Federal Register / Vol. 71, No.

249 / Thursday, December 28, 2006 / Notices 78185

o. Final amendments to the unit per-year, which would be sold to a application). A notice of intent must be
application must be filed with the local utility. served on the applicant(s) named in this
Commission no later than 30 days from l. Locations of Applications: A copy of public notice.
the issuance date of the notice of ready the application is available for q. Proposed Scope of Studies under
for environmental analysis. inspection and reproduction at the Permit: A preliminary permit, if issued,
Commission in the Public Reference does not authorize construction. The
Magalie R. Salas, Room, located at 888 First Street NE., term of the proposed preliminary permit
Secretary. Room 2A, Washington DC 20426, or by would be 36 months. The work
[FR Doc. E6–22212 Filed 12–27–06; 8:45 am] calling (202) 502–8371. This filing may proposed under the preliminary permit
BILLING CODE 6717–01–P also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
DEPARTMENT OF ENERGY number excluding the last three digits in impacts. Based on the results of these
the docket number field to access the studies, the Applicant would decide
Federal Energy Regulatory document. For assistance, call toll-free whether to proceed with the preparation
Commission 1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
Notice of Application Accepted for
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to
Filing and Soliciting Motions To Intervene: Anyone may submit
available for inspection and
Intervene, Protests, and Comments comments, a protest, or a motion to
reproduction at the address in item h
December 20, 2006. above. intervene in accordance with the
Take notice that the following m. Individuals desiring to be included requirements of Rules of Practice and
hydroelectric application has been filed on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211,
with the Commission and is available so indicate by writing to the Secretary 385.214. In determining the appropriate
for public inspection: of the Commission. action to take, the Commission will
n. Competing Preliminary Permit: consider all protests or other comments
a. Type of Application: Preliminary
Anyone desiring to file a competing filed, but only those who file a motion
Permit.
application for preliminary permit for a to intervene in accordance with the
b. Project No.: 12749–000.
proposed project must submit the Commission’s Rules may become a
c. Date Filed: November 2, 2006.
competing application itself, or a notice party to the proceeding. Any comments,
d. Applicant: Oregon Wave Energy of intent to file such an application, to protests, or motions to intervene must
Partners, LLC. P≤e. Name of Project: the Commission on or before the be received on or before the specified
Coos Bay OPT Wave Park Project. specified comment date for the comment date for the particular
f. Location: The project would be particular application (see 18 CFR 4.36). application.
located in the Pacific Ocean about 2.5 Submission of a timely notice of intent Comments, protests and interventions
miles off shore in Coos County, Oregon. allows an interested person to file the may be filed electronically via the
g. Filed Pursuant to: Federal Power competing preliminary permit Internet in lieu of paper; See 18 CFR
Act, 16 U.S.C. 791(a)—825(r). application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions
h. Applicant Contacts: Charles F. the specified comment date for the on the Commission’s Web site under ‘‘e-
Dunleavy, Oregon Wave Energy particular application. A competing filing’’ link. The Commission strongly
Partners, LLC, 1590 Reed Road, preliminary permit application must encourages electronic filing.
Pennington, NJ 08534, phone: (609)- conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive
730–0400. o. Competing Development Documents: Any filings must bear in all
i. FERC Contact: Robert Bell, (202) Application: Any qualified development capital letters the title ‘‘COMMENTS’’,
502–6062. applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS
j. Deadline for filing comments, development application must submit to AND CONDITIONS’’,
protests, and motions to intervene: 60 the Commission, on or before a ‘‘PROTEST’’,’’COMPETING
days from the issuance date of this specified comment date for the APPLICATION’’ OR ‘‘MOTION TO
notice. particular application, either a INTERVENE’’, as applicable, and the
The Commission’s Rules of Practice competing development application or a Project Number of the particular
and Procedure require all intervenors notice of intent to file such an application to which the filing refers.
filing documents with the Commission application. Submission of a timely Any of the above-named documents
to serve a copy of that document on notice of intent to file a development must be filed by providing the original
each person in the official service list application allows an interested person and the number of copies provided by
for the project. Further, if an intervenor to file the competing application no the Commission’s regulations to: The
files comments or documents with the later than 120 days after the specified Secretary, Federal Energy Regulatory
Commission relating to the merits of an comment date for the particular Commission, 888 First Street, NE.,
issue that may affect the responsibilities application. A competing license Washington, DC 20426. A copy of any
of a particular resource agency, they application must conform with 18 CFR motion to intervene must also be served
must also serve a copy of the document 4.30(b) and 4.36. upon each representative of the
on that resource agency. p. Notice of Intent: A notice of intent Applicant specified in the particular
k. Description of Project: The must specify the exact name, business application.
proposed project would consist of: (1) address, and telephone number of the t. Agency Comments: Federal, State,
200 to 400 Power Buoys having a total prospective applicant, and must include and local agencies are invited to file
sroberts on PROD1PC70 with NOTICES

installed capacity of 100 megawatts, (2) an unequivocal statement of intent to comments on the described application.
a proposed 13.8 kilovolt transmission submit, if such an application may be A copy of the application may be
line; and (3) appurtenant facilities. The filed, either a preliminary permit obtained by agencies directly from the
project is estimated to have an annual application or a development Applicant. If an agency does not file
generation of 306.6 gigawatt-hours per- application (specify which type of comments within the time specified for

VerDate Aug<31>2005 20:03 Dec 27, 2006 Jkt 211001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\28DEN1.SGM 28DEN1
78186 Federal Register / Vol. 71, No. 249 / Thursday, December 28, 2006 / Notices

filing comments, it will be presumed to for the project. Further, if an intervenor Commission’s Rules may become a
have no comments. One copy of an files comments or documents with the party to the proceeding. Any comments,
agency’s comments must also be sent to Commission relating to the merits of an protests, or motions to intervene must
the Applicant’s representatives. issue that may affect the responsibilities be received on or before the specified
of a particular resource agency, they comment date for the particular
Magalie R. Salas,
must also serve a copy of the document application.
Secretary. on that resource agency. q. Filing and Service of Responsive
[FR Doc. E6–22229 Filed 12–27–06; 8:45 am] k. Competing Application: Project No. Documents: Any filings must bear in all
BILLING CODE 6717–01–P 12727–000, Date Filed: August 17, 2006, capital letters the title ‘‘COMMENTS’’,
Date Issued: October 11, 2006, Due Date: ‘‘PROTEST’’, or ‘‘MOTION TO
December 11, 2006. INTERVENE’’, as applicable, and the
DEPARTMENT OF ENERGY l. Description of Project: The proposed Project Number of the particular
project would consist of: (1) 200 to 400 application to which the filing refers.
Federal Energy Regulatory Power Buoys having a total installed Any of the above-named documents
Commission capacity of 100 megawatts, (2) a must be filed by providing the original
proposed 13.8 kilovolt transmission and the number of copies provided by
Notice of Application Accepted for
line, and (3) appurtenant facilities. The the Commission’s regulations to: The
Filing and Soliciting Comments,
project is estimated to have an annual Secretary, Federal Energy Regulatory
Motions To Intervene, and Protests generation of 306.6 gigawatt-hours per- Commission, 888 First Street, NE.,
December 20, 2006. unit per-year, which would be sold to a Washington, DC 20426. An additional
Take notice that the following local utility. copy must be sent to Director, Division
hydroelectric application has been filed m. Locations of Applications: A copy of Hydropower Administration and
with the Commission and is available of the application is available for Compliance, Federal Energy Regulatory
for public inspection: inspection and reproduction at the Commission, at the above-mentioned
a. Type of Application: Preliminary Commission in the Public Reference address. A copy of any notice of intent,
Permit. Room, located at 888 First Street NE., competing application or motion to
b. Project No: 12750–000. Room 2A, Washington DC 20426, or by intervene must also be served upon each
c. Date Filed: November 2, 2006. calling (202) 502–8371. This filing may representative of the Applicant
d. Applicant: Oregon Wave Energy also be viewed on the Commission’s specified in the particular application.
Partners, LLC. Web site at http://www.ferc.gov using Comments, protests and interventions
e. Name of Project: Newport OPT the ‘‘eLibrary’’ link. Enter the docket may be filed electronically via the
Wave Park Project. number excluding the last three digits in Internet in lieu of paper; see 18 CFR
f. Location: The proposed tidal project the docket number field to access the 385.2001(a)(1)(iii) and the instructions
would be located in the Pacific Ocean document. For assistance, call toll-free on the Commission’s Web site under the
about 3 to 6 miles off shore in Lincoln 1–866–208–3676 or e-mail
‘‘e-Filing’’ link. The Commission
County, Oregon. FERCOnlineSupport@ferc.gov. For TTY,
strongly encourages electronic filings.
g. Filed Pursuant to: Federal Power call (202) 502–8659. A copy is also r. Agency Comments: Federal, State,
Act, 16 U.S.C. 791(a)-825(r). available for inspection and and local agencies are invited to file
h. Applicant Contacts: Charles F. reproduction at the address in item h. comments on the described application.
Dunleavy, Oregon Wave Energy above. A copy of the application may be
Partners, LLC, 1590 Reed Road, n. Individuals desiring to be included
obtained by agencies directly from the
Pennington, NJ 08534, phone: (609)- on the Commission(s mailing list should
Applicant. If an agency does not file
730–0400. so indicate by writing to the Secretary
comments within the time specified for
i. FERC Contact: Mr. Robert Bell, of the Commission.
o. Proposed Scope of Studies under filing comments, it will be presumed to
(202) 502–6062.
j. Deadline for filing motions to Permit: A preliminary permit, if issued, have no comments. One copy of an
intervene, protests and comments: 60 does not authorize construction. The agency’s comments must also be sent to
days from the issuance date of this term of the proposed preliminary permit the Applicant’s representatives.
notice. would be 36 months. The work Magalie R. Salas,
All documents (original and eight proposed under the preliminary permit Secretary.
copies) should be filed with: Magalie R. would include economic analysis, [FR Doc. E6–22230 Filed 12–27–06; 8:45 am]
Salas, Secretary, Federal Energy preparation of preliminary engineering BILLING CODE 6717–01–P
Regulatory Commission, 888 First plans, and a study of environmental
Street, NE., Washington, DC 20426. impacts. Based on the results of these
Comments, protests, and interventions studies, the Applicant would decide DEPARTMENT OF ENERGY
may be filed electronically via the whether to proceed with the preparation
Internet in lieu of paper; see 18 CFR of a development application to Federal Energy Regulatory
385.2001(a)(1)(iii) and the instructions construct and operate the project. Commission
on the Commission’s Web site under the p. Comments, Protests, or Motions to
[Project No. 2301–022]
‘‘e-Filing’’ link. The Commission Intervene: Anyone may submit
strongly encourages electronic filings. comments, a protest, or a motion to PPL Montana; Notice of
Please include the project number (P– intervene in accordance with the Teleconference to Discuss Additional
12750–000) on any comments or requirements of Rules of Practice and Information Needs for the Mystic Lake
motions filed. Procedure, 18 CFR 385.210, 385.211,
sroberts on PROD1PC70 with NOTICES

Hydroelectric Project
The Commission’s Rules of Practice 385.214. In determining the appropriate
and Procedure require all intervenors action to take, the Commission will December 20, 2006.
filing documents with the Commission consider all protests or other comments a. Date and Time of Teleconference:
to serve a copy of that document on filed, but only those who file a motion January 8, 2007; 9 a.m. MST (11 a.m.
each person in the official service list to intervene in accordance with the EST).

VerDate Aug<31>2005 20:03 Dec 27, 2006 Jkt 211001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\28DEN1.SGM 28DEN1