tankers and to allow simultaneous The second phase would involve Account.’’ You will be asked to select
unloading of two LNG tankers. The construction and operation of a new the type of filing you are making. This
modifications to the dual berthing slip 10,000-horsepower compressor station filing is considered a ‘‘Comment on
include: near Millen, Jenkins County, Georgia, on Filing.’’
—Adding four mooring dolphins (two a site where Southern currently operates In lieu of sending written comments,
for each berth); other aboveground facilities. The you are invited to attend public
—dredging approximately 72,000 cubic compressor station would increase the comment meetings the FERC staff will
yards of material from the slope at the pipeline design capacity by 230 MMcfd conduct in the project area to receive
back of the existing slip (and to a total of 1,175 MMcfd, and is comments on the draft EIS. Date, time,
disposing of dredged material into the proposed to be placed in service no later and location of these meetings will be
existing spoil disposal area adjacent than January 2013. sent under separate cover. Interested
to the terminal); and The draft EIS has been placed in the groups and individuals are encouraged
—installing a sheet pile bulkhead at the public files of the FERC and is available to attend and present oral comments on
back of the slip. for distribution and public inspection the draft EIS. Transcripts of the
These modifications would allow the at: Federal Energy Regulatory meetings will be prepared.
slip to accommodate larger LNG tankers Commission, Public Reference Room, After these comments are reviewed,
with an approximate overall length of 888 First Street, NE., Room 2A, any significant new issues are
345 meters (m) (compared to the current Washington, DC 20426, (202) 502–8371. investigated, and modifications are
288 m), breadth of 55 m (currently 49 CD–ROM copies of the draft EIS have made to the draft EIS, a final EIS will
m), design laden draft of 12.0 m been mailed to federal, state, and local be published and distributed. The final
(currently 11.7 m), and displacement of agencies; public interest groups; EIS will contain the FERC staff’s
177,000 metric tons (currently 128,000 individuals and affected landowners responses to timely comments received
metric tons). who requested a copy of the draft EIS on the draft EIS.
Phase B would be completed no later or provided comments during scoping; Comments will be considered by the
than December 2012 and would include libraries and newspapers in the project Commission but will not serve to make
the following facilities: area; and parties to this proceeding. the commenter a party to the
a. one new 200,000-m3 (1.25 million Hard copy versions of the draft EIS were proceeding. Any person seeking to
bbls) LNG storage tank; and mailed to those specifically requesting become a party to the proceeding must
b. three submerged combustion them. A limited number of hard copies file a motion to intervene pursuant to
vaporizers (two for service and one and CD–ROMs are available from the Rule 214 of the Commission’s Rules of
spare), each with a peak capacity of 180 Public Reference Room identified above. Practice and Procedures (18 CFR
MMcfd (providing a total peak send-out 385.214). Anyone may intervene in this
capacity of 2,115 MMcfd for the full Comment Procedures and Public
proceeding based on this draft EIS. You
facility at the completion of phase B). Meetings
must file your request to intervene as
Each phase would include all Any person wishing to comment on specified above.1 You do not need
necessary ancillary equipment the draft EIS may do so. To ensure intervener status to have your comments
including related pumps, piping, consideration prior to a Commission considered.
controls and appurtenances, and decision on the proposal, it is important Additional information about the
associated systems (electrical, that the Commission receive your project is available from the
mechanical, civil, instrumentation, comments before the date specified Commission’s Office of External Affairs,
hazard detection, and fire protection) below. Please carefully follow these at 1–866–208–FERC or on the FERC
and buildings necessary to instructions to ensure that your Internet Web site (www.ferc.gov) using
accommodate the associated tanks and comments are received and properly the eLibrary link. Click on the eLibrary
vaporizer units. recorded: link, click on ‘‘General Search’’ and
• Send an original and two copies of enter the docket number excluding the
Elba Express Pipeline
your comments to: Philis J. Posey, last three digits in the Docket Number
EEC proposes to construct and operate Acting Secretary, Federal Energy field. Be sure you have selected an
about 188 miles of new natural gas Regulatory Commission, 888 First appropriate date range. For assistance,
pipeline and appurtenant facilities in Street, NE., Room 1A, Washington, DC please contact FERC Online Support at
Georgia and South Carolina. The 20426. FERCOnlineSupport@ferc.gov or toll
pipeline would be constructed in two • Reference Docket Nos. CP06–470– free at 1–866–208–3676, or for TTY,
phases. The first phase is proposed to be 000, et al. contact (202) 502–8659. The eLibrary
placed in service no later than July 2011 • Label one copy of the comments for link on the FERC Internet Web site also
with a design capacity of 945 MMcfd, the attention of Gas Branch 1, DG2E. provides access to the texts of formal
and would consist of: • Mail your comments so that they documents issued by the Commission,
a. a ‘‘Southern Segment,’’ which will be received in Washington, DC on such as orders, notices, and
includes about 104.8 miles of 42-inch- or before May 21, 2007. rulemakings.
diameter pipeline extending from Port Please note that the Commission
In addition, the Commission now
Wentworth to the existing Southern strongly encourages electronic filing of
offers a free service called eSubscription
Wrens Compressor Station (Wrens) in any comments or interventions or
which allows you to keep track of all
Jefferson County, Georgia (to be protests to this proceeding. See 18 CFR
formal issuances and submittals in
collocated with existing Southern 385.2001(a)(1)(iii) and the instructions
specific dockets. This can reduce the
pipelines); and on the Commission’s Web site at
amount of time you spend researching
b. a ‘‘Northern Segment,’’ which http://www.ferc.gov under the ‘‘e-
proceedings by automatically providing
jlentini on PROD1PC65 with NOTICES
includes about 83.1 miles of 36-inch- Filing’’ link and the link to the User’s
you with notification of these filings,
diameter pipeline extending from Wrens Guide. Before you can file comments
to interconnects with Transco in Hart you will need to create a free account, 1 Interventions may also be filed electronically via
County, Georgia, and Anderson County, which can be created by clicking on the Internet in lieu of paper. See the previous
South Carolina. ‘‘Login to File’’ and then ‘‘New User discussion on filing comments electronically.
VerDate Aug<31>2005 17:37 Apr 04, 2007 Jkt 211001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\05APN1.SGM 05APN1
Federal Register / Vol. 72, No. 65 / Thursday, April 5, 2007 / Notices 16781
document summaries and direct links to newspapers, and parties to this and enter the docket number excluding
the documents. Go to the eSubscription proceeding. the last three digits in the Docket
link on the FERC Internet Web site. Any person wishing to comment on Number field. Be sure you have selected
the EA may do so. To ensure an appropriate date range. For
Philis J. Posey,
consideration prior to a Commission assistance, please contact FERC Online
Acting Secretary. decision on the proposal, it is important Support at FercOnlineSupport@ferc.gov
[FR Doc. E7–6315 Filed 4–4–07; 8:45 am] that we receive your comments before or toll free at 1–866–208–3676, or for
BILLING CODE 6717–01–P the date specified below. TTY, contact (202) 502–8659. The
Please note that the Commission eLibrary link also provides access to the
strongly encourages electronic filing of texts of formal documents issued by the
DEPARTMENT OF ENERGY any comments or interventions or Commission, such as orders, notices,
protests to this proceeding. See 18 CFR and rulemakings.
Federal Energy Regulatory
385.2001(a)(1)(iii) and the instructions In addition, the Commission now
Commission
on the Commission’s Web site at offers a free service called eSubscription
http://www.ferc.gov under the ‘‘e- which allows you to keep track of all
[Docket No. CP06–115–000] Filing’’ link and the link to the User’s formal issuances and submittals in
Guide. Before you can file comments specific dockets. This can reduce the
Texas Eastern Transmission, LP; you will need to create a free account amount of time you spend researching
Notice of Availability of the which can be created by clicking on proceedings by automatically providing
Environmental Assessment for the ‘‘Sign-up.’’ you with notification of these filings,
Proposed Texas Eastern Incremental If you are filing written comments, document summaries and direct links to
Market Expansion II Project please carefully follow these the documents. Go to http://
March 30, 2007. instructions to ensure that your www.ferc.gov/esubscribenow.htm.
The staff of the Federal Energy comments are received in time and
properly recorded: Philis J. Posey,
Regulatory Commission (FERC or
Commission) has prepared an • Send an original and two copies of Acting Secretary.
your comments to: Philis J. Posey, [FR Doc. E7–6314 Filed 4–4–07; 8:45 am]
environmental assessment (EA) on the
natural gas pipeline facilities proposed Acting Secretary, Federal Energy BILLING CODE 6717–01–P
VerDate Aug<31>2005 17:37 Apr 04, 2007 Jkt 211001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\05APN1.SGM 05APN1