IHI DISTILLERS
(START UP & SHUT DOWN PROGRAMS)
(Prepared by Mr. Kochunny Vanparambil, rewrote by Ashek Ullah)
Check the status of the P.T.W. issued on the unit and if any P.T.W is pending, checks the equipments
and isolations done for work. If all PTW is cancelled for the start up of the unit, then conform the proper
power supply. Instrument air supply to the units. Check all mechanical equipments and parts such as
man holes, covers, pipe spools etc. If all are found satisfactory then proceed for the preparation of unit.
Conform with lab for the availability of suitable chemicals for normal operation.
PREPARATION OF EVAPORATOR : -
Open the manual valves to the waste drain pit at boiler side - Full.
Open all steam trap isolating manual valves to full (LP & HP).
Open the manual valves of the steam drain by pass lines ( one valve to full & the other about
20% for initial warming up in HP line).
Open all drain valves of LP. Line to - Full.
D. PREPARATION OF EJECTOR: -
Note: - S.W.R. pumps to be prepared after starting the see water supply only.
i. Check oil level for the bearing.
ii. Open suction valves - H-106 , H- 108.
iii. Check the gland cooling water.
iv. Open the vent valves of the pump casing & release the air completely and close again.
5
v. Release the local EM push button.
vi. Open the local operated motor valve - H - 112.
vii. Check the C.B. by E.O.
i. Check all the alarms in the panel & if any abnormal alarm existing, rectify & reset it.
ii. Check the function of all motor valves & control valves and closed the valves.
iii. Close the brine blow down isolating valve H - 201 & control valve.
iv. Open sea water reject isolating valve H - 105 & Control valve about 50 %.
v. Open vent condenser cooling water valve H - 116 about 60 %.
vi. Open ejector condenser cooling water valve H - 115, about 60 5.
vii. Open Brine heater outlet valve H - 202.
viii. Open sea water to unit valve H - 101.
If the sea water line is empty, then it is necessary to fill the line before starting the supply pump.
Open the vent valve at the discharge line.
Open inter-connection valve of S.W. header & fill the line until flows out of the vent valve.
Open pump casing air venting isolating valve.
i. Start the S.W. pump , which is selected.
ii. Open gradually discharge valve.
iii. Check the S.W. header pressure approx. 2 bar & adjust the S.W. flow F - 201 to 9000 t/h by the
control valve. Adjust the vent condenser & ejector condenser cooling water flow as 1200 t / h &
420 t / h respectively by opening the valves H - 116 & H- 115.
iv. Check the bearing temp. & winding temp. time to time. Closed vent valves of water boxes for 18th ,
17th & 16th stages.
FILLING THE EVAPORATOR: -
Fill sea water in the bottom deck of evaporator about 250 to 300 mm, by opening the make up water by
pass valve or main valve.
Reading in TCR desk L - = 250 / 300 mm.
5. STARTING OF EJECTOR: -
When steam opened from boiler side, the warming up of turbine also to be carried out.
All drain valves opened while locally prepared.
H - 504 HP steam isolating valve - open full.
H - 505 HP steam isolating valve - open full.
• If the above conditions are fulfilled, then ready to start the B.R. pump: -
When brine flow reaches to 7,000 t / h , open the Brine blow down isolating valve H - 201 to full
& open control valve to adjust the brine blow down flow - F - 106 = 1,000 t / h.
Adjust the make up water flow also 1,000 t / h & set the level 300 mm & put in AUTO control.
8
7. STEAM TO MAIN HEATER :
As the steam passing to the B.H., the level in the condenser will increase, L - 103 = 450 mm.
Ready to start the B.H. condensate pump: -
Open the following valves: -
H - 406 & H - 409.
Select valve Line / Dump will be selected in Dump only.
Start the pump.
Discharge valve will open automatically.
9
Open the level control valve L - and adjust the level + 300 mm and select AUTO.
When LP steam temp. Increase > 115 OC ,
open the temp. Control valve T - , 60 % & select AUTO.
Note: - in winter time, when S.W. temp. comes down, S.W.R. Pump will put in service to increase the
S.W. temp.
• Follow the below sequence: -
F - 113 = 6000 t / h.
P - 302 = 3.5 bar.
T - 316 = 50 OC.
T - 501 = 28 OC.
SW header press. P - 301 = 2.5 bar.
Note: If the unit is normal operation, start the ball Recirculating pump in service for B.H & H.G. section
and check enough balls are Recirculating or not through the sight glass.
11
IHI DISTILLER SHUT DOWN PROGRAM
i. Conform the L.O. pump & gland steam fan are in service.
ii. Open pneumatic air drain valve of turbine.
iii.Re - set the turbine.
iv. Open HP steam drain manual valves.
v. Close the valve H - 505.
vi. -?- valve to 20 %.
vii. Check the trench & sump pit level. Check sump pumps.
viii. When the evaporator pressure reaches to P - 408 = 0 bar, the draining of the evaporator can be
done.
ix. Open brine blow down control valve & isolating valve to full.
x. Open evaporator main drain valve H - 204.
xi. Open other drain & vent valves of evaporator water boxes, main heater etc.,
xii. If adjacent unit in services, the S.W. Supply pump can be stopped.
xiii. Open the inter-connection valve of SW header to 10 % and close the S.W. to unit valve H - 101.
xiv. So, the only sufficient water will be taken to the shut down unit for brine re-circulation turbine oil
cooling through the utility lines without disturbing the adjacent and service unit.
xv. When turbine upper & lower bearings temp. comes down to 40 OC , then L.O. pump and Gland
steam fan can be stopped.
xv. Then close the S.W. header inter-connection valve.
xvi. Unit will be completely shut down.
• ACTION IN T.C.R.:-
Close steam to B.H. completely.
1. Close S.W. make up.
2. Reduce the B.R. turbine RPM & stop B.R. pump by push button
3. Close brine blow down control valve & isolating valve.
4. Stop B.H. condensate pump, according to level.
5. Stop distillate pump according to level.
6. Stop ejector & stop condensate pump.
7. Close HP steam & spray water from boiler side.
• ACTION IN L.C.R.: -
1. If required to keep the vacuum, then close the air valves of the ejector.
2. Stop Taprogge system Main heater & Heat gain section.
3. Open B.H. Condenser vent valve.
4. Stop chemical dosing.
5. Open all HP & LP steam drain valves.
6. Close HP steam valve H - 501.
7. Close spray water valve H - 413.
8. Close distillate isolating valve to tank H - 314.
9. Close deminerlising plant distillate valve to Lab H - 305 & open from other available unit.
10. Re set the turbine & close HP steam valve H - 505.
11. Conform L.O. primary oil pump & gland steam fan is in service.
12. Conform the L.O. cooling water for the turbine oil cooler.