Professional Documents
Culture Documents
P1231
L
Di
Tp
Do
= 12000mm (12meters)
= 717.6 mm
= 22.2 mm
= 762 mm
12000 mm
Tp = 22.2
T2
T1
+ 5 C
2253mm
-20 C
22.2
Heat flow across wall as:
T1
= -20 C or -4F
T2
= +5 C or 41F
T
= T2 - T1 = 25C or 45F
Heat Transmission across Wall Section of Pipe:
Q
= U x A x T
Q is Rate of heat transfer of Steel at 22.2 TBC
U = 33.75 Btu/hr/ft2/R in still Air
U is U value of wall(steel) = 33.75
A is Area = 27.04 m2 = 290.95 ft2
T is 25 C or 45F
Q
= 33.75 x 290.95 x 45 441,880 Btu
Take 10% safety factor in above,
The heat load 441,880 x 1.1
486068 Btu/Hr
142 KW heating
GB MARINE PTE LTD
SINGAPORE
FSO OKHA
P1231
Calculate heating Agent Flow from Calorifier through the I - tubes wrapped around:
As per ASHRAE:
Flow of heating agent
= total heat load / (500 x T)
Where T is temperature different between inlet and outlet of heating media via Tube &
Heaters.
We assume: inlet Temp 200F
Outlet Temp 175F
So T 25F
But this is not the same as the Korean said, which is not practical at all >:
Flow of liquid / Agent
Heating agent flow rate
--- (ASHRAE)
Check Velocity at 8.83 m3/Hr 12.20 m/sec 2400 ft/ min Linear Flow
Tank Volume = 1.2 x 0.8 x 1.2H = 1.152 m3 = 1152 litres
Now we calculate the total surface area of heating coil required to transfer heat
of required amount through the 16 mm OD copper tube:
Surface Area
= Total Heating Load / Loading
Total Heating Load
= 486068
Loading (as per ASHRAE) = 550
As = 486068 / 550 = 883.76 884 ft2
/
Pipe Diameter
= 16 mm = 0.0525 ft
Surface Area
= D Lp
Where Lp surface area(As) / D = 884 / D = 5362 ft = 1635 m
Add 10% safety factor on pipe 1798 m say 1800 m
FSO OKHA
P1231
Figure
12000mm
12000 16 mm pitch 750 Turns each turn at 2.5 m around hose pipe.
So, 750 x 2.5 1875 m of pipe is possible OK
Observation
Amount of Glycol remain over 1800m tube at all time
350 ~ 360 litres heated at all time.
Observation/ Consideration
1)
2)
3)
4)
FSO OKHA
P1231
Schematic of Piping
22.2 mm x 762 mm HOSE PIPE
Ckt 1
Ckt 2
Ckt 3
Ckt 4
Ckt 5
Supply
Header
Return
Header
200F
From Calorifier
Total Tube length
175F
To Calorifier
1800 meters on the body of the hose pipe
FSO OKHA
P1231
COMMENTS
(1)
Glass wool thickness and density are not mentioned in the contractor quotation.
We recommend mineral glass wool blanket at about 4'' (100mm) thickness at
minimum 80 Kg/ m3 density.
(2)
(3)
It appears that there is a gap of 16mm between every turn of tubes. We do not agree to
this, as this will not be sufficient to cater for heat load. In other word, length of copper
tube as suggested by the contractor of 1,017m approximately to be substantially low.
We would recommend that there is no gap between the copper tube (length would be
approximately 1800m to 2000m).
(4)
(5)
Outlet from Calorifier to the hawsepipe should be installed from bottom to upwards.
(6)
(7)
No comments are expressed on electrical heater and control parts for calorifier.
(8)
We assume that necessary pressure and temperature safety valve(s) will be arranged by
contractor.
(9)
We have not reviewed on overall pipes, fittings and valves etc., as we do not have any
layout, detailed drawings from vendor.