BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 1 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
In normal load operation, coal burner ignition and shutdown command on elevation is given
by manual operation on OPS.
In APS start-up and shutdown, automatic command of ignition and shutdown is given from
APS to MBC, if it is applicable.
As shown in Fig. 5-1-1 "Coal burner ignition and shutdown procedures", the ignition and
shutdown of the coal burners are performed by start-up and shutdown the coal mill, coal
feeder and its related dampers, and auxiliary equipment sequentially. The time chart for it is
as shown in Fig. 5-1-2 “Coal burner ignition and shut-down timing chart”.
Also, the related analog controls of coal amount, primary air flow, temperature, and wind
box dampers are performed by CCS, coal mill auxiliary control and burner control will be
performed by MBC.
The mill burner controller can automatically ignite and shutdown the coal burners without
requiring an operator by performing the start-up and stop of the equipment and the interface
of the equipment with the related controllers (control mode switching command)
sequentially.
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 2 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 3 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 4 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
5.2 Coal mill, Coal burner and Coal Feeder start permit
(1) Coal mill start permit
When the following conditions are satisfied, coal mill can be started.
a) Primary air pressure normal
b) Any PAF is running.
c) Coal mill seal air valve open
d) Coal mill seal air differential pressure not low
e) Spillage hopper level not high, if it is applicable.
f) Spillage hopper inlet gate and damper open, if it is applicable
g) No coal mill trip command existed.
h) Coal mill outlet temperature not high
i) Cold air gate open
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 5 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
In order to ignite the coal burners, either of the following two conditions must be satisfied.
a) Adjacent oil burner is in service.
b) Coal flow of adjacent coal burner is greater than 50%.
Z t/h
The state of the starting pulverization is monitored by the logic as shown in Fig. 5-3. When
the coal feeder fails to perform the starting pulverization, an alarm is issued and, at the
same time, the operation mode is switched from “automatic” to "manual", and the coal flow
is restricted to the minimum.
(This function is performed by CCS.)
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 6 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
Coal mill.
current at coal
feeder start
120S
Coal mill. Initial
coal feed
120S 3.0S error
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 7 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
The shutdown time until coal feeder stop depends upon a time in which the coal mill outlet
temperature lowers to 65℃. Normally the time varies according to the initial coal flow at the
start of shutdown and the water content of the coal. It is 3 to 4min according to MHI’s
experience.
As an initial set value, a purge time from the coal feeder OFF to coal mill OFF is set to 5
minutes based on the experience of the other plants.
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 8 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
3S Alarm
Coal monitor abnormal (chute section) Coal monitor abnormal
(chute section)
3S Alarm
Coal monitor abnormal (bunker section) Coal monitor abnormal
(bunker section)
5S
Coal mill & Coal feeder under operation Coal flow monitor
abnormal
* To next page
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 9 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
7 sec.
Coal feeder-to – Coal mill.
Difference pressure HIHI
180 sec.
5 sec.
COAL ON BELT
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 10 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 11 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 12 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
Ignition energy lost Coal mill & coal Continuous combustion is not
feeder trip allowed.
Run back trip command To reduce the quantity of coal mill to To be checked
gain a target load after run back necessity.
occurs.
MFT
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 13 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
MFT
3S
Coal mill start
60 sec.
Coal mill seal air
differential pressure LOW
LOW
160S
Coal mill & feeder start TD/WO
Coal mill-furnace
differential pressure LOW
LOW 5 sec.
MFT
~ Next Page
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 14 of 19
Pulv. start
~ Previous Page
Coal mill bearing temperature HIGH HIGH
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 15 of 19
Pulv. start
Coal feeding pipe Coal feeder trip Coal is not allowed to be charged
clogged into coal mill.
MFT
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 16 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
MFT
Coal feeder
trip
(to coal feeder control panel)
MFT
2S
Coal mill & feeder under
operation
5S
Coal mill & feeder shut- Note) Timer setting values are
down in progress
finalized at commissioning stage.
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 17 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 18 of 19
Guodian Taizhou Power Plant / Boiler 07457/07458 61120-0011-2 Rev. 0
BASIC PLAN FOR MBC (COAL) Mitsubishi Heavy Industries, LTD. Page 19 of 19