in way of the Tanktop.
Tanktop

SG | TS Ref.: 200515 Page 51 of 87


MV MARIA
COT COATING CONDITION REPORT

COT 6 STARBOAR D
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING 2 4
BULKHEAD FWD
BULKHEAD AFT 30 60
BULKHEAD STB 18 36
BULKHEAD PORT
LOWER STOOLS/HOPPER 5.5 5 18.5
TANKTOP 11 55 10 110

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
457 350 574

SG | TS Ref.: 200515 Page 52 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 6 STB

Key:
Lower hopper/stool demarkation
Bulkhead

Bulkhead b b b b b Fwd Bulkhead


b b b
b b b b b
b b b b b b b
b b b b b b b
b b b
b b b b b
b b b b b
b b b
b b Aft
Tank-top
Legend:

- Minor Corrosion Spot (< 225 cm ² )


- Bigger Corrosion Spot (> 225 cm ²) b Bulkhead
- Assuming paint cracking b

b - Blistering b
c - Cracking b b b b b
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE

SG | TS Ref.: 200515 Page 53 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Transv. Upper stool general cond.

003 Outboard bulkh. upper section general cond. 004 Transv. upper stool Aft bulkh. general cond.

005 Transv. upper stool Aft bulkh. general cond. 006 Intact blistering in way of the Transv. Upper stool Aft
bulkh.

007 Long upper stool bulkh. general cond. 008 Deckhead general cond.

SG | TS Ref.: 200515 Page 54 of 87


MV MARIA
COT COATING CONDITION REPORT

009 Aft bulkh. general cond. 010 Scattered Intact blistering in way of the Aft bulkh.

011 Inboard bulkh. general cond. 012 Fwd bulkh. general cond.

013 Outboard bulkh. general cond. 014 Scattered Intact blistering i

015 Transv. lower stool Fwd Bulkh. general cond. 016 Localised Intact blistering in way of the Transversal
lower stool Fwd bulkh.

SG | TS Ref.: 200515 Page 55 of 87


MV MARIA
COT COATING CONDITION REPORT

017 Massive corr. in way of the Transv. lower stool Fwd 018 Transv. lower stool bulkh. Aft general cond.
bulkh.

019 Massive corr. & blistering in way of the Transv. lower 020 Massive corr. in way of the Long. lower stool bulkh.
stool Aft bulkh.

021 Hopper bulkh. general cond. 022 Scattered Intact blistering in way of the Hopper bulkh.

023 Massive blistering & corr. in way of the Hopper bulkh. 024 Long. lower stool bulkh. general cond.

SG | TS Ref.: 200515 Page 56 of 87


MV MARIA
COT COATING CONDITION REPORT

024 Tanktop general cond. (2) 025 Tanktop general cond.

026 Scattered corrosion as result of broken blisters in way of 027 Massive intact blistering in way of the Tanktop.JPG
the Tanktop

028 Both Intact & broken blisters in way of the Tanktop 029 Topcoat detachment in way of the Tanktop.JPG

030 Intact & broken blisters in way of the Tanktop close up

SG | TS Ref.: 200515 Page 57 of 87


MV MARIA
COT COATING CONDITION REPORT

SG | TS Ref.: 200515 Page 58 of 87


MV MARIA
COT COATING CONDITION REPORT

SG | TS Ref.: 200515 Page 59 of 87


MV MARIA
COT COATING CONDITION REPORT

CT 8 PORT

SG | TS Ref.: 200515 Page 60 of 87


MV MARIA
COT COATING CONDITION REPORT

 Overhead / Deckhead: Without any visible coating defects.

 Upper stools & Wing: Scattered intact blistering has been noted on Transversal stool Aft bulkhead.

 Forward Bulkhead: Without any visible coating defects.

 Outboard (PS) Bulkhead: Without any visible coating defects.

 Inboard (SBS) Bulkhead: Without any visible coating defects.

 Aft Bulkhead: There were scattered intact blistering noted in way of these bulkhead.

 Lower Stools & Hopper: There was scattered intact blistering noted on the Transversal stool Fwd
bulkhead. Massive intact blistering has been noted in way of the Transversal stool Aft Tanktop.

 Tanktop: There were scattered areas of corrosion resulting from broken blisters. Massive intact
blisters has been noted throughout this area.

SG | TS Ref.: 200515 Page 61 of 87


MV MARIA
COT COATING CONDITION REPORT

Rust Cracks Blisters Detachment Discol. Repair


Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING 1.5 3
BULKHEAD FWD
BULKHEAD AFT 2.5 5
BULKHEAD STB
BULKHEAD PORT
LOWER STOOLS/HOPPER 3 6
TANKTOP 4 30 68

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
452 350 538

SG | TS Ref.: 200515 Page 62 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 8 PORT

Key:
Lower hopper/stool demarkation
Upper hopper/stool demarkation Bulkhead

b b
Bulkhead b Fwd Bulkhead

b b b
b b
b b b
b b
b b b
b b b b b
b b b

Tank-top Aft
Legend: b

- Minor Corrosion Spot (< 225 cm ² )


- Bigger Corrosion Spot (> 225 cm ²) b Bulkhead
- Assuming paint cracking b
b b
b - Blistering
c - Cracking
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE

SG | TS Ref.: 200515 Page 63 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Deckhead general cond.

003 Outboard bulkh. upper section general cond. 004 Transv. upper stool Fwd bulkh. general cond

005 Long. upper stool Bulkh. general cond. 006 Transv. upper stool Aft general cond..

007 Scattered Intact blistering in way of the Transv. upper 008 Aft bulkh. general cond.
stool Aft bulkh.

SG | TS Ref.: 200515 Page 64 of 87


MV MARIA
COT COATING CONDITION REPORT

009 Aft bulkh. general cond. 009 Scattered Intact blistering in way of the Aft bulkh.

010 Fwd bulkh. general cond. 011 Fwd bulkh. general cond.

012 Outboard bulkh. general cond. 013 Outboard bulkh. general cond.

014 Inboard bulkh. general cond. 015 Inboard bulkh. general cond.

SG | TS Ref.: 200515 Page 65 of 87


MV MARIA
COT COATING CONDITION REPORT

016 Long. lowewr stool bulkh. general cond. 017 Long. lower stool bulkh. general cond.,

018 Transv. lower stool Aft bulkh. general cond. 019 Transv. lower stool Aft bulkh. general cond.

020 Massive intact blistering in way of the Transv. lower stool 021 Transv. lower stool Fwd bulkh. general cond.
Aft Tanktop

022 Scattered intact blistering in way of the Transv. lower 023 Tanktop general cond.
stool Fwd bulkh.

SG | TS Ref.: 200515 Page 66 of 87


MV MARIA
COT COATING CONDITION REPORT

024 Tanktop general cond. 025 Both intact & broken blisters in way of the Tanktop

026 Massive Intact blistering in way of the Tanktop 027 Spot corr. as result of broken blisters

028 Both Intact qand broken blisters in way of the Tanktop


close up

SG | TS Ref.: 200515 Page 67 of 87


MV MARIA
COT COATING CONDITION REPORT

COT 8 STARBOAR D
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING 1.5 3
BULKHEAD FWD
BULKHEAD AFT 25 50
BULKHEAD STB
BULKHEAD PORT
LOWER STOOLS/HOPPER 0.3 4 8.6
TANKTOP 1.5 18 39

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
436 338 536

SG | TS Ref.: 200515 Page 68 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 8 STB

Key:
Lower hopper/stool demarkation
Upper hopper/stool demarkation Bulkhead

Bulkhead Fwd Bulkhead


b b b b
b b b b
b b b b
b b b b
b b b b b
b b b b
b b b b
b b
b Aft
Tank-top
Legend: b

- Minor Corrosion Spot (< 225 cm ² ) b


- Bigger Corrosion Spot (> 225 cm ²) b b b Bulkhead
- Assuming paint cracking
b b b
c - Blistering b b b
c - Cracking
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE

SG | TS Ref.: 200515 Page 69 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Deckhead general cond.

003 Long. upper stool bulkh. general cond. 004 Transv. upper stool Aft bulkh. General cond.

005 Scattrered intact blistering in way of the transv. upper 006 Aft bulkh. general cond.
stool bulkh.

007 Scattered intact blistering in way of the Aft bulkh. 008 Scattered intact blistering in way of the Aft bulkh.

SG | TS Ref.: 200515 Page 70 of 87


MV MARIA
COT COATING CONDITION REPORT

009 Fwd bulkh. general cond. 011 Fwd bulkh. general cond.

012 Inboard bulkh. general cond. 013 Inboard bulkh. general cond.

014 Outboard bulkh. general cond. 015 Outboard bulkh. general cond.

016 Transv. lower stool Aft bulkh. general cond. 017 Scattered intact blistering in way of the Transv. Lower
stool Aft bulkh.

SG | TS Ref.: 200515 Page 71 of 87


MV MARIA
COT COATING CONDITION REPORT

018 Both intact & broken blisters in way of the Transv. lower 019 Long. lower stool bulkh. general cond..
stool Aft Tanktop

020 Long. lower stool bulkh. general cond. 021 Spot corr. in way of the Long. lower stool bulkh.

022 Hopper bulkh. general cond. 023 Scattered intact blistering in way of the Hopper bulkh.

024 Tanktop general cond. 025 Tanktop general cond.

SG | TS Ref.: 200515 Page 72 of 87


MV MARIA
COT COATING CONDITION REPORT

026 Massive intact blistering in way of the Tanktop 027 Massive Intact blistering in way of the Tanktop

028 Minor spot corr. as result of broken blisters in way of the


Tanktop

SG | TS Ref.: 200515 Page 73 of 87


MV MARIA
COT COATING CONDITION REPORT

COT 9 PORT
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING
BULKHEAD FWD
BULKHEAD AFT
BULKHEAD PORT
BULKHEAD STB
LOWER STOOLS/HOPPER 3 6
TANKTOP 1 5 12

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
452 302 592

SG | TS Ref.: 200515 Page 74 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 9 PORT

Key:
Lower hopper/stool demarkation
Upper hopper/stool demarkation Bulkhead

Bulkhead Fwd Bulkhead


b

b
b
b b
b b
b b b b b
b

Tank-top Aft
Legend:

- Minor Corrosion Spot (< 225 cm ² )


- Bigger Corrosion Spot (> 225 cm ²) Bulkhead
- Assuming paint cracking
b
b - Blistering b
c - Cracking
d - Detachment Aft

Deckhead

Fwd

SG | TS Ref.: 200515 Page 75 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: 9 PORT

Key:
Lower hopper/stool demarkation
Upper hopper/stool demarkation Bulkhead

Bulkhead Fwd Bulkhead


b

b
b
b b
b b
b b b b b
b

Tank-top Aft
Legend:

- Minor Corrosion Spot (< 225 cm ² )


- Bigger Corrosion Spot (> 225 cm ²) Bulkhead
- Assuming paint cracking
b
b - Blistering b
c - Cracking
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE

SG | TS Ref.: 200515 Page 76 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Deckhead general cond.

003 Transc. upper stool Fwd bulkh. general cond. 004 Long. upper stool bulkh. general cond.

005 Transv. upper stool Aft bulkh. general cond. 006 Transv. lower stool Aft bulkh. general cond.

007 Outboard bulkh. upper section general cond. 008 Aft bulkh. general cond.

SG | TS Ref.: 200515 Page 77 of 87


MV MARIA
COT COATING CONDITION REPORT

009 Aft bulkh. general cond. 010 Fwd bulkh. general cond.

011 Fwd bulkh. general cond. 012 Inboard bulkh. general cond.

013 Inboard bulkh. general cond. 014 Outboard bulkh. general cond.

015 Outboard bulkh. general cond. 016 Transv. lower stool Aft bulkh. General cond.

SG | TS Ref.: 200515 Page 78 of 87


MV MARIA
COT COATING CONDITION REPORT

017 Localised intact blistering in way of the Transv. lower 018 Scattered intact blistering in way of the transv. lower
stool Aft bulkh. stool Aft Tanktop

019 Long. lower stool bulkh. general cond. 020 Localised intact blistering in way of the Long. Lower
stool bulkh.

021 Hopper bulkh. general cond. 022 Scattered intact blistering in way of the Hopper bulkh.

023 Hopper bulkh. general cond. 024 Transv. lower stool Fwd bul

SG | TS Ref.: 200515 Page 79 of 87


MV MARIA
COT COATING CONDITION REPORT

025 Transv. lower stool Fwd bulkh. general cond. 026 Tanktop general cond.

027 Tanktop general cond. 029 Scattered spot corr. In way of the Tanktop

030 Both Intact & Broken blisters in way of the Tanktop 031 Scattered intact & Broken blisters in way of the Tanktop

032 Remedial T-up coar failure in way of the Tanktop

SG | TS Ref.: 200515 Page 80 of 87


MV MARIA
COT COATING CONDITION REPORT

SG | TS Ref.: 200515 Page 81 of 87


MV MARIA
COT COATING CONDITION REPORT

SLOP STARBOARD
Rust Cracks Blisters Detachment Discol. Repair
Sub Location Pitting
(m²) (m²) (m²) (m²) (m²) Extent (m²)
DECKHEAD
UPPER STOOLS/WING
BULKHEAD FWD
BULKHEAD AFT 1 2
BULKHEAD STB
BULKHEAD PORT
LOWER STOOLS/HOPPER 1 2
TANKTOP 0.2 0.5 1.8

NDFT Specified DFT (µm) Mean DFT (µm) Min DFT (µm) Max DFT (µm)
419 318 550

SG | TS Ref.: 200515 Page 82 of 87


MV MARIA
COT COATING CONDITION REPORT

Vessel: MV MARIA
Tank #: SLOP STB

Key:
Lower hopper/stool demarkation
Upper hopper/stool demarkation Bulkhead

b b
Bulkhead Fwd Bulkhead

Tank-top Aft
Legend: b
b
- Minor Corrosion Spot (< 225 cm ² ) b
- Bigger Corrosion Spot (> 225 cm ²) Bulkhead
- Assuming paint cracking b b

b - Blistering
c - Cracking
d - Detachment Aft

Deckhead

Fwd
PHOTO REFERENCE - COT SLOP STB

SG | TS Ref.: 200515 Page 83 of 87


MV MARIA
COT COATING CONDITION REPORT

001 Tank entry 002 Deckhead general cond.

003 Aft bulkh. general cond. 004 Scattered i ntact blistering in way of the Aft bulkh.

005 Scattered intact blistering in way of the Aft bulkh 006 Fwd bulkh. general cond.

007 Outboard bulkh. general cond. 008 Transv. lower stool Fwd bulkh

SG | TS Ref.: 200515 Page 84 of 87


MV MARIA
COT COATING CONDITION REPORT

009 Scattered intact blistering in way of the Transv. lower 010 Inboard bulkh. general cond.
stool Fwd bulkh.

011 Hopper bulkh. general cond. 012 Tanktop general cond.

013 minor spot corr as result oif broken blisters in way of the 014 Minor Intact blistering in way of the Tanktop
Tanktop

SG | TS Ref.: 200515 Page 85 of 87


MV MARIA
COT COATING CONDITION REPORT

SG | TS Ref.: 200515 Page 86 of 87