Dated 09.06.10
S.E. (Operations)
"
Sr..organizatiorr:..Namesofofficers&Designati64.
N9.
L
2,
DTL.
3.:
uvnn"
S/Shri
BBMB ."
. I ,-, '
Direclor(PR),Chandigarh, .
sEffpM;ripccl,
:'
"
,,,:
7.
RVPN
CE(C&LD); EE(SLDC)Jaipur
',
8., .'.Up'pCf,r' '.
GM(US);Fax:0522-2287880, DGlvf, ziow agra, Faxo562:260i465'
9.
PTCUL
DGM (LD), EE (T&C), Roorkee:Fax No,01332-265767
:cenerarli4anager-GV,'Dehradun. I"
l
.i::
to.'
UJVNL "'
l't','
' Pow-erGrid, NR-t , GM(O&M); Ctr. Manager, New D.BIhi .
'
l,i "' ". TI;PC " ',
AGM, (Electrical design), Pragatipuram, Rishikesh.
"1 t.l.
r
r
..
".:
1,3- PowliGrid,,NR-Il" DGM(O&M),,Jtrmmu
,:
:' Dir(LD&T),KatwariaSarai,N:wDelhi :,
'l'
14.,: CEA,t
15
NRLDC
CM (CS); CM (TS)', New Delhi
16
NRPC '
SE (Operations); EE (O-I) ,
,
A Sub-committee, under the convener-ship of Ms Vineeta Agrawal, Chief Manager, NLDC was
constituted to prepare the technical specifications for RTUs and to recommend a list of certified
manufacturers. 14 venders were short listed and their RTUs were tested. Following 8 RTU vendors
were able to interface their RTUs with the existing system successfully and were found suitable for
integration with the existing ULDC system in Northern Region:
S.No.
1
2
3
4
5
6
7
8
Make
ABB
BPL
Chemtrol
CGL
GE
Siemens
Synergy
Dongfang
RTU Model
RTU 560
A-200
Callisto-NX
Xcell(Rack:081
D25
SICAM AK1703ACP
6049-E70
DF1331
Following vendors were considered to be conditionally passed. Constituents were advised to select
vendors subject to demonstrating the deficiencies as brought out in the report.
S.No.
1
2
3
Make
Areva
MB Control
Easun Reyrolle
RTU Model
Micom C264
ACE 3600
ER 1000
The matter was also discussed in the 15th TCC and 16th NRPC meeting held on 15th /16th April 2010
respectively.
2
TCC/ NRPC had approved the report of subcommittee and it was decided that constituents may procure
the RTUs quickly as recommended in the report.
Constituents may initiate action for procurement of RTUs as per requirement so that data is made
available to the Control Centres matching with the commissioning of the new stations
Constituents may submit the action plan for procurement and its integration in the system.
4.
Changing the Isolator and Breaker Numbers in ULDC SCADA System as per field
conventions
BBMB had changed the numbering scheme of two BBMB Sub-Stations i.e. 220kV Jagadhri and
220kV Samaypur. No problems were faced/reported during or after the implementation of revised
databases and displays. In view of the above, BBMB in the last meeting had requested that they may
be allowed to carry out changes for other BBMB Stations as well. HVPNL had stated that they have
not received the modified single line diagrams for the stations modified by BBMB. They also stated
that before implementing similar modifications in other stations, they would like to observe the
modified stations for at least one month. It was decided that further modification will be carried out
after one month of observation and feedback from HVPN.
BBMB may give the feed back of modification and Members may like to deliberate.
5.
NRLDC has reported that the existing AMC contract shall be expiring on 30th September, 2010 and
there is provision under the clause no.8.1 of the existing contract for extension of another two years at
the same terms & conditions. Since the equipments are under use and are required to be maintained to
facilitate secured functioning of the NR grid, the existing contract need to be extended for a period of
two years effective from 1st Oct, 2010.
Members may kindly deliberate and concur.
6.
Issue of TDS certificate & refunding the WC tax against AMC payment
NRLDC has reported that income tax is being deducted by the constituents while the payment is
released against the AMC bill. NRLDC has already written to all the constituents for issue of TDS
certificate. However, NRLDC are yet to receive the same. Further, work contract tax (WC) @2% has
been deducted by PSEB & DTL from the bill which is to be paid to the vendor additionally as per
actual. Hence PSEB and DTL may kindly reimburse the deducted amount to settle the accounts.
Members may like to deliberate.
7. Telemetry from generating stations & substations already under commercial
also those coming up during 2010-11
operation
The real time data from number of generating stations, which are already under commercial operation,
are not available at NRLDC. The list is attached at Annexure-I. Member may discuss the integration
plan of these stations.
4
During the last USMG meeting, MS, NRPC had requested constituents to submit details of sub-station
coming in the next year so that communication related issues can be discussed in time. He also
requested constituents to submit details of RTU in the following format:
Name of utility:
S.No
Voltage
Sub-station
Make
of Comm. mode
remarks
RTU
PLCC/wide band
During the hearing in CERC in the suo- motto petition on Grid disturbance in NR on 2nd Jan 2010,
concern was shown on non- reporting/ non availability of RTUs in the generating/ substations of NR.
Constituents may update and deliberate.
8.
NRLDC has reported that the modification in the database files are to be done to incorporate changes in
the system parameters/configuration and the same should be made available before 10th of each
month so that the on lining could be done in a planned way. It has however been observed that correct
network parameters are not entered while preparing the database. This is creating delay in onlining and
giving erroneous flows in state Estimator output. It is requested that all files may be sent to NRLDC
before 10th of every month after due checking of the network parameters.
Members may like to deliberate.
the constituents. As such, it will not be technically possible for the constituents to arrange the
insurance of the equipment as the equipment are not on the constituents book. BBMB has proposed
that the existing insurance practice may be continued.
Members may like to deliberate.
10.0 ANY ADDITIONAL AGENDA POINT
11.0 DATE, TIME AND PLACE OF NEXT MEETING
The Group may decide the date and venue of the next meeting.
Annexure- I
Utility
HVPNL
HVPNL
HVPNL
HVPNL
HVPNL
HVPNL
HVPNL
HVPNL
HVPNL
PSEB
PSEB
PSEB
PSEB
PSEB
PSEB
PSEB
PSEB
PSEB
PSEB
PTCUL
PTCUL
PTCUL
PTCUL
PTCUL
RRVPNL
RRVPNL
RRVPNL
RRVPNL
RRVPNL
RRVPNL
RRVPNL
RRVPNL
RRVPNL
UPPCL
UPPCL
UPPCL
UPPCL
UPPCL
UPPCL
UPPCL
UPPCL
KV Level
Station
Remarks
220
220
220
220
220
220
220
400
Cheeka
Daulatabad
IMT Manesar
Jorian
Nilokheri
Palli
Tepla
RGTP
2X600 MW
220
220
220
220
220
220
220
220
220
Bajakhana
Botiawala
Derabassi
Dhuri
Hambran
Khasa
Kotli Suratmali
Patran
Rajla
400
220
220
220
Kashipur
Haldwani
Pantnagar
Roorkee
220
220
220
220
220
220
400
220
220
220
220
220
220
220
220
Attrauli
Dohna
RPH
Gomati Nagar
Jhansi
Sambhal
Rosa Power TPS (IPP) 1 X 300 MW Relince
7
8
8
1
1
2
UPPCL
UPPCL
PGCIL
PGCIL
J&K
PDD
PDD
400
220
Vishnupryag Hydro
(IPP)
Raibareily
400
KOTA
400
220
Baglihar Hydro
Burn
4X 100 MW JP
3 X150 MW