You are on page 1of 9

List Of Drawings

WIT
Design
IA1.1 Demolition Plan, Schedules, Legends, And Abbreviations Associates
IA2.1 Partition Plan And Partition Types 550 Huntington Ave.
Boston, MA 02115

IA2.2 Furniture Layout Plan And Finish Plan


IA2.3 Power And Signal Plan ACME
DIVISION CO.
IA3.1 Ref lected Ceiling Plan 1 Federal Street
Boston, MA 02210

IA4.1 Interior Elevations 20th Floor

IA5.1 Cabinetry And Details


IA6.1 Reception Desk

Project North

No.
No. Description Date
Revisions

Drawn By

Alisha Petipas-Haggerty
Checked By

Job No.

Scale

Date

December 10, 2008


Drawing Title

INTD500 Construction
Documents

Dwg. No.
17 16 15 14 13 12 11 General Legend
WIT
Detail Key:
Design
6'-1"
X'-X" Dimension Line
Revision Key: Associates
X Detail Number
IAX.X 1 550 Huntington Ave.
Drawing Number
Column Line Boston, MA 02115
Room Key: Revision Number
C A Indicators
1
Room Room Name
XXX Room Number ACME
Keynote Indicator DIVISION CO.
Ceiling Finish Key: 1
X 1 Federal Street
Floor Mounted Power Section Key Boston, MA 02210
Receptacles (TYP) 9'-0" Ceiling Height IAX.X
Material 20th Floor
ACT 1 Window Type Key
D Elevation Key:
Finish Key:

P Finish Type Drawing Number


X A Partition Type
1 Finish Number IAX.X Elevation Number

1
Elev. Spot Elevation XX Door Number
E 0'-0" Key 4 IAX.X 2 Multiple Elevations

Align Key: S
3 Sealant
Recessed Floor
DN
Align Finish Surfaces
Closures Enlarged Plan Key:
UP
Limit Of Work T Tempered Glass
X Enlarged Plan Number
IAX.X
F Match Line
Drawing Number
Match Line
Recessed Floor See X/XXXX
Closures

Hardware Set 1 Hardware Set 5


Room Type: Off ice Lock Room Type: Closet
Hinges: Butt Hinges - 1.5 pair Hinges: Butt Hinges - 3 pair
Latch: Off ice Lock (F82) Latch: Dummy Trim - 1 pair
G Closer: None Closer: None
Remove Miscellaneous: Friction Ball Catch with strike - 1 Pair (top mount)
Concrete As Miscellaneous: Coat Hook
Required To
Accommodate, Hardware Set 2 Hardware Set 6
Coordinate Size Room Type: Conference Type: Glass Door
And Depth With Hinges: Butt Hinges - 1.5 pair Hinges: Pivot Hinge - Chromed - 1 pair
Manufacturer's Latch: Passage Latch (F82) Latch: Staple Pulls - 12” x 1”d - Chromed - 2 pair
Specif ications Closer: Recessed Floor Closer
Closer: Surface Mount
Miscellaneous: None Miscellaneous: None
H Hardware Set 3 Hardware Set 7
Room Type: File / Copy / Plan / Storage / Phone Type: Pocket Door
Partition Legend Hinges: Butt Hinges - 1.5 pair Roller: 4 Wheel Roller - 2 Pair and continuous Aluminum T Track
Latch: Passage Latch (F75) Latch: Finger Pulls - Chromed - 1 pair
Existing Closer: None Miscellaneous: Concealed Rubber Bumpers
New Miscellaneous: None
Hardware Set 8
Demo Project North
Hardware Set 4 Type: Pocket Door
Room Type: Secondary Egress Abbreviations Roller: 4 Wheel Roller - 2 Pair and continuous Aluminum T Track
Hinges: Butt Hinges - 1.5 pair Latch: Finger Pulls - Chromed - 1 pair
I Latch: Exit Lock Miscellaneous: Concealed Rubber Bumpers, Bottom Bolt
Closer: Surface Mount with cylinder locks and f loor receiver - Chrome - 1 pair (common key)
Miscellaneous: Provide blank plate at corridor side.
Room Information

Demolition Plan Number Type Floor Ceiling 1 Ceiling 2 Walls Base Remarks
1/8"=1'-0" 35 35 35 35 35 35 35 0
Abbreviations
Hardware Set 5 200 Cash ManagementCarpet 3 ACT - 9' NA Paint 2 Vinyl
ock Room Type: Closet Door Information 201 Corridor A Carpet 3 ACT - 9' NA Paint 2 Vinyl
1.5 pair Hinges: Butt Hinges - 3 pair 202 Office Carpet 1,2 ACT - 9' NA Paint 2 Vinyl
Number Size Material Door Elevation
82) Latch: Dummy Trim - Hardware
1 pair Type Frame Material Frame Elevation Remarks 203 Secretary Carpet 1 ACT - 9' NA Paint 3 Vinyl
ACT- Acoustical Ceiling Tile EQ- Equal MAX- Maximum SECT- Section
30 30 30 30 30 30 30 0 AFF- Above Finished Floor EWC- Electric Water Cooler MDO- Medium Density Overlay SF- Square Feet
Closer: None 204 Partner's Office Carpet 2 ACT - 9' NA Paint 2 Vinyl ARCH- Architectural EXIST- Existing MECH- Mechanical SHT- Sheet
01 3'0" x 7'10" Wood A
Miscellaneous: Friction1 Ball Catch with
Hollow Metal- 1 Pair
strike A (top mount)
Hook 205 Partner's Conference
Carpet 1,2 ACT - 9' NA Paint 2 Vinyl
EXP- Expansion MFR- Manufacturer SIM- Similar
02 3'0" x 7'10" Wood A 1 Hollow Metal C BETW- Between EXT- Exterior MIN- Minimum SPEC- Specif ications
03 3'0" x 7'10" Wood A 2 Hollow Metal C 206 Secretary Carpet 1 ACT - 9' NA Paint 3 Vinyl BLDG- Building MO- Masonry Opening STD- Standard
Hardware Set 6 BLKG- Blocking FD- Floor Drain
04 3'0" x 7'10" Wood A 1 Hollow Metal C 207 Office Carpet 1,2 ACT - 9' NA Paint 2 Vinyl MS- Metal Stud STL- Steel
nce Type: Glass Door BO- By Others FE- Fire Extinguisher MTL- Metal Stud STR- Structural
208 Office Carpet 1,2 ACT - 9' NA Paint 2 Vinyl No.
No. Description Date
1.5 pair 05 3'0" x 7'10" Wood Hinges:A Pivot Hinge -1Chromed - 1 pair Hollow Metal C BOT- Bottom FEC- Fire Extinguisher Cabinet SVF- Sheet Vinyl Flooring
209 Office Carpet 1,2 ACT - 9' NA Paint 2 Vinyl Revisions
h (F82) 06 3'0" x 7'10" Wood Latch: Staple
A Pulls - 12”
1 x 1”d - Chromed - 2 pair C
Hollow Metal BP- Building Paper FIN- Finish N- North S4S- Surface Four Sides
Closer:ARecessed Floor 210 Office Carpet 1,2 ACT - 9' NA Paint 2 Vinyl BR- Brass FL- Floor NIC- Not In Contract
nt 07 3'0" x 7'10" Wood 1 Closer Hollow Metal C BRZ-Bronze FLUOR- Fluorescent NTS- Not To Scale T- Treads
08 3'0" x 7'10" Wood Miscellaneous:
A None 1 Hollow Metal C 211 Office Carpet 1,2 ACT - 9' NA Paint 2 Vinyl FOC- Face of Concrete TBD- To Be Determined Drawn By
09 3'0" x 7'10" Wood A 1 Hollow Metal C 212 Office Carpet 2 ACT - 9' NA Paint 2 Vinyl CL- Centerline FOF- Face of Finish OA- Overall T&G- Tongue & Groove
Hardware Set 7 213 Secretary Carpet 1 ACT - 9' NA Paint 3 Vinyl
CAB- Cabinet FR- Fire Resistant OC- On Center TEMP- Tempered Alisha Petipas-Haggerty
10 3'0" x 7'10" Wood A 2 Hollow Metal C CPT- Carpet FTR- Fin Tube Radiation OD- Outside Diameter TEL- Telephone
py / Plan / Storage / Phone Type: Pocket Door 214 Small Conference Carpet 1,3 ACT - 9' NA Paint 2 Vinyl CHR- Chrome FV- Field Verify OH- Overhead THK- Thick
Checked By
11 3'0" x 7'10" Wood
1.5 pair Roller: A4 Wheel Roller1 - 2 Pair and continuous
Hollow Metal C
Aluminum T Track 215 Secretary Carpet 1 ACT - 9' NA Paint 3 Vinyl CJ- Control Joint FWC- Fabric Wall Covering OPG- Opening T.O.- Top Of
12 3'0" x 7'10" Wood A 1 Hollow Metal C
h (F75) Latch: Finger Pulls - Chromed - 1 pair 216 File/Copy Carpet 3 ACT - 9' NA Paint 1 Vinyl
CLG- Ceiling OPHD- Opposite Hand TOC- Top of Concrete
13 3'0" x 7'10" Wood A
Miscellaneous: 1
Concealed Hollow Metal
Rubber Bumpers C CLR- Clearance GA- Gauge OPP- Opposite TOM- Top of Masonry Job No.

20 2'6" x 7'10" Wood B 3 Hollow Metal A 217 Corridor C Carpet 3 ACT - 9' NA Paint 2 Vinyl CMU- Concrete Masonry Unit GALV- Galvanized TOS- Top of Steel
218 Plan Room Carpet 3 ACT - 9' NA Paint 1 Vinyl COL- Column GC- General Contractor P&S - Power & Signal Plan TOP- Top of Wall
30 2'8" x 7'10" Wood HardwareA Set 8 2 Hollow Metal A COMP- Compressible GL- Glass PERF- Perforated TRANS- Translucent Scale
31 2'8" x 7'10" Wood A
Type: Pocket Door 2 Hollow Metal A 219 Office Carpet 3 ACT - 9' NA Paint 2 Vinyl CONC- Concrete GWB- Gypsum Wall Board PERP- Perpendicular TYP- Typical As Noted
40 2'10" x 7'10" Wood Roller: A4 Wheel Roller3 - 2 Pair and continuous
Hollow Metal Aluminum
A T Track 220 Office Carpet 3 ACT - 9' NA Paint 2 Vinyl CONT- Continuous PLAM- Plastic Laminate
ary Egress COP- Copper HC- Handicapped PM- Pressed Metal UL- Underwriters Laboratory
1.5 pair 41 2'10" x 7'10" Wood Latch: Finger
A Pulls - Chromed
3 - 1 pair
Hollow Metal A 221 Office Carpet 3 ACT - 9' NA Paint 2 Vinyl Date
CT- Ceramic Tile HDW- Hardware PNL- Panel UON- Unless Otherwise Noted
42 2'10" x 7'10" Wood Miscellaneous:
A Concealed
3 Rubber Bumpers,
Hollow Metal Bottom
A Bolt 222 Secretary Carpet 3 ACT - 9' NA Paint 2 Vinyl HT- Height PT- Pressure Treated December 10, 2008
with cylinder locks and f o
l or receiver - Chrome - 1 DEMO- Demolition HM- Hollow Metal PTD- Painted VCT- Vinyl Composition Tile
nt 43 2'10" x 7'10" Wood A 3 Hollow Metal Apair (common key) 223 Storage VCT ACT - 9' NA Paint 1 Vinyl
DTL- Detail HORZ- Horizontal PWD- Plywood VEN- Veneer Drawing Title
de blank plate at corridor
44 side. 2'10" x 7'10" Wood A 3 Hollow Metal A 224 Gallery Tile 1 Gypsum Wall Board
NA10' Paint 1 Vinyl DIM- Dimension HVAC- Heating, Ventilation, VER- Verify
45 2'10" x 7'10" Wood A 3 Hollow Metal A 225 Reception Carpet 1, Tile 1 Gypsum Wall Board
NA10' Paint 1 Vinyl DN- Down Air Conditioning QT- Quarry Tile VERT- Vertical Demolition Plan,
226 Closet Carpet 1 ACT - 9' NA Paint 1 Vinyl DR- Door VEST- Vestibule
46 2'10" x 7'10" Wood A 3 Hollow Metal A DWG- Drawing ID- Inside Diameter R- Radius or Risers VIF- Verify In Field Schedules,
50 3'0" x 7'10" Wood B 5 Hollow Metal B 227 Corridor B Carpet 2,1 Gypsum Wall Board
NA9' Paint 3 Vinyl INSUL- Insulation RAD- Radiator VWC- Vinyl Wall Covering
228 Closet Carpet 1 ACT - 9' NA Paint 1 Vinyl E- East INT- Interior RCP- Ref lected Ceiling Plan Legends, and
51 4'0" x 7'10" Wood B 5 Hollow Metal B
EA- Each REINF- Reinforced W- West
60 6'0" x 7'10" Glass C 6 N/A B 229 Phone Carpet 1 ACT - 9' NA Paint 1 Vinyl
EJ- Expansion Joint JINT- Joint REQD- Required WC- Water Closet
Abbreviations
70 6'0" x 7'10" Wood A 5 Hollow Metal B 230 Storage VCT ACT - 9' NA Paint 1 Vinyl EL- Elevation REQMTS- Requirements WD- Wood
231 Large Conference Carpet 3, Tile 1 Gypsum Wall Board
NA10' Paint 1 Vinyl ELEC- Electric KD- Knocked Down RH- Right Hand W/- With
80 4'8" x 7'10" Glass C 6 N/A B RO- Rough Opening W/O- Without Dwg. No.
90 6'0" x 7'10" Wood A 1 Hollow Metal B 232 Storage VCT ACT - 9' NA Paint 1 Vinyl L- Length WGL- Wired Glass
91 5'8" x 7'10" Wood A 1 Hollow Metal B 233 Secretary Carpet 3 ACT - 9' NA Paint 2 Vinyl LAM- Laminate S- South WP- Working Point
234 Kitchen Tile 3 ACT - 9' NA Paint 1 Vinyl LAV- Lavatory SAFB- Sound Attenuation Fiber WTH- Width

IA1.1
LH- Left Hand Blanket
LT- Light SCR- Screw
WIT
17 16 15 14 13 12 11 Design
Associates
14'6 Typical 14'6
550 Huntington Ave.
CL
15'-0" Boston, MA 02115
Where Required - Fill Flutes With
Acoustical Insulation

Typical
C See Schedule For Ceiling

6"
Align Cash Management
Finish ACME
Off ice #10 200 DIVISION CO.
202 1/2" GWB Each Side
B B 1 Federal Street
Boston, MA 02210
15'-0"

4'-0 1/4" 5'-8" 4'-0 1/4" Sec. #1A 20th Floor


D
203
Partner's Off ice
204 1
1'-0" 1'-11"
D 2
1'-0"
1'-0"

5'-0"
91 Align

C
Partner's Conference Corridor A 201

C
7 205 D

6"
2 1/2" Metal Stud At 16" OC

3'-0"
30

A1
IA3.1 1A 2'-7 1/2" 1/2" Plywood Sheathing
IA4.1

9'-10 1/4"
D Large Conference 231 1 1/2" Acoustical Insulation
6" 1 20 2'6" Door
Align

A2

1'-0" 6'-10"
B
3 4'-0" Wood Blocking
D

Sec. #1 206 Sec. #4

A2
1'-0" 2'-8"

B 4 IA4.1 2 C1 Stor. 233


C A2 #3 Base - See Finish Schedule
A2
E 4

Typical
232 C

A1

6"
3 Base - See Finish Schedule
1'-0"

A2
2'8" Door

3'-4"
4'-8" S

A2
40 Phone 41 31 S
Top of Slab

B
A2
60

1'-6"
C1
Off ice #9 229 Kitchen 234

2'-6"
1 1/2" = 1'0" 5 1/2"
3 5/8" 1 1/2" = 1'0"
A1

A1
207 Stor. #2
B

2'-8 1/2"

DN
230 IA4.1
C1 Exist. 13

C
A1 228
1'-4"

208 Stair
Off ice #8 50 A2
2'-2"
A1

6'-4"
4'-0"

UP
12
7'-4"

2'-2"

B
6'-3"
A1

C
227

F 5 70 46
A STC 45
B

1'-0"
Corridor B

6'-0" B STC 50

A2
10'-0"

80
6'-0"

Reception

2'-0"
6
90 8
225 Gallery
Off ice #7 5 IA3.1 224

A1
4"
3'-9 1/2" 1'-5 1/2"

209 45
IA4.1 6 Stor. #1
STC 35 STC 44
7'-4"

Align 8
4'-0"

A1 Delete Acoustical Insulation B1


A1

5" Delete Acoustical Insulation


4'-6"
B

A1
A2

C1 223 44
51

A2
B

C1 7 3'-6"
A1 226
2'-0"

G A2 9 A2
A2 A1
C
STC 30
8'-6" A2

B
C 2'-6" Sec #3 6"
B

3A 1'-0" Delete Acoustical Insulation


A2
A2

A2
IA4.1
A2

Off ice #6
5'-0" 6" Sec. #2 11 IA4.1 10 222 GWB One Side Only
A2

210 2'-6" Plan Room C


7 215 File/Copy
B

C
1'-6" 216 218
CL B 4" 2'-6"
2A 42 43 Identical To A Except Stud Is 5 1/2"
IA4.1 A3
6"

6"
8
Off ice #5 2'-6"
5'-0"
C

211
C

Align 1'-0"
D

Corridor C 217
6'-4"
H
B

11 12 13
10 14'6 14'6
Small Conference 214
9
Off ice #4 Sec. #2A
212 213
Metal Brace (2) Per Span Project North
B
D D B
Off ice #2 Off ice #1 2 Layers 1/2" GWB Each Side
Off ice #3
Align

220 221
219
I

7 3/4"
Varies
Partition Plan CL
1/8"=1'0" Partition Legend
Note: All partitions Are Type "A" UON

Partition Legend

Existing
2 1/2" MTL Studs
New
Demo
No.
No. Description Date
2 1/2" Metal Studs
2" Acoustical Insulation Revisions

Base - See Finish Schedule


Base - See Finish Schedule Drawn By
S S Alisha Petipas-Haggerty
Top of Slab Top of Slab
1 1/2" = 1'0" 1 1/2" = 1'0" Checked By

Job No.

Scale

STC 55 As Noted
C STC 47 D
Date

December 10, 2008


Drawing Title

STC 40
C1 Delete Acoustical Insulation
Partition Plan
and Partition
Types

Dwg. No.

IA2.1
WIT
17 16 15 14 13 12 11 17 16 15 14 13 12 11 Design
Associates
550 Huntington Ave.
Boston, MA 02115

C C
Cash Management ACME
Off ice #10 200
DIVISION CO.
202
1 Federal Street
P P Boston, MA 02210
C
2 2
Sec. #1A 3 20th Floor
203 C
T
Partner's Off ice
1
204 1
D 2 D
91 C1 C3
Partner's Conference Corridor A 201
205
30
P
T C3
C
T 1
3
Large Conference 231 P
T C
20 1 P
1
3 VCT 3
3
Sec. #1 206 Sec. #4 C 2
Stor. 233 3
#3 VCT C3
E 4 232 E T
C1 VCT
40 Phone 41 31
C 2 T3
60
Off ice #9 229 Kitchen 234
207 Stor. #2 1 VCT T
DN DN
230
228 Exist. 3
208 Stair
Off ice #8 50 UP
C
T C
UP

T3
1
2
227

1
F 5 70 46 F T1
Corridor B

80 T T1 X
Reception 90 C1
T
6 C2 1
225 Gallery 1
Off ice #7 224 P
T T1
209 45 1
2
Stor. #1
VCT
223 44 C3
51 VCT C3
226
G G
Sec #3
Off ice #6
Sec. #2 222 C C
T C
T P C
210 Plan Room P
7 215 File/Copy 1 T 1
3 1
3 3
218 2
216 3
1
42 43 C
T
8
Off ice #5 1
211 C
C1 C3
Corridor C 217 3
H H
10
11 12 13 P
T
Small Conference 214
1
3
Off ice #4
9
Sec. #2A C C C C
212 213 C P 3 3 3
3 P P P Project North
1 2
2 2 2
Off ice #2 Off ice #1
Off ice #3
220 221 Align
219
I I

3'-6"
Furniture Layout Plan Finish Plan
1/8"=1'0" 1/8"=1'0"

Finish Legend
Furniture Inventory
VCT: 12"x12" Mannington Vinyl Compositon Tile
No.
No. Description Date
Off ices Secretary (Four Locations) Carpet: Revisions
Desk (8'6" x 6'6") Desk (5'0" x 5'0") C1: Limestone #104
Desk Chair Return (5'0" x 5'0") C2: Empress Light Green #201
2 Guest Chairs Desk Chair C3: Imperial Brown #335
Bookcase (1'0" x 5'6") Drawn By

Secretary 2A and 3A Tile: Alisha Petipas-Haggerty


Partner's Off ice and Off ice #4 Desk (5'0" x 5'0")
Desk (3'0" x 6'0") Desk Chair T1: 16"x16" Honed Limestone Checked By

Desk Chair Demi Roche


Credenza (1'6" x 5'0") Reception T2: 16"x16" Honed Limestone Job No.
3 Guest Chairs (2 at Off ice #4) Reception Desk and Chair Bateig Blanca
Bookcase (2 at 1'0" x 4'0") Seating for 4 T3: 8"x8" Crossville Ceramic
Plum Hue, Matte Finish Scale
Partner's Conference Cash Management
Conference Table (3'0" x 3'0") 1/8"=1'-0"
4 Conference Chairs 8 Workstations (5'0" x 6'0") Paint:
Date
Credenza P1: Benjamin Moore SW 6126 Navajo White
Telephone P2: Benjamin Moore SW 6128 Blonde December 10, 2008
Large Conference Chair P3: Benjamin Moore SW 6169 Chatroom
Drawing Title
Seating for 14
Projection Screen (8" x 8'0") Kitchen
3'0" Diameter Table with 4 Chairs Notes:
All Partitions P1 UON
Small Conference Furniture Layout
Plan Room
Conference Table (3'6" x 10'0")
Table (4'0" x 8'0") Please Refer To Interior Elevation And RCP Drawings Plan and Finish Plan
Seating for 8
Credenza (1'6" x 6'0") Seating for 8 For Additional Finishes

Dwg. No.

IA2.2
WIT
Design
17 16 15 14 13 12 11 Associates
550 Huntington Ave.
Boston, MA 02115

ACME
C DIVISION CO.
Cash Management
Off ice #10 1 Federal Street
200
1'-5" Boston, MA 02210
7'-4" 202

20th Floor

Sec. #1A

7'-0"
203

6'-4"
Partner's Off ice

3'-8"
204 1

D 2

6'-1 1/2"

5'-6"
91 10'-0" 5'-6"
Partner's Conference Corridor A 201
205
36" 30 36"
Large Conference 231
20
3
Sec. #1 206 36" Note: Provide Ceiling
Sec. #4
36" Mounted J-box for LCD 8"
Stor. 233

2'-9"
3'-8" #3
Projector At Large 7'-0" Wide 65 Inch High Def inition
36" 36" 36" 36" Conference Room Retractable
E 4 232
Screen
Plasma Display
(WxHXD)

8"
40 Phone 41 31 10'-0" 61.2x36.4x3.7
60
Off ice #9 229 Kitchen 234 LCD Projector
207 Stor. #2
DN
230 42"
228 Exist.
208 Stair 42"
Off ice #8 50 1/2" GWB On 2 1/2" Metal Framing
UP
With Vertical Supports From Structure 8'-0"
42" 42" Above At 4'-0" OC
227

F 5 70 46
Corridor B

80
Reception 90
6 225 Gallery GWB Full

3'-7 1/2"

3'-0 1/8"
Off ice #7 224 Height
209 45
Stor. #1 Storage
223 44
51
226
G 36"
11'-6" 6"
42" 42" 36"
36" 36" Sec #3
Off ice #6 CL Pole
Sec. #2 36" 42" 222
210 File/Copy Plan Room 36"

3'-6"
7 215 42"
42" 218
216 36"
Insulate
36" 42 60" 43 60"
8
Off ice #5 No Insulation
4'-5"
5'-4"

Required

5'-6"
211 6'-6"
Corridor C 217
1'-0" 4'-0"
H
11 12 13
10
6'-9"

Small Conference 214


9 Project North
7'-10"

Off ice #4 Sec. #2A


212 213
5'-8"
8'-0"
Off ice #2 Off ice #1
Off ice #3
220 221
219
I

Power and Signal Plan Legend


Power and Signal Plan Section At Large Conference
1/8"=1'0" Outlet- Duplex 1/2"=1'0"
Outlet- Quadraplex
Outlet- Telephone
No.
No. Description Date
Outlet- Data
Revisions
Floor mount outlet - Duplex
Floor mount outlet - Quadraplex
Drawn By
Floor mount outlet - Telephone Alisha Petipas-Haggerty
Floor mount outlet - Data Checked By

Notes:
All Receptacles Are 1'-6" AFF UON, Job No.
And All Switches Are 4' AFF UON.
General Contractor: Provide A Switching Scale
Plan For Review And Approval By The As Noted
Designer Prior To Installation Of Any
Wiring. Date

December 10, 2008


Drawing Title

Power and Signal


Plan

Dwg. No.

IA2.3
17 16 15 14 13 12 11
WIT
Design
Associates
(4) 2'-0" x 2'-0" Fixtures
Centered At Corner Off ices 550 Huntington Ave.
Boston, MA 02115

C 3 1/2" MIN Metal Framing


Secured To Structure

2x10 Joist On Joist Hangers ACME


Sec. #1A
Off ice #10 DIVISION CO.
202 Cash Management 2x10 Joist On Hangers
203 2x Blocking 1 Federal Street
Partner's Off ice 200
Boston, MA 02210
204
1 20th Floor
8'-0" O.C Sliding Door Hardware
D 2 . 2x Blocking
91 CL Painted Wood
Partner's Conference Corridor A 9'-0" Sliding Door Hardware
205 30 GWB Soff it - 2 1/2" MTL Framing At 16"
ACT Ceiling O.C.
Large Conference 227 Ceiling Typical At Sec. Align
GWB Soff it at Mounted
Perimeter Off ices LCD
20

Eq.
3 Sec. #1 206 Projector 10'-0" GWB Ceiling
Sec. #4

6'-0"
Stor. 229

Eq.
Off ice #9 8'-0" 10'-0" #3 No Ceiling Required ACT Ceiling
E 207
4
GWB GWB
Soff it Wood Veneer Door Ceiling See Schedule
40 41 31 Existing Wall Beyond
5'-9 3/4" 7'-10 1/4" 60
New Wall Beyond Brace To Structure Above
Eq. Eq. Phone
Stor. #2 DN
CL
Kitchen 230
8'-0" AFF Off ice #8 2" 1/2" GWB
At All 50
Window 208 9'-0" 8'-0" UP
10'0"
Soff its GWB 3'-0" GWB Head Detail At Partner's Conference 2"
Soff it
F 70 46 7B 2 1/2" Metal Track
Corridor B

5 Sliding Door
4'-0"

Reception
225 80 Head Detail At Gallery Sliding Door
Off ice #7
4'-0" 4'-0" 4'-0" 90
8B Steel Frame
Eq.

6 Gallery 3"=1'-0"
4'-0"
1/2" 1/2"

209
224
CL

Wood Door
4'-11

45
Stor. #1 3 1/2" MTL Studs To
5'-0Eq.

10'-0" 223 (2) 2x6 Extend Full HT To Structure Above- Align


51
GWB 44 Structure Above- Secure With With CL Of Door If
Clip Angle Top And Bottom Possible
Off ice #6 9'-0"
G 210 ACT
Bumper
File/Copy
Sec #3 Existing WD Blocking
Eq.
Sec. #2 Plan Room 222 Full HT To Structure Above
7 215 216
218
Metal Ceiling Runner
2'-0" x 2'0" Eq.
Flourescent Off ice #5 42 43 Bumper Wood Blocking
Fixtures 211 8 9'0"
Typical At Corridor C
Off ices CL Concealed Pivot Hinge
Center
H Fixtures In Chrome
11 12 13

2"
Corridor
1/2"

10 Wood Veneer Door


Small Conference 214
7'-6Eq.

9 Sec. #2A 1/2" Tempered Glass


213 Door- Polished
Off ice #4 Off ice #3 Off ice #2 Off ice #1 Aluminum Top And
Bottom Rail
Eq.3/8"

212 219 220 221


Head Detail At Gallery
2 Project North
6'-5

2x4's Extend Full HT To 1/2" GWB 3"=1'-0"


Structure Above
I
Existing Wall
2" 3"=1'-0"
Center Fixtures WD Veneer Door- Solid
Ref lected Ceiling Plan Over Task 1 3/4"
2"
1/8"-1'0" Core
1 6 1/2"
IA3.1
3'-0" 2" 6'-0" 2" 6'-0" Jamb Detail At Partner's Conference
Ref lected Ceiling Plan Legend 7A Sliding Door 3" 4 1/2"
2"

2"

2" 7 1/2"
2'0" x 2'0" Flourescent Fixtures Brace To Structure Above
Wall Washers 1'-0"
Downlights 2 1/2" Metal Stud No.
No. Description Date
7'-10"

7'-10"

8'-0"

3 Metal Runner Revisions


Gypsum Wall Board T Jamb Detail At Gallery Sliding Door
IA3.1 Wood Blocking 10'-0"
8A 3"=1'-0"
Acoustical Ceiling Tile Grid Drawn By
2'0" x 2'0" Painted
Hollow Pivot Hinge 1/2" GWB Alisha Petipas-Haggerty
Metal Checked By

Notes: Center Lights in Ceiling Grid UON A B C


All Ceiling Heights 9'-0" UON
Door Frame Elevations 9'0" Ceiling See Schedule Job No.

5
1/4" = 1'0" Jamb Detail At Large Conference
IA3.1 Scale
3'-0" 2'-6" 5'-0"
Varies 1 2"
3/4" 6 3"=1'-0" As Noted
3"=1'-0" 1/2" GWB
Date

December 10, 2008


2 1/2" MTL Track
1/2" 2 1/2" Metal Track Drawing Title
3 1/2"

Wood
Wood Blocking
7'-10"

8'-0"

8'-0"
Flush Bronze Threshold Steel Frame Ref lected Ceiling
2"

7'10" 2"x2"x1/2" Stainless


6 16"x16" Honed Limestone Tile Angle Door Stop Plan
IA3.1
Wood Door
Recessed Floor Closer Concealed Pivot Hinge
Dwg. No.

A B C
Sill Detail At Gallery Typical Jamb Detail Head Detail At Large Conference
Door Type Elevations
4 5
IA3.1
3"=1'-0" 3 Typical Head Detail 3"=1'-0"
1/4" = 1'0" 3"=1'-0"
1
3"=1'-0"

1/2"
3'-0" 4'-6" 2'-10" 7'-10" 3'-4" 4'-6" 2'-9" 2'-8" 3'-1" 2'-5"
TYP 7'-0"
Wood Veneer Cabinet Doors
8'-0" 10'-0" Soff it In Ceiling
10'-0" WIT
Retractable Screen
Fbo/Ibc 8'-0" Painted GWB 8'-0"
Design
Associates

3'-7 1/2"
550 Huntington Ave.
5'-0"

5'-0"
5'-0"
Plasma Screen
Fbo/Ibc Boston, MA 02115

2'-0"
3'-6"
2'-11"

2'-11"
Painted GWB ACME
Wood Base
DIVISION CO.
Wood Base Wood Veneer Cabinet Doors Wood Base 3'-0"
Wood Veneer Cabinet Doors
Wood Base 1 Federal Street
Boston, MA 02210

Large Conference: North Large Conference: East Large Conference: South Large Conference: West 20th Floor
1 2 3 4

2'-4"
5'-4" 10'-0" 4'-0"
2'-0" 3'-0" TYP Wood Veneer Sliding Doors
10'-0" 10'-0" 2'-9" CL2'-8Eq.
5/8"
Wood Veneer Panels Painted 10'-0"
Painted GWB 10'-0" GWB 2'-0" 2'-0" 9'-0"
8'-0"
8'-0"

Wood Veneer
Panels

Open To
Beyond Open To
Beyond
2'-11"

3'-0"
Stone Panels

2'-11"
Stone Base

10"
1" Reveal Between Panels Typical
Wood Base
Reception: North
5 Reception: East
6 Reception: West
Reception: South
7 8

(4) Adjustable Wood Shelves 1"x12" On


1'-6" 12'-0" 2'-0" Surface MTD Pilaster Studs 2'-0" O.C.
1'-6" 2'-0 1/4" 2'-0" 2'-0" 2'-0" 1'-0"
9'-0" 9'-0"
9'-0"
8'-0" Project North

Painted GWB
1'-0"

9'-0"
Sink
10"

NIC NIC

4'-6"
N.I.C.

3'-6"
Icemaker

4'-0" Microwave Dishwasher

File/Copy: North File/Copy: East


9 10 File/Copy: West Kitchen: South
11 12

No.
No. Description Date
Revisions

Drawn By

Alisha Petipas-Haggerty
Checked By

1'-0" 2'-0" 3'-2"


2" 2'-0"
Eq. 2'-0"
Eq. 2'-0"
Eq.
2'-0"
Eq. 2'-0"
Eq. 2'-0"
Eq. 2" 3'-6" 1" TYP 3'-6" Job No.
9'-0" 9'-0" 9'-0"
9'-0"
8'-0" Scale

1'-3 1/4" TYP


1/4"=1'0"
3'-6"

Date

1" TYP
December 10, 2008
1'-6"

1" Drawing Title


2'-0"

2'-0"

Plastic Laminate
on 1" MDF
3'-0"
Interior Elevations
3'-0"

2'-6"

Open

9 1/2"
3"

Refrigerator 2"
2'-8"
TYP
Dwg. No.
Kitchen: West Secretary Secretary
13 1A 2A Plan Room: North
3A

Note: Please Refer To Finish Plan And RCP Drawings For Additional Finishes
IA4.1
WIT
Design
Associates
550 Huntington Ave.
Boston, MA 02115
Metal Stud Anchored To Straight Deck Above-
Diagonal Brace 16" O.C.

ACME
DIVISION CO.
1 Federal Street
Boston, MA 02210

9'-0" 20th Floor


1/2" GWB Fascia

Painted GWB

8'-0" 8'-0"
8'-0" 1/2" GWB Surface

1"
1/2" Gap TYP

Plaster Spots
(2) Adjustable 3/4"
Limestone Panel 3/4" Plywood Shelves-
2'-2" Melamine Surface
3/4" Hardwood
Veneer Plywood
Shelves

3'-6"

3'-6"
Wood Blocking To Secure Wire Anchors
5 7/8"
10"

Limestone Base 1'-0" Recessed Standards


Recessed Pilaster
Standards

21 1/8"
3/4" 22 1/2"
3/4" 1" 3/4"7/8" 1 1/8"
Line Of Wall Beyond
6 3/4"
6"

Under Cabinet Light

2"

2"
Under Cabinet Light
Section Detail At Stone Wall

3"=1'-0" Thinset Ceramic Tile Provide Shims As Required To


Backsplash On 1/4" Achieve Straight Installation
Cement Backer Board
Painted GWB

1'-6"
6 3/4"
6"

2'-0"3/8"
1/2" Homosote Fabric Wrapped

1'-11
Plastic Laminate Varies
2'-0 3/4"

1 1/2"
Countertop Project North
2" Diameter Grommet Polished Granite
3/4" Hardwood Nosing Countertop 1"
Radius Bull Nose
3/4" 3/4"

2"
3/4" Limestone Panel 5" ADA Staple Pull,

1 1/4"
Brushed SS

1/16" Joint With Sealant 2"

3'-0"

3/4"
Plaster Spots

2'-6"
2'-6
No.
No. Description Date

3 1/2"
Revisions
3 1/2"

Drawn By
1x3 Wood Alisha Petipas-Haggerty
Base
Checked By

Job No.

Section Detail: Kitchen Cabinets Section Detail: Secretary


1 1/2"=1'0" 1 1/2"=1'0" Scale
As Noted

Date

December 10, 2008


Drawing Title
1/4"

1/4" Cabinetry
And Details
Plan Detail At Stone Wall

3"=1'-0"
Dwg. No.

IA5.1
WIT

1/2" 1 1/2"
Solid Wood Edge Band Design

1/2"
6"
Associates
1
IA6.1 550 Huntington Ave.

11 3/4"
Boston, MA 02115

2'-7"
10'-0" Wood Veneer Plywood
(1" Shown)

ACME
2'-6" 2'-6"
3 DIVISION CO.

3/4"
IA6.1 1 Federal Street
Boston, MA 02210

4"
20th Floor

Reception Desk Section Reception Desk Side Elevation Reception Desk Section
Plastic Laminate On 6 1"=1'-0"
3 1"=1'-0"
7 1"=1'-0"
Plywood With Hardwood
2'-0"

Nosing
3'-0"

2 1/2" Diameter Grommets


With St. Steel Insert

1"
8"

3/4"
1/2"
5 3/4" 5EQ
3/4" 5EQ
3/4" 5EQ
3/4" 5EQ
3/4"
Align With Face Of Soff it
Above
2
IA6.1

Reception Desk Plan


4
1"=1'-0"

4
IA6.1
Reception Desk Section
5 1"=1'-0"

8"
1/4" Wide x 1/4" Deep
Reveal- Painted Black

3'-6"
5
IA6.1

Project North

1"
3"
1/4" Thick Clear Glass
Dividers With Glass Top

Reception Desk Front Elevation


Plastic Laminate
2 1"=1'-0" Countertop

6 7
IA6.1 IA6.1 Wood Veneer Divider
Plastic Laminate
Countertop- Overhangs
Drawers By 3/4"
Wood Divider

No.
No. Description Date
Pull-out Drawer- Face Of
Revisions
Drawer To Back Of Cab.
Box 2'-0" TYP
Drawn By
3 Plastic
Laminate Pull Alisha Petipas-Haggerty
Out Drawers Checked By
CPU Plastic Laminate Door And
Shelves Behind
Job No.

Plastic Laminate Scale


1"=1'0"

Date

Wood Veneer Panels December 10, 2008


Drawing Title

Reception Desk Rear Elevation


1 1"=1'-0"
Reception Desk

Reception Desk Axon


1"=1'-0"
Dwg. No.

IA6.1

You might also like