You are on page 1of 8

C.

V: Yawar Jamil

YAWAR JAMIL

PERSONAL
Phone: 021-35885583
Mobile: 0322-2012280
Email: yjamil@gmail.com
Date of Birth: 27th February 1977
Marital Status: Married

Personal address
94/C, 10th Commercial Street,
Phase IV, DHA, Karachi-75500
Pakistan.

PROFILE
More than nine years working experience on environmental projects and management/consultancy
of HSE Management System in the oil, power plant (independent power producer), pharmaceutical
and automotive sectors.
More than 3.5 years experience as Head of HSE Department in oil and energy (power) sectors.
Good knowledge of chemical engineering/applied chemistry, environmental engineering,
engineering management and business management.
Have key technical skills in project management softwares (Primavera and Microsoft Project), and
some basic knowledge of Dynamic simulation software tool (Powersim and Arena) and engineering
design software (Pro-e).
Very good knowledge of ISO, 9001, 14001 and OHSAS 18001Management Systems.
Good knowledge of ISO 9001, 14001 and OHSAS 18001 Management Systems Audits.
Have very good knowledge of Hazard Identification and Risk Assessment (HIRA), Environmental
Aspects/Impacts, Process Hazard Analysis (PHA), Process Safety Management, Job Safety
Analysis (JSA), etc.
An excellent HSE Trainer and conducted more than 100 training sessions on different HSE topics.
Good knowledge of Power Plants, Oil Depots/Terminals and Pipeline, Pharmaceutical and
Automotive industries HSE requirements.
Very good knowledge of Pakistan & UAE environmental laws.
Very good knowledge of prequalification and proposal development, and have completed more
than 200 proposals/ prequalification documents for IEE/ EIA, ESA, Waste Management, Waste
water treatment plants optimization, QC laboratory setup consultancy, Environmental Baseline,
Environmental Monitoring, HSE trainings and other environmental/safety projects.
Have sound skills of report writing and completed around 70 technical reports on environmental
site assessments (Phase I, II & III), Ground Water Monitoring, Crops Protection Program, Initial
Environmental Examination (IEE), Environmental Impact Assessment (EIA) and Solid Waste
Management. Also developed HSE manuals and audit reports for pharmaceutical, automotive and
oil storage and transportation companies.
Good knowledge of Security Management System, Business Continuity Plan and
Emergency/Disaster Response Plan for oil storage/transportation company and power plant.
Good communication, people management, training and leadership skills.

WORK EXPERIENCE
January 2011- Present

Asia Petroleum Limited


(Oil Storage & Transportation Company)

Position Hold

A.M HSE (Head of HSE Department)

Page 1-8

C.V: Yawar Jamil


Responsibilities

S.No.

HSE Areas

The main responsibilities in Asia Petroleum limited is to


monitor the performance of HSE Management System, update
the environmental aspects/impacts and risk assessment for
process/auxiliaries equipment and routine/non-routine jobs by
the help of other team members. Other responsibilities include
the HSE trainings to APL and contractual employees, internal
QHSE audits and their reporting to company management and
environmental monitoring of plant by the help of third party
laboratory. The details of responsibilities are given in
following table.

Responsibilities Details

Gap Analysis

Carried out Gap Analysis for ISO 14001:2004 and OHSAS 18001:2007
Management Systems.

QHSE
Procedures
Development &
Implementation

Developed/finalized the procedures according to clauses of ISO


9001:2008, ISO 14001 & OHSAS 18001 and assisted management in
implementing them within Asia Petroleum Limited.

HIRA and
Environmental
Aspects/Impacts

HAZOP and
PHA

Employees
Health
Management

Inspection

7
8

Environmental
Monitoring
HSE Incident
Investigation
and Reporting
Emergency
Management
Organisation

10

Reporting

11

Training

12

Internal Audit

Carried out hazard identification and risk assessment and environmental


aspects/impacts for all equipment, process and routine/non-routine
activities with the help of team of engineers, supervisors and chemist.
Also review them on on-going basis.
Reviewed already existing hazard operability and process hazard
assessment studies of plant and assisted management in complete
implementation of said studies.
Co-ordinates with HR Department for pre-employment health assessment
of new employees and periodic medical check-up of existing employees.
Make sure that fire fighting, safety and emergency items are inspected on
periodic basis.
Coordinate with third party laboratory for monitoring of gaseous
emissions, waste water, noise, etc.
To assist supervisors and sectional heads in carryout the HSE incidents
investigations and determination of root causes.
Lead the emergency management organisation of Asia Petroleum Limited
Report HSE performance of Company to management on monthly and
quarterly basis.
Conduct trainings for employees on different HSE topics
Carryout Internal Audits of ISO 9001:2008, ISO 14001:2004 & OHSAS
18001:2007 Management Systems by the help of internal auditors. Also
prepare internal audit reports for management review.

June 2009- January, 2011

DHA Cogen Limited


(Desalination & Power Generation Company)
Ashmore Energy Internationals (USA Based Firm) Holding

Position Held

EHS Manager (Head of EHS Department)

Responsibilities

In DHA Cogen Limited, I was responsible for implementation


of environmental health and safety procedures, leading the
EHS Team, provide training on different EHS topics,
compliance with all applicable environmental and safety
Page 2-8

C.V: Yawar Jamil


laws/regulations, perform audits and preparation of monthly,
quarterly and yearly EHS reports. The details of EHS activities
in DCL are given in following table.

S.No.
1

2
3

EHS Areas

Responsibilities Details

EHS Procedures
Development &
Implementation
Coordination
with Sindh EPA
EHS
Compliance
Calendar

Developed the standard operating procedures according to clauses of ISO


14001, OHSAS 18001 and Ashmore Energy (main assets holder of DCL)
guidelines and also implemented them.
Co-ordinate with the Sindh Environmental Protection Agency for
compliance of applicable environmental laws/ regulations.
In order to ensure that EHS procedures are followed strictly by all
departments such as Operation, Maintenance, Procurement & Store,
Laboratory and Admin., I developed and implemented the EHS
Compliance Calendar.
For personnel and plant safety, I have implemented the following
inspection/ audit programs at DHA Cogen Limited.
Portable Fire Extinguishers
Fire Hydrants/Hoses
House Keeping
Portable/Fixed Ladder
Rigging Tools such as Slings, Shackles, Eye Bolt, Chain Long, Jacks,
etc.
Safety Walkdown of Plant
Hoist and Cranes
PPEs Compliance
Fork Lifter
Power Tools
Safety Valves

Inspection &
Audits

EHS Incident
Investigation &
Reporting

To help Managers/Supervisor in carrying out the incidents investigations,


determination of root cause of all incidents, their findings, closeouts and
reporting
Preparation of monthly, quarterly and Annual EHS Reports and their
reporting to Ashmore Energy International
Provide trainings to DCL and contractual employees on different EHS
issues such as Job Safety Analysis, Hazmat, Work Permit System,
Confined Space, Chemical Management, Hot Work, Working at Height,
Electrical Safety, Emergency Evacuation and Response Plan, MSDS, Fire
Fighting, etc.

Reporting

7
Training

May 2008-June 2009

SGS Pakistan (Pvt.) Ltd.


(Switzerland Based Firm)

Position Held

Executive Officer
(Mineral & Environmental Department)

Responsibilities

In SGS Pakistan, I worked as Environmental Expert for


different Initial Environmental
Examination (IEE),
Environmental Impact Assessment (EIA), Environmental Site
Assessment (ESA) and Environmental Baseline Projects. The
brief description of these projects is given in following table.

S.No.
1

Client
KESC

Project Details
Supervised the environmental monitoring activities of
KESC Power Plants by following the Self Monitoring and
Reporting Tool (SMART) program. The locations of these
Page 3-8

C.V: Yawar Jamil

KESC

KESC

KESC

KESC

KESC

Nestle Pakistan

Pakistan
Cosmetics

Nestle Pakistan

10

Nestle Pakistan

11

PARCO

12

RAK Gas, UAE

plants are Korangi, Bin Qasim Town and SITE Industrial


areas.
The main purpose of this project was to determine the
power plants compliance with Pakistan National
Environmental Quality Standards (NEQS) and other
international standards. The scope of environmental
monitoring included the checking of waste water quality,
gaseous emissions quality from stacks, ambient air quality
and sound level recording. Suggestion of mitigation
measures/control measures for these environmental impacts
was also included in the scope of work.
Conducted the Environmental Impact Assessment (EIA) Study
for 132 KV Hybrid Grid Stations and Underground
Transmission Lines Project, located in Azizabad, Gulshal-eIqbal and Liaquatabad.
Conducted the EIA study for 132 KV Hybrid Grid Stations,
located in different areas of Karachi City.
Conducted the EIA Study for Hybrid Grid Station, located in
Memon Goth.
Conducted the EIA Study for Overhead Transmission Lines and
Hybrid Grid Station, located in Airport and Korangi Areas.
Conducted the EIA Study for Hybrid Grid Station, located in
Gulshan-e-Maymar.
Completed the Initial Environmental Examination (IEE) Study
for 06 Hydrocarbon storage tanks which were proposed to
construct/commissioned in existing Nestle Sheikhupura Plant.
In Pakistan Cosmetics, I conducted the Gap Analysis against the
principal requirements of ISO 14001 and OHSAS 18001:2007
by visiting the site, observing the potential risk and examine the
existing organization policies and procedures.
Completed EIA Study for Nestle Waste Water Treatment Plant
located in Kabirwala City, Punjab.
Completed IEE Study for Nestle Power House, Butter Oil Store
& Rework Processing Plant, located in Kabirwala City, Punjab.
Completed EIA Study for Air Asphalt Blowing Unit and
Hydrodesulphurization Unit located in Mid Country Refinery
(MCR), Mehmood Kot, Punjab.
Completed the EIA Study for Waste Water Treatment Plant,
located in RAK Gas Plant, Ras Al Khaimah, U.A.E.
Carried out the Environmental Risk Assessment of all
available disposal options for highly concentrated brine
waste water.
Also helped the project designer in selecting the most
environmental friendly option for disposing the waste water

September 2007- April 2008

Environmental Management Consultants

Position Held

Environmental Engineer

Responsibilities

The main responsibility in Environmental Management


Consultants (EMC) was the technical report writing of IEE &
EIA Projects. Other responsibilities included the project
management, ISO 14001 and OHSAS 18001 systems
implementation and their standard operating procedures
development, Proposals development for different IEE/EIA,
Waste water treatment plant and Solid Waste Projects. The
Page 4-8

C.V: Yawar Jamil


details of projects completed in recent past are given in the
following table.

S.No
1

4
5

6
7
8
9
10

11

Client

Project Details

Successfully developed and implemented the Occupational Health and


Safety (OHSAS 18001-2007) system at HinoPak Motors in 07 months
time. During implementation stage, completed the following tasks:
Developed and implemented standard operating and control
procedures related to Occupational Health & Safety Management
System
Trained People on OHSAS-2007 System, Basic Health & Safety,
OH&S legal and regulatory requirements, OH&S internal audit,
Permit to work, Emergency Response Plan Driving Safety, etc
Conducted several Occupational Health & safety audits of HinoPak
different shops and departments during OHSAS 18001-2007
implementation phase
Similarly conducted the internal audit for all shops of Assembly
and Body Plants of HinoPak Motors, just prior to OHSAS 180012007 Certificate Stage-1 Assessment Program.
Al Tuwairqi Group Completed EIA Report for Tuwairqi Steel Mill. This project is
proposed to set-up in Port Qasim Industrial Area, and Dry Reduced
Iron and Rolling Mill will be the main features of the Project.
Fauji Akbar Portia Completed EIA Report for Fauji Akbar Portia Terminal which is
proposed to setup in Port Qasim, just adjacent to QICT, for the storage
Limited
of Grains, Fertiliser, Oilseeds and Rice.
Completed the Initial Environmental Examination Report on NGL
National Gasses
proposed LPG-Plant in Hub Industrial Estates, Balauchistan.
Limited
Completed the Environmental Impact Assessment (EIA) Draft Report
Pakistan Textile
on Pakistan Textile City Project, which will be setup in Port Qasim
City Limited
Industrial Area.
Completed Initial Environmental Examination (IEE) Report on
McDonalds
McDonalds, which is in operation in Islamabad F-9 Park.
Pakistan
Completed IEE Report on Additional Oil Storage Tank at Bosicor
Bosicor Pakistan
Pakistan Limited near Hub, Balauchistan.
Limited
National Refinery Completed IEE Draft Report for Expansion of National Refinery
Limited.
Limited
Completed IEE Draft Report on Expansion of LPG Storage by
SHV Energy
Additional Storage Tanks at Port Qasim
Pakistan
Chevron Pakistan Successfully supervised the solid waste management activity for
Chevron Pakistan. This project was about the disposal of oil
contaminated soil in environmental friendly manner.
Completed the IEE Report on Service Apartments project which is
Orix Properties
proposed to construct in Gulberg, Lahore.
(Pvt.) Limited
HinoPak Motors
Limited

May 2005- August 2007

Tekcellent (Pvt.) Ltd.

Position Held

Report Writer (Environmental Projects)

Responsibilities

The main responsibility in Tekcellent was the technical report


writing and development and implementation of HSE
procedures for different activities of company projects. In
Tekcellent, I also prepared and implemented the HSE
procedures in well known pharmaceutical company. The detail
of projects completed in Tekcellent is given in following table:

Page 5-8

C.V: Yawar Jamil

S.No

Clients

Project Details

Chevron Pakistan

Performed Environmental Site Assessments (Phase I & II) for two


sites in Karachi.
Completed six factual reports on Environmental Site Assessments
(Phase I & II) for sites in Dhurnal, Shikarpur, Taru Jabba,
Rawalpindi, Karachi and Machike.

Shell Pakistan

Completed ten comprehensive reports on Groundwater Monitoring


Events (GMEs) for sites in Shikarpur, Machike, Bakkar, Sargodha,
Vehari, Shershah Islamabad, Daulatpur, Karachi and Multan.

Shell Pakistan

Completed two reports on Environmental Site Assessments (Phase II)


for sites in Faisalabad and Sahiwal.

Shell Pakistan

Completed three factual reports on Environmental Site Assessments


(ESAs), also called Crops Protection Program (CPP) for sites in
Lahore, Faisalabad and Multan.

Shell Pakistan

Qasim International
Container
Terminal(QICT)
Huntsman

Johnson & Johnson

Completed two Quarterly comprehensive reports on Phase Separated


Hydrocarbon (PSH) Recovery in Shell DP, NDP, Bakkar, Sargodha
and Shershah.
Conducted a continuous 48 hour survey to monitor fitness of Trailers
on the terminal in accordance with checklist and of the bona fides of
the vehicle operators as per given specifications.
Performed Phase I environmental site assessment (ESA) on
Huntsman and Gul Ahmeds joint textile chemicals blending
plant. This assessment addressed the soil and groundwater,
surface water and wastewater, air emissions, solid and hazardous
waste, asbestos, lead, PCBs, storage tanks, process safety
management, life and fire protections. These ESAs follow ASTM
E 1527 standards, and address environmental issues and
regulatory compliance, including a historical site review.
Completed comprehensive report on ESA-1 by following ASTM
E 1527 standards
Assisted the Tekcellent Principal Consultant in developing the
safety and environmental operating procedures for well known
pharmaceutical company.
During implementation phase, I provided several trainings to
management and non management staff on Work Permit System,
LOTO, Confined Space, Hot Work, Waste Management, Working
at Height, Chemical Management, etc. I also helped the
management in identifying the HSE gaps in their system by
conducting the surveys, and meeting with company staff.

May 2003-April 2005

Envirotek Consulting Services (Pvt.) Ltd.

Position Held

Project Engineer

Responsibilities

The details of responsibilities in ECSL were as follows:

S.No.

Client

Project Details

Beltexco Ltd.

MNA Energy

Supervised the environmental monitoring of entire plant, located in


Export Promotion Zone, Karachi.
Completed the Initial Environmental Examination for LPG Plant,
located in Port Qasim, Karachi.
Page 6-8

C.V: Yawar Jamil


3
4

Haschome (Oil
Marketing Company)
Pakistan State Oil

Pakistan State Oil

Pakistan State Oil

Pakistan State Oil

Completed the Initial Environmental Examination for Auto Gas


Pump, located on Shahrae Faisal, Karachi.
Completed the Environmental Site Assessment (Phase I & II) for
Oil Terminal, located in Keamari, Sindh.
Completed the Environmental Site Assessment (Phase I & II) for
Oil Terminal, located in Pipri, Sindh.
Completed the Environmental Site Assessment (Phase I & II) for
Oil Terminal, located in Sihala, Punjab.
Completed the Environmental Site Assessment (Phase I & II) for
Oil Terminal, located in Mehmood Kot, Punjab.

EDUCATION
2001-2002

MSc Engineering Management


University of Sunderland, United Kingdom.

1996-2000

Bachelor of Chemical Technology/Engineering


Chemical Technology & Engineering Dept, Karachi University.

RESEARCH & DESIGN PROJECTS


Completed M.Sc Project on the Investigation and evaluating the current position regarding Supply
Chain trends in automotive industries, with particular emphasis on Modular concept. The main
areas of this project are mentioned below.

Current Supply Chain trends such as pull system, built to order, integrating system, just in
sequences, market places, strategic alliances, etc.
Modular concept
Future modular activities
Automotive quality system-QS9000
Operation strategies for implementing modular concept such as Cellular Manufacturing
System, Just in Time, Kanban, FMS, Concurrent Engineering, etc.

Designed and developed bachelor project Fluidize Catalytic Cracking Unit for the catalytic
cracking of crude oil and also prepared a research report on different catalysts which can be used
safely in this unit and also available easily at reasonable cost. The motivation behind this project
was to design such a unit that can crack the crude oil readily and also use fewer of catalysts.
Balanced Material & Energy for several units of Refinery for processing 20,000 bbl/day of crude
oil.

TECHNICAL & COMPUTER SKILLS

Project Planner Primavera 3 (Project Management Software)


Microsoft Project (Project Management Software)
Microsoft Office (Word, Excel, PowerPoint, Front Page, Publisher)
FORTRAN (Can use it for translating mathematical formulae into computer programs)
Internet (World Wide Web, E-mail, Discussions Groups, etc)
Powersim, Arena (Dynamic Simulation Software Tool)
Pro-e (Professional Engineering Software)

MEMBERSHIP

Member of Society of Chemical Engineering and Technology, Pakistan


Member of Engineering Management Council, United Kingdom

Page 7-8

C.V: Yawar Jamil

LANGUAGES

English
Urdu

Speaking
Excellent
Excellent

Writing
Excellent
Excellent

Listening
Excellent
Excellent

Reading
Excellent
Excellent

TRAININGS

NEBOSH IGC (Result is expected in first quarter of 2013).


IRCA approved Lead Auditor Course on OHSAS 18001:2007
ISO 9001:2008 Internal Auditor Course by PIQC
ISO 14001 & OHSAS 18001 Internal Auditor Course by Future Tech Consulting
Two Days Seminar on Occupational, Health and Safety, organized by The Institutions of
Engineers Pakistan.
06 Weeks Internship in Gul Ahmed Textile Mill
02 Days Conference on Marketing in Sheraton Hotel, conducted by MAP
01 Day Conference on Quality Control in PC Hotel, conducted by PIQC
01 Day Fire Fighting Training Course by Haseen Habib
01 Day First Aid Training Course by Haseen Habib
02 Days First Aid Training Course by St John Ambulance
ISO 9001:2008 (Quality Management System) basic awareness course by PIQC

REFERENCES
References will be provided on demand.

Page 8-8

You might also like