START UP MAIN SEQUENCE

1. PREPARATION THE UNIT FROM LOCAL.


2. PREPARATION FROM T.C.R .
3. START UP S.W. SUPPLY PUMP.
4. WARMING UP STEAM LINES.
5. START UP EJECTOR & EJECTOR COND. PUMP.
6. START UP BRINE RECIRCULATION PUMP.
7. ADMIT STEAM TO BRINE HEATER.
8. START UP BRINE HEATER COND. PUMP.
9. START UP DISTILLATE PUMP.
10. START UP SEA WATER RE-CIRCULATION PUMP.
11. REACHES FULL PRODUCTION & NORMALIZED THE SYSTEM.

1. PREPARATION OF THE UNIT FROM LOCAL: -

Check the status of the P.T.W. issued on the unit and if any P.T.W is pending, checks the equipments
and isolations done for work. If all PTW is cancelled for the start up of the unit, then conform the proper
power supply. Instrument air supply to the units. Check all mechanical equipments and parts such as
man holes, covers, pipe spools etc. If all are found satisfactory then proceed for the preparation of unit.
Conform with lab for the availability of suitable chemicals for normal operation.

PREPARATION OF EVAPORATOR : -

Close all the following drain valves and vent valves: -


i. S.W. supply line to unit.
ii. Brine pump suction line.
iii. Distillate pumps suction line.
iv. S.W.R. pump suction line.
v. Vent condenser water boxes.
vi. Vent condenser
vii. M.H. water boxes.
viii. Evaporator main drain - H - 203.
ix. Evaporator transformer box.
x. All water boxes.
[Note: - Vent valves of 18 th, 17 th & 16 th stages water boxes to be kept opened.]
xi. Main drain valve of water box drain header at east & west side of the evaporator to be kept
opened.
xii. Brine pump discharge line.
xiii. Vent condensate to 18th stage - kept opened.
2
xiv. Make up water strainers.
xv. Brine to heater ‘U’ tube.
xvi. Brine heater vent valve - WG06G02 - open full.
xvii. All evaporator chambers vent valves.
xviii. All level glasses of all cells, Brine heater, and Ejector condenser.
xix. All chemical tanks.

• OPEN THE FOLLOWING VALVES (From Local)

i. Stripping steam H - 204 - Full open.


ii. Vent valve of the 10th stage - H - 709 - 22 % open.
iii. Vent valve of 5th stage - H - 710 - 20 % open.
iv. Acid cleaning line valve - H - 205 , H - 207, H - 206 - Closed.
v. Distillate min. flow valve H - 215 - Closed.
vi. Make up water Strainer should be either Port one or Port two.
vii. Distillate to Demineralisation plant H - 305 Closed.
viii. Open the vent condenser cooling water valve H - 116.
ix. Open the ejector condenser cooling water valve H - 115.

• A. PREPARATION OF STEAM LINES & STEAM REDUCING STATIONS: -

 Open the manual valves to the waste drain pit at boiler side - Full.
 Open all steam trap isolating manual valves to full (LP & HP).
 Open the manual valves of the steam drain by pass lines ( one valve to full & the other about
20% for initial warming up in HP line).
 Open all drain valves of LP. Line to - Full.

• B. OPEN THE FOLLOWING VALVES LOCALLY: -

 Main steam isolating valve - H - 501.


 Main D.S.H. water isolating valve - H - 413.
 L.P. header valves H - 602, H - 604, H - 605, H - 606.
 Spray water line manual isolating valves.
 Ejector spray water line- WD06G01, WD06G02, ( WD07G02 Closed).
 Spray water to R/S - WD04G01, WD04G02,( WD05G02 - Closed / by pass/
WD02G01,WD02G02, (WD03G02 - BY pass / Close.)
 Close the drain valve of the spray water of the each line.
 Ejector steam manual valves - WH05G01, WH05G02.
 Atomizing steam lines - keep one strainers of the atomizing steam line in service and the other
one as S / B
The other valves WH07G03, - open, WH07G05 - open, WH08G01 - Close B / P.
 Atomising steam spray water - Keep one strainer in service and other as stand by.
 Open the other manual valves - WC19G04.
 Close the drain valve of this line.
3
C. PREPARATION OF THE B.R. Pump & TURBINE: -

i. Check the power supply at the local turbine panel.


ii. Start primary L.O. pump & check pressure (put AUTO position) - Lube oil pressure - 0.5 to 0.65 bar,
servo Oil pressure - 6.2 bar.
iii. Open the discharge valve of gland fan start it from Local panel.
iv. Open the steam drain manual valves for worming - up.
v. Open pneumatic drain valves from local panel.
vi. Check oil level for turbine.
vii. Check oil level for turbine.
viii. Open thrust bearing oil cooling water valves - inlet & outlet valves.
ix. Open gland cooling water line from out side source.
x. All pressure gauges & transmitters, isolation valves to be opened and drain valves to be Closed.
xi. Turbine oil cooling water isolating valves to be opened to about 60 %.
xii. Utility water line to be put in service.
xiii. Check the open - close functions of the steam valves H - 505 & keep by pass open.

D. PREPARATION OF EJECTOR: -

i. Open the drain valve of steam line.


ii. Open air valves - H-701, H-703, H-707, H - 708.
iii. Open the discharge valves on steam line WE02G01, WE03G01, WE04G01, WE05G01.
iv. Open the manual valves on steam line WE02G01, WE03G01, WE04G01, WE05G01.
v. Open the Hogger manual valves to atmosphere- WE10G05.
vi. Close the inlet valve after the manual valves on steam lines H - 509, H - 510, H-511, H-512.

E. PREPARATION OF S.W.S. PUMP: -

i. Check oil level for thrust bearing.


ii. Check oil level for motor.
iii. Open valves for cooling water line & check pressure as 1.2 & diff. press. ( to be less than 0.2 ).
iv. Local push button to be released.
v. Discharge valve selection switch should be in T.C.R.
vi. Check the Circuit Breaker at the SWG room (by E.O).
vii. Pump casing vent isolating valve open.

F. PREPARATION OF DISTILLATE PUMP: -

i. Check oil level for thrust bearing.


ii. Check oil level for motor.
iii. Open the distillate cooling water line from the header.
iv. Open cooling water line strainer isolating valves.
v. Open distillate isolating valve H - 314 to T.W. & ring valve.
vi. Open cooling water valves to thrust bearing & conform the flow through the flow sight glass.
vii. Open gland cooling water valve.
viii. Open the air vent valve to evaporator.
4
ix. Open the air vent valve H - 301, H - 303.
x. Release the local push button.
xi. All pressure gauges & isolating valves to be opened.
xii. All drain valves in the distillate line to be closed.
xiii. Local operated valves in distillate line to be opened H - 306 & H - 311.
xiv. Distillate sampling line isolating valve - Open.
xv. All isolating valves to level transmitter to be opened
xvi. Check the C.B. by E.O.

G. PREPARATION OF B.H. CONDENSATE PUMP: -

i. Check bearing oil level.


ii. Open air vent valve of the pump to B.H.
iii. Open sealing water valves & gland cooling water valves.
iv. Close oil cooling water line valve. It is opened only when finds necessary as bearing temp.
increases.
v. Open suction valve H - 401, H - 403.
vi. Release the local push button.
vii. Open local operated motor valve H - 405, H - 408.
viii. Open manual isolating valve in the condensate reject line - WC15G01, WC15G03 & WC16G01.
ix. Close the drain valves in the condensate line.
x. Open all isolating valves of the level transmitter
xi. Check the C.B. by E.O.

H. PREPARATION OF EJECTOR CONDENSATE PUMP: -

i. Check bearing lube oil level.


ii. Open partially air vent valve of the pump to condenser.
iii. Open partially gland sealing water valve.
iv. Release local EM push button.
v. Open suction valve - ( WC07G01, WC08G01).
vi. Open discharge valve ( WC09G02, WC10G02).
vii. Open the isolating valve before control valve - WC09G04
viii. Close drain valve in the discharge line.
ix. Bearing cooling water valve to be closed. It will open only, when finds necessary as bearing temp.
increases.
x. Open all isolating valves to the gauges & transmitters.
xi. Check the C.B. by E.O.

I. PREPARATION OF S.W.R. PUMP: -

Note: - S.W.R. pumps to be prepared after starting the see water supply only.
i. Check oil level for the bearing.
ii. Open suction valves - H-106 , H- 108.
iii. Check the gland cooling water.
iv. Open the vent valves of the pump casing & release the air completely and close again.
5
v. Release the local EM push button.
vi. Open the local operated motor valve - H - 112.
vii. Check the C.B. by E.O.

2. PREPARATION FROM T.C.R.: -

i. Check all the alarms in the panel & if any abnormal alarm existing, rectify & reset it.
ii. Check the function of all motor valves & control valves and closed the valves.
iii. Close the brine blow down isolating valve H - 201 & control valve.
iv. Open sea water reject isolating valve H - 105 & Control valve about 50 %.
v. Open vent condenser cooling water valve H - 116 about 60 %.
vi. Open ejector condenser cooling water valve H - 115, about 60 5.
vii. Open Brine heater outlet valve H - 202.
viii. Open sea water to unit valve H - 101.

3. START UP SEA WATER PUMP : -

If the sea water line is empty, then it is necessary to fill the line before starting the supply pump.
 Open the vent valve at the discharge line.
 Open inter-connection valve of S.W. header & fill the line until flows out of the vent valve.
 Open pump casing air venting isolating valve.
i. Start the S.W. pump , which is selected.
ii. Open gradually discharge valve.
iii. Check the S.W. header pressure approx. 2 bar & adjust the S.W. flow F - 201 to 9000 t/h by the
control valve. Adjust the vent condenser & ejector condenser cooling water flow as 1200 t / h &
420 t / h respectively by opening the valves H - 116 & H- 115.
iv. Check the bearing temp. & winding temp. time to time. Closed vent valves of water boxes for 18th ,
17th & 16th stages.
FILLING THE EVAPORATOR: -

Fill sea water in the bottom deck of evaporator about 250 to 300 mm, by opening the make up water by
pass valve or main valve.
Reading in TCR desk L - = 250 / 300 mm.

4. WARMING UP OF STEAM LINES: -

 Open HP steam by pass valve from the boiler side.


 Watch pressure P - 404 to reach up to 20 bar & temp. T - 17 to be increased.
 Open steam by pass valve H - 504 to turbine [ from TCR]
 Open steam by pass valve H - 505 to turbine [ from LOCAL].
 Open steam valve to ejector.
 H - 506 - Partially.
 H - 508 - Full
 Pressure Control valve P - 607 approx. 20 % open.
 When found all drains water is completed & steam comes out through the drains,
close H - 504 & H - 505.
6
 Open main steam valves from boiler side & D.S.H. water valve also.
 Check steam pressure P - 404, approx. 64 bar.
 Check D.S.H. water pressure P - 403, approx. 115 bar.
 Check temp. T - 16, approx. 130 OC.
 Then open gradually steam valve to turbine, H - 504 to full.
 Open steam valve to ejector H - 506 fully.
 Close all H.P steam drain by pass valves in R/S while opening the H.P. steam main valve from
boiler side.

5. STARTING OF EJECTOR: -

 Close all air valves of the ejector - Locally.


 Close outlet valve of Hogger H - 706 - Locally.
 Increase the ejector steam pressure, P - 607, up to 13 bar, TCR.
 Adjust the steam temp. T - 19, 195 OC by opening the spray water - TCR.
 Start hogger ejector, secondary ejector & primary ejector by opening the inlet steam valve -,
H - 511,H - 512, H - 510. Locally.
 Open the respective air valve of ejectors, from local.
 Maintain the ejector steam pressure P - 607 = 13 bar,
 Temp. = 195 OC, TCR
 & select Pressure & temp. Control AUTO.
 When condenser level increases L - 104,
 Start the ejector condensate pump & maintain L - 104 , 300 mm by adjusting the CV.
 Set the level in 300 mm & select Controller “ AUTO’.
 Check gland sealing water of pump, Locally.
 As the ejector started , the vacuum starts to improve in the evaporator,
 Check vacuum pressure P - 408 should be - 0.5 with in 45 mins.

6. START UP THE BRINE RECIRCULATION PUMP: -

 When steam opened from boiler side, the warming up of turbine also to be carried out.
 All drain valves opened while locally prepared.
 H - 504 HP steam isolating valve - open full.
 H - 505 HP steam isolating valve - open full.

 For warming up: -


 When vacuum is reached to - 0.5 bar in evaporator, the B.R. turbine can be started.
 Before starting the turbine check the following : -
 HP steam pressure - P - 411 = approx. 64 bar.
 HP steam temp. minimum - T- 20 = 320 OC.
 If L.O. cooling water pressure Low or High , it can be adjusted by opening / closing of the
cooling water outlet valve.
 Oil cooling water pressure - P - 801 = 1.2 bar.
 Lube oil pressure - P - = 0.6 bar.
 Servo oil pressure - P - = 6.2 bar.
 Evaporator 18th stage level - L - 101 = 350 mm.
7
 Oil level of turbine = normal.
 Oil level of thrust bearing of B.R. pump = normal.
 Lube oil temp. = normal.
 Gland cooling water - open from outside source.
 Exhaust atmospheric valve - H - 612 open from TCR.
 Exhaust valve - H- 611 Open.
 Brine pump discharge valve H - 154 - Open full.
 Make up isolating valve H - 102 - Open LCR ( Local operated).
 All isolating valves of gauge glasses & transmitters - Open.
 Brine heater outlet valve H - 202 - Open full.

• If the above conditions are fulfilled, then ready to start the B.R. pump: -

 Open make up water isolating valve H - 103.


 Open make up water control valve & increase 18th stage level L - 101 to approx. 450 mm from
TCR.
 Reset all the alarms on local panel.
 Close the valve H - 505 to full & get the close signal on the turbine panel .
 Wait the steam chest pressure to come down to zero - P - 411 = 0 bar.
 Press the push button - START - LCR.
 Open the HP steam inlet valve H - 505 slowly.
 After getting the pressure to the turbine , it will start at a R.P.M. of 185, it means turbine started.
 Close the pneumatic drain valves & HP steam drain valves full.
 Check the primary L.O. pump in AUTO position.
 Then increase the B.R.pump speed from TCR, by pressing push button from TCR desk (every
push can be increasing 3 R.P.M.) & observe the evaporator level.
 Enough make up water to be added to maintain the level about 350 mm. Open discharge valve
H - 154 to full according to the level.
Note: - Maximum care to be given for the 18th stage, when increasing turbine speed.

• Check the following: -


 Increase the turbine PRM until Brine flow -F - 105, reach to 7000 t / h.
 Brine pump discharge pressure P - 402 , = 3.0 bar.
 Brine heater outlet pressure- P - 402 = 0.2 bar.
 Turbine exhausts pressure - P - < 0.8 bar.
 Check bearings temp., cooling water temp. time to time.
 Check locally, is there any leakage water , steam or oil etc.
 When exhaust steam valve opened to the LP steam header, so; LP header steam pressure not
exceeds 1.2 bar.

 When brine flow reaches to 7,000 t / h , open the Brine blow down isolating valve H - 201 to full
& open control valve to adjust the brine blow down flow - F - 106 = 1,000 t / h.
 Adjust the make up water flow also 1,000 t / h & set the level 300 mm & put in AUTO control.
8
7. STEAM TO MAIN HEATER :

 When brine flow F - 105, reaches to 6, 000 t / h,


 The LP steam header pressure will be around 0.9 bar.
 All drain valves & steam trap valves are opened at the time of pre-heating of the units.
 Again check the drain valves of LP steam to B.H. in front of L.C. R.
 Open L.P steam isolating valve H - 609 & watch the brine heater condenser pressure P - 701.
 It will increase due to most of the air will enter the condenser from the line. It will release through
the vent valve, which was kept opened full.
 As the pressure comes down in the brine condenser P - 701 = 0.0 bar.
 Then open LP steam valve H - 609 to full by watching condenser pressure.
 Open the steam control valve to the B.H. to about 10 %, so; LP header pressure will come down.
 Then close the turbine exhaust valve H - 612 to full.
 So, all the turbine exhaust steam will go to the LP header & to B.H. by the time the brine flow
should reach to 7,000 t / h.
 The steam flow F - 110 will be around 20 t / h.
 As the initial steam flow to B.H. is 55 t / h,
 Put any of the steam reducing station in service. By opening the turbine Extraction steam flap
from generator turbine.

• TURBUNE EXTRACTION REDUCING STATION IN SEVICE: -

 Open all the drain valves on this line.


 Open isolating valve & control valve ( H - 601 & P - 603 ) to about 10 % and do warming up the
by the pressure in the header.
 After about 10 mins. Close these valves (H - 601 & P - 603) and open the extraction steam flap
from turbine side.
 Watch pressure P - 405.
 P - 405 = 1.5 bar.
 Let the temp. to come up , T - 17 to 150 OC,
 Slowly open the LP steam isolating valve H - 601 to full.
 The B.H. condenser pressure P - 701 may increase and the pressure will be released through
vent valve, which one was kept open earlier.
 Open the control valve P - 603 slowly & take the steam to B.H. to reach 55 t / h , F - 110 = 55 t/ h.
 Set the pressure at 0.4 bar and put in AUTO position.
 Close the B.H. vent valve, all LP drain valves to full Steam trap will be in services.

8. START UP B.H. CONDENDENSATE PUMP:

 As the steam passing to the B.H., the level in the condenser will increase, L - 103 = 450 mm.
Ready to start the B.H. condensate pump: -
 Open the following valves: -
 H - 406 & H - 409.
 Select valve Line / Dump will be selected in Dump only.
 Start the pump.
 Discharge valve will open automatically.
9
 Open the level control valve L - and adjust the level + 300 mm and select AUTO.
 When LP steam temp. Increase > 115 OC ,
 open the temp. Control valve T - , 60 % & select AUTO.

• Check the following: -

 LP steam temp T - 502 = 115 OC.


 D.S.H. water flow F - 109 = 6 t / h.
 Condensate P.P. disch. pressure P - 304 = 9.5 bar.
 Condensate pump disch. Flow F - 108 = 55 t / h.
 Pump bearing temp. T - 318 = 50 OC .
 Cond. conductivity D - 203 = < 5 μs / cm.
 Inform lab to check conductivity , if found within limit , put cond. in line.
 Set the conductivity on 8 μs / cm and select on AUTO (Line / Dump) Selection.
The brine temp. will increase gradually, when it reaches to > 40 OC,
 Start the anti-scale and anti- foam chemicals.
 As the condensate put on line, then the steam flow can be increased to B.H. and gradually
increase the brine temp. (Top temp.) T - 401,
 by this time the vacuum in the evaporator will reach to maximum P - 408 = - 0.96 bar.
 Normally at top temp. of 45 OC and full vacuum, the distillate production will be started and the
distillate water will flow to distillate chamber.
 The distillate level L - 103 = 450 mm and ready to start the distillate pump.
 When distillate production started the sea water reject temp. will increase by 8 OC than S.W.
temp. It is time to stop the hogging ejector. Stop it by closing the following valves: -
i. Air valve - H - 708
ii. Steam valve H - 512.

9. START THE DISTILLATE PUMP:-


When the top temp. reach to 50 OC and distillate chamber level is above L - 103 = 450 mm, ready to
start the distillate pump.
Open the following valves : -
i. H - 307, H - 309
ii. Line / Dump selection, ON ‘DUMP’
iii. Start the distillate pump & open discharge valve.
iv. Adjust the distillate flow by opening the level control valve, F - 203 = 500 t / h.
v. Bring down the level L - 103 = 300 mm.
vi. Set the level 300 mm & select AUTO control.
vii. Check the flow, F- 103 = 500 t / h,
viii. & pressure, P - 301 = 3.5 bar.
ix. Check bearing temp. T - 312 = 50 OC .
x. Check conductivity D - 202 = < 500 μs / cm.
xi. Inform lab. to check the conductivity.
xii. If conductivity within limit, put on line by the selection valve on Line.
xiii. & close the valve H - 309.
xiv. Start caustic soda pump at an injection rate of ppm & brine flow.
xv. Inform lab to start the chlorine injection & lime injection at the concerned points.
10

10. INCREASE THE STEAM FLOW FOR MAXIMUM PRODUCTION:

• Check the following readings: -

 F - 203 = 800 t / h - production.


 F - 110 = 105 t / h - steam flow.
 T - 401 = 93 OC - top temp.
 F - 105 = 9600 t / h - brine flow.
 F - 106 = 2200 t / h - brine blow down flow.
 F - 202 = 3000 t / h - make up water flow.
 F - 201 = 9800 t / h - S.W. Reject flow.
 F - 109 = 6 t / h - D.S.H. water flow.

11. START UP THE S.W.R. PUMP: -

Note: - in winter time, when S.W. temp. comes down, S.W.R. Pump will put in service to increase the
S.W. temp.
• Follow the below sequence: -

i. Open valve no. H - 105 & H - 103.


ii. Close the S.W. reject control valve to about 30 %
iii. Start the S.W.R. pump.
iv. Open discharge valve H -
v. Open temp. control, T - 501 to 60 %
vi. Close the S.W. reject control valve full.
vii. Open S.W. minimum flow valve H - 117 to full .
viii. Open the temp. Control valve T - 501 to 70 % & Set the temp. at 28 OC & Select AUTO control.

• Check the following: -

 F - 113 = 6000 t / h.
 P - 302 = 3.5 bar.
 T - 316 = 50 OC.
 T - 501 = 28 OC.
 SW header press. P - 301 = 2.5 bar.

Note: If the unit is normal operation, start the ball Recirculating pump in service for B.H & H.G. section
and check enough balls are Recirculating or not through the sight glass.
11
IHI DISTILLER SHUT DOWN PROGRAM

A. NORMAL SHUT DOWN: -


Preparation: -
1. Stop the ball Recirculation
2. Close distillate water to deminerlising plant valve H - 305 , if it is in service.
3. Open B.H. condenser vent valve to full.
4. Inform Lab regarding shut down program.

• SHUT DOWN SEQUENCE: -


i. Reduce steam to brine heater by closing the steam control valve ( T - 401) & when top temp. start
to come down reduce the brine flow F - 105 to about 8,000 t / h.
ii. As the steam reducing to B.H. , the reducing station , which is in service also to be closed , either in
hand or by AUTO and open the drain valves of LP lines to full.
iii. Close the steam to B.H. completely and isolate the steam valve H - 609 and open the turbine
exhaust valve to atmosphere H - 612, Check the steam header pressure & it should not be > 1.2 bar. If
the pressure is more then 1.2 bar, reduce the B.H. pump RPM.
iv. If the adjacent unit is in service, the turbine exhaust steam can be sent to that unit by opening the
LP steam header inter-connection valve H - 651.
v. As the steam is cut off to B.H. then the level in the condenser will be come down. Stop the B.H.
condensate pump. Change the Selection valve to Dump & close the valves in the discharge line.
vi. Keep the B.R. pump in service and let the temp. of brine come down to about 38 OC. Increase the
brine blow down flow ( F - 106 ) to maximum & increase the make up water flow also, so; that the brine
temp. will come down faster.
vii. As the brine temp. comes down, the distillate production also comes down then distillate level
controller put in manual & adjust the flow about 400 t / h (minimum flow).
viii. When distillate level comes down to about 30 mm, then close the discharge valve & stop the pump.
Change the Line / Dump Selection valve to Dump & close all isolating valves in the discharge line.
ix. Inform Lab. after shut down the distiller, they will stop all chemical dosing.
x. When brine temp. comes down < 45 OC , stop anti - scale & anti - foam chemicals dosing.
xi. When brine temp. comes down to 38 OC , then brine pump can be stopped.
xii. Close the make up , by closing the control valve & isolating valve.
xiii. As the brine level L - 101 starts to come down, then reduce turbine RPM & reach the brine flow to
6,000 t / h, by maintaining the level to 300 mm and again when level comes down , close the discharge
valve H - 154 according to the level. The brine blow down control valve remains full open & all brine
water will flow out. Then again the level comes down, reduce RPM according to the brine level. Reduce
the RPM to reach minimum (185 RPM) , when level reach to 30 mm stop the brine pump.
xiv. Check L.O. pressure low alarm. When the RPM of brine pump comes down and oil pressure will
come down. Then the primary oil pump will be started automatically to maintain the oil pressure. If L.O.
pressure comes down & primary oil pump do not start then, put the pump in Manual Selection & Start
the pump. Action should be taking very fast.
xv. As soon as the brine pump stops, the brine blow down control & isolating valves should be closed
to avoid the sucking of culvert water to enter the evaporator.
xvi. Then stop the ejector by closing the steam control valve & closing the isolating valve. Close spray
water isolating valve.
12
xvii. When level in the ejector condenser comes down to 30 mm, stop pump & close the discharge line
isolating valve.
 Close H.P. steam and spray water isolating valves from boiler side.
 Check the pressure P - 404 = 0 bar.
 Check the pressure P - 403 = 0 bar

• ACTION FROM LOCAL: -


i. Break the vacuum.
ii. Open ejector air valves - H - 701 & H - 705.
iii. Open Hogging ejector manual valve WF10G05 to about 30 % to atmosphere.
iii. Air will be entering through these lines to evaporator.

 Gradually vacuum will break & pressure will be _ P - 408 = 0 bar.


v. When pressure approx. P - 408 = - 0.35 bar _ open WG10G05 to full.
vi. Close steam isolating valve H - 501.
vii. Close spray water valve H - 413.
viii. Open all H.P. steam drain steam trap by pass valves to 20 %.

• ACTION FOR B.R. PUMP TURBINE FORM LOCAL.

i. Conform the L.O. pump & gland steam fan are in service.
ii. Open pneumatic air drain valve of turbine.
iii.Re - set the turbine.
iv. Open HP steam drain manual valves.
v. Close the valve H - 505.
vi. -?- valve to 20 %.
vii. Check the trench & sump pit level. Check sump pumps.
viii. When the evaporator pressure reaches to P - 408 = 0 bar, the draining of the evaporator can be
done.
ix. Open brine blow down control valve & isolating valve to full.
x. Open evaporator main drain valve H - 204.
xi. Open other drain & vent valves of evaporator water boxes, main heater etc.,
xii. If adjacent unit in services, the S.W. Supply pump can be stopped.
xiii. Open the inter-connection valve of SW header to 10 % and close the S.W. to unit valve H - 101.
xiv. So, the only sufficient water will be taken to the shut down unit for brine re-circulation turbine oil
cooling through the utility lines without disturbing the adjacent and service unit.
xv. When turbine upper & lower bearings temp. comes down to 40 OC , then L.O. pump and Gland
steam fan can be stopped.
xv. Then close the S.W. header inter-connection valve.
xvi. Unit will be completely shut down.

B. EMERGENCY SHUT DOWN: -

Emergency shut down is required in case of : -


1. Heavy leak in the system.
2. Boiler emergency shut down.
13
3. Major trouble in B.R. pump
4. Major trouble in S.W. system & Non- availability of stand S.W. supply pump.

• ACTION IN T.C.R.:-
Close steam to B.H. completely.
1. Close S.W. make up.
2. Reduce the B.R. turbine RPM & stop B.R. pump by push button
3. Close brine blow down control valve & isolating valve.
4. Stop B.H. condensate pump, according to level.
5. Stop distillate pump according to level.
6. Stop ejector & stop condensate pump.
7. Close HP steam & spray water from boiler side.

• ACTION IN L.C.R.: -

1. If required to keep the vacuum, then close the air valves of the ejector.
2. Stop Taprogge system Main heater & Heat gain section.
3. Open B.H. Condenser vent valve.
4. Stop chemical dosing.
5. Open all HP & LP steam drain valves.
6. Close HP steam valve H - 501.
7. Close spray water valve H - 413.
8. Close distillate isolating valve to tank H - 314.
9. Close deminerlising plant distillate valve to Lab H - 305 & open from other available unit.
10. Re set the turbine & close HP steam valve H - 505.
11. Conform L.O. primary oil pump & gland steam fan is in service.
12. Conform the L.O. cooling water for the turbine oil cooler.