CHAPTER I - INTRODUCTION
I.
HISTORICAL BACKGROUND
greater
Metro
Occidental. 1
Relocation Debacle
In 2001, the 3 oil companies and the Department of
Energy (DOE) entered into a memorandum of agreement
(MOA) providing for a formulation of a "master plan" for the
relocation of the Pandacan oil terminals. Then Manila
Mayor Lito Atienza approved City Ordinance No. 8027,
reclassifying the land use of the Pandacan oil depot area
from Industrial II to Commercial I. In 2002, with the 6month deadline looming, the city of Manila and the DOE
entered into a memorandum of understanding (MOU),
reverted
high-density
by the giant oil depots that lie on the banks of Pasig River.
residents.
the
area
back
to
its
A.
Makati.3
Despite all of this, the oil storage facilities still did not
conform to the land use of the area. The inconformity to
the zoning and land use plan of the oil depot results to
numerous environmental hazards that pose threat to the
lives and health of the people and the community.
B.
gave the oil companies in the Pandacan oil depot until Jan
31, 2016 to shut down their oil storage facilities and
5
depot
of
may
be
complicated
by
the
presence
C.
to
be
left
on
the
site.
Through
Brownfield
investors,
and
hence
prolonging
the
cleanup
II.
brownfield land?
III.
order for the site to be safe and at the same time be useful
established.
Risk
Last
October
9,
2004
HRA
(Health
and
economic
benefits
from
brownfield
redevelopment that:
Preserves
historical
landmarks
and
heritage
architecture
areas
IV.
Pandacan.
Informing
developers
on
the
benefits
of
parameters
given
by
the
local
government
redevelopment
of the site.
V.
Circulation,
Site
Selection,
Inventory
&
depot.
the
research
on
revenue
will
be
corresponding stretch.
Design
feasibility
(Background,
Architectural
Analysis
(Space
Design
Standards
and
11
VI.
CONCEPTUAL FRAMEWORK
12
VII.
DEFINITION OF TERMS
exhaust.
Community - a group of people who live in the same area
Blight - something that spoils or damages something, a
disease that affects plants, or a general state of neglect
existing structures.
products
memory,
cognition,
or
judgment
and/or
psychophysiology.
idea
of
sustainability
is
to
concentrate
on
minimize
the
undesirable
aspects
of
these
constructions.
environment.
14
15
16
I.
LITERATURE
A.
Local
Pandacan
Sta. Mesa, and Sta. Ana. Along the same riverbank, less
during
the
American
occupation.
Shell
Whats a brownfield?
By Amado de Jesus
2016 to relocate.
Moreover, this article is indeed helpful for the
researchers as an overview of the history and problems
about Pandacan Oil Depot which will be the site for the
a cleaner environment
resources.
The
most
important
consideration
by law.
This particular section contributes on to how the
Furthermore, there are several ways to apply
remediation techniques in a contaminated brownfield
depending on the type and location of the contaminant.
Remediation techniques include removal of contaminants
from the site; others are treated on site, while others are
contained on site so as not to spread. In the case of
diesel-contaminated soil, some of the shallow soil is
excavated and aerated so that volatile hydrocarbons will
be released before the soil is removed from the site. The
Foreign
six (6)
B.
20
done
proponents:
This
code
handbook
provides
guidance
for
redevelopment
Evaluate
current
State
Voluntary
According
Cleanup
development
is
to
this
handbook,
constantly
reinventing
commercial
itself.
After
are
experiencing
renaissance,
as
people
21
are
being
brownfields
transformed.
into
urban
Cities
villages
are
with
converting
housing, retail,
Handbook
smart commercial
through public
The guidance
policy
is
is
and
and
based
guide
to
mixed-use
land
on
use
the
Detailed,
HumanScaled
attractive
development
following
that
Smart
encouraging
ordinances.
design
Design.
design
is pedestrianfriendly
is
and
necessary.
22
are referenced.
II.
STUDIES
A.
Local
and
safety
practices
were
divided
among
RISKS
Communication
This
study,
perceptions,
which
attitudes
sought
and
to
behaviors
determine
of
the
Pandacan
The
as
risk
which
alarming,
the
residents
dreadful,
generally
shocking
and
nature
people since then. The said study verified that as for the
topic on safety and security, local residents indeed
terrorist attacks.
processes
the
municipalities
developer
which
in
turn
and
government
strengthens
the
residential densities.
24
effect
that
helped
precipitate
neighborhood-level
Foreign
Baltimore, Maryland
and today the sites fill the wants and needs of thousands
Baltimore.
This
thesis
investigates
federal
and
25
city.
and
This thesis is beneficial to the proponents because
to
curb
land-consumption.
suburbanization,
many
industrial
sites
were
better
soil and local bodies of water. The quality and state of the
environment
degrades
in
the
process.
This
has
many ways that the Phillips Metals and G-36 site can be
revitalization
can
be
achieved
through
The soil would be more stable to sustain plant life and the
water that flows in 2nd Creek would become suitable to
support wildlife.
opportunities is presented
III.
A.
Local
Rockwell Centre
STRUCTURES
was
carried
out
by
international
architectural
firm
productive use.
where
office
buildings,
residential
through
the
Declaration
of
Covenants,
the mind
conical
towers
serves
as
convergence
point
and
emphasizes the technological focus. This environmentallyPhilippines Diliman and property developer Ayala
Land. It occupies 20 hectares within the 37.5 hectares of
B.
Foreign
process,
over
7,500
cubic
yards
of
oil-
Key accomplishments:
Conservation
approximately $900,000.
Fund
Grant
for
total
of
Honored
by
International
the
Midwestern
Society
of
chapter
Arboriculture
of
the
for
the
31
Key accomplishments:
leveraged.
floor.
Outcome:
EPA awarded a $52,000 cleanup grant to the nonprofit Weir Corporation for the redevelopment of the
140,000-square-foot historic Robertson
Mill
with
its
34
METHODOLOGY
CROSS
SECTIONAL
STUDY AREA
This particular project will utilize a part of Pandacan
oil depot as the site for the study. Identifying the proper
site within the depot is important since the aim is to
provide a better environment for the local residents and
the community as well. Facts gathered form different
government agencies and departments that includes data
AND
LONGITUDINAL
APPROACH
A cross-sectional study is based on observations of
phenomena at a single point in time, while the longitudinal
study involves analyzing data at different points in time
(Babbie 2010). In this study, the cross-sectional analysis
35
1.
community.
studies.
which have high cost impacts in more than one subcategory) it does not prescribe the importance of most
selection elements but rather, incorporates a weighting
system whereby a district or community can assign a
range of importance to each element. It is recognized that
information for all the elements cannot always be
determined nor are all elements applicable to every site.
However, detail and rigor in addressing the elements is
important for an effective evaluation.
The selection elements are as follows:
a)
Site Surveying
The geological and hydrological structure of the site is
indeed important in determining what kind of development
2.
The main entrances and the main road abutting the site
Material Efficiency
Major Landmarks
After spotting the major landmarks, analyze the integrity of
their existence in close proximity to the site. It is essential
to know as to what kind of impact these structures would
Site Services
Study of services on site is also very important. The major
site services include:
have on a site.
Proximity to other facilities
Water Supply
Electricity Lines
Drainage Lines
b)
Socio-Economic Characteristics
Energy Efficiency
Water Efficiency
38
4.
c)
selection
element
is
evaluated
according
to
3. Weighing Factor
Social and Land Use Factors
Assigning weighing factors to the analysis is an
CRITERIA:
RATING:
Size of Site
Proximity to Population to be Served
Proximity to Future Expansion of
Community
Proximity to
Important
Existing
Facilities
Year-round Accessibility
Site Topography
Weighting Factors
Road Access
1 = undesirable
2 = desirable
3 = highly desirable
39
RATING:
Aesthetic Value
Sun Orientation
Soils/Foundation Conditions
Site Drainage
Zoning/Land Use
Availability of Fuel
Equipment
Storage/Distribution
Flooding
Year-round Accessibility
Access to Outdoor
Recreation/Learning
Noise
Wetlands
Materials
Site Cost
Existing Site Development
TOTAL:
40
RATING:
CRITERIA:
Social and Land Use
Factors
Construction Cost Factors
Maintenance
and
Operating Cost Factors
PHASE
I
PHASE
II
as
method
of
design
investigation
and
design
communication.
Government Data
B.
III.
SOURCES OF DATA
of data collected.
A.
Library
Hall
proponents
will
introduce
this
process
for
public
Hall
42
C.
Interviews
Several people are known to be experts of the area of
D.
staff
of
the
company
specialized
in
Surveys
Surveys are significant to this study. Areas near
public
this study.
would
accept
the
process
of
brownfield
Hall)
study area.
Engr.
Gil
F.
Ferareza
Sr.
(Environmental
o
o
o
o
o
o
o
o
o
o
E.
School
Commercial Mall
Hotel
Condominium
BPO Office Building
Hospital
Wet and dry market
Commercial Stall/s
Parking Building
Museum or Exhibit Gallery
Ocular Inspection
Site inspection will give on-hand data on the
44
45
I.
FEASIBILITY STUDY
that
Knoxville
presented
that
contaminants such
as
would
hydrocarbons
aid
the
existing
and
future
problems
(PAHs),
lead
based
paint,
asbestos
containing
buildings
materials,
industrial
chemicals
by
petroleum
hydrocarbons
including
46
process.
programs
delinquent
medical
Conversion
environment-based
youths,
skills
development,
for
seminars,
development
12
and
Development
where
office
Authority;
buildings,
into
residential
47
will
surely
be
another
world-class
the people.
II.
units,
BPO
offices,
parking
building,
A. Soil Type
This soil map shows that there are different soil
types within the site boundaries. Understanding the soil
characteristics is important for this project in determining
the development potentials of the site
diversified
and
vegetable
crops,
while
C. Development Controls
provided
that
the
minimum
horizontal
50
2.
R -1
(m)
Front
Side
Rear
4.50
2.00
2.00
R3
R5
lot/unit)
(m)
Max
Basic
Max
(m)
(m)
(m)
(m)
3.00
8.00
3.00
8.00
4.50
2.00
2.00
(opti
(optional
onal)
2.00
2.00
2.00
2.00
2.00
(Indiv.
Basic
2.00
R4
(m)
6.00
3.00
3.00
51
Building/Str
ucture Use
or
Occupancy
(or Land
Use)
Duly
Approv
ed
Zoning
Comme
rcial 3
Commercial
(Comm
3)
TOSL
(ISA +
USA)
20
Road Right-ofWay
(RROW) Width
(meters)
30.00 & above
25.00 to 29.00
20.00 to 24.00
10.00 to 19.00
Below 10.00
Front
(meters)
Side
(meters)
Rear
(meters)
8.00
6.00
5.00
5.00
5.00
5.00
3.00
3.00
2.00
2.00
5.00
3.00
3.00
2.00
2.00
10
The study area which is the Shell perimeter is
bounded by a 8-m RROW, thus having the minimum
Character of
Use or
Occupancy
Residential
Commercial
Type of
Building/
Structure
R5
Condominiums
C3
Commercial 3
Land Use
7. Other
commercial
activities
and
those
not
elsewhere classified
Commercial/Mixed Use
High Intensity Commercial/Mixed
Use C3/MXD
0.80
7
2. Height Regulations
standards,
safety codes.
building
it
shall
have
commercial
footprints
and
regulations
related
to
land
rules
of
rattan
furniture
including
upholstered
prescribed LUIC.
6. Large-scale
commercial
warehousing
activity
54
Ratio (FAR).
III.
SITE DATA
February 2008
The
Pandacan
Oil
Depot,
formerly
largely
After
the
war,
the
oil
depots
were
reconstructed.
itself.
55
daycare
centers
and
residences
situated
B. Annual Precipitation
According
to
Coronas
Classification
(1920),
school near the Petron depot. Along the walls of the Shell
56
(Source: http://nababaha.com)
the soil.
H. Existing Circulation
Currently
there
are
no
pedestrian
friendly
58
B. Phasing
PHASE I:
Pilipinas
Shell
Petroleum
Corporation's
Part of
USER:
Shell
Petroleum Corporation
BARANGAY NO.: 847
ZONE: 92
PRESENT
LAND-
USE: Industrial
ADJACENT
PUBLIC
CRITERIA:
RATING:
Size of Site
Proximity to Population to be Served
Proximity to Future Expansion of
Community
Proximity to Important Existing
Facilities
Year-round Accessibility
Site Topography
Road Access
Visibility, Safety of Driveways
Driveway Conflicts and Internal
Circulation
Safe Routes to School for Pedestrians
and Bicycles
Roadway Capacity, Safety Needs
Aesthetic Value
Sun Orientation
Protection from Elements
Site Drainage
Proximity to Natural Hazards
Zoning/Land Use
Proximity to Fire Response
Equipment
Flooding
Existing Site Development
3
3
3
2
3
3
2
2
1
2
1
3
3
3
2
3
1
1
2
2
2
60
Flooding
Existing Site Development
Access to Outdoor
Noise
Potential for Hazardous Materials
TOTAL:
2
2
2
2
2
53
CRITERIA:
RATING:
Soils/Foundation Conditions
Availability of Water Utilities
Availability of Sewer Utilities
Availability of Electric Power
Availability of Fuel
Storage/Distribution
Year-round Accessibility
Driveway Conflicts and Internal
Circulation
Roadway Capacity, Safety Needs
Ease of Transporting Construction
Materials
Site Cost
Existing Site Development
TOTAL:
3
3
3
3
3
2
3
CRITERIA:
RATING:
TOTAL:
3
1
1
3
2
2
2
16
PHASE II:
The Caltex Terminal is bounded by Estero De
1
2
2
3
3
32
in the South.
61
CRITERIA:
Size of Site
Proximity to Population to be Served
Proximity to Future Expansion of
Community
Proximity to Important Existing Facilities
Year-round Accessibility
Site Topography
Road Access
Visibility, Safety of Driveways
Driveway Conflicts and Internal
Circulation
Safe Routes to School for Pedestrians
and Bicycles
Roadway Capacity, Safety Needs
Aesthetic Value
Sun Orientation
Protection from Elements
Site Drainage
Proximity to Natural Hazards
Zoning/Land Use
Proximity to Fire Response
Equipment
RATING:
1
2
1
1
3
3
1
3
3
2
2
3
3
3
1
1
3
1
1
Flooding
Existing Site Development
Access to Outdoor
Recreation/Learning
Noise
Wetlands
Potential for Hazardous Materials
TOTAL:
2
2
1
1
1
1
1
42
1
1
3
3
29
RATING:
RATING:
3
3
3
3
2
2
3
1
1
1
2
2
2
2
1
1
1
12
63
PHASE III:
Petron Corporation is the largest oil refining and
marketing company in the Philippines. Supplying nearly
40% of the countrys oil requirements, the companys
world-class products and quality services fuel the lives of
millions of Filipinos. Petrons vision is to be the leading
provider of total customer solutions in the energy sector
and its derivative businesses.
CRITERIA:
Size of Site
Proximity to Population to be Served
Proximity to Future Expansion of
Community
Proximity to Important Existing
Facilities
Year-round Accessibility
Site Topography
Road Access
Visibility, Safety of Driveways
Driveway Conflicts and Internal
Circulation
RATING:
3
3
3
2
2
3
2
2
2
64
1
1
1
2
1
2
2
2
2
2
2
1
2
1
2
1
2
49
RATING:
3
3
3
3
2
Storage/Distribution
Year-round Accessibility
Driveway Conflicts and Internal Circulation
Roadway Capacity, Safety Needs
Ease of Transporting Construction
Materials
Site Cost
Existing Site Development
TOTAL:
2
3
2
1
1
2
2
2
29
RATING:
2
2
2
2
2
2
2
1
15
65
C. Site Justification:
SITE
CRITERIA:
Social and Land Use
Factors
Construction Cost
Factors
Maintenance and
Operating Cost Factors
TOTAL:
occur. Phase II, on the other hand is not good for the
PHASE
I
PHASE
II
PHASE
III
53
49
49
development
because
of
the
absence
of
access.
32
29
29
16
12
15
101
90
93
D. S.M.A.R.T Analysis
Specific:
The site is located in Barangay 834, Zone , one of the
zone belongs to District VI known as the Pandacan Area
Measurable:
Business park development is needed to have a large
scale of lot. The Shell Corporation acquires 11.5 hectares
66
the
Achievable:
With
Time-Bound:
of
Ayaland
Corporation,
the
local
E. S.W.O.T Analysis
Realistic:
Strength:
The
strengths
will
be
improved
by
the
following
accordingly:
relatively
flat.
Proper
planning
of
the
The
public
is
not
familiar
to
brownfield
Pandacan residents.
weakness.
Opportunities:
development.
Weaknesses:
The
project
community
will
to
provide
live
opportunity
healthier
and
for
the
cleanlier
Threats:
Corporation.
while
the
brownfield
redevelopment
treatment is ongoing.
Existing condition of
Pandacan de Estero
V.
A. General Guidelines
modulation
indentations
warehousing is encouraged.
and
architectural details;
b. Building entry accentuation;
c. Screening of equipment and storage areas; and
d. Landscaping to soften building exteriors and
buffer between uses.
C. Building Design
1. Variety in building forms should be employed to
create visual character and interest.
2. Facades with a high level of visual interest from
both vehicular and pedestrian viewpoints are
71
enhance
pedestrian
activity
in
their
immediate vicinities.
interest.
pop-outs,
roof
elements,
columns,
or
other
architectural elements.
harvesting.
D. Roofs
visual
park
continuous planes.
harvesting.
continuity.
Rooflines
of
business
72
and
other
simulated
materials
and
desirable.
the building.
7. Pedestrian
circulation
should
be
physically
attractive.
8. Intersections
where
pedestrian
routes
cross
street.
project
buildings served.
with
related
materials
and
forms
74
activity areas.
between
neighboring
properties
G. Landscaping
possible.
materials.
Regionally
appropriate
landscape
areas
by
shall
be
incorporating
canopied
trees,
identified
distinct
and
and
paving
extensive
groundcover plantings.
use of curbs.
15. Parking
areas
should
be
well-lit
and
well
minimum
24
box
tree
shall
be
planted
17. Surface
parking
areas
adjacent
to
primary
18. Landscaped
clearance
areas
to
fire
should
provide
protection
sufficient
features
(i.e.
76
parking,
shipping
and
receiving,
pedestrian
growth.
H. Lighting
Landscaped
areas
should
provide
sufficient
VI.
ARCHITECTURAL PROGRAMMING
A. User Analysis
1. Existing User
a.
Community of Pandacan:
-
plant growth.
residents
of
Pandacan,
Manila.
The
the
community
will
have
cleaner
c. The Facilitator:
-
Since
the
proposal
is
complex
development.
2. Potential Users
a.
The Developer:
-
Accessibility Law).
e. Consumers
-
b. The Owner:
-
B. Space Analysis
1. Mall
accessible.
overlooking a void.
79
office
building
must
have
flexible
and
calls or teleconferences.
Reception Areas - All stand-alone office suites require an
Beverage Counters, Kitchenettes - increase the area
3. Condominium
Space allocations shall provide areas for living,
Parking
Space
Requirement
The
parking
slot
Refuse
remaining
meters
sidewalk/planting strip.
shall
be
developed
as
Collection/Disposal
Centralized
garbage
4. Parking Building
Parking Space - Typical parking stall dimensions vary with
the angle at which the stall is arranged in relation to the
aisle. Stall widths (measured perpendicular to the vehicle
when parked) range from 8-1/2 to 9-1/2 feet. The minimum
width for public use parking spaces is 9 feet by 19 feet.
C. Site Inventory
84
D. Site Analysis
TOPOGRAPHICAL SETTING:
The sites topography is relatively flat with some portions
below sea level. During high tide, the sea water goes
about two kilometers inland along the Pasig river towards
its source, the Laguna de Bay a fresh water lake.
HYDROLOGICAL SETTING:
Natural Drainage:
The existing river in the site is the Pasig River. The river
provides main drainage that links to Manila de Bay and
ANNUAL PRECIPITATION:
According to theCoronas Classification (1920), Manilas
climate belong to the 1st type of which has two pronounced
seasons dry from November to April and wet duringthe
rest of the year.
SEISMICITY:
Pandacan is classified in low risk zone meaning, the
stability of the structures and development is not delicate
in this area.
Laguna de Bay.
BUFFER ZONE:
Buffer Elements:
SOIL CONDITION:
The major soil in the mapping unit consists of Eutropepts
and Dystropepts. Both belong to the order of inceptisols.
These soil have narrower adaptability for agriculttural
crops and is more desirable for construction purposes.
86
87
88
89
90
VII.
A. Design Philosophy
VIII.
CONCEPTUAL PERSPECTIVES
92
93
94
IX.
o Security System
COST ANALYSIS
o Telecommunication System
o Mechanical System
o Acoustics Materials
Cost Breakdown:
o Labor Cost
o Roofing Materials
o Finishes
-
Exterior Finishes
Interior Finishes
Flooring Finishes
equipment.
o Mechanical System
o Acoustics Materials
meter.
Cost Breakdown:
o Labor Cost
o Roofing Materials
o Finishes
Exterior Finishes
Interior Finishes
on:
Flooring Finishes
o Security System
-
o Roofing Materials
systems.
o Finishes
o Telecommunication System
Exterior Finishes
96
Interior Finishes
Flooring Finishes
is greatly advised)
o Built In Appliances
o Cabinets
o Carpeting
o Countertops
systems.
o Doors
o Mechanical System
-
o Excavation
o Exterior Finish
o Labor Cost
o Exterior Trim
o Final Cleanup
o Finish Carpentry
o Finish Hardware
o Flooring
o Foundation, Piers, Flatwork
o Heating and Cooling Systems
97
o Insulation
o Interior Wall Finish
o Lighting Fixtures
o Painting
o Plumbing Fixtures
o Plumbing Rough-in and Connection
o Rough Carpentry
o Rough Hardware
o Windows
o Wiring
types of vehicles.
17,200,000Php
Intersection
above
Brownfield
Redevelopment
Treatment
This
option
of
o Intersection Options:
Signalized
6. Cost
for
approximately
15,050,000Php.
Brownfield
and Land
99
revitalization
of
EPA
(Environment
Protection
X.
GOVERNING LAWS
Industrial Lands)
Ordinance:
Apartment Building
(approx. 2 100 sq.m.)
Condominium (approx.
2 000 sq. m.)
Brownfield Redevelopment
TOTAL: