WIND LOAD CALCULATION FOR PITCHED ROOF

** TRUSS-1
1 height of structure (H) = 5.00 m
2 width of structure (W) = 5.23 m
3 angle of inclination of roof = 15 Degree
4 height of structure at center part = 5.7 m
5 BASIC WIND SPEED Vb = 50.00 m/s
6 K1 IS 875 PART-3 (table - 1) = 1.00
7 K2 IS 875 PART-3 (table - 2) = 1.05
8 K3 IS 875 PART-3 = 1.00
9 K4 IS 875 PART-3 = 1.15
10 DESIGN WIND SPEED Vz = Vb x K1 x K2 x K3 IS 875 PART-3 = 60.38
11 WIND PRESSURE ON STRUCTURE Pz = 0.6 x Vz2IS 875 PART-3 = 2.187 KN/m2
12 WIND DIRECTIONALITY AVERAGING FACTOR Kd = = 0.90
13 AREA AVERAGING FACTOR Ka = = 1.00
14 COMBINATION FACTOR Kc = = 0.90
15 DESIGN WIND PRESSURE Pd = Kd x Ka x kc x Pz = 1.77 KN/m2
16 DESIGN WIND PRESSURE Pd = 0.7 x Pz = 1.53 KN/m2
17 SPACING OF TRUSS = 4.12 m
18 PURLIN SPACING = 1.00 m
19 LENGTH OF OVERALL STRUCTURE = 8.34 m
20 DEAD LOAD ON FRAME =( FRAME SPACING X 0.25 KN/m^2) = 1.03 kN/m
21 LIVE LOAD ON FRAME =( FRAME SPACING X 0.75 KN/m^2) = 3.09 kN/m

** WIND ON COLUMN
SHAPE FACTOR IS 875 PART-3 (TABLE 29) = 2.00
SIZE OF COLUMN MEMBER (100 X 100 X 4) mm = 0.10 m
WIND ON MEMBER = 0.35 kN/m

* 0.95602 1/2<H/W<3/2
* 1.59465 3/2<L/W<4

~ WIND LOAD ON ROOF 0 DEGREE

H/W CPI = 0.70 INT, PRESSURE CPI = -0.70 INT, SUCTION


**CPI IS CONSIDERED AS 0.5 OR 0.7 (ve+ , ve-) (As Per Opening Size)
EF GH EF GH EF GH
-0.70 -0.50 -1.40 -1.20 0.00 0.20
(Cpe-Cpi) (Cpe-Cpi) (Cpe-Cpi) (Cpe-Cpi)

** PRESSURE=(Cpe-Cpi) x Pz -2.48 -2.13 KN/m2 0.00 0.35 KN/m2

** Uniformly distributed load on frame = (Cpe - Cpi) x spacing of truss x Pz


-10.21 -8.75 KN/m 0.00 1.46 KN/m

~ WIND LOAD ON ROOF 90 DEGREE

H/W CPI = 0.70 INT, PRESSURE CPI = -0.70 INT, SUCTION


**CPI IS CONSIDERED AS 0.5 OR 0.7 (ve+ , ve-) (As Per Opening Size)
EF GH EF GH EF GH
-0.80 -0.60 -1.50 -1.30 -0.10 0.10
(Cpe-Cpi) (Cpe-Cpi) (Cpe+Cpi) (Cpe+Cpi)

** PRESSURE=(Cpe-Cpi) x Pz -2.66 -2.30 KN/m2 -0.18 0.18 KN/m2

** Uniformly distributed load on frame = (Cpe - Cpi) x spacing of truss x Pz


-10.93 -9.48 KN/m -0.73 0.73 KN/m
"+VE VALUE INDICATES PRESSURE TOWARDS STRUCTURE"
"-VE VALUE INDICATES PRESSURE AWAY FROM STRUCTURE"

-10.21 -8.75 0.00 1.46

0.35 0.35 0.35 0.35

(Wind angle=+ 0) Cpi=+0.7 (Wind angle=+ 0) Cpi= - 0.7

-10.93 -9.48 -0.73 0.73

0.35 0.35 0.35 0.35

(Wind angle=90) Cpi= +0.7 (Wind angle=90) Cpi= - 0.7