Professional Documents
Culture Documents
@e)PNTOEC NTFTFTI
t,,/
)'\q'brflN
808217
TEI-ANGANA
T. Sabitha
POWER OF ATTORNEY
E
Hyderabad-
5OOO82oTelangana State do.hereby authori2e Shri Shakthi Singh Shlkhawat S/o (aran Singh
Shekhwat aged 5l years R/o Plot No. D-I67, Karshna Marg, Jhotwara, JAIPUR, Rajasthan State
td represent on behalf of the company for obtaining "Class AA' contractor licence with
Water Resouces Deparment, Govt of Rajasthan, Jaipur and is authorized to execute, negotiate,
sftn required documents and also provide necessary information and documents as per the
requirement of the concerned officer on our behalf, which are binding'on us.
&
H
H
I accept to do so
\\,sry2Afln
Place: Hyderabad
Dte
:30,07.2015
II ATTES
Authorised Signatory
S.
No.
Description of make,
Make
modeland
Capacity retention
and
Model
TATA
1,
Model
/ year
of
manufacture
Category
Proposed
Owned
Hired
period
(A)
(B)
of Retention
2000
Tippers
2
z
3
Trucks
TATA
Tanker
1
ET Hostel, Kirandul
2010-2072
2005
Ste
2013
DEWALT D2871.5
1,2
Scaffnldino o
13
Vibrator
1.4
Plate vibrator
15
Chain Pulley
14-lnch
Kirloskar
Kirloska r
Sharp
Site
Site
Store
/ sitp
Store
Store
/ Site
/ Site
1.2 x 0.6
2000
Nav Engineering
Sufficient
Ste
Ste
Store
2 Tonne
L6
Marshal Dl
Mahindra
2007
17
Mahindra Utility
Mahindra Pickup
Mahindra
Mahindra
?nna
18
Cutting Set
nsporter
)o1a
Advani Oprlilr
1,r
Tra
Jaypee
Welding Set
IU
Satpal Singh
IUU4
requirement
As per our
requirement
Savaii
As per our
Present Location
Details of hirer
zUIU
Site
Store / Sitc
1,
B.Chandrashekar
M.Harikrishana
M.V.Viswanath
Siva kumar.N
Challa Srinivas
C.Prasada Rao
P.Bhaskar Narsimha
C.Sudheer
Vinay karwa
K.Ramyaveni
N.Venkateswur. Rudd
CPrabhakar Rao
AL.Chakrapani
M.Shravan Kurnar
M.Suresh
Naveen.k
K.
Prasa nna
T.Ramesh yadav
R.Venkat Reddy
K.Naveen kumai
a Tej e s wa r R e d d yL.Ravikumar
Ramana Cha
S.Shivashankar Red-d
Maa Basha Shakim
P,Dilip kumar
N .S h iv
Director TechnEl
Vice President
GM-projects-TeGcom
GM-arsines
AGM-Solar
Sr.Manager fin.nE
Sr. Manager Fin;aceSr. Manage, n..ornt,
Sr.Accounts officer
Audit Departm.nt
Audit Departrnunt
Sr. Executive
HR-manager
c;;;
Exec
rpi
ut
ive- co
"r.i.
lloject Manaeer
Splicer-Technical
Site Engineer
Site Engineer
Site En
Site Engineer
Sr.Site SupervGoT
Site Supervisor
pervisor-Tra inee
Supervisor
Su
TaEFJE
Laision officer
Laision officer
Executive A/C & pur
Project Mana
Site
M. Haribushan
Parshu Ramulu
Anil kumar.K
Venkatesh
ouulopiilt
T'Sal,J4.q
808218
T. Sabitha
LICENCED STAMP VENDOR
LIC. NO : t5_02-002/20t4
H.No. 4_9_124, LIC Colony.
Hayathnagar, R.R. Dist
AFFIDAVIT
7 17 7
7,
Punjagurta,
l.
F
2.
H
That
ure of Deponent)
Verification
l, gbove named deponent, do hereby verify that statement made by me in the above para I & 2 are true
and correct to the best of my knowledge and belief. Nothing is false and nothing is concealed in it.
!
=
5
Pl8ce :
Hyderabad
(Si
D$e : 30.07.2015
.rh,,
ent)
No:YEC/WO I
Proiect Site:
Widening of existing road 2 lane NH standards along with improvement and realignment from
Potin-Panging via Yachuli, Z:iro, Daporizo, .Aalong in Arunachal Pradesh under Arunachal
Pradesh package of roads and highways (Apprcx. 407 Kms)on National Highway No.229 .
Scope of Work
Value of the
Date of
Date of
Contract
Allotment
Completion
(Rs)
PIACE: HYDERABAD
DATE: 05.02.2014.
12,79,00,000.00
25.06.2013
30.01.2014
& Contractors
.''.
"r.'..r.
registered
This is to certify that M/s Naolin Infrastructure Private Limited, having
office at D.No.6-3-873/L, Flat No. 202, Arien Apartments, Somajiguda,
vide our
Hyderabad-soQ OB2 has successfully completed the Works awarded
Work Order No.W.O. No:YEC/WO/t3-14/O4, dated 25'06'2013'
v'
six Laning of Etawah-chakeri section (Kanpur) of NH2 under NHDP Phase
Scooe of Work
Value of the
Contract
(Rs)
Date of
Allotment
Date of
Completion
10,39,00,000.00
20.LO.2074
25.03.20 15
PLACE: HYDERABAD
DATE: 31.03,2015