Caculation Sheet
Date:
Project No:
Designed by: MURII
Checked by: JNK
File Ref:
Project Title:
Element:
Item
LIFT CORE
Sheet:
of:
Rev:
Output
BUILDING DATA
Building Length , L =
20.000
Building Width , W =
13.000
No. of Stories
5.00
Floor to Floor Height
(excluding basement and roof)
Height, H =
3.60
23.00
WALL DATA
Length , L =
1800.000
mm
l1=
2200
Width , W =
1800.000
mm
w1=
1800
Wall thickness , D =
200.000
mm
23.00
A1=
A2=
A=
0.88
0.72
1.6
500.000
mm
Height, H =
Minimum Overhang of base
from wall face (assumed)
Materials Specifications
Grade of Concrete
Grade of Steel
425.00
N/mm2
N/mm2
Concrete
Steel
Soil
24.00
kN/m3
78.50
kN/m3
18.00
kN/m3
Bearing capacity of Soil
300.00
kN/m2
25.00
safety factor for Dead Load , =
1.40
safety factor for Live Load , =
1.60
Caculation Sheet
Date:
Project No:
Designed by: MURII
Checked by: JNK
File Ref:
Project Title:
Element:
Item
LIFT CORE
LOADING
Operating Self Weight of lift
Carrying Capacity of lift
10
100
kN
kN
Basic Wind Speed, vb
s1 =
65.840
M/S
s2 =
0.970
s3 =
1.000
vs =
63.86
q=
cf
2.50
WIND LOAD CONDITION
Calculation of operating Load
Gravity Load
Depth of Wall Below GFL
Depth of base
Weight of wall (neglecting openings)
Weight of Wall + Lift Car Accessories
(10% of wall weight assumed)
Loading from slab
Operating Load
Wind Load
1.000
M/S
kN/m2
1.000
1.50
400.00
940.80
1034.88
m
mm
KN
kN
1137.93
2282.81
kN
Wind load= cf .q .Ae
250.03
Wind moment
1437.64
kN
kNm
0.00
kNm
Seismic Load
Seismic Moment
Shear at Base Due to Wind
250.03
kN
Gravity load from Roof
275.00
kN
Gravity load from slab
275.00
kN
Sheet:
of:
Rev:
Output
Caculation Sheet
Date:
Project No:
Designed by: MURII
Checked by: JNK
File Ref:
Project Title:
Element:
Item
LIFT CORE
Ht. (m)
(KN)
21.60 90.0
1
18.00
180.0
2
14.40
180.0
2
10.80
180.
02
7.20
180.0
2
3.60
180.0
2
0.00
275.0
0
Sheet:
of:
Rev:
Output
KN
ROOF
275.0
0
KN
FR N
275.0
0
KN
FR 3
275.0
0
KN
FR 2
275.0
0
KN
FR 1
275.0
0
KN
275.0
0
KN
GRD
BASE
Caculation Sheet
Date:
Project No:
Designed by: MURII
Checked by: JNK
File Ref:
Project Title:
Element:
Item
LIFT CORE
Ht. (m)
V (KN)
M (KNM)
N (KN)
18.00
90.01
324.0
275.00
14.40
270.03
550.00
10.80
450.05
825.00
7.20
630.06
1100.00
3.60
810.08
1375.00
0.00
990.10
1650.00
Sheet:
of:
Rev:
Output
Caculation Sheet
Date:
Project No:
Designed by: MURII
Checked by: JNK
File Ref:
Project Title:
Element:
Item
LIFT CORE
Area of shell Wall
Perimeter of shell wall
1.6 M2
4.10
Check for Bearing Pressure
A = Dl / Po
Area of Raft
7.61 M2
Minimum Length of
base=
2800
mm
Minimum Width of
base=
2800
mm
Sheet:
of:
Rev:
Output
7.84 M2
Area of lift core base provided
Service Gravity Dead loads
Service Gravity Live loads
Gravity factored loads
1120.14 KN
100 KN
3378.2016 KN
=
823.95 KN/M
Design Moments
For the purpose of analysis of the lift base slab, it may be assumed to be supported on
fictitious supports at the outer periphery and loaded with:
Ultimate uniform pressure, p
Aspect ratio
Span
430.89 kN/M2
1
Supports
moment Msx
33.51
43.28
Msy
33.51
44.67
Caculation Sheet
Date:
Project No:
Designed by: MURII
Checked by: JNK
File Ref:
Project Title:
Element:
Item
LIFT CORE
823.
95
823.95
KN/M
KN/M
43
0.8
9
KN.M
33.51
53.86
Maximum Moments for Design
Support moment at cantilever edge, Mc
53.86 kNm
Span moment of base, Mi
33.51 kNm
Check for Effective Depth
Required effective depth from flexure, d
117.5 mm
Provided effective depth, dp
340.0 mm
Reinforcement Calculation
Main Reinforcement
k=Mu/fcubd2 =
Lever arm, Z =
0.012 N/mm2
323
Area of steel Required
Provided steel bar diameter
257 mm2
12.00
mm
KN.M
Sheet:
of:
Rev:
Output
Caculation Sheet
Date:
Project No:
Designed by: isu
Checked by: jk
File Ref:
Project Title:
Element:
Item
LIFT CORE
Spacing of Reinforcement Required
Secondary Reinforcement
Sheet:
of:
Rev:
Output
425 mm
334
Area of steel Required
Min Area of Steel
Provided steel bar diameter
Spacing of Reinforcement Required
413 mm2
520 mm2/ m width
mm
12.00
200 mm
Provide 12mm diameter bars @200mm C/C B1 (main)
565.7
Provide 12mm diameter bars @200mm C/C B2 (distribution)
565.7
Check for shear
Footing acts as a wide beam, therefore critical section for shear is at a distance equal
to the effective depth=
mm from the face of tank shell
340
or
mm from edge of footing
160.0
Max shear per meter length
=
68.94 KN
Applied shear stress =
0.203 N/mm2
Check Allowable Shear stress c
100As/bd=
0.166
vc=
section ok for shear
3.043
Deflection and Cracking
No need to check deflection in foundations
cracks,
no need to provide side reinforcement
N/mm2