Federal Register / Vol. 72, No.

65 / Thursday, April 5, 2007 / Notices 16779

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY issued as a Letter of Recommendation


with conditions. The Captain of the Port
Federal Energy Regulatory Federal Energy Regulatory Savannah is the point of contact for this
Commission Commission action. The COE would need to evaluate
[Docket Nos. CP06–470–000; CP06–471– the project and issue Section 404
[Project Nos. 11437–016] 000; CP06–472–000; CP06–473–000; CP06– Permits for wetland impacts associated
474–000] with expansion of the terminal and
Hydro Matrix Limited Partnership; pipeline construction, easements where
Notice of Availability of Environment Southern LNG Inc.; Elba Express the pipeline would cross COE-managed
Assessment Company, L.L.C.; Southern Natural lands, modifications to existing COE
Gas Company; Notice of Availability of Mitigation Lands, and an approval for a
March 30, 2007. the Draft Environmental Impact large fuel-carrying pipeline to cross
In accordance with the National Statement for the Elba III Project federal property. NOAA Fisheries has
responsibilities for evaluating potential
Environmental Policy Act of 1969 and March 30, 2007. impacts on essential fish habitat and
the Federal Energy Regulatory The staff of the Federal Energy threatened or endangered aquatic
Commission’s regulations, the Office of Regulatory Commission (FERC or species.
Energy Projects has reviewed the Hydro Commission) has prepared a draft The FERC staff has concluded that if
Matrix Limited Partnership’s (licensee) Environmental Impact Statement (EIS) the project is constructed and operated
application requesting the for the Elba III Project, proposed by in accordance with applicable laws and
Commission’s authorization to amend Southern LNG Inc. (Southern LNG), regulations, each project sponsor’s
its license for the Jordan Dam Elba Express Company, L.L.C. (EEC), proposed mitigation, and the staff’s
Hydroelectric Project. The licensee and their parent company Southern additional mitigation recommendations,
proposes to install two generating units Natural Gas Company (Southern), a it would have limited adverse
rated at 2200 kW, rather than the subsidiary of El Paso Corporation. As environmental impact and would be an
authorized eighty 100 kW units. This described in the above-referenced environmentally acceptable action.
would reduce the generating capacity of dockets, this project would consist of The draft EIS addresses the potential
the project from 8.0 MW to 4.4 MW, and the following components: environmental effects of construction
reduce the hydraulic capacity of the • Southern LNG’s expansion of the and operation of the following LNG
existing Elba Island Liquefied Natural terminal and natural gas pipeline
project form 2320 cubic feet per second
Gas (LNG) Import Terminal near facilities:
(cfs) to 1200 cfs. The unconstructed
Savannah in Chatham County, Georgia;
project is located at the U.S. Army • EEC’s construction and operation of Elba Terminal Expansion
Corps of Engineers (Corps) B. Everett natural gas pipeline and compression The proposed expansion of the
Jordan Dam on the Haw River, in facilities (Elba Express Pipeline) existing LNG import terminal would: (a)
Chatham County, North Carolina. An extending between existing facilities More than double the site’s LNG storage
environmental assessment (EA) has owned by Southern in Chatham County capacity by adding 405,000 cubic meters
been prepared. and those of Transcontinental Gas Pipe (m3) of new storage; (b) substantially
In the EA, the Commission’s staff Line Corporation (Transco) in Hart increase the facility’s existing
concludes that approval of the licensee’s County, Georgia and Anderson County, vaporization capacity; (c) upgrade the
application would not constitute a South Carolina; and terminal’s send-out meter station to
major federal action significantly • Southern’s abandonment by sale to increase the natural gas send-out
affecting the quality of the human EEC of an undivided interest in its capacity of the facility by an additional
environment. No ground disturbing pipeline facilities that extend between 900 million cubic feet per day (MMcfd);
the LNG import terminal and the and (d) modify the terminal’s LNG
activities are involved with the
existing Port Wentworth Meter Station tanker berthing and unloading facilities
licensee’s proposal.
(where the Elba Express Pipeline would to accommodate larger tankers and
A copy of the EA is attached to a begin), and purchase of an undivided provide for simultaneous unloading of
Commission order titled ‘‘Order interest in the first 10 miles of the Elba two LNG tankers. All of the planned
Amending License and Revising Annual Express Pipeline. facilities would be located entirely
Charges,’’ issued March 30, 2007, and is The draft EIS was prepared to satisfy within the existing 190-acre facility site
available at the Commission’s Public the requirements of the National on Elba Island.
Reference Room. A copy of the EA may Environmental Policy Act of 1969 The LNG terminal expansion would
also be viewed on the Commission’s (NEPA), and was completed with the be constructed in two phases, A and B.
Web site at http://www.ferc.gov using cooperation of the U.S. Coast Guard Southern LNG anticipates completing
the ‘‘elibrary’’ link. Enter the docket (Coast Guard), the U.S. Army Corps of Phase A as early as January 2010. Phase
number (P–11437) in the docket field to Engineers (COE), and the National A would include the following facilities:
access the document. For assistance, Oceanic and Atmospheric a. One new 200,000-m3 (1.25 million
call (202) 502–8222 or (202) 502–8659 Administration’s National Marine barrels [bbls]) LNG storage tank, one
(for TTY). Fisheries Service (NOAA Fisheries). A associated boil-off gas condenser, and
cooperating agency has jurisdiction by three boil-off gas compressors;
Philis J. Posey, law or special expertise with respect to b. three submerged combustion
Acting Secretary. potential environmental impacts vaporizers, each with a peak capacity of
[FR Doc. E7–6324 Filed 4–4–07; 8:45 am] associated with the proposal, and 180 MMcfd (providing a total peak
jlentini on PROD1PC65 with NOTICES

BILLING CODE 6717–01–P


participates in the NEPA analysis. send-out capacity of 1,755 MMcfd for
The Coast Guard is responsible for the full facility at the completion of
determining the suitability of a phase A); and
waterway for LNG marine traffic; in this c. modifications to the unloading
instance, the determination would be docks to accommodate larger LNG

VerDate Aug<31>2005 17:37 Apr 04, 2007 Jkt 211001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\05APN1.SGM 05APN1
16780 Federal Register / Vol. 72, No. 65 / Thursday, April 5, 2007 / Notices

tankers and to allow simultaneous The second phase would involve Account.’’ You will be asked to select
unloading of two LNG tankers. The construction and operation of a new the type of filing you are making. This
modifications to the dual berthing slip 10,000-horsepower compressor station filing is considered a ‘‘Comment on
include: near Millen, Jenkins County, Georgia, on Filing.’’
—Adding four mooring dolphins (two a site where Southern currently operates In lieu of sending written comments,
for each berth); other aboveground facilities. The you are invited to attend public
—dredging approximately 72,000 cubic compressor station would increase the comment meetings the FERC staff will
yards of material from the slope at the pipeline design capacity by 230 MMcfd conduct in the project area to receive
back of the existing slip (and to a total of 1,175 MMcfd, and is comments on the draft EIS. Date, time,
disposing of dredged material into the proposed to be placed in service no later and location of these meetings will be
existing spoil disposal area adjacent than January 2013. sent under separate cover. Interested
to the terminal); and The draft EIS has been placed in the groups and individuals are encouraged
—installing a sheet pile bulkhead at the public files of the FERC and is available to attend and present oral comments on
back of the slip. for distribution and public inspection the draft EIS. Transcripts of the
These modifications would allow the at: Federal Energy Regulatory meetings will be prepared.
slip to accommodate larger LNG tankers Commission, Public Reference Room, After these comments are reviewed,
with an approximate overall length of 888 First Street, NE., Room 2A, any significant new issues are
345 meters (m) (compared to the current Washington, DC 20426, (202) 502–8371. investigated, and modifications are
288 m), breadth of 55 m (currently 49 CD–ROM copies of the draft EIS have made to the draft EIS, a final EIS will
m), design laden draft of 12.0 m been mailed to federal, state, and local be published and distributed. The final
(currently 11.7 m), and displacement of agencies; public interest groups; EIS will contain the FERC staff’s
177,000 metric tons (currently 128,000 individuals and affected landowners responses to timely comments received
metric tons). who requested a copy of the draft EIS on the draft EIS.
Phase B would be completed no later or provided comments during scoping; Comments will be considered by the
than December 2012 and would include libraries and newspapers in the project Commission but will not serve to make
the following facilities: area; and parties to this proceeding. the commenter a party to the
a. one new 200,000-m3 (1.25 million Hard copy versions of the draft EIS were proceeding. Any person seeking to
bbls) LNG storage tank; and mailed to those specifically requesting become a party to the proceeding must
b. three submerged combustion them. A limited number of hard copies file a motion to intervene pursuant to
vaporizers (two for service and one and CD–ROMs are available from the Rule 214 of the Commission’s Rules of
spare), each with a peak capacity of 180 Public Reference Room identified above. Practice and Procedures (18 CFR
MMcfd (providing a total peak send-out 385.214). Anyone may intervene in this
capacity of 2,115 MMcfd for the full Comment Procedures and Public
proceeding based on this draft EIS. You
facility at the completion of phase B). Meetings
must file your request to intervene as
Each phase would include all Any person wishing to comment on specified above.1 You do not need
necessary ancillary equipment the draft EIS may do so. To ensure intervener status to have your comments
including related pumps, piping, consideration prior to a Commission considered.
controls and appurtenances, and decision on the proposal, it is important Additional information about the
associated systems (electrical, that the Commission receive your project is available from the
mechanical, civil, instrumentation, comments before the date specified Commission’s Office of External Affairs,
hazard detection, and fire protection) below. Please carefully follow these at 1–866–208–FERC or on the FERC
and buildings necessary to instructions to ensure that your Internet Web site (www.ferc.gov) using
accommodate the associated tanks and comments are received and properly the eLibrary link. Click on the eLibrary
vaporizer units. recorded: link, click on ‘‘General Search’’ and
• Send an original and two copies of enter the docket number excluding the
Elba Express Pipeline
your comments to: Philis J. Posey, last three digits in the Docket Number
EEC proposes to construct and operate Acting Secretary, Federal Energy field. Be sure you have selected an
about 188 miles of new natural gas Regulatory Commission, 888 First appropriate date range. For assistance,
pipeline and appurtenant facilities in Street, NE., Room 1A, Washington, DC please contact FERC Online Support at
Georgia and South Carolina. The 20426. FERCOnlineSupport@ferc.gov or toll
pipeline would be constructed in two • Reference Docket Nos. CP06–470– free at 1–866–208–3676, or for TTY,
phases. The first phase is proposed to be 000, et al. contact (202) 502–8659. The eLibrary
placed in service no later than July 2011 • Label one copy of the comments for link on the FERC Internet Web site also
with a design capacity of 945 MMcfd, the attention of Gas Branch 1, DG2E. provides access to the texts of formal
and would consist of: • Mail your comments so that they documents issued by the Commission,
a. a ‘‘Southern Segment,’’ which will be received in Washington, DC on such as orders, notices, and
includes about 104.8 miles of 42-inch- or before May 21, 2007. rulemakings.
diameter pipeline extending from Port Please note that the Commission
In addition, the Commission now
Wentworth to the existing Southern strongly encourages electronic filing of
offers a free service called eSubscription
Wrens Compressor Station (Wrens) in any comments or interventions or
which allows you to keep track of all
Jefferson County, Georgia (to be protests to this proceeding. See 18 CFR
formal issuances and submittals in
collocated with existing Southern 385.2001(a)(1)(iii) and the instructions
specific dockets. This can reduce the
pipelines); and on the Commission’s Web site at
amount of time you spend researching
b. a ‘‘Northern Segment,’’ which http://www.ferc.gov under the ‘‘e-
proceedings by automatically providing
jlentini on PROD1PC65 with NOTICES

includes about 83.1 miles of 36-inch- Filing’’ link and the link to the User’s
you with notification of these filings,
diameter pipeline extending from Wrens Guide. Before you can file comments
to interconnects with Transco in Hart you will need to create a free account, 1 Interventions may also be filed electronically via
County, Georgia, and Anderson County, which can be created by clicking on the Internet in lieu of paper. See the previous
South Carolina. ‘‘Login to File’’ and then ‘‘New User discussion on filing comments electronically.

VerDate Aug<31>2005 17:37 Apr 04, 2007 Jkt 211001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\05APN1.SGM 05APN1
Federal Register / Vol. 72, No. 65 / Thursday, April 5, 2007 / Notices 16781

document summaries and direct links to newspapers, and parties to this and enter the docket number excluding
the documents. Go to the eSubscription proceeding. the last three digits in the Docket
link on the FERC Internet Web site. Any person wishing to comment on Number field. Be sure you have selected
the EA may do so. To ensure an appropriate date range. For
Philis J. Posey,
consideration prior to a Commission assistance, please contact FERC Online
Acting Secretary. decision on the proposal, it is important Support at FercOnlineSupport@ferc.gov
[FR Doc. E7–6315 Filed 4–4–07; 8:45 am] that we receive your comments before or toll free at 1–866–208–3676, or for
BILLING CODE 6717–01–P the date specified below. TTY, contact (202) 502–8659. The
Please note that the Commission eLibrary link also provides access to the
strongly encourages electronic filing of texts of formal documents issued by the
DEPARTMENT OF ENERGY any comments or interventions or Commission, such as orders, notices,
protests to this proceeding. See 18 CFR and rulemakings.
Federal Energy Regulatory
385.2001(a)(1)(iii) and the instructions In addition, the Commission now
Commission
on the Commission’s Web site at offers a free service called eSubscription
http://www.ferc.gov under the ‘‘e- which allows you to keep track of all
[Docket No. CP06–115–000] Filing’’ link and the link to the User’s formal issuances and submittals in
Guide. Before you can file comments specific dockets. This can reduce the
Texas Eastern Transmission, LP; you will need to create a free account amount of time you spend researching
Notice of Availability of the which can be created by clicking on proceedings by automatically providing
Environmental Assessment for the ‘‘Sign-up.’’ you with notification of these filings,
Proposed Texas Eastern Incremental If you are filing written comments, document summaries and direct links to
Market Expansion II Project please carefully follow these the documents. Go to http://
March 30, 2007. instructions to ensure that your www.ferc.gov/esubscribenow.htm.
The staff of the Federal Energy comments are received in time and
properly recorded: Philis J. Posey,
Regulatory Commission (FERC or
Commission) has prepared an • Send an original and two copies of Acting Secretary.
your comments to: Philis J. Posey, [FR Doc. E7–6314 Filed 4–4–07; 8:45 am]
environmental assessment (EA) on the
natural gas pipeline facilities proposed Acting Secretary, Federal Energy BILLING CODE 6717–01–P

by Texas Eastern Transmission, LP Regulatory Commission, 888 First St.,


(Texas Eastern) in the above-referenced NE., Room 1A, Washington, DC 20426;
docket. • Reference Docket No. CP06–115– DEPARTMENT OF ENERGY
The EA was prepared to satisfy the 000;
• Label one copy of the comments for Federal Energy Regulatory
requirements of the National Commission
Environmental Policy Act. The FERC the attention of the Gas Branch 1, PJ–
staff concludes that approval of the 11.1; and [Docket No. CP07–14–000; BLM Reference
• Mail your comments so that they No. 2880/UTU–82750 and WYW–67229 (EA
proposed project, with appropriate
will be received in Washington, DC on No. UT–080–06–156)]
mitigating measures, would not
or before April 30, 2007.
constitute a major federal action Wyoming Interstate Company, Ltd.;
Comments will be considered by the
significantly affecting the quality of the Notice of Availability of the
Commission but will not serve to make
human environment. Environmental Assessment for the
the commentor a party to the
The EA assesses the potential Proposed Kanda Lateral and Mainline
proceeding. Any person seeking to
environmental effects of the Expansion Project
become a party to the proceeding must
construction and operation of Texas
file a motion to intervene pursuant to March 30, 2007.
Eastern’s proposed Texas Eastern
Rule 214 of the Commission’s Rules of
Incremental Market Expansion II Project The staff of the Federal Energy
Practice and Procedures (18 CFR
(TIME II). The TIME II project would Regulatory Commission (FERC or
385.214).1 Only intervenors have the
involve construction, replacement, and Commission), with the cooperation of
right to seek rehearing of the
operation of facilities by Texas Eastern the U.S. Department of Interior, Bureau
Commission’s decision.
Transmission, LP (Texas Eastern) in of Land Management (BLM) and the
Affected landowners and parties with
Pickaway and Monroe Counties, Ohio Sweetwater County Conservation
environmental concerns may be granted
and Somerset, Bedford, Franklin, Bucks, District, has prepared an environmental
intervenor status upon showing good
Fayette, and Adams Counties, assessment (EA) on the natural gas
cause by stating that they have a clear
Pennsylvania. The purpose of the pipeline facilities proposed by
and direct interest in this proceeding
facilities is to provide up to 150,000 Wyoming Interstate Company, Ltd. in
which would not be adequately
dekatherms per day of new the above-referenced docket.
represented by any other parties. You do
transportation service to the New Jersey The EA was prepared to satisfy the
not need intervenor status to have your
market area. requirements of the National
comments considered.
The EA has been placed in the public Environmental Policy Act. The staff
Additional information about the
files of the FERC. A limited number of concludes that approval of the proposed
project is available from the
copies of the EA are available for Kanda Lateral and Mainline Expansion
Commission’s Office of External Affairs,
distribution and public inspection at: Project, with appropriate mitigating
at 1–866–208–FERC or on the FERC
Federal Energy Regulatory Commission, measures, would not constitute a major
Internet Web site (http://www.ferc.gov)
Public Reference Room, 888 First Street, federal action significantly affecting the
using the eLibrary link. Click on the
jlentini on PROD1PC65 with NOTICES

NE., Room 2A, Washington, DC 20426, quality of the human environment.


eLibrary link, click on ‘‘General Search’’
(202) 502–8371. The BLM is participating as a
Copies of the EA have been mailed to 1 Interventions may also be filed electronically via cooperating agency in the preparation of
federal, state, and local agencies, public the Internet in lieu of paper. See the previous the EA because the project would cross
interest groups, interested individuals, discussion on filing comments electronically. federal lands under BLM administration