DETAILED PROJECT REPORT OF IWMP


(2010 2014)

Declaration
Under Integrated Watershed Management Programme (IWMP) 2010-14, the Detailed Project Report (DPR) of Chirang-2
(DAISUMJHORA) cluster consisting of 26 priority villages, has been prepared. The total project area proposed to be treated under this
cluster is 3600 ha with the total project cost Rs. 432.00 Lakhs. Low Agriculture Production, Health Problems, High cost of basic
amenities Water Scarcity of techniques Practice and market knowledge
It states briefly the need for implementing the watershed project in Chirang-2 (DAISUMJHORA) cluster and suggests the appropriate
solutions to overcome for soil and water scarcity through holistic approach. It also put the emphasis on improving livelihood pattern
of the rural section.
The DPR is finally submitted to SLNA for the approval.

Authority Signatory

Acknowledgements
We would like to sincerely thank Mrs.N.A.Hazrika, Honorable Commissioner, Department of Soil conservation, Government
of Assam and Chairperson, SLNA, IWMP, Assam entrusting us the task of preparation of Detail Project Report of Chirang-2
(Diasumjhora) watershed, under IWMP project, Assam. We would also like on place on record our appreciation for Dr.Prem
Sharan, Ex-Commissioner, Department of Soil Conservation, Assam for giving us the opportunity for working in Assam.
We are grateful to Mr. F.S. Choudhary CEO, SLNA, IWMP, Assam for his continuous support and guidance. We shall also be
thankful to Special Duty Officers viz .Mr. J.M Talukdar, Mr.Chutia, Mr. B.Bhutta and Mr. P.Barkakoty for their suggestions,
coordination, support, comments and feedback from time to time.
Our special thanks to Divisional officer- Chirang, Mr.N.Sinha for his timely support in providing divisional information relevant
to the project and feedback on the draft report.
This project would have not been completed without moral and active support of Terracon staff who patiently worked on the
arduous task of data collection, interpretation and analysis over last 8 months.
We highly appreciate the sincere field work put by all field officers, survey team and data analysts.

Ashok Jain
Director & Strategist,
Terracon EcotechPvt. Ltd

Terracon Ecotech Pvt. Ltd., Mumbai

Study Team
Name

Designation

Ashok Jain

Project Advisor, Financial Analyst

Surabhi Mehrotra

Project Head, Environment Planner

Yashada Kulkarni

PRA coordinator and Data Analyst

Ashish Tadas

GIS and GPS Expert and Documentation

Swapna Patil

Data Analyst , Engineering Expert

Field Team
Vivek Sharma

Regional coordinator

Hemanta Deka

Socio Economic coordinator

Mr. Saburam & Team

Field Coordinator

Terracon Ecotech Pvt. Ltd., Mumbai

EXECUTIVE SUMMARY
Brief about area
Daisumjhora Micro watershed is located in Borobazar Block, Chirang district of Assam state. The total project area of the watershed is
about 4120 ha out of which 3600ha has been undertaken to be treated under Integrated Watershed Management Programmes (IWMP)
starting year 2010-2011.
The watershed includes six Gram Panchayat namely Subaijhar, Kumansali Batabari, Monghian, Poslabari, Borobazar. Assamies,
Bengalies and Muslim are the primary inhabitants of the village.
The livelihood of these people is primary based on rainfed agriculture, vegetable, cultivation, Poultry farming and wage labourer. The
major source of income of the people is from agriculture. Important crops are paddy and winter vegetables. Poultry, piggery are more
preferable work in project area.
The productivity of all the crops is in average. With the help of natural & human resources, it is possible to uplift their socio-economic
status. There is immense scope to conserve and utilize soil and water properly under this watershed. The nearest town is Bijni which is
about 8 to 10 km from the project area and is well connected by tar road. Chirang-2 (Daisumjhora) project is located in Borobazar block,
Chirang district of Assam state.
The project area falls under Bodoland Territorial Autonomous council (BTAD). The project is a cluster of six micro-watersheds with
3A2A2/I(a), 3A2A2/I(b), 3A2A2/I(c), 3A2A2/I(d), 3A2A2/I(e), 3A2A2/I (f)) as their respective codes.

Micro Watershed Name & Code No.:


Microwatershed
Name

Kumarsali

Ladanguri

Daugapara

Deotari

Uttarpara

Amguri

Watershed Code

3A2A2/I(a)

3A2A2/I(b)

3A2A2/I(c)

3A2A2/I(d)

3A2A2/I(e)

3A2A2/I(f)

Terracon Ecotech Pvt. Ltd., Mumbai

Institutional arrangements
The new common guideline has provided for
establishment of dedicated institutions for the
purpose of implementation of IWMP. It includes a
Central Level Nodal Agency (CLNA), below it State
Level Nodal Agencies (SLNAs) in all the states, below
it District Watershed Development Units (DWDUs)
at the district level; Project Implementing Agencies
(PIAs) at the project level and Watershed
Committees (WCs) at village level.

Salient features
1.
2.
3.
4.
5.
6.
7.

Delegation of powers to the States for sanctioning and implementation of projects.


Dedicated institutions of multi-disciplinary professionals at national, state and district levels
Project duration made flexible into 3 distinct phases- preparatory phase, works phase and consolidation phase
Focus on Livelihoods through integrated farming systems
Clustering of small watershed in the range of 1000-5000 ha. areas to optimize transaction cost.
Focus on scientific planning and capacity building
Multi tier Ridge to valley approach

Treatment area and details


Since 1996, Government of India has issued guideline for the implementation of area development programme adopting
watershed approach. Watershed approach aims at restoration of ecological balance preserving environment and stabilizing the income
of village community both farmers, asset less and landless agricultural labour. The importance of watershed development cannot be
underestimated. On one hand is the need to increase food productivity and hence productivity from soil and the other decreasing soil
erosion and depleting water availability.

Terracon Ecotech Pvt. Ltd., Mumbai

ii

The scope of soil conservation is very wide and encompasses much more than physical work for erosion control. The concept of
soil conservation, now-a-days has been expanded to mean protection of the soil against physical loss by erosion or against chemical
deterioration. Thus, the effective conservation and management of land, water and vegetation resources aimed at obtaining optimum
and sustained return from these resources without degrading them can be achieved by adopting watershed as basic unit of
development. Watershed being a natural hydrological entity, it responds most effectively to various engineering, biological and cultural
treatments. Monitoring of runoff and silt at the outlet of the watershed can help assess the impact of various treatments aimed at
conserving soil and water, and protecting vegetation.
Watershed management involves protection of land against all forms of degradation, restoration of degraded land, sediment
control, pollutants control, and prevention of floods, etc. A workable size of the watershed can be decided in accordance with the aim
and objective of the particular system as well as the size of the stream for which it forms a catchment. Watershed of smaller size has
distinct advantage of involving a smaller number of families within a resource unit with a common social and economic pattern.
Demarcation of watershed and subsequently sub watersheds can be done either by using toposheet of the area available with Survey of
India or by interpretation of remotely sensed imagery of the area. Prioritization of sub watershed should be done on the basis of
sediment yield and pollutants concentration in the runoff from the sub watershed. The entire watershed can be treated gradually over a
number of years as per the availability of financial and other resources.
Numerous treatment technologies in the form of engineering measures and agronomic practices are available. But identification of
most suitable technologies as per the site condition and their application in correct way is most important to achieve the desired
results. These technologies when adopted within the boundary of watershed, facilitates favourable interaction among various
watershed factors such as Physiographic, land slope, soil characteristics, land use, hydrological behaviour etc, land and water resources
to produce food, fodder, fuel and fibre on sustainable basis. In Chirang 2 cluster, majorly Boulder pitching, well repairing, check dam
construction is suggested. This will help in soil and water conservation in the area which is the main concern in rainfed agricultural
areas.
Based on surveys and PRA activities, number of livelihood activities like wood craft, bee keeping, Tarza making etc are suggested to
boost the economy of the area. Along with livelihood activities and microenterprises suggested, capacity building of asset less and small
farmers as well as institutional arrangement are suggested for sustainable management of the watershed.

Terracon Ecotech Pvt. Ltd., Mumbai

iii

Contents
EXECUTIVE SUMMARY ...............................................................................................................................................................................i
CHAPTER 1 INTRODUCTION AND BACKGROUND ............................................................................................................................................. 1
Introduction .................................................................................................................................................................................................. 1
Profile of the watershed project .................................................................................................................................................................. 3
Table 1.1: Project at a Glance ................................................................................................................................................................... 3
Weightage Criteria ........................................................................................................................................................................................ 4
Table 1.2: Need and Scope for Watershed Development ........................................................................................................................ 4
Table 1.3: Watershed information............................................................................................................................................................ 6
Table 1.4: Status of other development project in the area .................................................................................................................... 7
Table 1.5: Status of previous watershed programme .............................................................................................................................. 8
CHAPTER 2 GENERAL DESCRIPTION OF PROJECT AREA ................................................................................................................................... 9
Table 2.1: Location .................................................................................................................................................................................... 9
Watershed Location ................................................................................................................................................................................ 10
Table 2.2: Land Details ............................................................................................................................................................................ 12
Table 2.3: Details of the types of beneficiaries covered under the project ........................................................................................... 14
Soil and Topography: .............................................................................................................................................................................. 15

Terracon Ecotech Pvt. Ltd., Mumbai

iv

Table 2.4: Details of Agro-climatic condition .......................................................................................................................................... 15


Table 2.5: Details of flood and drought in the project area ................................................................................................................... 17
Table 2.6: Details of soil erosion in the project area .............................................................................................................................. 18
Table 2.7: Details of the Soil pH .............................................................................................................................................................. 19
Table 2.8: Climatic Condition .................................................................................................................................................................. 20
Table 2.9: Physiographic Features .......................................................................................................................................................... 20
Table 2.10: Watershed characteristics ................................................................................................................................................... 20
CHAPTER 3 BASE LINE INFORMATION OF WATERSHED ................................................................................................................................ 21
Socio-economic profile ............................................................................................................................................................................... 21
Table 3.1: Demographic features............................................................................................................................................................ 21
Livestock: .................................................................................................................................................................................................... 25
Table 3.2: Livestock details ..................................................................................................................................................................... 25
Table 3.3: Socio- economic status .......................................................................................................................................................... 28
Table 3.4: Migration Details .................................................................................................................................................................... 35
Table 3.5: Details of Community Based Organizations existing in the watershed village ...................................................................... 37
Table 3.6: Infrastructure Facilities ......................................................................................................................................................... 38
Table 3.7: Land use pattern (in Hectares) ............................................................................................................................................... 40
Table 3.8: Details of Common Property Resources ................................................................................................................................ 42
Table 3.9: Agriculture implements ............................................................................................................................................................. 46
Terracon Ecotech Pvt. Ltd., Mumbai

Table 3.10: Crop Classification ................................................................................................................................................................... 46


Table 3.11: Crops & Cropping pattern .................................................................................................................................................... 47
Table 3.12: Land capability Classification .............................................................................................................................................. 61
Table 3.13: Irrigation facilities................................................................................................................................................................ 61
Table 3.14: Status of water table ............................................................................................................................................................ 67
Table 3.15: Assessment of drinking water facility .................................................................................................................................. 68
Table 3.16: Surface water resources...................................................................................................................................................... 71
Table 3.17: Ground Water Structures to be repaired............................................................................................................................. 77
Table 3.18: Details of existing livelihoods ............................................................................................................................................... 81
Comparative data of the crop productivity of the area: Project area Vs District Vs State Vs country Vs world ....................................... 85
Table 3.19: Problem Typology of the Watershed ................................................................................................................................... 87
CHAPTER 4 INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT .......................................................................................................... 89
Table 4.1: Details of SHGs & UGs newly formed under IWMP ............................................................................................................... 89
Watershed Committees.............................................................................................................................................................................. 90
Table 4.2: Details of Watershed Committees (WC) ............................................................................................................................... 90
Table 4.3: WDT Particulars ...................................................................................................................................................................... 93
Table 4.4: PIA particulars ....................................................................................................................................................................... 94
Table 4.5: Bank Account Details ............................................................................................................................................................. 94
Institutional Mechanisms: .......................................................................................................................................................................... 95
Terracon Ecotech Pvt. Ltd., Mumbai

vi

Flow Chart of Institutional Arrangement from District to watershed level ........................................................................................... 95


Fund Flow mechanisms flow chart ...................................................................................................................................................... 95
List of Watershed Records to be maintained ......................................................................................................................................... 96
Project Implementation.............................................................................................................................................................................. 97
Table 4.6: Convergence plan with IWMP................................................................................................................................................ 97
CHAPTER 5 MANAGEMENT/ACTION PLAN .................................................................................................................................................... 98
Description on methodology of plan adopted ........................................................................................................................................... 98
Details of Natural Resource Management Activities ............................................................................................................................... 103
Table 5.1: Soil and Moisture Conservation structures ......................................................................................................................... 105
Table 5.2: Water Harvesting Structures................................................................................................................................................ 106
Table 5.3: Vegetative Covers ................................................................................................................................................................ 110
Structure or Activity Wise Details of Engineering Structure and Vegetative Measures .......................................................................... 122
Table 5.4: Engineering structures for Soil Conservation Measures (SMC) .......................................................................................... 122
Table 5.5: Details of engineering structures for Water Harvesting WHS ............................................................................................. 123
Table 5.6: Details of activities connected with vegetative cover in watershed works ........................................................................ 123
CHAPTER 6 CAPACITY BUILDING PLAN......................................................................................................................................................... 125
Table 6.1: Details of Capacity Building.................................................................................................................................................. 125
CHAPTER 7 PHASING OF PROGRAMME AND BUDGETING .......................................................................................................................... 127
Table 7.1: Phasing of the action plan ................................................................................................................................................... 127
Terracon Ecotech Pvt. Ltd., Mumbai

vii

Table 7.2: Estimated Benefit Cost Ratio ............................................................................................................................................... 132


CHAPTER 8 CONSOLIDATION AND COMPLETION OF VARIOUS WORKS ...................................................................................................... 134
Table 8.1: Consolidation of Action Plan ................................................................................................................................................ 134
CHAPTER 9 EXPECTED OUTCOMES ............................................................................................................................................................. 135
Ground Water: .......................................................................................................................................................................................... 135
Vegetative/Crop: ...................................................................................................................................................................................... 136
Migration: ................................................................................................................................................................................................. 136
Table 9.1: Expected outcome: Quantifiable indicators ........................................................................................................................ 137
Table 9.2: Backward and Forward Linkages ......................................................................................................................................... 138
CHAPTER 10 MAPS ...................................................................................................................................................................................... 140
APPENDIX A ENGINEERING ESTIMATES
APPENDIX B MICRO-WATERSHEDWISE ACTION PLAN - PRODUCTION

A-1
ICROENTERPRISE

APPENDIX C MICRO-WATERSHEDWISE ACTION PLAN - LI ELIHOOD ACTI ITIES

Terracon Ecotech Pvt. Ltd., Mumbai

viii

B-1
C-1

List of Figures

Fig. 2.1: Landscape and vegetation of project area


Fig. 2.2: Interaction with Farmers and testing soil quality of their land using pH meter
Fig. 2.3: Landuse Pattern of project area
Fig. 2.4: Type of Beneficiaries in the project area
Fig. 3.1: SC and ST population percentage in project area
Fig. 3.2: Gender wise Literacy percentage
Fig.3.3: Livestock
Fig. 3.4: Status of Socio-

..

Fig. 3.5: I

66

Fig. 3.6: Proportion of existing livelihoods


Fig. 3.7: Comparative rice productivity
Fig. 3.8: Comparative mustard productivity

Terracon Ecotech Pvt. Ltd., Mumbai

34

ix

CHAPTER 1
INTRODUCTION AND BACKGROUND
Introduction
Chirang is one of the 26 districts of Assam state in north-eastern India . As of 2011 it is the second least populous district in the state,
after Dima Hasao. The district has been functioning with effect from 04 th June, 2004. It was carved out of the districts of Kokrajhar,
Bongaigaon and Barpeta. Kajalgaon is the district Headquarter. There are two Sub-Divisions in the district:
1. Kajalgaon Sadar Sub-Division
2. Bijni Civil Sub-Division
According to the 2011 census Chirang district has a population of 4,81,818, roughly equal to the nation of Suriname . This gives it a
ranking of 547th in India (out of a total of 640 ). The district has a population density of 244 inhabitants per square kilometre (630 /sq
mi), its population growth rate over the decade 2001-2011 was 11.26 %. Chirang has a sex ratio of 969 females for every 1000 males,
and a literacy rate of 64.71 %. The salient project features is as follows:

Name of the District

: Chirang

Names of the Blocks

: Borobazar

Name of the project

: Daisumjhora IWMP project

Financial Year of sanction

: 2010-11

Project duration

: From 2010 to 2014

Terracon Ecotech Pvt. Ltd., Mumbai

Map of the project area showing village boundaries, contours and drainage

Terracon Ecotech Pvt. Ltd., Mumbai

Profile of the watershed project


Daisumjhora watershed is located in Chirang district of Assam. It consists of 26 villages and covers 6 micro-watersheds. The climate of
the district is sub-tropical in nature with warm and humid summer followed by dry and cool winter. The average annual rainfall is about
1900 mm per annum of which 75% is received during June and September. During Monsoon the climate is normally wet and dry during
winter. Both pre and post-monsoon months have unpredictable and erratic rainfall. The maximum and minimum temperature varies
from 33o to 38o C and 9o to 10o C respectively. The average radiation is the highest during March to April while overcast sky reduces the
solar radiation to the east during July. More and more agricultural land is required to be brought under irrigation on priority basis (there
being potentiality), both for increasing production and productivity through intensification of agriculture. The average ground water
table in the district can be reached at depth of about 5 to 7 m from ground level. (Source: Chirang.gov.in)
Table 1.1: Project at a Glance
1
2
3
4
5
6

Name of the State


Name of the project
Name of the District
Names of the Blocks
Names of Gram Panchayats
Names & Census Code of Villages covered

Assam
Daisumjhora IWM project 2010-11
Chirang
Borobazar
Subaijhar, Kumansali Batabari, Monghian, Poslabari, Borobazar.
00366200 Kumarsali Pathar 00366900 Uttarpara
00383400
No.1
00366100 Kumarsali
00367100 Uttarpara
00369000
No.2
00366000 Choto Ladanguri 00369300 Deotari
00368800
No.1
00365900 Choto Ladanguri 00367300 Subaijhar
00372700
No.2
00365800 Boro Ladanguri
00367500 Saraikhusra 00379900
No.1
00365700 Boro Ladamguri- 00369100 Betnapara 00372600
2
00366800 Dimajhora
00369200 Golapara
00368400
00365600
00367200

Terracon Ecotech Pvt. Ltd., Mumbai

Dagarpara No.1
Dagarpara No.2

Monakosha
Katuribari
Bashbari
Ambari-1
Bashbari
Ambari-2
Chorapat
No.1
Gelasugaon
Majhrabari
No.1

00367400 Maliapara
00267600 Silbari
3

Four major reasons for selection of


watershed

Name, Address, Phone No and Reg. No. of


the PIA(s)
Date of approval of Watershed
Development Plan by the DPC
Area of the Project (ha.)
Area proposed to be treated (ha.)
Financial Year of sanction
Project duration
Project Cost (Rs. in Lakhs)
Date of Sanction by State authority
Date of Release of 1st Installment of Central
Assistance (To be filled by DoLR)
Any other, please specify

9
10
11
12
13
14
15
16
17

1. The area preponderance of degraded land.7(c),


2. The area is dominated by SC and ST population 7(f),
3. There is acute problem of drinking water 7(a),
4. The major area of agriculture is rain fed and most it is susceptible to soil erosion
due to over exploitation of ground cover.
Divisional Officer, Chirang S.C. Division. Kajalgaon.

4120
3600
F
Rs. 432.00

Vast degradation of forest area at the foothill of Bhutan lead to severe erosion and
less time of concentration in watershed area

Weightage Criteria
Watershed Development programme is prioritized on the basis of 13 parameters namely poverty Index, Percentage of SC/ST, Actual
wages, percentage of small and marginal farmers, Ground water status, Moisture Index, Area under rain fed agriculture, Drinking water
situation in the area, Percentage of the degraded land, Productivity potential of the land, Continuity of another watershed that has
already developed/ treated, Cluster approach for plain or for hilly terrain.
Table 1.2: Need and Scope for Watershed Development
Project Name
Chirang-2

Project Type
(Daisumjhora- IWMP), Moderately slope area

Terracon Ecotech Pvt. Ltd., Mumbai

i
7.5

ii
10

Iii
5

iv
5

v
3

Weightage
vi vii ix x xi xii
0 10 7.5 10 15 10

xiii
10

Total
93

Sn
i

Criteria

Max
Score
10

Ranges and Scores


Above 80% (10)

80 to 50 % (7.5)

50 to 20 % (5)

10

More than 40% (10)

20 to 40 % (5)

Less than 20% (3)

Actual wages are


significantly lower than
minimum wages (5)
More than 80% (10)

Actual wages are equal


to or higher than
minimum wages (0)
50 to 80% (5)

Less than 50 (3)

Critical (10)
-33.3 to -66.6 (5) DPAP
Block
10 to 20% (10)

Sub critical (5)


0 to -33.2 (0) Non
DPAP/DDP Block
20 to 30% (5)

ii

Poverty index(%of
poor to population)
% of SC/ST population

iii

Actual wages

iv

% of small and
marginal farmers
Ground water status
Moisture index/
DPAP/DDP Block
Area under assured
irrigation

10

15

Over exploited (15)


-66.7 & below (10) DDP
Block
Less than 10% (15)

viii

Drinking water

10

No source (10)

Problematic village (7.5)

Partially covered (5)

ix

Degraded land

15

High above 20% (15)

Productivity potential
of the land

10

Low less than 10 % of TGA


(5)
Lands with high production
& where productivity can be
marginally enhanced with
reasonable efforts (0)

xi

Contiguity to another
watershed that has
already been
developed/treated

10

xii

Cluster approach in

15

Lands with low production


& where productivity can
be significantly enhanced
with reasonable efforts
(10)
Contiguous to previously
treated watershed &
contiguity within the micro
watersheds in the project
(10)
Above 6 micro-watersheds

Medium 10 to 20 %
(10)
Land with moderate
production & where
productivity can be
enhanced with
reasonable efforts (5)
Contiguity within the
micro watersheds in the
project but non
contiguous to previously
treated watershed (5)
4 to 6 micro watersheds

v
vi
vii

15
10

Terracon Ecotech Pvt. Ltd., Mumbai

Below
20% (2.5)

Safe (0)

Above
30%
(Reject)
Fully
covered
(0)

Neither contiguous to
previously treated
watershed nor contiguity
within the micro watersheds
in the project (0)
2 to 4 micro watersheds in

xiii

the plains (more than


one contiguous microwatersheds in the
project)
Cluster approach in
15
the hills (More than
one contiguous microwatersheds in the
project)
Total
150

in cluster (15)

in cluster (10)

cluster (5)

Above 5 micro-watersheds
in cluster (15)

3 to 5 micro watersheds
in cluster (10)

2 to 3 micro watersheds in
cluster (5)

150

90

41

2.5

Table 1.3: Watershed information


S.N.
1.
2.
3
4.
5.
6.
7.
8.
9.
10.
11.
12.
13
13.
14.
15.

Name of Project

Watershed Code

Villages to be Treated

Geographical Area(Ha)

3A2A2/I(a)
3A2A2/I(b)
3A2A2/I(c)
3A2A2/I(d)
3A2A2/I(e)
3A2A2/I(f)

Kumarsali Pathar
Kumarsali
Choto Ladanguri No.1
Choto Ladanguri No.2
Boro Ladanguri No.1
Boro Ladanguri No.2
Dimajhora
Dagarpara No.1
Dagarpara No.2
Uttarpara No.1
Uttarpara No.2
Deotari

71
115
136
108
119
99
147
189
131
101
79
330

Treatable
Area(Ha)*
50.00
100.00
130.00
100.00
100.00
80.00
130.00
160.00
110.00
90.00
60.00
290.00

Subaijhar
Saraikhusra
Betnapara

280
41
328

250.00
30.00
290.00

Daisumjhora

Terracon Ecotech Pvt. Ltd., Mumbai

Approval Year

2010-11

16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.

Golapara
Malipara 2
Silbari
Monakosha
Katribari
Bashbari Ambari-1
Bashbari Ambari-2
Chorapat No.1
Gelasugaon
Bholatal-1
Majrabari No.1
Total

228
83
245
150
192
184
149
160
197
185
73
4120

200.00
70.00
230.00
125.00
175.00
150.00
130.00
140.00
180.00
170.00
60.00
3600

Table 1.4: Status of other development project in the area


S. No.

Name of the
programme/scheme

Sponsoring
agency

Objectives of the
programme/scheme

Awas yojana (IAY)

GOI

Household

2000

24

1046

Swarnjayanti gram Swarojgar GOI,


yojana (SGSY)
NREGA
GOI, DRDA

Livelihood

2009

20

96

Employment, Road
Construction

2009

26

120

Terracon Ecotech Pvt. Ltd., Mumbai

Year of
commencement

Villages
covered

Estimated
number of
beneficiaries

Table 1.5: Status of previous watershed programme


S
N

Project
name

DPAP+DD
P+IWDP
Other
Watershe
d Project

Terracon Ecotech Pvt. Ltd., Mumbai

CHAPTER 2
GENERAL DESCRIPTION OF PROJECT AREA
Table 2.1: Location
Longitude

90

Latitude

EN-

E
N

State

Assam

District

Chirang

Subdivision

Borobazar

Block

Borobazar

Panchayat

Subaijhar, Kumansali Batabari, Monghian, Poslabari, Borobazar.

Villages

Kumarshali Pathar, Kumarshali,Choto Ladamguri -1,Choto Ladamguri 2,Boro Ladamguri -1,Boro Ladamguri -2,Dimajhora,Dagarpara
1,Dagarpara 2,Uttarpara 1,Uttarpara
2,Deotari,Subaijhar,Saraikhusra,Betnapara,Golapara,Malipara 2,
Silbari,Monakosha,Katribari,Banshbari Ambari-1,Banshbari Ambari2,Charapet-1 Gelasugaon,Bholatal-1,Mojrabari-2

Approach Road

Bongaigaon>Bijni>Project Area

Terracon Ecotech Pvt. Ltd., Mumbai

Watershed Location

Terracon Ecotech Pvt. Ltd., Mumbai

10

Fig. 2.1: Landscape and vegetation of project area

F ig. 2.2: Interaction with Farmers and testing soil quality of their land using pH meter
measuring soil pH
Terracon Ecotech Pvt. Ltd., Mumbai

11

Table 2.2: Land Details


S.
No.

Names of villages

Geographic
al Area of
the village
(ha)

Forest
Area (ha)

Land under
agricultural
use (ha)

Rain-fed Irrigated
area
Area
(ha)

Permanent
pastures
(ha)

Wasteland
Cultivable
(ha)

Noncultivable (ha)

Kumarsali Pathar

71

55

50

Kumarsali

115

91

80

11

13

Terracon Ecotech Pvt. Ltd., Mumbai

12

17.

Malipara 2

83

Terracon Ecotech Pvt. Ltd., Mumbai

64

58

10

13

Table 2.3: Details of the types of beneficiaries covered under the project
No. of beneficiaries covered
S. No.

Name of village

MF

SF

LF

Landless

Total

Kumarsali Pathar

102

51

45

25

223

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Kumarsali
Choto Ladanguri No.1
Choto Ladanguri No.2
Boro Ladanguri No.1
Boro Ladanguri No.2
Dimajhora
Dagarpara No.1
Dagarpara No.2
Uttarpara No.1
Uttarpara No.2
Deotari
Subaijhar
Saraikhusra
Betnapara
Golapara
Malipara 2
Silbari
Monakosha
Katribari

200
11
78
20
145
35
134
22
150
26
122
28
102
121
205
126
55
120
25

75
80
65
2
95
61
60
15
25
44
87
14.5
28
91
85
99
89
90

20
30
102
50
47
00
12
0
15
30
0
6
45
17
43
20
107
40

50
250
52
20
35
00
25
10
100
15
56
13
85
41
65
45
46
250

350
470
297
5
322
96
231
47
280
115
265
55.5
260
270
398
290
297
500

Terracon Ecotech Pvt. Ltd., Mumbai

14

Fig. 2.4: Type of Beneficiaries in the project area


Soil and Topography:
Daisumjhora watershed project falls under Lower Brahmaputra valley zone No. 4. The general and average soil character of cultivable
land in the watershed area is mainly alluvial and composed of mixture of sand (coarse to fine) and clay in varying proportions.
Moderately deep, well drained fine sandy loam. Colour of soil is grayish and fine with a high percentage of nitrogen which is good for
rice cultivation are found in the area. The soil pH is ranging from 5.5 to 7.5. Topography of the area is flat or plain and slope range from
1 to 3.5%.
Table 2.4: Details of Agro-climatic condition
1
S.
No.
1

Name of the
Project

Name of the
Agro-climatic
zone covers
project area
Lower

Terracon Ecotech Pvt. Ltd., Mumbai

Major soil types

Major crops

Area in ha

Names of the
villages

a)Type
71

Kumansali Pathar

Alfisol

b) Area in ha

a) Name

b) Area in ha

71

Mainly rice

46
15

2
3

Daisumjhor
IWM Project

Brahmaputra
valley Zone no-4

4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

115
136
108

119
99
147
189
131
101
79
330
280
41
328
228
83
245
150
192
184
149
160
197
185
73
Total
4,120
Source: PPR-Soil Conservation Department
Terracon Ecotech Pvt. Ltd., Mumbai

Kumarsali
Sandy
Choto Ladanguri - Loam
1
Choto Ladanguri 2
Boro Ladanguri -1
Boro Ladanguri -2
Dimajhora
Dagarpara No.1
Dagarpara -2
Uttarpara No.1
Uttarpara -2
Deotari
Subaijhar
Saraikhusra
Betnapara
Golapara
Maliapara 2
Silbari
Monakosha
Katribari
Bashbari Ambari-1
Bashbari Ambari-2
Chorapat No.1
Gelasugaon
Bholatal
Majrabari No.1

115
136

as
wet paddy
cultivation

84
98

108

81

119
99
147
189
131
101
79
330
280
41
328
228
83
245
150
192
184
149
160
197
185
73

80
59
95
143
93
66
51
264
211
27
272
174
63
208
106
154
139
106
131
156
140
44

16

Table 2.5: Details of flood and drought in the project area


1

S. No.

Particulars

Villages

Flood

No. of villages

4
Periodicity
Any other
Annual
(please specify)

Drought

No. of villages
Name(s) of villages

Terracon Ecotech Pvt. Ltd., Mumbai

Not affected

Nil

Choto
Ladanguri No.1,
Kumarsali

Sabaijhar

Occasional flash flood occurs during


high rain fall in upper catchment in
Bhutan and cause heavy loss to
standing crops and silt/sand
deposition takes place on cultivable
land on river bank. Also bank cutting
and shifting of river course are
common in project area.

Nil

2
Scanty and uneven rainfall causes
drought during certain monsoon
season.

Name(s) of villages

Sabaijhar

17

Table 2.6: Details of soil erosion in the project area


1

Cause

Type of erosion

Area affected (ha)

Water erosion
a
b
c

Sheet Erosion
Rill Erosion
Gully Erosion
Sub-Total

Wind erosion
Total

1854.00 hect
865.20 hect
1400.80 hect
4120.00 hect

4
Run off
(mm/ year)
1329 mm/Yr.
1329 mm/Yr.
1329 mm/Yr.

5
Average soil loss (Tonnes/ ha/
year)
20.36 Mt/ha/yr.
12.98 Mt/ha/yr.
21.01 Mt/ha/yr.

4120.00 hect

Source- PPR- Soil Conservation Dep

The four orders of soils are found in the district


1) Entisols (recent alluvium),
2) Inceptisols (old alluvium),
3) Alfisols(Mountain valley)
4) Ultisols (Laterised red).
The soil of zone is mostly acidic nature and p H increases near the river Brahmaputra. The organic carbon and available Nitrogen
of the soil mostly varies from medium to high, low in available P2O5 and medium in K2O status (Source: Agricultural
University,Jorhat and Krishi Vigyan Kendra, Chirang, Assam).

Terracon Ecotech Pvt. Ltd., Mumbai

18

Table 2.7: Details of the Soil pH


Name of the Villages
Kumansali Pathar
Kumarsali
Choto Ladanguri -1
Choto Ladanguri -2
Boro Ladanguri -1
Boro Ladanguri -2
Dimajhora
Dagarpara No.1
Dagarpara -2
Uttarpara No.1
Uttarpara -2
Deotari
Subaijhar
Saraikhusra
Betnapara
Golapara
Maliapara 2
Silbari
Monakosha
Katribari
Bashbari Ambari-1
Bashbari Ambari-2
Chorapat No.1
Gelasugaon
Bholatal
Majrabari No.1

Sample no

Soil Ph

1
1
1
2
1
1
2
1
1
2
1
2
1
1
1
1
2
1
2
2
1
1
2
1
2
1

6.5
5.8
6.2
5.9
6.1
5.6
6.4
7.1
6.2
5.7
5.3
6.7
6.5
6.8
6.5
7.2
6.7
6.5
6.5
7.1
5.8
5.6
5.9
6.3
6.8
5.6

Soil Type

Sandy Loam soil

Source: Analog Soil pH and moisture meter-(Model DM-15)


Terracon Ecotech Pvt. Ltd., Mumbai

19

Table 2.8: Climatic Condition


Average
Annual
rainfall(in
mm)preced
ing 5 years

Average
Open pan
Annual run
Average Monthly Rain fall
evaporation Relative
off
S N Year
(in mm)
Max Min
(mm per day) Humidity(RH) (mm/year)
1
2010
4241.3
35.3
23.5
60-85 %
1329
mm/Yr.
2
2009
2797.3
36.5
24.5
1329
3
2008
3497.5
38.6
26.5
3034.36
mm/Yr.
4
2007
3302.4
37.5
25.5
1329
37.9
5
2006
1333.3
26.8
mm/Yr.
(Source: Meteorological data, IMD, Guwahati, 2010, http://www.mustseeindia.com/Guwahati-weather; kamrup.nic.in/ghy.htm,
http://www.imd.gov.in/section/climate/guwahati2.htm)
Temp(0C)

Wind
Velocit
y

Table 2.9: Physiographic Features

Elevation(MSL)

85 mtr

Slope Range (%)

0-3

Order of
Watershed

Major Stream
Dulani and
Kukulong

Toposequence
(Soil series)

Average
annual
soil
loss(Ton
/
hectare/year)

Entisols, Inceptisols, Alfisols and


Ultisols.

54.35

Table 2.10: Watershed characteristics


Shape index of
the watershed

Length of main
stream

Drainage density

Average slope

Watershed relief

Perimeter of the
watershed

Elliptical

34.607 km

2.75

2.5 %

70 m

48549.801

Terracon Ecotech Pvt. Ltd., Mumbai

20

CHAPTER 3
BASE LINE INFORMATION OF WATERSHED
Socio-economic profile
Daisumjhora project covers 26 villages in Borobazar Dev. block. The project has the total population of 12005 with 6074 males and 5931
females. The sex ratio is 969 females for every 1000 males. The literacy rate is about 47 per cent with male literacy 55 per cent and 38
per cent female literacy. The major castes in the village are Boro, Bengali, and others. Most of the population is involved in the
agriculture, labor work and animal husbandry.
Table 3.1: Demographic features
Name of
village

Population
T

Kumarsal
i Pathar
Kumarsal
i
Choto
Ladangur
i No.2
Choto
Ladangur
i No.1
Boro
Ladangur
i No.2
Boro
Ladangur
i No.1
Dimajhor

SC
F

ST

Others

Literacy

Total work
force

Illiteracy

373

193 180

357

184

173

12

122

67

55

251

126 125

208

109

99

439

229 210

291

152

139

148

77

71

135

69

66

304

160 144

130

125

371

202 169

146

77

69

225

125

100

208

132

76

163

70

93

179

101

78

549

271 278

110

53

57

439

218

221

337

186

151

212

85

127

276

138

138

67

30

37

67

30

37

45

21

24

22

13

25

17

432

220 212

425

217

208

238

137

101

194

83

111

116

79

37

927

439 488

528

242

286

399

197

202

424

244

180

503

195 308

347

222

125

Terracon Ecotech Pvt. Ltd., Mumbai

21

a
Dagarpar
a No.1
Dagarpar
a No.2
Uttarpar
a No.1
Uttarpar
a No.2
Deotari

646

334 312

637

331

306

392

224

168

254

110 144

355

181

174

360

171 189

360

171

189

209

120

89

151

51

100

151

75

76

331

165 166

331

165

166

173

111

62

158

54

104

191

98

93

287

141 146

287

141

146

194

102

92

93

39

54

101

63

38

1082 569 513

38
9

20
1

18
8

693

368

325

320

211

109

762

358 404

280

270

10

39

21

18

636

604

630

385

245

649

272 377

581

323

258

124
0
581

284

297

237

140

97

344

144 200

321

153

168

119

60

59

79

49

30

40

11

29

46

27

19

441

211

230

230

140

90

211

71

140

337

156

181

217

111

106

81

56

25

136

55

81

107

52

55

472

241

231

270

158

112

204

84

120

246

119

127

349

193

156

154

100

54

195

93

102

210

108

102

628

310

318

314

192

122

314

118 196

291

148

143

14

279

143

136

148

85

63

145

64

81

88

80

474

236

238

186

124

62

288

112 176

171

106

65

281

141

140

123

57

66

219

127

92

185

71

114

102

98

11

61

51

770

398

372

279

182

97

603

277 326

243

226

17

Subaijhar
Saraikhu
sra
Betnapar
1279 657 622
a
Golapara 581 284 297
Malipara
119 60
59
2
Silbari
441 211 230
Monakos
217 111 106
ha
Katribari 474 242 232
Bashbari
349 193 156
Ambari-1
Bashbari
628 310 318
Ambari-2
Chorapat
293 149 144
No.1
Gelasuga
474 236 238
on
Bholatal404 198 206
1
Majrabar 882 459 423

Terracon Ecotech Pvt. Ltd., Mumbai

22

i No.1
Total

1200 607 593 56 29 26 862 432


5
4
1
0
3
7
0
9
Source: Census 2001*Total - T, Male- M, Female- F

429
1

282
5

145
2

137
3

562
4

336
2

226
2

638
1

271 366
2
9

510
2

307
4

202
8

Fig: 3.1: SC and ST population percentage in project area

Terracon Ecotech Pvt. Ltd., Mumbai

23

oject

1
Sr .No.

2
Feature

3
Male

4
Female

5
Total

Children(0-14 years)

1125

Sex Ratio

1.09

Birth Rate

Death Rate

Fig. 3.2: Gender wise Literacy percentage

Terracon Ecotech Pvt. Ltd., Mumbai

24

Livestock:
In the Daisumjhora project, there are 3818 cows, 181 Buffaloes, & 1696 goat. Lack of surface water has reduced the fodder and pasture
availability for their animals. But milk production is sufficient in the area. There is need of dairy cooperative in the project area.

Uttarpara
No.2

Deotari

Subaijhar

Saraikhusr
a

Betnapara

120
2
228

256
2
195

80
0
29

180
50
0

201
0
0

232
0
68

45
2
0

127
10
34

205
0
92

0
0

0
0

74
0

23
0

0
6

14
0

171
0

0
2

0
0

0
50

86
0

0
0

60
2

54
0

7
0

300
51
390

250
0
150

184
26
25

123
0
85

201
56
35

150
32
144

805
59
30

800
40
256

638
79
109

900
80
115

611
34
160

392
203
980

25
0
59

36
24
134

810
62
115

sufficient

sufficient

sufficient

sufficient

sufficient

sufficient

sufficient

sufficient

sufficient

nil

sufficient

sufficient

scarce

sufficient

sufficient

sufficient

sufficient

sufficient

sufficient

sufficient

nil

nil

sufficient

sufficient

sufficient

sufficient
sufficient

Terracon Ecotech Pvt. Ltd., Mumbai

sufficient

sufficient

Green (Abundant/
Sufficient/ Scarce)

(No./ quantity)

sufficient

1 Milch Animals
Cows
Buffaloes
Goat, sheep
2 Draft Animals
Ox
He Buffalo
3 Others
Poultry
Piggery
Total Milk production
4
(Ll/day)
Fodder Availability
5
Dry (Abundant/ Sufficient/
Scarce)

Dagarpara
No.2

124
32
14

S.N Feature

Dagarpara
No.1

111
10
149

Ladanguri
No.2
Dimajhora

65
5
10

Ladanguri
No.1
Boro

55
0
135

Ladanguri
No.2
Boro

102
0
15

Choto
Ladanguri
No.1
Choto

108
0
97

Kumarsali
Pathar
Kumarsali

Name of villages

Uttarpara
No.1

Table 3.2: Livestock details

25

abundant

abundant

scarce

scarce

nil

abundant

scarce

abundant

scarce

abundant

scarce

scarce

scarce

abundant

abundant

Fuel wood Availability


6 (Abundant/Sufficient/Scar
ce)

Bashbari
Ambari-2

Chorapat
No.1

Gelasugaon

Bholatal-1

Majrabari
No.1

40
3
2

161
0
95

102
26
20

115
25
31

227
0
105

185
0
85

236
0
108

0
0

0
0

12
0

0
0

0
0

0
0

34
0

24
0

0
0

0
0

146
0

113
41

298
109

150

23

11

859

203

700

900

900

Bashbari
Ambari-1

204
0
0

Katribari

203
14
35

Silbari

302
0
119

Malipara 2

32
0
30

Golapara

Name of
villages

Monakosha

S.No Feature
1 Milch Animals
Cows
Buffaloes
Goat, sheep
2 Draft Animals
Ox
He Buffalo
3 Others
Poultry
Piggery

Terracon Ecotech Pvt. Ltd., Mumbai

26

Table 3.3: Socio- economic status


1

S.
No

Name of
Villages

Type

Total
HHs

No.
of
BPL
HHs

Land Holding (Ha)


Rain fed

1
Kumarsali
2 Pathar
3
4
1
Kumarsali
2
3
4
1 Choto
2 Ladanguri
No.1
3
4

Marginal
Small
Farmers
Big
farmers
Landless
Total
Marginal
Small
Farmers
Big
farmers
Landless
Total
Marginal
Small
Farmers
Big
farmers
Landless

Annual Gross Income (Rs.)


Irrigated

SC

ST

Other
s

SC

ST

Other
s

SC

ST

Others

Total

30

2.66

5.32

0.665

1.33

1.596

50000

80000

10000

140000

26

1.33

7.98

0.665

0.665

2.394

60000

70000

75000

205000

2.66

6.65

3.99

6.65

80000

90000

20000

190000

1
60

1
1

0
13.3

0
39.9

0
2.66

0
11.97

0
21.28

0
0

0
190000

0
240000

0
105000

0
535000

50

2.66

11.97

7.98

11.97

80000

150000

230000

22

4.522

6.384

12.64

500000

200000

700000

5.32

4.788

9.044

1.33

30000

20000

50000

Terracon Ecotech Pvt. Ltd., Mumbai

28

1 Choto
2 Ladanguri
No.2
3
4

1 Boro
2 Ladanguri
No.1
3
4

1
2

Dimajhora

3
4

1
2
3
4

Dagarpara- 1

Total
Marginal
Small
Farmers
Big
farmers

78
28

0
6

12.502
2.66

23.142
3.99

0
0

17.024
1.995

25.94
3.99

0
0

610000
50000

370000
80000

0
0

980000
130000

42

3.99

6.65

2.128

4.655

90000

10000

190000

15

5.32

10.64

6.384

11.97

80000

120000

200000

Landless

Total
Marginal
Small
Farmers
Big
farmers

85
68

10
0

11.97
5.03

21.28
5.05

0
0

10.507
2.66

20.615
6.65

0
0

220000
50000

210000
150000

0
0

430000
200000

33

3.45

3.32

9.31

11.43

130000

170000

300000

32

11.9

15.29

9.31

11.57

150000

200000

350000

Landless

Total

140

20.38

23.66

21.28

29.65

330000

520000

Marginal
Small
Farmers
Big
farmers
Landless

103

10.6

17.3

3.99

9.97

500000

300000

850000
800000

45

7.98

11.9

2.66

6.9

400000

200000

600000

8
0

0
0

5.32
0

15.9
0

0
0

2.66
0

10.64
0

200000

200000

Total

156

23.9

45.1

9.31

27.51

900000

700000

135

49

46.5

1.33

26.6

3.325

650000

500000

0
160000
0
115000
0

98

43

50.54

2.66

23.94

0.665

670000

300000

970000

50

25.27

1.33

7.448

3.99

200000

30000

230000
0

Marginal
Small
Farmers
Big
farmers
Landless

Terracon Ecotech Pvt. Ltd., Mumbai

29

1
2
3 Dagarpara- 2
4

1 Uttarpara -1
2
3
4
1
2 Uttarpara- 2
3
4
1
2 Deotari
3
4

Total

286

95

122.31

5.32

57.988

7.98

152000
0

830000

Marginal
Small
Farmers
Big
farmers

100

23

3.99

7.98

7.98

3.325

9.31

10.64

200000

250000

250000

235000
0
700000

80

15

3.99

10.64

10.64

4.788

7.315

7.98

200000

250000

200000

650000

15

5.32

7.98

7.98

2.926

10.64

3.724

500000

450000

620000

Landless

Total

200

43

13.3

26.6

26.6

11.039

27.265

900000

950000

Marginal
Small
Farmers
Big
farmers
Landless
Total
Marginal

60

32

22.34
4
0

107000
0
0

55

21

25

2
142

2
55

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

50

18

2.66

7.98

3.99

6.65

100000

150000

250000

42

12

1.596

16.23

4.665

1.33

100000

200000

300000

1.33

4.788

9.31

6.118

100000

250000

350000

Small
Farmers
Big
farmers
Landless
Total
Marginal
Small
Farmers
Big
farmers
Landless

Terracon Ecotech Pvt. Ltd., Mumbai

157000
0
292000
0
700000
0

30

1
2

Subaijhar

3
4
1 Saraikhusra
2
3
4
1
2 Betnapara
3
4

1
2 Golapara
3
4
1 Malipara
2

Total
Marginal
Small
Farmers
Big
farmers
Landless
Total
Marginal
Small
Farmers
Big
farmers
Landless
Total
Marginal
Small
Farmers
Big
farmers
Landless
Total
Marginal
Small
Farmers
Big
farmers
Landless
Total
Marginal
Small

100

30

5.586

28.998

17.965

14.098

205

53

33.25

27.93

16.625

45

15

13.97

5.985

10.906

40

7.98

7.315

5.985

10

10

300

78

55.2

41.23

33.516

300000

600000

900000

300000

320000

620000

200000

150000

350000

7.98

150000

80000

230000

31.12
2

650000

550000

0
120000
0

12.63
5
10.50
7

25
18

Terracon Ecotech Pvt. Ltd., Mumbai

31

3
4
1
2 Silbari
3
4
1 Monakosha

Farmers
Big
farmers
Landless
Total
Marginal
Small
Farmers
Big
farmers
Landless
Total
Marginal

Small
Farmers

Big
farmers
Landless

Total
1
2
3
4

Katuribari

Marginal
Small
Farmers
Big
farmers
Landless
Total

7
0
50
105
99
41
5
250
118

19.95

10.64

80

32

27.27

9.31

32

15.3

8.645

232

34

62.52

28.595

109

80

19.95

8.645

115

67

31.92

24.74

25

18.62

12.24

252

150

70.49

45.625

340000
0
101000
0

10.64

9.975

7.315

500000

400000

250000
0

9.975

11.7

5.985

300000

400000

310000

5.054

5.985

4.655

200000

150000

200000

25.669

27.66

17.95
5

100000
0

950000

301000
0

496000
0
340000
0

200000

60000

180000

440000

250000

90000

292000

632000

4.788

180000

320000

120000

620000

0
37.90
5

630000

470000

592000

0
169200
0

31.92
11.43
8
12.63
5
0
55.99
3
13.69
9
19.41
8

550000

Marginal
Terracon Ecotech Pvt. Ltd., Mumbai

32

2 Banshbari
Ambari-1
3
4

1
2

Chorapet-1

3
4
1

Total
Marginal
Small
Farmers
Big
farmers
Landless
Total

Gelasugaon
Marginal
Small
Farmers
Big
farmers
Landless

2
3
4

1
2
3

Small
Farmers
Big
farmers
Landless

Bholatal-1

1 Majrabari-1
2

Total
Marginal
Small
Farmers
Big
farmers
Landless

13.57

11.97

300000

100000

150000

550000

5.32

5.187

6.916

175000

150000

125000

450000

2.66

10.64

2.66

250000

40000

600000

890000

0
26.99
9

39.9

21.417

725000

290000

875000

7.98

15000

125000

0
189000
0
140000

10.64

15000

210000

225000

4.256

8.645

40000

90000

130000

70000

425000

0.266
0.532

0
0

0
0

100000
240000

0
0

300000
400000

495000
400000
640000

52

16.63

8.246

40

42

23.94

15.96

24

7.98

3.99

124

94

48.55

28.196

102

42

1.33

106

35

1.33

35

12.63
5
11.70
4

23.94

60

Total

246

80

6.916

27.26
5
54.53

Marginal
Small

8
11

2
1

1.197
5.32

0
0

3.325
5.32

Terracon Ecotech Pvt. Ltd., Mumbai

12.23
6
0
31.12
2

33

3
4

Farmers
Big
farmers
Landless

62

4.655

320000

320000

18

Total

99

11

6.517

13.3

0.798

340000

0
102000
0

0
136000
0

Fig. 3.4: Status of Socio-economic

Terracon Ecotech Pvt. Ltd., Mumbai

34

Table 3.4: Migration Details


1

S
No.

Name of village

Distance of
Income from
No. of days
Major reason(s)
destination of
Occupation
such
No. of persons migrating per year of
for migrating migration from the during migration occupation
migration
village (km)
(Rs.)
M
F
Total

1 Kumarsali Pathar

Nearby village/city

12000

2 Kumarsali

Nearby village/city

16000

3 Choto Ladanguri No.1

Nearby village/city

7000

4 Choto Ladanguri No.2

5 Boro Ladanguri No.1

6 Boro Ladanguri No.2

7 Dimajhora

36

18

54

22

8 Dagarpara No.1

9 Dagarpara No.2

10 Uttarpara No.1

11 Uttarpara No.2

12 Deotari

180

13 Subaijhar

14 Saraikhusra

15 Betnapara

16 Golapara

12

17 Malipara 2

Terracon Ecotech Pvt. Ltd., Mumbai

To get regular
wages etc.
during lean
period of the
year and after
completing of
cultivation
practice and get
subsidiary
income for
upliftment of
the family
member.

Nearby village/city

Nearby village/city

7000

Nearby village/city

4.5km
Nearby village/city
Nearby village/city

Labour
/Servant/Securit
y

65000
7000
7000

Nearby village/city

7000

Nearby village/city

8000

Nearby village/city

Nearby village/city

4000

Nearby village/city

5000

Nearby village/city

7000

17

180

Nearby village/city

12

To get regular

Nearby village/city

Labour

1200
35

18 Silbari

19 Monakosha

20 Katribari

10

21 Bashbari Ambari-1

14

10

22 Bashbari Ambari-2

23 Chorapat No.1

24 Gelasugaon

25 Bholatal-1

26 Majrabari No.1

121

84

205

Total

wages etc.
during lean
period of the
year and after
completing of
cultivation
practice and get
subsidiary
income for
upliftment of
the family
member.

Nearby village/city
Nearby village/city

/Servant/Securit
y

1450
8000

Nearby village/city

5000

Nearby village/city

15000

Nearby village/city

Nearby village/city

1200

Nearby village/city

19000

Nearby village/city

5000

600-700 KM

3000-5000

Source: Baseline Survey 2011

Terracon Ecotech Pvt. Ltd., Mumbai

36

Table 3.5: Details of Community Based Organizations existing in the watershed village

3
4

SHG

164

152

Total

164

152

UGs

No. of members

Total

With both

Total no. of CBOs

With only
Men
With only
Women

S.
No.

Type of Group

No. of
Bank linkage
No. of SC
No. of ST in
Others in No. of BPL in
in each
each category
each
each category
category
category
No.
Bank
of
Loan
M
F
T M F T M F T M
F
T
SHGs Amount
(Rs.)

(i) LL
(ii)
MF
169 485 (iii)
SF
(iv)
LF
169 485
(i) LL
(ii)
MF
(iii)
SF
(iv)
LF

Total
VSS
FG/ FC

Terracon Ecotech Pvt. Ltd., Mumbai

37

5
6
7

WUA
F-SHG-C
F-SHG-B

PG

PC

Other
related
10
Groups
(Specify)
Source: Baseline Survey 2011, VSS: Van Suraksha Samiti, FG: Farmers Group/ Farmers Club, WUA: Water User Association, F
at Block), PG: Producers Group, PC: Producers Cooperative.

Table 3.6: Infrastructure Facilities

1
S.No

2
Infrastructure type
1 Educational Institutions
Anganwadi
Primary School
Secondary school

3
No./Quantity

4
Distance (km)

0 km
20

3-8 km

10 km

Govt. College
Vocational Institutions
Terracon Ecotech Pvt. Ltd., Mumbai

5
Status (description)
All villages having Anganwadi
facility in the village itself.
Most of village having secondary
school in village itself.
None of village have college so
they have to go Borobazar and
Bijni.

38

2 Service Institutions
Bank
Post office
Primary Health Care Center

Veterinary Center
Markets/ Village Haat

1
1

0 km

0 km

10

0 km

3 No. of bore wells/pump sets


(Functional)
4 No. of Milk collection centers (
Union/ Society/ Pvt. Agency/Others)
Total Quantity of surplus milk
5 Road Connectivity (to main road by
an all-weather road) (Yes/No)
6 Bus facility (Yes/No)

Within homestead area

Yes

Yes

No

No
-

8 No. of HHs with access to drinking


water

10 Any other facilities (specify-------------)

Some of village have primary


health center in village rest of
villagers have to go to nearby
village or Borobazar.

Most of the villagers have their


own borewells for drinking water
purpose.

7 No. of HHs provided electricity

9 Access to Agro Industries (Yes/No)

3-5 kmBorobazar
-

Yes

As most of the cows are of local


breed milk production is very less.
All villages have not good road
connectivity

Almost all villages have electricity.


Villages have borewell in their
homestead area as a source of
drinking water.
Most of the villagers have safe
access to rice mills in the area.
-

Source: Baseline Survey 2011


Terracon Ecotech Pvt. Ltd., Mumbai

39

Table 3.7: Land use pattern (in Hectares)

Cultivated area

13*

Net Area sown


more than once
Gross Cropped
Area

Uncultivated
Private land

12

Net Sown Area

11

Cultivated
Irrigated

10

Cultivated
Rainfed

Permanen
t Fallow

Temporary
fallow

Land Under
miscellaneous
use

Permanent
Pastures

Kumarsali

Land under
Agriculture Use

Kumarsali Pathar

Community Land

Village

Forest Area

S. N

Geographical
Area#

71

55

50

55

115

91

13

80

11

91

136

109

15

12

95

14

109

108

84

13

76

84

119

91

14

10

83

91

99

79

12

69

10

79

147

113

17

12

103

10

113

Choto Ladanguri
No.1
Choto Ladanguri
No.2
Boro
Ladamguri -1
Boro
Ladamguri -2
Dimajhora

Dagarpara No.1

189

146

20

17

132

14

146

Dagarpara No.2

131

111

14

92

19

111

10 Uttarpara No.1

101

83

10

71

12

83

11 Uttarpara No.2

79

65

55

10

65

3
4
5
6

Terracon Ecotech Pvt. Ltd., Mumbai

40

12 Deotari

330

270

10

30

20

231

39

270

13 Subaijhar

280

224

31

25

196

28

224

14 Saraikhusra

41

32

29

32

15 Betnapara

328

268

10

32

18

230

38

268

16 Golapara

228

193

20

15

160

33

193

17 Malipara 2

83

64

10

58

64

18 Silbari

245

200

20

17

171

29

200

19 Monakosha

150

115

22

105

10

115

20 Katribari

192

159

18

15

134

25

159

184

147

20

17

129

18

147

149

114

23

104

10

114

160

123

18

14

112

11

123

24 Gelasugaon

197

167

19

11

138

29

167

25 Bholatal-1

185

142

20

17

130

12

142

26 Majrabari No.1

73

56

10

51

56

TOTAL

4,120

3301

84

441

294

2884

417

3301

Bashbari Ambari1
Bashbari Ambari22
2
23 Chorapat No.1
21

Source: PPR- Soil Conservation Department, Chirang.

Terracon Ecotech Pvt. Ltd., Mumbai

41

Table 3.8: Details of Common Property Resources


1

S.No

2
Name of
village
Kumarsali
Pathar

CPR
Particulars

Choto
Ladanguri
No.2

Wasteland/
degraded land
Pastures
Village Ponds/
Tanks
Others (Pl.
specify)
Total
Wasteland/
degraded land
Pastures
Orchards
Village Forest
Total
Wasteland/
degraded land
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Pastures

Boro
Ladanguri

Total
Wasteland/
degraded land

Kumarsali

Choto
Ladanguri
No.1

Terracon Ecotech Pvt. Ltd., Mumbai

Total Area (ha)


Area owned/ In possession of
Govt.
Any other
Pvt.
(specify
PRI
(Pl.
persons
dept.)
Specify)
5
9

Area available for treatment (ha)


Pvt.
persons
3

2.0
0.45

10.0

12.0

1.0

3.6

8.4

4.0

1.2

0.98

0.56

17.0

5.4

15.0

14

10.9
0.89

2.8

3.0

10

Any other
(Pl.
Specify)

0.45

0.89

6.0

PRI

0.85

2.5

8.0

Govt.
(Specify
dept.)
6.5

12.4
3.0

6.7

10.3

42

No.1

Dimajhora

Dagarpara
No.1

Dagarpara
No.2

Uttarpara
No.1

Uttarpara
No.2

Deotari

Pastures
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Pastures
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Pastures
Village Ponds/
Tanks
Others (Pls.
Specify)
Total
Wasteland/
degraded land
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Pastures
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Pastures
Total
Wasteland/

Terracon Ecotech Pvt. Ltd., Mumbai

4.0
0.0968

10

19

1.8
0.0968

6.4

5.0
0.065

12.0

25.0

3.2
0.065

8.7

6.0
0.284
16.3

8.0

10.2

12.0

3.7

11.0

8.0

2.1

35.0

7.4
1.8
0.098

1.5

2.0
15.0

9.4
0.065

3.0
0.098

4.0

16.5
2.7
0.284

0.065

4.0

13.4

4.5
2.0

8.4

17.8
43

Subaijhar

Saraikhusra

Betnapara

Golapara

Malipara 2

degraded land
Pastures
Orchards
Village Forest
Forest
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Village Ponds/
Tanks
Temples/
Places of
worship
Others (Pl.
specify)
Total
Wasteland/
degraded land
Pastures
Total
Wasteland/
degraded land
Pastures
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Village Ponds/
Tanks
Total
Wasteland/

Terracon Ecotech Pvt. Ltd., Mumbai

10.0

10.0

6.5

0.50

0.50

46.0

4.6

0.86

25.4
0.86

10.3
41.3
2.5

17
5.5

18
1.5

1.0
15.0

35.0

7.4

20.5
6.4
1.3

15.0
0.50

6.0

11

0.67

10.0
1.3

10.0

13
3.1

10.0

0.50

2.5

6.7
44

Silbari

Monakosha

Katribari

Bashbari
Ambari-1

Bashbari
Ambari-2

Chorapat

degraded land
Pastures
Orchards
Village Forest
Forest
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Pastures
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Pastures
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Total
Wasteland/
degraded land
Pastures
Total
Wasteland/

Terracon Ecotech Pvt. Ltd., Mumbai

15.0

3.0

1.8

2.4

1.4

0.80

0.80

22.0

10.2

8.0
0.80

10.0

20.0

5.4
0.65

5.4

5.0
1.5

13.0

20.0

12.4

12.9
3.2
1.0

8.4

0.50

14.6
0.50

10.0

17.0

6.4

10.9

10.0

20.0

6.5

14.5

5.0
10.0

22.0

3.2
7.3

12.0
45

No.1

degraded land
Pastures
Total
Wasteland/
degraded land
Village Ponds/
Tanks
Total
Wasteland/
degraded land
Pastures
Total

Gelasugaon

Majrabari
No.1

5.0
12.0

18.0

3.4
7.0

0.50

5.0

10.0
2.0

12.0
0.50

2.4

6.8
1.0

Table 3.9: Agriculture implements


1

S. No

Implements

Nos.

Tractor

Sprayers-manual/ power

52

Cultivators/Harrows

35

Seed drill

Table 3.10: Crop Classification


1

S. No

Crop classification

Single crop

Double crop

Multiple crop

Terracon Ecotech Pvt. Ltd., Mumbai

Area (Ac)

46

Table 3.11: Crops & Cropping pattern

Potato

5.
2
8

0
0
0
3000
3500
4800
4100
3800
3500

5
4
7
3
4.5
3
4
8
2.5

3.5
3
4
3.5
5
4
3
6
10

4400
4500
4600
4200
4300
450
4200
4400
4000

Cost of
cultivation
(Rs. /ha)

9000
3000
2500
3000
3500
4800
4100
3800
3500

6
Total

3.8

12.3

17100

5000

9.0

16.4

32100

10000

3.6

2100

2200

6.6

1850

3640

13

10.2

3950

5840

Cost of
cultivation
(Rs. /ha)

5000

Production
(Ton/yr)

15000

Area (ha)

4.1

Terracon Ecotech Pvt. Ltd., Mumbai

Productivity
(Kgs/ha)

5
Irrigated

Productivity
(Kgs/ha)

Production
(Ton/yr)

Area (ha)

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

Production
(Ton/yr)

Area (ha)

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

4
Rain fed

0
0
0
4200
4300
4500
4200
4400
4000

Cost of
cultivation
(Rs. /ha)

Jute

0
0
0
0
0
0
3
3.5
4.5
5
3
4
4
3
8
6
2.5
10
Village : Kumarsali

Productivity
(Kgs/ha)

1 Kharif

9000
3000
2500
0
0
0
0
0
0

Production
(Ton/yr)

3
Crop
sown
Area (ha)

1
2
S Season
N

4400
4500
4600
0
0
0
0
0
0

Area (ha)

3 Summer

3.5
3
4
0
0
0
0
0
0

Total

Cost of
cultivation
(Rs. /ha)

2 Rabi

5
4
7
0
0
0
0
0
0

Productivity
(Kgs/ha)

Jute
Maize
Pulse
Diese
Maize
Mustard
Rice
Jute
Maize

Rain fed
Production
(Ton/yr)

1 Kharif

Production
(Ton/yr)

3
Crop
sown

Area (ha)

1
2
S Season
N

Block: Borobazar
Village : Kumarsali Pathar
5
Irrigated

47

2 Rabi
3 Summer

Maize
Pulsee
Mustard
Oil
Basmuti
Aiyang
Parimal

7
3

4.3
2.6

1600
400

1600
1650

3
1

6.8
4.5

2170
1650

1967
2016

10
4

11.1
7.1

3770
2050

3567
3666

5.1

1370

3017

5.1

1370

3017

0
0
0

0
0
0

0
0
0

0
0
0

4.6
2.51
1.99

2
9
1.5

2400
2900
154

1450
4300
1500

4.6
2.51
1.99

2
9
1.5

2400
2900
154

1450
4300
1500

Total

1000
9000
1500
750

4.2
2.4
5
10

6
7.4
5.1
4.2

51.50
1140
25.70
520

1003.5
6029
925.7
920.15

7.4
4.4
9
18

9.9
9.3
13.3
9.0

261.5
2140
1525.7
920.15

2003.5
15029.6
1520.6
1670.15

2.1

19.50

1900

2.1

19.50

1900

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

12.6
3.99
4.2
2.5

12
5
9.11
14.11

76.5
1923.3
1755
182

3006.5
2516.56
6250
2506

12.6
3.99
4.2
2.5

12
5
9.11
14.11

76.5
1923.3
1755
182

3006.5
2516.56
6250
2506

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

210
1000
600
400

Production
(Ton/yr)

3.9
1.9
8.3
4.8

Area (ha)

3.2
2.0
4
8

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

3 Summer

Production
(Ton/yr)

2 Rabi

Area (ha)

Jute
Maize
Potato
Pulse
Mustard
Oil
Ranjit
Paromil
Aiyang
Basumati

6
Total

Cost of
cultivation
(Rs. /ha)

1 Kharif

Village : Choto Ladanguri-1


5
Irrigated

4
Rain fed
Production
(Ton/yr)
Productivity
(Kgs/ha)

3
Crop
sown
Area (ha)

1
2
S Season
N
o

Total
1
2
S Season

3
Crop

4
Rain fed

Terracon Ecotech Pvt. Ltd., Mumbai

Village : Choto Ladanguri-2


5
Irrigated

6
Total
48

3 Summer

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

7.5
6
8
4

24.5
3.6
4.8
2.9

5200
6820
7200
9200

3500
1600
1700
1200

1550

2900

1550

2900

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

4.12
2.66
1.89
1.5

5
5
2.9
4

2840
2780
2000
1800

150.8
450
18.29
158

4.12
2.66
1.89
1.5

5
5
2.9
4

2840
2780
2000
1800

150.8
450
18.29
158

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

3500
1600
1700
1200

Production
(Ton/yr)

5200
6820
7200
9200

Area (ha)

24.5
3.6
4.8
2.9

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

7.5
6
8
4

Production
(Ton/yr)

Area (ha)

2 Rabi

Cost of
cultivation
(Rs. /ha)

Jute
Maize
Potato
Pulses
Mustard
Oil
Jwsa
Parimol
Aiyang
Basumati

Productivity
(Kgs/ha)

1 Kharif

Production
(Ton/yr)

sown
Area (ha)

N
o

Total

2 Rabi

4000

7.5

43.9

2215.6

5700

1.6
2.6
3.7

10050
2500
7000

1800
9000
15000

5
4
6

7.6
6.2
5.2

7000
9000
7600

7000
4500
1900

9
8
10.5

9.2
8.8
8.9

17050
11500
14600

8800
13500
16900

1000

23000

9.10

1550

1800

15

13.1

2550

24800

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

1215.6

Production
(Ton/yr)

4.5

Area (ha)

4.5

Cost of
cultivation
(Rs. /ha)

1700

Terracon Ecotech Pvt. Ltd., Mumbai

Productivity
(Kgs/ha)

1000

Production
(Ton/yr)

3.4

Area (ha)

Cost of
cultivation
(Rs. /ha)

3.0
5
4
4
4.5

6
Total

Productivity
(Kgs/ha)

Jute

Production
(Ton/yr)

1 Kharif

Maize
Alu
Pulse
Mustard
Oil

Village : Boro Ladanguri-1


5
Irrigated

4
Rain fed
Area (ha)

Crop sown

Season

1
S
N
o

49

3 Summer

Maize
Potato
Pulses
Mustard
Oil
Jwsa
Parimol
Aiyang
Basumati

5.98

14.8

3400

3774

9.70

19.3

7600

6874

3.6
4.8
2.9

6820
7200
9200

1600
1700
1200

6
7
2

15.9
17.8
16.4

7000
8000
1700

2650
2266
5600

12
17
6

19.5
12.6
19.3

13820
15200
10900

4250
3966
6800

4.2

1670

1600

4.2

1670

1600

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

6.65
6.11
4.6
2.12

9
7
5
3

4580
2941
2500
2600

1684
1980
3142
1400

6.65
6.11
4.6
2.12

9
7
5
3

4580
2941
2500
2600

1684
1980
3142
1400

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

Productivity
(Kgs/ha)

3100

Production
(Ton/yr)

Production(
Ton/yr)

4200

3.7
2
6
2.5
4

Area (ha)

Cost of
cultivation
(Rs. /ha)

2 Rabi

Jute

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

1 Kharif

Area (ha)

Production
(Ton/yr)
4.5

Area (ha)

N
o

Total

1282

3656

7.17

19.9

2282

3.2
3.1
3.1
0

30.0
11.00
11.00
0

1600
1700
1100
0

6
5
4
4

3.8
3.4
6.2
4.2

31.5
21.5
17.7
1670

3565
2165
1956
1600

12
8
7
4

7.0
6.5
9.3
4.2

61.5
32.5
28.7
1670

Cost of
cultivation
(Rs. /ha)

14.6

Terracon Ecotech Pvt. Ltd., Mumbai

Productivity
(Kgs/ha)

5.18

Production
(Ton/yr)

3100

Area (ha)

Productivity
(Kgs/ha)

1000

Cost of
cultivation
(Rs. /ha)

Production
(Ton/yr)

6
3
3
0

5.3

Area (ha)

2 Rabi

Jute
Pulse
Potato
Mustard

1.99

Cost of
cultivation
(Rs. /ha)

Maize

6
Total

Productivity
(Kgs/ha)

1 Kharif

4
Rain fed
Production
(Ton/yr)

3
Crop sown
Area (ha)

1
2
S Season
N
o

Village : Dagarpara-2
5
Irrigated

6756
5165
3865
3056
1600
51

3 Summer

Oil
Ronfit
Asu
Promingal
Aiyang

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

4.12
5.85
4.52
2.26

9
4
6
8

36.5
14.63
21.44
24.00

3650
2450
3260
1340

4.12
5.85
4.52
2.26

9
4
6
8

36.5
14.63
21.44
24.00

3650
2450
3260
1340

Total

1000
2500
1100
1850

2.66
5
2
4

11.2
7.5
8.2
5.5

2340
2540
2170
18.50

2785
2640
2476
2027

6.76
14
9
8

16.8
12.2
12.4
9.1

3340
4740
3170
1218.5

3785
5140
3576
3877

3.10

14.70

2018

3.10

14.70

2018

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

6.65
5.82
3.32
2.87

8
9
6
5

1400
2700
1480
1264

2760
8662
9482
7864

6.65
5.82
3.32
2.87

8
9
6
5

1400
2700
1480
1264

2760
8662
9482
7864

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

1000
2200
1100
1200

Cost of
cultivation
(Rs. /ha)

Productivity
(Kgs/ha)

5.6
4.7
4.2
3.6

Production
(Ton/yr)

4.1
9
7
4

Area (ha)

Production
(Ton/yr)

3 Summer

Area (ha)

2 Rabi

Cost of
cultivation
(Rs. /ha)

Potato
Jute
Maize
Pulse
Mustard
Oil
Ranjit
Aiyang
Basmuti
Parimal

6
Total

Productivity
(Kgs/ha)

1 Kharif

4
Rain fed
Production
(Ton/yr)

3
Crop sown
Area (ha)

1
2
S Season
N
o

Village : Uttarpara-1
5
Irrigated

Total
Village : Uttarpara-2
1
2
S Season

3
Crop sown

4
Rain fed

Terracon Ecotech Pvt. Ltd., Mumbai

5
Irrigated

6
Total

52

5.98

14.8

3400

3774

9.70

19.3

7600

6874

3.6
4.8
2.9

6820
7200
9200

1600
1700
1200

6
7
2

15.9
17.8
16.4

7000
8000
1700

2650
2266
5600

12
17
6

19.5
22.6
19.3

13820
15200
10900

4250
3966
6800

4.2

1670

1600

4.2

1670

1600

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

6.65
6.11
4.65
2.21

9
7
5
3

4580
2941
2500
2600

1684
1980
3142
1400

6.65
6.11
4.65
2.21

9
7
5
3

4580
2941
2500
2600

1684
1980
3142
1400

Cost of
cultivation
(Rs. /ha)

Production
(Ton/yr)

3 Summer

Maize
Potato
Pulses
Mustard
Oil
Jwsa
Parimol
Aiyang
Basumati

Productivity
(Kgs/ha)

Area (ha)

3100

Cost of
cultivation
(Rs. /ha)

4200

3.7
2
6
10
4

Productivity
(Kgs/ha)

Cost of
cultivation
(Rs. /ha)

2 Rabi

Jute

Production
(Ton/yr)

Productivity
(Kgs/ha)

1 Kharif

Area (ha)

Production
(Ton/yr)
4.5

Area (ha)

N
o

Total
Village : Deotari

3.59
1.72
2.52
3.19

13.5
17.6
10.77
19.9

2100
2400
1900
1200

1900
2500
2300
1700

6.25
3.98
5.44
5.85

18.8
23.3
14.67
25.9

4800
4600
3800
3500

3700
3800
3300
3200

19

5.9

2100

1900

19

5.9

2100

1900

Terracon Ecotech Pvt. Ltd., Mumbai

Cost of
cultivation
(Rs. /ha)

1800
1300
1000
1500

Productivit
y (Kgs/ha)

2700
2200
1900
2300

Cost of
cultivation
(Rs. /ha)

5.3
5.7
3.9
6.0

Productivit
y (Kgs/ha)

2.66
2.26
2.92
2.66

Area (ha)

Production
(Ton/yr)

Production
(Ton/yr)

6
Total
Area (ha)

2 Rabi

5
Irrigated
Cost of
cultivation
(Rs. /ha)

Jute
Maize
Potato
Pulse
Mustard
Oil

Productivit
y (Kgs/ha)

1 Kharif

4
Rain fed
Production
(Ton/yr)

3
Crop
sown

Area (ha)

1
2
S Season
N
o

53

3 Summer

Ranjit
Asu
Aiyanng
Jwsa

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

49
38
50
47

39
35
40
49

4391
3410
4240
4550

1832.1
31.7
31.52
40.45

49
38
50
47

39
35
40
49

4391
3410
4240
4550

1832.1
31.7
31.52
40.45

Total
Village : Subaijhar

1800
1600
7000
1400

4.65
4
3
5

14.5
7.5
8.6
5.8

5100
6000
8000
9050

3776
2746
8924
5924

7.98
13
8
13

19.9
10.1
11.8
10.6

7200
7000
11000
17050

5576
4346
15924
7324

9.2

4200

4000

9.2

4200

4000

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

5.32
5
4.655
2.66

9
10
2
3

3560
2500
2800
3050

2530
2450
9000
1300

5.32
5
4.655
2.66

9
10
2
3

3560
2500
2800
3050

2530
2450
9000
1300

Area (ha)

Cost of
cultivation
(Rs. /ha)

2100
1000
3000
8000

Productivit
y (Kgs/ha)

Cost of
cultivation
(Rs. /ha)

5.4
2.6
3.2
4.8

Production
(Ton/yr)

Productivit
y (Kgs/ha)

3 Summer

Production
(Ton/yr)

2 Rabi

6
Total

3.32
9
5
8

Area (ha)

Jute
Maize
Potato
Pulse
Mustard
Oil
Aysu
Aiyang
Basumati
Ranjit

5
Irrigated
Cost of
cultivation
(Rs. /ha)

1 Kharif

4
Rain fed
Production
(Ton/yr)
Productivit
y (Kgs/ha)

3
Crop
sown

Area (ha)

1
2
S Season
N

Total

Terracon Ecotech Pvt. Ltd., Mumbai

Cost of
cultivati
on (Rs.
/ha)

ivity
(Kgs/ha)

Total
Product
ion
(Ton/yr)
Product

Irrigated
(ha)

Rain fed

Product
ivity
(Kgs/ha)
Cost of
cultivati
on (Rs.
/ha)
Area

Crop
sown

Product
ion
(Ton/yr)

Area
(ha)

S Season
N

(ha)

Product
ion
(Ton/yr)
Product
ivity
(Kgs/ha)
Cost of
cultivati
on (Rs.
/ha)
Area

Village : Saraikhusra
5

54

1 Kharif

2 Rabi

Jute
Maize
Potato
Pulse
Mustard
Oil

3.724
2.394
1.596
3.059

6.5
4.3
3.5
5.3

2900
2100
18000
2600

1900
1200
800
1400

3.99
7
5
9

16.5
12.5
15.5
20.5

4100
4200
3000
2900

4275
3862
5310
6670

7.714
9.394
6.596
12.059

23
16.8
19
25.8

7000
6300
21000
5500

6175
5062
6110
8070

9.5

3000

8990

9.5

3000

8990

Total
Village :Betnapara

1500
2200
1700
1200

1400
2100
1700
1650

3.192
6
4
2

12.4
7.5
6.7
5.50

1850
2850
2270
1750

1399
2650
2567
1926

7.18
15
11
6

18
12.2
10.9
9.1

3350
5050
3970
2950

2799
4750
4267
3576

3.10

1470

2017

3.10

1470

2017

5.32

3450

2675

5.32

3450

2675

5.45

2750

2150

5.45

2750

2150

Parimal

1.99

2150

1350

1.99

2150

1350

cultivat
ion (Rs.
/ha)

5.6
4.7
4.2
3.6

Produc
tion
(Ton/y
Produc
r)
tivity
(Kgs/h
a) of
Cost

6
Total

tivity
(Kgs/h
Cost
a) of
cultivat
ion (Rs.
/ha)
Area
(ha)

3.99
9
7
4

Produc
tion
(Ton/y
r)
Produc

Potato
Jute
Maize
Pulse
Mustard
Oil
Ranjit
Aiyang

3 Summer

5
Irrigated
(ha)

1 Kharif

2 Rabi

4
Rain fed
Produc
tion
(Ton/y
Produc
r)
tivity
(Kgs/h
Cost of
a)
cultivat
ion (Rs.
/ha)
Area

3
Crop
sown

Area
(ha)

1
2
S Season
N
o

Total
S

Season

Crop

Rain fed

Terracon Ecotech Pvt. Ltd., Mumbai

Village: Golapara
Irrigated

Total

55

S Season
N
o

Crop
sown

1 Kharif

Jute
Maize
Potato
Pulse
Mustard
Oil
Alo
Basmuti
Aiyang

2 Rabi
3 Summer

2.6
3.5
4.1
3.6

5.2
4.6
6.2
3.7

6856
8605
7206
7507

4706
8407
624
8505

6.6
7.5
10.1
6.6

10.2
10.6
10.2
7.7

12356
13605
12706
14007

10306
12407
1124
14505

9.5

3000

8990

9.5

3000

8990

6.65

4740

1684

6.65

4740

1684

Rain fed

Area (ha)

Cost of
cultivation
(Rs. /ha)

5600
4000
500
6000

Village : Malipara 2
Irrigated

Productivity
(Kgs/ha)

5500
5000
5500
6500

Production
(Ton/yr)

Cost of
cultivation
(Rs. /ha)

5
6
4
4

Area (ha)

Productivity
(Kgs/ha)

3 Summer
Total

Production
(Ton/yr)

2 Rabi

4
4
6
3

Cost of
cultivation
(Rs. /ha)

Parimal
Ranjit
Aiyang
Basumati
Mustard
Oil
Jwsa

Productivity
(Kgs/ha)

1 Kharif

Production
(Ton/yr)

sown

Area (ha)

N
o

Total

3.72
2.39
1.59
3.05

6.5
4.3
3.5
5.3

2900
2100
1800
2600

1900
1200
8000
1400

4.3
7
5
9

16.5
12.5
15.5
20.5

4100
4200
3000
2900

4275
3862
5310
6670

8.09
9.36
6.59
12.05

23
16.8
19
25.8

7000
6300
4800
5500

6175
5062
13310
8070

9.5

3000

8990

9.5

3000

8990

0
0
0

0
0
0

0
0
0

0
0
0

6
3
5.3

12
10
18

13.2
5850
14007

4312
3112
6200

6
3
5.3

12
10
18

13.2
5850
14007

4312
3112
6200

Total
Village : Monakosha
Terracon Ecotech Pvt. Ltd., Mumbai

56

S Season
N

Crop
sown

1 Kharif

Jute
Maize
Alu
Pulse
Mustard
Oil
Jwsa
Ranjit
Basmuti
Parimal

2 Rabi
3 Summer

S Season
N
o

Crop
sown

1 Kharif

Jute
Maize
Potato
Pulse
Mustard
Oil

2 Rabi

Rain fed

Irrigated

Total

3.2
10
4
7

3.4
1.6
2.6
3.7

1100
10050
2500
7000

1700
1800
9000
15000

5.2
5
4
6

40.50
7.6
6.2
5.2

1115.6
7000
9000
7600

4000
7000
4500
1900

7.4
15
8
13

43.9
9.2
8.8
8.9

2215.6
17050
11500
14600

5700
8800
13500
16900

9.10

1000

8500

9.10

1000

8500

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

5.0
7
3.6
1.9

5
3
1.6
4

1400
2700
1480
1264

4320
9876
11308
9788

5.0
7
3.6
1.9

5
3
1.6
4

1400
2700
1480
1264

4320
9876
11308
9788

Village: Katribari
Irrigated

Rain fed

Total

4.2
8
2.5
6

4.6
2.8
1.9
3.7

840
720
600
900

4000
18000
16000
15000

6.5
8
4.2
5

16.2
18.3
19.4
17.8

860
900
600
760

14561
28561
23681
15000

10.7
16
6.7
11

20.8
21.1
21.3
21.5

1700
1620
1200
1660

18561
46561
39681
30000

28.9

1608

4600

28.9

1608

4600

Terracon Ecotech Pvt. Ltd., Mumbai

57

3 Summer

Parimol
Aiyang
Jwsa

S Season
N
o

Crop
sown

Kharif

Rabi
Summer

Jute
Potato
Maize
Pulse
Mustard
Oil
Ranjit
Aiyang
Parimole
Basmuti

0
0
0

0
0
0

0
0
0

0
0
0

Rain fed

6.2
8
1810.9
4.0
5
2118.8
7
3
3520.7
Village : Gelasugaon
Irrigated

8380
9226
4020

6.2
4.0
7

8
5
3

1810.9
2118.8
3520.7

8380
9226
4020

Total

4.5
8
6
2

3.1
2.6
3.2
2.4

120
2000
750
650

1200
2000
1650
1900

2.9
6
9
3

12.2
6.2
5.5
4.2

3500
2022
1200
876

2825
3425
1950
2000

6.4
14
15
5.0

15.3
8.8
8.7
6.6

3620
4022
1950
1526

4025
5425
3600
3900

6.15

2500

5000

6.15

2500

5000

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

3.0
6.0
3.1
4.1

2
9
2
2

3450
2100
2500
1900

3575
21000
9501
15000

3.0
6.0
3.1
4.1

2
9
2
2

3450
2100
2500
1900

3575
21000
9501
15000

Total
S Season
N
o

Crop
sown

1 Kharif

Jute
Maize
Potato

Village: Silbari
Irrigated

Rain fed

5.58
7
2

4.5
3.7
4.2

Terracon Ecotech Pvt. Ltd., Mumbai

2100
2000
1800

2100
1800
1600

4.78
5
3.5

13.5
6.5
8.7

3150
2450
2170

Total

2665
2550
2156

10.3
12
5.5

18
10.2
12.9

5250
4450
3970

4765
4350
3756
58

2 Rabi
3 Summer

Pulse
Mustard
Oil
Ranjit
Basmuti
Aiyang
Parimol

3.6

12.00

1100

5.60

16.50

1931

10

9.2

28.5

3031

1450

2800

4.1

1470

2500

11

6.1

2920

5300

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

5.586
5.985
4.788
2.128

7
3
5
2

36.50
28.41
2100
2400

2578
2450
3100
1450

5.586
5.985
4.788
2.128

7
3
5
2

36.50
28.41
2100
2400

2578
2450
3100
1450

Total

Kharif

1900

Rabi

Summer

Maize
Jute
Mustard
Oil
Ranjit
Basmuti
Parimola

2.4
2.1

1500
1600

0
0
0

0
0
0

Cost of
cultivation
(Rs. /ha)

3000

Productivit
y (Kgs/ha)

3.3

Production
(Ton/yr)

2500

6
Total
Cost of
cultivation
(Rs. /ha)
Area (ha)

2900

Productivit
y (Kgs/ha)

4.6

Production
(Ton/yr)

3.8
2.26
1
1.4
2.6

Area (ha)

Cost of
cultivation
(Rs. /ha)

Potato
Pulse

Productivit
y (Kgs/ha)

4
Rain fed
Production
(Ton/yr)

3
Crop
sown
Area (ha)

1
2
S
Season
No

Village : Bashbari Ambari-1


5
Irrigated

2.1

3450

5000

6.51

6.7

6350

7500

1.5

2950

2500

4.256

4.8

5950

4400

1500
2400

2.66
1.99
5
1.19
1.99

1.5
2.9

1960
2000

3000
4300

2.66
4.655

3.9
5

3460
3600

4500
6700

2.5

3.5

2100

5000

2.5

3.5

2100

5000

0
0
0

0
0
0

2.79
2.57
1.72

8
4
6

2950
1500
2100

9000
6500
7900

2.79
2.57
1.72

8
4
6

2950
1500
2100

9000
6500
7900

Total
Village : Majrabari No.1
Terracon Ecotech Pvt. Ltd., Mumbai

59

Cost of
cultivation
(Rs. /ha)

Area (ha)

Production
(Ton/yr)

Production
(Ton/yr)

Productivit
y (Kgs/ha)

6
Total

Kharif

4.8
3.4
2.1
3.6

5.4
6.1
3.4
5.4

1450
897
1384
1460

8500
7800
7045
6400

5.2
4.8
2.9
3.8

6.1
5.4
4.2
6.1

1530
1240
1460
1780

9400
8200
6700
7000

10.0
8.2
5
7.4

11.5
11.5
7.6
11.5

2980
2137
2844
3240

17900
16000
13745
13400

Rabi

8.4

12.4

2350

5800

8.4

12.4

2350

5800

Summer

Potato
Pulse
Maize
Jute
Mustard
Oil
Ranjit
Basmuti

7.8

3800

8700

3.2

7.8

3800

8700

6.4

1500

6500

2.575

6.4

1500

6500

Parimola

3.2
2.57
5
4.6

7.4

2100

7900

4.6

7.4

2100

7900

Cost of
cultivation
(Rs. /ha)

Productivit
y (Kgs/ha)

5
Irrigated
Cost of
cultivation
(Rs. /ha)
Area (ha)

Production
(Ton/yr)

4
Rain fed

Productivit
y (Kgs/ha)

3
Crop
sown
Area (ha)

1
2
S. Season
No

Total
Source: Baseline Survey 2011

Terracon Ecotech Pvt. Ltd., Mumbai

60

Table 3.12: Land capability Classification

Flat

4120

Sandy

6
Erosion
(mention area in ha)

Strong
slope (615)
Steep
(>15)

Moderate
slope (2-6)

Nearly
Level (0-2)

Soil
Texture*

5
Based on Slope (%) (mention area
in ha)
Very. Deep
(>90)

4
Based on Depth (cms)(mention area in ha)
Moderate
deep
(22.545.00)
Deep
(45.0-90.0)

3
Total
Area
(ha)

Shallow
(7.5-22.5)

2
Land
type

V. Shallow
(0.75)

1
S.No

Water

Land
class

Wind

Sheet

Rill

Gully

1854.00

865.20

1400.80

Loamy

Table 3.13: Irrigation facilities


S. No.
1
2
3
4
5
1
2
3
4
5
1
2
3

Name of Village
Kumarsali Pathar

Kumarsali

Choto Ladanguri No.1

Terracon Ecotech Pvt. Ltd., Mumbai

Type of the Source


Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

Nos.
2
12
23
0
0

Command area (in ha)


-

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

4
18
15
0
0

Ponds
Open wells
Bore wells

0
10
15

61

4
5

Canal irrigation
Natural spring head

1
0

1
2
3
4
5

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

2
8
12
1
0

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

5
10
12
0
0

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

2
19
35
0
0

Ponds

Open wells
Bore wells
Canal irrigation
Natural spring head

31
11
0
1

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

3
5
7
4
9

1
2
3
4
5
1
2
3
4
5

Choto Ladanguri No.2

Boro Ladanguri No.1

Boro Ladanguri No.2

1
2
3
4
5
1
2
3
4
5

Dimajhora

Dagarpara No.1

Terracon Ecotech Pvt. Ltd., Mumbai

62

1
2
3
4
5
1
2
3

Dagarpara No.2

Uttarpara No.1

Terracon Ecotech Pvt. Ltd., Mumbai

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

5
8
15
0
0

Ponds
Open wells
Bore wells

3
12
8

63

Natural spring head

1
2
3
4
5

Betnapara

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

0
25
35
1
0

Golapara

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

0
18
27
1
0

Malipara

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

5
12
22
1
0

Silbari

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

1
9
13
0
0

1
2
3
4
5

Monakosha

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

4
7
4
0
0

Katribari

Ponds

1
2
3
4
5
1
2
3
4
5
1
2
3
4
5

Terracon Ecotech Pvt. Ltd., Mumbai

64

2
3
4
5

Open wells
Bore wells
Canal irrigation
Natural spring head

14
8
0
0

1
2
3
4
5

Bashbari Ambari-1

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

3
11
4
0
0

Bashbari Ambari-2

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

0
12
35
0
0

Chorapat No.1

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

5
7
9
0
0

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

3
7
12
1
0

Ponds
Open wells
Bore wells
Canal irrigation

2
4
6
8

1
2
3
4
5
1
2
3
4
5
1
2
3
4
5
1
2
3
4

Gelasugaon

Bholatal-1

Terracon Ecotech Pvt. Ltd., Mumbai

65

Natural spring head

1
2
3
4
5

Ponds
Open wells
Bore wells
Canal irrigation
Natural spring head

5
6
9
1
0

Majrabari No.1

Fig: 3.5: Irrigation facilities at project area

Terracon Ecotech Pvt. Ltd., Mumbai

66

Table 3.14: Status of water table


1
S.No

2
Source (open well)**

1 Malipara (Open well)


2 Malipara (Open well)
3 Choto Ladanguri No.1
(Open well)
4 Choto Ladanguri No.1
(open well)
5 Subaijarh (Open well)
6 Subaijarh (open well)
7 Golapara (Open well)
8 Golapara (open well)
9 Saraikhusra (Open well)
10 Saraikhusra (open well)
11 Dimajhara (Ring Well)

3
Plot No
of the
source
-

S. Brahma
B. Bassumtary
Sambar Bty

Lalmohan Bty

P. Basumatry
B. Bono

12 Dimajhara (Ring Well)


13 Dimajhara (Ring Well)

5
16

14 Dimajhara (Ring Well)


15 Dimajhara (Ring Well)

26
37

16 Katuribari (Open well)


17 Katuribari (open well)

Terracon Ecotech Pvt. Ltd., Mumbai

4
Name of the
Owner*

B. Basumotary
T. Basumotary
Biren
Basumotary
Bipin Basumotary
Padrasoor
Basumotary
Narayan Daher
Gangaprasad
Chetri
Kada Masahany
Andash
Masahany

5
Date of
recording

7
Source located at
(ridge/middle/valley)

2011
2011

6
Depth of water
table from
ground level (in
mts)
6.0
3.5

2011

5.0

Valley

2011

7.0

ridge

2011
2011
2011
2011
2011
2011

6.0
7.0
9.0
2.5
7.0
9.0

Valley
ridge

2011

9.5

middle

2011

10.0

2011

8.0

2011

7.0

2011

8.0

2011

7.0

2011

8.0

8
Remarks

Valley
ridge

Valley
ridge

67

18 Dagarapara 2 (Open well)

19 Dagarapara 2 (Open well)


20 Dagarapara 1(Open well)
21 Dagarapara 1 (Open
well)
22 Uttarapar 2 (Open well)
23 Uttarapara 2 (Open well)
24 Betnapara (Open well)

25 Betnapara (Open well)


26 Monakosha (Open well)

27

Bimal
Basumatary
Niabanam Bono
Doren Brahma
Bimot Brahma

Monakosha (Open well)

Kinon Brahma
Upen Musahorny
Bimal
Basumatary
Niabanam Bono
Ranjit
Basumatary
Jara Basumatory

2011

7.0

Valley

2011
2011

7.5
5.5

ridge
Valley

2011

6.0

ridge

2011
2011

8.0
7.5

Valley
ridge

2011

7.5

Valley

2011

8.0

ridge

2011

2.5

Valley

2011

8.5

ridge

Dagarpara
No.2

Uttarpara
No.1

Uttarpara
No.2

Deotari

Subaijhar

Dagarpara
No.1

3000

2500

1850

3500

30000 2251

2051

2043

2083

3541

3050

Ltrs/
2200 2680
day

796

1500

1350

3100

2500
0

681

876

8242

1806

3313

2826

Nos

21

17

18

15

12

17

54

17

15

19

13

43

16

Nos

17

15

10

12

14

26

11

10

18

14

40

10

Kumarsali
Pathar

Choto
Ladanguri
No.1
Choto
Ladanguri
No.2
Boro
Ladanguri
No.1
Boro

Drinking water
requirement
Present
2 availability of
drinking water
No. of drinking
3 water sources
available
a) Functional
1

3040

Units

S.
No
.

Total

Kumarsali

Item

Ladanguri
No.2
Dimajhora

Table 3.15: Assessment of drinking water facility

Ltrs/
2800
day

Terracon Ecotech Pvt. Ltd., Mumbai

68

b) Need Repairing

Nos

18

18

c) Defunct

Nos
Ltrs
/da
y

12

19

600

360

2204

1000

500

400

5000

1570

1175

801

277

228

224

Nos
.

Nos.

18

16

12

15

16

18

20

20

19

4 Short fall if any


No. of families
getting drinking
5 water from out
side the Micro
watershed area
Requirement of
new drinking
6
water sources (if
any)

Silbari

Katribari

Bashbari
Ambari-1

Bashbari
Ambari-2

Chorapat
No.1

Gelasugao
n

Bholatal-1

Majrabari
No.1

2051

2038

4053

3500 3070

2264

2010

2300

2800

3020

2053

2000

Ltrs/
day

631

876

1809

3201

2800

2782

2040

1100

1700

2000

2620

788

801

Nos

17

15

22

30

24

18

21

43

25

35

16

16

16

Nos

15

10

18

20

18

12

15

19

19

29

16

10

12

b) Need Repairing

Nos

12

c) Defunct

Nos
Ltrs
/da

20
1485

0
1175

0
229

5
852

2
700

0
288

1
224

12
910

3
600

2
800

0
400

0
1265

0
1199

4 Short fall if any

Terracon Ecotech Pvt. Ltd., Mumbai

Monakosh
a

Malipara 2

Ltrs/
2116
day

Saraikhusr
a

Drinking water
requirement
Present
2 availability of
drinking water
No. of drinking
3 water sources
available
a) Functional

Units

Golapara

Item

Betnapara

S.
No
.

Total

69

y
No. of families
getting drinking
Nos
5 water from out
0
.
side the Micro
watershed area
Requirement of
new drinking
6
Nos. 16
water sources (if
any)
Source: Baseline Survey 2011

16

15

20

19

24

12

10

12

19

17

15

Terracon Ecotech Pvt. Ltd., Mumbai

70

Table 3.16: Surface water resources


1
2
S. No. Type of water resource
1
Tank
2
3
4
5
6
7
1

Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify----------)
Tank

2
3
4
5
6

Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify-------------)

7
1

Tank

2
3
4
5
6

Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify-------------)
Tank

7
1

Terracon Ecotech Pvt. Ltd., Mumbai

Name of village
Kumarsali Pathar

Kumarsali

Choto Ladanguri
No.1

3
Nos.
0
2

4
Area irrigated (Ha)
0
0

5
Storage capacity (Cu.m)
0
0

1
3
0
0
0
2
4

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
2
0
3
0
0
4

Choto Ladanguri

71

No.2
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1

Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify-----------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify-----------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify--------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify---------)
Tank

Terracon Ecotech Pvt. Ltd., Mumbai

5
1
0
0
1
0
Boro Ladanguri No.1

Boro Ladanguri No.2

Dimajhora
-

Dagarpara No.1

5
2
0
0
1
0
0
5
0
1
0
0
5
0
8
0
3
0
2
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
72

2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2

Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify----------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify--------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify-----------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify----------)
Tank
Pond

Terracon Ecotech Pvt. Ltd., Mumbai

Dagarpara No.2

Uttarpara No.1

Uttarpara No.2

Deotari

3
0
0
0
1
12
0
5
1
0
0
0
0
0
3
0
1
0
0
0
0
3
0
0
0
1
5
0
8

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
73

3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3

Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify--------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify-----------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify------------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify-----------)
Tank
Pond
Lake

Terracon Ecotech Pvt. Ltd., Mumbai

Subaijhar

Saraikhusra

Betnapara

Golapara

0
3
0
0
0
1
5
0
0
0
0
12
0
8
0
2
0
0
10
0
8
2
0
0
1
0
0
4
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
74

4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4

Check dam
Percolation tank
Channel/Canal
Any others (specify-----------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify------------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify-----------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify--------)
Tank
Pond
Lake
Check dam

Terracon Ecotech Pvt. Ltd., Mumbai

Malipara 2

Silbari

Monakosha

Katribari

0
0
0
0
0
5
0
1
0
0
5
2
10
0
0
0
1
0
3
8
0
2
0
1
0
2
10
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
75

5
6
7
1
2
3
4
5
6
7

Percolation tank
Channel/Canal
Any others (specify-------Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify-------)

Tank

2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5

Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify------)
Tank
Pond
Lake
Check dam
Percolation tank
Channel/Canal
Any others (specify----------)
Tank
Pond
Lake
Check dam
Percolation tank

Terracon Ecotech Pvt. Ltd., Mumbai

Bashbari Ambari-1

Bashbari Ambari-2

Chorapat No.1

Gelasugaon

0
0
12
0
12
2
0
0
1
8
1

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

9
0
2
0
0
0
0
12
2
3
0
0
0
0
4
3
2
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
76

Table 3.17: Ground Water Structures to be repaired


S.
No.

Name of Village

Type of structure

Kumarsali Pathar

No. available
No. with no interventions
required

No. to be
Repaired

No. to be
rejuvenated

Open Well

Tube Well

11

Canal

1
12

0
5

0
3

Total

Terracon Ecotech Pvt. Ltd., Mumbai

Total

77

Choto Ladanguri No.1

Open Well
Tube Well
Canal

Total
Choto Ladanguri No.2
Open Well
Tube Well
Canal
Total
Boro Ladanguri No.1
Open Well
Tube Well
Canal
Total
Boro Ladanguri No.2
Open Well
Tube Well
Canal
Total
Dimajhora

Open Well
Tube Well
Total

Dagarpara No.1

Open Well
Tube Well
Canal
Total

Dagarpara No.2

Open Well
Tube Well
Canal
Total

Uttarpara No.1

Open Well
Tube Well
Canal
Total

Uttarpara No.2

Open Well

Terracon Ecotech Pvt. Ltd., Mumbai

2
4
1
7
5
3
1
9
7
4
0
11
4
2

2
4
3
9
4
2
1
7
2
1
0
3
2
1

4
2
5
11
2
0
0
2
2
0
0
2
1
0

8
10
9
27
11
5
2
18
11
5
0
16
7
3

6
2
2
4
4
3
4
11
3
3
1
7
4
2
1
7
3

3
1
3
4
5
3
4
12
6
4
3
13
2
4
6
12
2

1
0
0
0
3
1
4
8
2
2
2
6
4
6
5
15
4

10
3
5
8
8
5
6
19
11
9
6
26
10
12
12
34
9
78

Tube Well
Canal
Total
Deotari

Open Well
Tube Well
Canal
Total

Subaijhar

Open Well
Tube Well
Canal
Total

Saraikhusra

Open Well
Tube Well
Canal
Total

Betnapara

Open Well
Tube Well
Canal
Total

Golapara

Open Well
Tube Well
Canal
Total

Malipara2

Open Well

Terracon Ecotech Pvt. Ltd., Mumbai

2
1
6
9
3
5
17
3
2
4
9
3
4
2
9
2
3
1
6
5
3
4
12
7

4
5
11
6
9
7
22
3
3
1
7
5
6
1
12
3
2
3
8
8
2
4
14
3

2
3
9
3
5
8
16
4
2
1
7
3
2
6
11
2
2
1
5
6
2
8
16
5

8
9
26
18
17
20
55
10
7
6
23
11
12
9
32
7
7
5
19
19
7
16
42
15

79

Tube Well
Canal
Total
Katribari

Open Well
Tube Well
Canal
Total

Bashbari Ambari1

Open Well
Tube Well
Canal
Total

Bashbari Ambari1

Open Well
Tube Well
Canal
Total

Charapet1

Open Well

Terracon Ecotech Pvt. Ltd., Mumbai

5
6
15
8
4
3
15
6
4
8
18
3
7
1
11
3

4
1
5
9
4
3
16
3
5
6
14
2
1
0
3
1

4
2
11
7
6
21
34
6
2
5
13
12
5
0
17
0

13
9
31
24
14
27
65
15
11
19
45
17
13
1
31
4

80

Table 3.18: Details of existing livelihoods


1
S.
N.

Paddy Cultivation
Goatery
Sericulture

SC
35
0
42

3
No. of beneficiaries
ST
Others
Total
25
0
60
0
0
0
15
10
67

Paddy Crops
Dal

20
25

40
30

0
0

Mustard Oil

15

21

Choto Ladanguri
No.1

Paddy Crops
Dal
Mustard Oil

0
0
0

Choto Ladanguri
No.2

Paddy Crops
Fishery
Poultry

Boro Ladanguri
No.1

Name of village

4
Women
12
0
18

Pre-project average
income per HH (Rs.)
14000
0
12000

60
55

16
8

17000
8000

36

12000

80
50
40

0
0
0

80
50
40

15
10
7

23000
20000
15000

22
25
15

35
30
21

0
0
0

60
55
36

16
8
5

18000
12000
12000

Poultry
Cultivation
Handloom

15
42
10

40
18
12

12
10
0

67
70
22

10
15
17

14000
22000
15000

Boro Ladanguri
No.2

Cultivation
Business
Poulatry

15
10
12

48
5
6

12
15
12

75
4
5

18
19
35

24000
14000
11000

Dimajhora

Cultivation
Gottery

21
25

32
30

0
0

53
55

16
8

18000
15500

Kumarsali Pathar

Kumarsali

Name of activity

Terracon Ecotech Pvt. Ltd., Mumbai

81

Dagarpara No.1

Dagarpara No.2

Uttarpara No.1

Uttarpara No.2

Deotari

Subaijhar

Saraikhusra

Betnapara

Business

15

21

36

12000

Cultivation
Gottery
Fishery

32
22
18

25
12
12

10
5
10

67
39
40

15
8
12

20000
12000
24000

Cultivation
Fishery
Bamboo Plantation

24
28
14

26
12
15

12
15
8

62
55
5

14
15
42

25000
16000
18000

Cultivation
Fishery
Bamboo Plantation

32
10
12

15
5
10

10
0
5

57
15
27

10
5
3

35000
21000
17000

Gottery
Bamboo Plantation
Agriculture

10
13
28

12
15
22

8
12
11

30
40
61

4
6
8

12000
18000
24000

Cultivation
Bamboo Plantation
Handloom

32
18
10

14
12
15

8
6
0

54
36
25

14
12
14

35000
15500
17500

Paddy Crops
Dal
Mustard Oil

0
0
0

66
53
40

0
0
0

66
53
40

12
3
5

23000
18300
19320

Paddy Cultivation
Vegetables
Carpentry

34
19
10

12
11
2

18
12
0

64
42
12

16
14
0

28500
16800
12500

Cultivation
Poultry

18
0

14
0

5
0

37
0

4
0

17500
0

Terracon Ecotech Pvt. Ltd., Mumbai

82

Carpentry

Golapara

Cultivation
Bamboo Plantation
Business

25
12
2

15
17
0

5
2
4

45
31
6

11
10
1

26500
22500
12500

Malipara 2

Cultivation
Bamboo Plantation

28
12

11
17

10
0

49
29

12
8

37500
23500

Cultivation
Supari Processing
Unit

32

15

10

57

27500

Silbari

10

14

24

Cultivation
Dairy
Supari Processing
Unit

18
5

25
8

42
0

85
13

15
2

12

14

26

Cultivation
Bamboo Plantation
Fishery
Carpentry

18
5
9
2

10
8
5
0

0
2
0
7

28
15
14
9

8
4
2
0

17500
22000
12500
11000

Cultivation
Bashbari Ambari-1 Bamboo Plantation
Fishery

27
12
10

0
15
5

13
0
0

40
27
15

8
5
3

32500
24500
18500

Cultivation
Bashbari Ambari-2 Bamboo Plantation
Fishery

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

Chorapat No.1

38

12

10

60

15

26500

Monakosha

Katribari

Cultivation

Terracon Ecotech Pvt. Ltd., Mumbai

20500
28500
14500
17500

83

Poultry
Carpentry

10

12

13500

Gelasugaon

Paddy Crops
Bamboo Plantation
Mustard Oil

0
0
0

50
35
80

0
0
0

50
35
80

20
15
40

18000
11000
13000

Bholatal-1

Cultivation
Fishery
Business

35
15
5

17
10
0

20
12
4

72
37
9

14
8
2

24500
15700
12000

Majrabari No.1

Cultivation
Piggery
Carpentry

34
19
10

12
11
2

18
12
0

64
42
12

16
14
0

28500
16800
12500

Fig. 3.6: Proportion of existing livelihoods


Terracon Ecotech Pvt. Ltd., Mumbai

84

Comparative data of the crop productivity of the area: Project area Vs District Vs State Vs country Vs
world
The purpose of this section is to provide comparative analysis of watershed area with reference to world, India, Assam and Chirang
District. The term productivity means the total output per unit of factor input. For example land productivity means output per hectare
of land. Productivity is an average and is calculated by dividing the total output of a particular crop by the total cultivated area under
that crop.
Data made available by baseline survey (for all villages), comprehensive district agricultural plan of district Handbook (C- DAP), website
of Govt. of Assam, Directorate of Economics and Statistics (http://ecostatassam.nic.in/) and website of Food Agriculture Organization of
United Nations (http://faostat.fao.org/). The results show that productivity is important not only because we observe a strong
relationship with profits but that watershed area that should be taken to improve the production. These results indicate that the
farmers do rainfed farming. They sow crops like rice, jute, lentil in kharif which is depending on rainfall. While in winter season crops
like Rapeseed, Blackgram, Green gram vegetables like potato, chilly, brinjal etc. Taken by farmers based on tubewell irrigation.
The world productivity for Rice is 4003.8 kg/ha. In India, it is grown in about 9.2 million ha with a production of 280.56 lakh tonnes and
productivity 3049.6 kg/ha. At national level assam contributes over 5 per cent of rice area and 4 per cent of rice production. Assam
covers 2/3rd of the total cropped area in the state with productivity of around 1456 kg/ha. Chirang has lower productivity compared to
Diasumjhora watershed area has similar productivity of around 1900 kg/ha.

Fig. 3.7: Comparative rice productivity


Terracon Ecotech Pvt. Ltd., Mumbai

85

Mustard is the oilseed crop in the area. The worlds Mustard productivity is 1981 kg/ha covering area of 30.47 million hectares. In India,
it is grown in about 2.5 million ha with a production of 0.52 lakh tones and productivity 1143 kg/ha. Assam has productivity of around
523 kg/ha. Chirang has productivity of about 555 kg/ha. While Diasumjhora watershed area has productivity of around 1050 kg/ha.

Fig. 3.8: Comparative mustard productivity

Terracon Ecotech Pvt. Ltd., Mumbai

86

Table 3.19: Problem Typology of the Watershed


1
S.No
1

2
Problem area

3
Problem analysis

Soil Conservation (slope, erosion, soil

Topography of the watershed is flat, but some

4
Proposed interventions to
overcome problems
Intervention of boulder pitching,

loss, rainfall, productivity, etc)

villages are facing severe erosion problem due to

vegetation etc will help to avoid

rivers, rainfall of the area is also erratic which

soil erosion problem as well as

leads to flood in project area, crop production is

increase in water storage will

also less so there is ample scope to increase crop

help to improve crop

productivity.

productivity.

Water conservation (Water budget,

Exploitation of water thereby water level also

Need of artificial recharge of

Ground water norms, productivity)

decreases.

water will help to improve


quantity and quality of water.

Crop coverage {80% of w/s area

There is no irrigation facility in Rabi season and

Need to implement of relevant

should be with canopy}

lack of any scheme related to water and fertilizer. scheme for improve the status of
crops. There is tremendous scope
of agriculture.

Agriculture productivity (crop wise

Seed is not getting through any scheme.

compare with dist. average)

Supply of seed .With increase in


water storage capacity due to
water harvesting structures more
water will be available for
irrigation purpose, which results
in increased productivity in rabi
season.

Livestock productivity (Milk Yield, Meat Insufficient of cow, buffalo and goat.

There will be improving cow,

yield, Eggs, Wool Yield, Kidding etc.)

buffalo, piggery. Credit service,


bank linkage.

Terracon Ecotech Pvt. Ltd., Mumbai

87

Existing Livelihood activities for Asset

There is lack of activities.

less persons

Formation of SHGs and


promotion of new livelihood
activities will help assetless
persons.

Community Based Organizations &

No building or land available for training

Social capital base


8

Formation of more SHG groups,


strengthing the groups.

Capacity Building (participation,

Peoples and watershed community are

training, awareness of watershed

interested in improve the problem.

Need of relevant trainings.

community
9

Others (specify)

Terracon Ecotech Pvt. Ltd., Mumbai

88

CHAPTER 4
INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT
Table 4.1: Details of SHGs & UGs newly formed under IWMP
1

Total no. of CBOs


Sl. Type of
No. Group

No. of members

With
With
With
only
only
Total
both
Men Women

SHG

Total

UGs

No. of ST in No. of SC in
each
each
category
category

No. of
Others in
each
category

No. of BPL
in each
category

9
Bank linkage

No.
Amount
M F Total M F Total M F Total M F Total M F Total of
(Rs)
SHGs
(i)
Landless

42

(ii) MF

357

(iii) SF

101

(iv) LF

100

500
(i)
Landless
(ii) MF
(iii) SF
(iv) LF

Total

Terracon Ecotech Pvt. Ltd., Mumbai

89

Watershed Committees
The Village communities/Gram Sabha will constitute the Watershed Committee (WC) to implement the Watershed project with the
technical support of the WDT in the village. The Watershed Committee (WC) has to be registered under the Society Registration Act,
1860. The Gram Sabha may elect/appoint any suitable person from the village as the Chairman of Watershed Committee. The secretary
of the Watershed Committee (WC) will be a paid functionary of the Watershed Committee (WC). The Watershed Committee (WC) will
comprise of at least 10 members, half of the members shall be representatives of SHGs and User Groups, SC/ST community, women and
landless persons in the village. One member of the WDT shall also be represented in the Watershed Committee (WC). Where the
Panchayat covers more than one village, they would constitute a separate subcommittee for each village to manage the watershed
development project in the concerned village. Where a watershed project covers more than one Gram Panchayat, separate committees
will be constituted for each Gram Panchayat. The Watershed Committee (WC) would be provided with an independent rented office
accommodation.

Date of Registration
as a Society
(dd/mm/ yyyy)

No. of members in
WC

Terracon Ecotech Pvt. Ltd., Mumbai

SC ST

Emelshwar
Musahari
Banikunda
Secretary
Basumathery
Someshwar
Member
Basumathery
Jayashal
Member
Basumathery
Apen
Member
Basumathery
President

Kumarsali

Name

Designation

1
Name of WCs

Table 4.2: Details of Watershed Committees (WC)

M/F

10 11

12

13

14 15

16

17

18

LandAny
UG SHG GP
less
other Educl
Function/
qualifis assigned
cation
Write Yes if applicable

SF MF LF

M
M
M
M
M
90

Mrs. Doibsal
Musahary
Mrs.Bimola
Member
Basumathery
Murgram
President
Basumathery
Member

Secretary Jhalih Musahary


Member
Ladanguri

Member
Member

Member

Deotari

Leuis Musahary

Sukur Brahmo

Mrs. Kasam Goari


Mrs.Butabari
Member
Basumathery
Member Bonic Brahmo
President Purna Boro

Terracon Ecotech Pvt. Ltd., Mumbai

Mrs.Sabala Boro
Mrs.Promala
Member
Narjary
Mital
President
Basumathery
Navnath
Secretary
Basumathery
Shambaru
Member
Basumathery
Member

Mimsalong
Musahary
Lankeshwar
Basumathery

Member

Daugapar
a

F
F
M
M
M
M
F
F
M

91

Secretary

Terracon Ecotech Pvt. Ltd., Mumbai

92

Member

Mohamad Albanu
Ali

Member

Nooresh Ali

Mrs.Arghi
Basumathery
Mrs.Kshali
Basumathery

Member
Member
A.
C.
E.
G.
I.

F
F

PNP and PRA


Maintenance of Accounts
Supervision of construction activities
Verification & Measurement
Social Audit

B.
D.
F.
H.
J.

Planning
Signing of cheques and making payments
Cost Estimation
Record of labour employed
Any other (please specify).

Table 4.3: WDT Particulars


1

S.No
1
2

2
Names of WDT
members
Kumud Kakoti

M/F#

Age

Qualification /
Experience

Description of
professional training

Role/ Function*

M
M

Hiran Kumar
Soughary
Promo Kumar Deka

Ranju Narjary

A.
C.
E.
G.
I.

Team Leader
Field Officer

PNP and PRA


Maintenance of Accounts
Supervision of construction activities
Verification & Measurement
Social Audit

Terracon Ecotech Pvt. Ltd., Mumbai

Field Officer

B.
D.
F.
H.
J.

Planning
Signing of cheques and making payments
Cost Estimation
Record of labour employed
Any other (please specify).
93

Table 4.4: PIA particulars


1
2

Terracon Ecotech Pvt. Ltd., Mumbai

94

Institutional Mechanisms:
Flow Chart of Institutional Arrangement from District to watershed level

Fund Flow mechanisms flow chart

Terracon Ecotech Pvt. Ltd., Mumbai

95

List of Watershed Records to be maintained

DWDU:

Cheque book register


Grants received from Centre/State
Grants Distribution Register
UCs register for UCs received from
PIA/watershed committees
Activities wise Physical and Financial Progress
Details

PIA Level

Register for grants received from states


UCs register for UCs to be sent to DWDUs
Bank pass book/cheque resgister
Bank Reconciliation statement register
UCs register for UCs received from different
watershed committees
Physical and financial progress report

Terracon Ecotech Pvt. Ltd., Mumbai

Watershed Committee Level

Cash book
Contingency bill register
Voucher register
Bank Pass Book
Bank Reconciliation statement register
Advances/Adjustment register
Bank cheque book register
Asset Register
Income register (from watershed assets)
WDF Account Register
Revolving Fund Register
Register showing physical and financial progress

96

Project Implementation
The project will be implemented by the PIA i.e. the Divisional Officer, The Soil Conservation Department, Chirang and the Assam
Government. Watershed Development Team (WDT) plays a regular responsible role though not a full time part. They will provide
training for the village communities, supervise watershed development activities, inspect and authenticate project accounts, encourage
adoption of low cost technologies and build upon indigenous technical knowledge, monitor and review the overall project
implementation and set up institutional arrangements for post-project operation and maintenance and further development of the
assets created during the project period.
The PIA, after careful study, shall submit the Action Plan for Watershed Development Project for approval of the DWDU/DRDA and
other arrangements. The PIA shall submit the periodical progress report to DWDU. The PIA shall also arrange physical, financial and
social audit of the work undertaken. It will facilitate the mobilization of additional financial resources from other government
programmes, such as NREGA, BRGF, SGRY, National Horticulture Mission, Tribal Welfare Schemes, Artificial Ground Water Recharging,
Greening India, etc.
Table 4.6: Convergence plan with IWMP
1

S. No.

1
2
3
4
5
6
7

3
Name of activity/task/structure
proposed under convergence
Names of Departments
(a) Structures
with Schemes
(b) livelihoods
converging with IWMP
(c) Capacity Building
(d) Any other (pl. specify)
RCC Drop
Agriculture
Plantation
Social Forestry
Earthen Dam
Soil Conservation
Road Construction
DRDA

Period of
Support
(Years)

Reference no. of
activity/ task/
structure in DPR

6
Estimated
Fund
Proposed
Under
Convergence
(in Rs.)

7
Level of
decision taken
for
convergence
Block/district

Irrigation
Social Forestry
Total

Terracon Ecotech Pvt. Ltd., Mumbai

97

CHAPTER 5
MANAGEMENT/ACTION PLAN
Description on methodology of plan adopted
A) Awareness generation interventions (Nukkad Natak, Video show, Exposure, Wall painting, door to door campaign, posters,
pamphlets, village meeting etc)
B) Initial Orientation program (Concept seeding, About Watershed? /Watershed Management? Importance of peoples
participation in planning and implementation.)
Concept seeding/About Watershed
Watershed:
A watershed is the area of land where all of the water that is under it or drains off of it goes into the same place. It can be defined as the
area of land that drains to a particular point along a stream. The boundary of a watershed is defined by the highest elevations surrounding
the stream. In recent decades, watershed has been recognized as a unit for Integrated Resource Management (IRM) where management
is not merely of land, water and biomass, rather integration for self reliance and holistic development of the rural poor.
A prime feature of watershed management is that it is more community-based, than just technology oriented leading to empowerment
and self reliance of the primary stakeholders.
Watershed Management:
In recent years, watershed management has become the focal point of agricultural and rural development in rainfed areas of India.
Farming and allied activities have been promoted keeping in mind conservation and regeneration of resources. Animal resources
have the potential to become a major source of income hence; a comprehensive animal husbandry component would contribute
significantly to ensuring a better and sustainable livelihood for the people.

Importance of peoples participation in planning and implementation:


Terracon Ecotech Pvt. Ltd., Mumbai

98

It is now widely accepted that if the productivity of natural resources is to be enhanced in a sustainable fashion, the communities must
participate in plans for rehabilitation and management. Their participation will generate a stake in the process and enhance the prospects
of both institutional and ecological sustainability. Thus, there has been a shift in focus in management that accepts increased attention on
community participation in planning and management.
C ) Formation process UGs & Watershed Committee
Watershed Committee:
The Gram Sabha will constitute the Watershed Committee (WC) to implement the Watershed project with the technical support of the
WDT in the village. The Watershed Committee (WC) has to be registered under the Society Registration Act, 1860. The Gram Sabha may
elect/appoint any suitable person from the village as the Chairman of Watershed Committee. The secretary of the Watershed Committee
(WC) will be a paid functionary of the Watershed Committee (WC). The Watershed Committee (WC) will comprise of at least 10 members,
half of the members shall be representatives of SHGs and User Groups, SC/ST community, women and landless persons in the village. One
member of the WDT shall also be represented in the Watershed Committee (WC). Where the Panchayat covers more than one village,
they would constitute a separate subcommittee for each village to manage the watershed development project in the concerned village.
Where a watershed project covers more than one Gram Panchayat, separate committees will be constituted for each Gram Panchayat.
The Watershed Committee (WC) would be provided with an independent rented office accommodation.
User Groups:
The Watershed Committee (WC) shall also constitute User Groups in the watershed area with the help of WDT. These shall be
homogenous groups of persons most affected by each work/ activity and shall include those having land holdings within the watershed
areas. Each User Group shall consist of those who are likely to derive direct benefits from a particular watershed work or activity. The
Watershed Committee (WC) with the help of the WDT shall facilitate resource-use agreements among the User Groups based on the
principles of equity and sustainability. These agreements must be worked out before the concerned work is undertaken. It must be
regarded as a pre-condition for that activity. The User Groups will be responsible for the operation and maintenance of all the assets
created under the project in close collaboration with the Gram Panchayat and the Gram Sabha

D) DPR preparation process


Terracon Ecotech Pvt. Ltd., Mumbai

99

Data Collection: Primary and Secondary Data Collection, SE Survey, PRA tools (Social map, matrix ranking, wealth ranking,
seasonality of labour, migration, crop, disease, Resource map, Transect walk), sample collection & testing. The Baseline survey work was
carried out in 5 micro watersheds located in Kalaigaon block, Udalguri district. In general, participatory approach of data collection was
made based on PRA observation during the site visits, survey with prescribed household and field formats and discussion with focus group
in all the watershed areas. The information required for Baseline survey have been collected both from primary and secondary data
sources.
The primary data sources involved the watershed beneficiaries from different watersheds in the village by door to door survey. The
officers of Agriculture Department of Udalguri, district, Village President in different VCDC, Panchayat union offices in the above
watershed, in addition this, the coordinator and Organizing Secretary involved the Watershed committee members allotted for various
watersheds. Moreover the soil analysis and rainfall particulars were collected from nearby soil survey organisation and IMD, Guwahati.
Field to field Survey: Field to field survey was also carried out in the farms, community land, pasture land and land under Gram
Panchayat. It also includes the soil profiles, No. of wells in the area, crop taken in the field, cropping pattern, fertilizer used and various
sources of irrigation in the field. The details of agriculture as well as pasture lands of the village where the existing condition and
structures to be proposed, were written down. Most of the farmers of the village were there to support the survey team. The purpose of
the survey was also to understand water availability, patterns of water use and peoples understanding & perceptions about both surface
and groundwater resources in this area. Village agreements will be done on the basis of such detailed work. This survey focuses on the
pattern of surface and groundwater use and the basic understanding of farmers regarding groundwater recharge and discharge. This
understanding was expected to help in improved planning for any watershed programme and to develop longer-term protocols of
groundwater management in respective areas.
PRA and Transect walk: The past experience of watershed has given tremendous input to focus on creating accountability of the
stakeholders towards the programme. This has created an emphasis to include all the stakeholder communities and their local and
Indigenous Technological Knowledge (ITK) while planning for any activity. Participatory approach provides a new path for planning,
implementing, monitoring and post-withdrawal activities with a complete accountability of the stakeholders. Various PRA techniques like
resource mapping, social mapping, transect walk and season calendars were used to understand the physical and social orientation of the
village in general and watershed in specific. These tools put the villagers in ease than the complicated questionnaires. Various tools like
Matrix ranking, Venn diagram were used to identify various local vegetations, fodders crops and even various institutions to identify their
significance in the life of the farmers.
Terracon Ecotech Pvt. Ltd., Mumbai

100

Planning Process- PNP, FGDs, IB and CB plans:


PNP: Participatory Net Planning (PNP) is a planning, mobilization, project formulation, training and monitoring tool that is also invaluable
for evaluation purposes. The PNP methodology puts the stakeholder at the centre of the process; introduces him to tested scientific
practices and knowledge; engages him in a dialogue with a view to arriving at informed choices and allows him the final word in regard to
measures to be undertaken. It focuses primarily on resource management and is concerned with the conservation, productivity
enhancement and sustainable management of all natural and biotic resources available in the watershed.
At the time of undertaking PNP, the planning team together with the farmer or land owning couple and/or adult members of the farmer
household study the farm or plot of land from all aspects, including that of proposed land use after treatment. They discuss, agree to and
finalise in writing the
T
activity that is planned provided it does not adversely affect the neighbours or may result in damage.
FGDs: Focused Group Discussions were organized based on the typologies derived through the data collected and entered to the
computer. From such discussions interventions for productivity enhancement in agriculture, livestock; livelihood development were
derived at.
IB and CB plans: Based on the observations during the DPR process, PRA exercises, LUP and Household data analysis, Focused Group
Discussions plans we were prepared Institution Building and Capacity Building plan.
Problems Identification: After analysis the information collected during PRA exercise, the main problems identified as:
Low agricultural productivity
Soil Erosion from farm land
Improper Crop Rotation
Less use of bio-fertilizers
Almost negligible cultivation of arid fruits
Low milk production
No use of vermi compost
Lack of value addition practices
Migration
Sanitation Problems
Less Nutritional Level & Malnutrition in few farm families
Terracon Ecotech Pvt. Ltd., Mumbai

101

Mapping:
GIS and Remote sensing plays an important role in the study of natural resources mapping and helps in planning of water resources
development in study area One of the greatest advantages of using remote sensing data for hydrological investigations and monitoring is
its ability to generate information in spatial and temporal domain, which is very crucial for successful analysis, prediction and validation.
With the help of GIS we are mapped number of features such as drainage, land slope, soil classification, and landuse. By using remote
sensing we interpret order of watershed, direction of drainages, surface elevation, rate of slope and interpretation of soil types and
landuse planning. Global positioning system (GPS) was used for locating suitable place for soil and water conservation structures.
Preparation of contour map by using survey of India.
Hydro-geological Survey:
Hydro-geologically, the district is underlain by semiconsolidated to unconsolidated formations ranging in age from Upper Tertiary to
Recent. Most of the microwatersheds in the project are situated on plain areas thereby the water can percolate to ground. We observed
existing water resources structure during the site reconnaissance and site mapping. The main source of water is from rainwater and few
perennial and seasonal rivers. The rainwater is harnessed for use by constructing water harvesting structures, which serves as source for
both drinking and recharging groundwater. The water from perennial and seasonal rivers is use for minor irrigation by cutting channels
along the field. Mechanism of harvesting water by mini storage tanks, drain and other structure will be explored under the project.
Public-Private Partnership:
Public-Private Partnership (PPP) is a mode of implementing government programmes /schemes in partnership with the private sector. The
term private in PPP is often understood to stan
enterprises. This institution has a critical role to play in linking agricultural and allied sectors with national and international markets to
achieve the objective of faster and more inclusive growth.
The private sector could be interpreted to encompass all non-government agencies such as the corporate sector, voluntary organizations,
self-help groups, partnership firms, individuals and community based organizations, the roles and responsibilities of the partners may vary
from sector to sector. While in some schemes/projects, the private provider may have significant involvement in regard to all aspects of
implementation; in others s/he may have only a limited role.
Terracon Ecotech Pvt. Ltd., Mumbai

102

The voluntary sector or NGOs may be broadly classified as traditional, community based and government sponsored. Traditional sector
comprises the various religious and charitable trusts dedicated to spread of education, health care, orphanages and rehabilitation homes
etc. The Community based Organizations (CBOs) comprise societies for relief from natural disasters, neighborhood societies, micro-Credit
SHG
G
y sector comprises agencies
engaged in welfare programmes such as rural development, afforestation programmes, watershed management, health and education
services(Parent Teacher associations, Village Education Committees) as well as those engaged in research and evaluation.
Consolidation & preparation of DPR document A
PRA
problems, all data has been complied and Detailed Action plan has been prepared. Action Plan includes year wise allocation of funds for
each component of watershed, phasing of activities, capacity building and benefit cost ratio calculations.
Approval by Aam Sabha/Gram Sabha: After all survey has been completed and activities identified in co-ordination with village people
and village watershed committee, action plan has been developed and approved in Gram sabha.

Details of Natural Resource Management Activities


The physical treatments are to be carried on during the watershed development work phase. While implementing the project it is
necessary that the treatments are carried out starting form ridge and progressing towards the valley. This approach is followed with the
following objectives
1. Protect the upper reaches to avoid erosion and reduce runoff
2. Avoid siltation of structures in the middle and lower catchments.
3. Ensure the cost effectiveness of structures in the valley and
4. Improve overall efficiency of the measures.
Mainly the watershed development works are divided into three stages such as ridge area treatments, Slope treatment, Plains or flat level
(Area treatment) and Drainage line treatments, Different treatments are planned for each village to see the geographical and socio
economic condition of that specific area. The details are briefly described below:
A. Ridge Area Treatment Plans
Terracon Ecotech Pvt. Ltd., Mumbai

103

For the ridge area treatment of project villages area following structure are been Proposed after interaction between the villagers,
watershed committee, Range Forest Officer (RFO) and other field staff of forest.
1. Afforestation /Plantation
2. Contour bund
3. Gully Plug
B. Slope Treatment: The second tier treatment is the slope treatment. This is generally done on agricultural land or waste land. This
generally includes water conservation or surface water storage structures. This being highly labor intensive, will involve more of manual
labour, so, funds from National Rural Employment Guarantee Scheme (MGNREGA) can be taken.
Following structures are been proposed in these areas
1. Earth filling
2. Plantation
3. Diversion drain

C. Plains or Flat Level Treatment:

D. Water conservation Structures and activity:

Terracon Ecotech Pvt. Ltd., Mumbai

104

Table 5.1: Soil and Moisture Conservation structures


S.
No

1
MicroWatershe
d

Ladanguri

Dagarpara

Amgori

2
Name of the
Activities
(Structures)

3
Name of
the Hamlet
/ Village

Earthern
bund

6
Area (in Ha)/
Dimension ( in
M/ Sq. M /
CuM) of
Structure

7
Unit Cost

8
Total
Cost (in
Rs.)

No. 2
Latongguri

600 m

543/ m

325525

3rd Year

Pond
repairing

Dimajora

330.93 sq. m.

163/ sq.
m.

53946

3rd Year

Boulder
pitching at
Gagla Bandh

Subaijhar

60 sq. m.

1408/ sq.
m.

84483

2nd Year

300 sq. m.

1154/ sq.
m.

346249

2nd Year

120 sq. m.

1408/ sq.
m.

168966

2nd Year

Boulder
pitching

4
Plot
Numbers

5
Name
of
Benefi
ciaries

9
10
11
Co Total
Year of
nt Grant Implementatio
rib Amou
n
uti nt (in (1st/2nd/3rd/4t
on
Rs)
h/5th)

Boulder
pitching at
Hanshudaba
river

Malipara 2

Bund

No. 2
Dagarpara

800 m

543/ m

434034

3rd Year

Gelasugaon

60 sq. m.

1937/ sq.
m.

116245

2nd Year

Boulder
pitching

Terracon Ecotech Pvt. Ltd., Mumbai

105

Table 5.2: Water Harvesting Structures


1

Name of the
Activities
(Structures)

Name of
the
Hamlet /
Village

S.
N
MicroWatersh
ed

Check dam
Kumar
Sali

Ring Well

Kumarsa Well( Bathao


Mandir)
li
Rain water
storage(10ft.de
ep pond)

Kumarsali
(pathar)

Drain cleaning
100 mtr.
1 Biga pond
,deep 10 ft

Chotolato
nguri 1

Well at Ram
Terracon Ecotech Pvt. Ltd., Mumbai

Plot
Noumb
ers

Name of
Beneficiar
ies

6
Area (in
Ha)/
Dimensi
on ( in
M/ Sq.
M/
CuM) of
Structur
e
1327.5
cum

10

11

Unit
Cost

Total
Cost
(in
Rs.)

Contributi
on

Total
Grant
Amou
nt (in
Rs)

Year of
Implementation
(1st/2nd/3rd/4th
/5th)

115/
cum

1520
41

4th Year

18 m
Depth

333
3/ m
Dept
h

6000
0

5th Year

18 m
Depth

333
3/ m
Dept
h

6000
0

4th Year

416.56
cum

67/
cum

2779
4

3rd Year

800 m

248/
m

1980
00

2nd Year

3405.46
cum

56/
cum

1891
95

3rd Year

18 m

333

6000

4th Year
106

temple

Terracon Ecotech Pvt. Ltd., Mumbai

Depth

3/ m
Dept
h

107

mtr)

Drain cleaning
(Khingkhra
dong)

1200 m

267/
m

3207
60

2nd Year

Check dam at
Sawbari bandh

1212
cum

113/
cum

1366
77

4th Year

800 m

79/
m

6310
3

2nd Year

18 m
Depth

333
3/ m
Dept
h

6000
0

4th Year

Check dam
repairing

1246.88
cum

42/
cum

5273
3

4th Year

Check dam

2224.69
cum

116/
cum

2582
55

4th Year

1500
cum

123/
cum

1850
50

4th Year

18 m
Depth

333
3/ m
Dept
h

6000
0

4th Year

766 m

181/
m

1386
46

3rd Year

Sawbaidisa
Mathauri
bandh repairing
(800 mtr)

Dagarpa
ra

Subaijhar

Well at
Sobaijhar
Brahma
Mandir.

Check dam at
Owasong
bandh.

No 2
Dagarpara

Well at Bathao
temple
Fishery
repairing
Terracon Ecotech Pvt. Ltd., Mumbai

109

Well at
Deothangpara
LP school
Bandh
repairing (
Umashi bandh)
Well at
Malipara
Brahma Mandir

Dagarpara
no. 1

Dagarpara
no. 1
Malipara 2

Bandh
repairing
Amgori
Check dam

Gelasugao
n

Check dam at
Kudunguri jan

18 m
Depth

333
3/ m
Dept
h

6000
0

4th Year

30 m

79/
m

2361

2nd Year

18 m
Depth

333
3/ m
Dept
h

6000
0

4th Year

35 m

79/
m

2754

2nd Year

1215.47
cum

115/
cum

1397
38

4th Year

1325.06
cum

116/
cum

1533
67

4th Year

Table 5.3: Vegetative Covers


1
S. N.

Microwat
ershed

Name of the
Activities

Name of
the
Hamlet
/ Village

Plot
Number
s
(includi
ng Name
of the
local
Patch)

5
Name of
Beneficiari
es

6
Area
(in
Ha)

Unit Cost Total Cost


(in Rs.)

9
Contribu
tion

10

11

Total
Grant
Amou
nt (in
Rs)

Year of
Implementation
(1st/2nd/3rd/4th/
5th)

3rd Year

Terracon Ecotech Pvt. Ltd., Mumbai

110

Afforestation

2nd Year
2nd Year
2nd Year
4th Year
3rd Year
5th Year
3rd Year
2nd Year
5th Year
3rd Year
3rd Year
4th Year
2nd Year

Terracon Ecotech Pvt. Ltd., Mumbai

111

Terracon Ecotech Pvt. Ltd., Mumbai

112

3rd Year
Boro
Ladam
guri -2

5th Year
3rd Year
5th Year
3rd Year
3rd Year
3rd Year
2nd Year
5th Year
5th Year
3rd Year
4th Year
3rd Year

Terracon Ecotech Pvt. Ltd., Mumbai

113

3rd Year
2nd Year
5th Year
3rd Year
3rd Year
3rd Year
2nd Year
3rd Year
4th Year
3rd Year
3rd Year
2nd Year

Terracon Ecotech Pvt. Ltd., Mumbai

114

3rd Year
4th Year
3rd Year
Fuel Wood
Plantation

2nd Year

Road side
plantation

5th Year

Bamboo
plantation

3rd Year

Turmeric
Plantation

5th Year
2nd Year
2nd Year

Assam Lemon
Papaya

3rd Year
5th Year
3rd Year
2nd Year

Terracon Ecotech Pvt. Ltd., Mumbai

116

4th Year
3rd Year
3rd Year
2nd Year
3rd Year
3rd Year
4th Year
5th Year
3rd Year
3rd Year
3rd Year
2nd Year
3rd Year

Terracon Ecotech Pvt. Ltd., Mumbai

117

5th Year
3rd Year
2nd Year
3rd Year
5th Year
3rd Year
5th Year
3rd Year
4th Year
2nd Year
3rd Year
5th Year
5th Year

Terracon Ecotech Pvt. Ltd., Mumbai

118

3rd Year
2nd Year
3rd Year
3rd Year
3rd Year
5th Year
4th Year
5th Year
2nd Year
3rd Year
4th Year
3rd Year
5th Year

Terracon Ecotech Pvt. Ltd., Mumbai

119

2nd Year
Fuel wood
Plantation

2nd Year
3rd Year
4th Year
3rd Year
2nd Year
5th Year
3rd Year
3rd Year

Fuel wood
Plantation

2nd Year

Road side
plantation

5th Year

Medicinal
Plantation

3rd Year
4th Year

Terracon Ecotech Pvt. Ltd., Mumbai

120

3rd Year
3rd Year
3rd Year
3rd Year
5th Year
3rd Year
4th Year
3rd Year
5th Year
3rd Year
3rd Year
5th Year
3rd Year

Terracon Ecotech Pvt. Ltd., Mumbai

121

4th Year

Structure or Activity Wise Details of Engineering Structure and Vegetative Measures


Table 5.4: Engineering structures for Soil Conservation Measures (SMC)
Proposed plan
Area
S.
No.

Name of
structures

Farmers

UNIT COST
Total units

(ha)

(No./ cu.m./
rmt)

(Rs)

Farmers
contribution
Estimated cost* (Rs. in lakh)

Grant
Portion

(Rs. in lakh) (Rs. in lakh)

330.9 sq. m.
1400 m

540 sq. m.

Terracon Ecotech Pvt. Ltd., Mumbai

122

Table 5.5: Details of engineering structures for Water Harvesting WHS


1

Proposed plan
S. No.

Name of structures

Total units (No./


cu.m./ rmt)

UNIT COST

Estimated cost*

Farmers contribution

(Rs)

(Rs. in lakh)

(Rs)

15 wells- 18m
Depth each

3333/ m
Depth

9.00000

79/ m

2.65083

118/ cum

15.05701

1246.88 m

42/ m

0.52732

2700 m

246/ m

6.74685

3822.02 cum

61/ cum

2.16989

766 m

181/ m

1.38646

3365 m
12821.72 cum

Table 5.6: Details of activities connected with vegetative cover in watershed works
1
S.
No.

2
Name of the Activities

Area
(ha)

No. of
Plants

Terracon Ecotech Pvt. Ltd., Mumbai

5
Proposed plan unit cost
(Rs.)

6
Estimated cost (Rs. In
Lakhs)

7
Farmer
Contribution
(Rs. In

8
Grant (Rs. In
Lakhs)

123

Lakhs)

16100

48300

Aromatic Plantation

12.49

94600

1181554

Assam Lemon Papaya

14.5

51000

739500

18.162

42770

776788.74

5.5

27200

149600

11.035

157900

1742426.5

9.398

144500

1358011

Medicinal Plantation

6.364

109000

693676

Pasture Development

28.1

16200

455220

1800

2772000

94810

663670

9.879

148900

1470983.1

Bamboo Plantation
Fuel wood Plantation
Ginger Plantation

Road Side
Development
Rubber Plantation
Turmeric Plantation

1540

Terracon Ecotech Pvt. Ltd., Mumbai

124

CHAPTER 6
CAPACITY BUILDING PLAN
Capacity Building:
Capacity Building is the process of assisting the group or individuals to identify and address issues and gain the insights, knowledge and
experience needed to solve problems and implement change. There is a realization in the development sector that there is a need to
appraise the success of development interventions by going beyond the conventional development targets and measures of success (e.g.
in the form of commodities, goods and services) to take into account improvements to human potential. Capacity building of stakeholders
is also increasingly viewed as an important factor in developmental projects that involve participation of stakeholders at all levels for
effective implementation of projects.

Table 6.1: Details of Capacity Building


1

SN

Name of the Training &


Exposure ( Knowledge,
Skill, etc. at both Being
and Doing level)

Number
of
events

Total
Total
Number Trainee
Number of
of days days (=
Cost per
Participants
per
3x4x
Trainee
in an event
event
5)
day (in Rs)
SHG/ UG / WC / PI related

10

Total Cost
required
for the
programm
e (= 6 x7 ;
in Rs.)

Total
Grant
Amount
(in Rs)

Year of
Implementation
(1st/2nd/3rd/4t
h/5th)

Orientation program

50

1050

25000

175000

1st , 2nd and 3rd

WC meetings
Institutional building
training for WC, SHGs,
UG
Subtotal

30

10

300

1000

30000

1st to 5th year

Terracon Ecotech Pvt. Ltd., Mumbai

6
43

30
90

2
360
6
1710
NRM related

10000
36000

60000
265000

2nd, 3rd, 4th and


5th

125

UG trainings

UG meetings
Subtotal

183
190

SHGs training

17

SHG meetings
Subtotal

166
183

30

630

4
1
732
34
4
1362
Production Enhancement related
17

1445

830
1
137780
847
6
139225
Livelihoods / Micro-enterprises related
26

1690

20000

140000

1000
21000

183000
323000

20000

340000

1000
21000

166000
506000

2nd, 3rd, 4th and


5th
2nd, 3rd, 4th and
5th

2nd, 3rd, 4th


and 5th
2nd and 4th

2nd, 3rd, 4th


and 5th

SHGs training

13

20000

260000

SHGs meetings
Subtotal

158
790
1
124820
1000
171
816
6
126510
21000
Convergence / Rights & entitlement / Well Being related

158000
418000

2nd and 3rd

Convergence Meetings

1000

8000

On Gender Training
Subtotal

4
12

5000
6000

20000
28000

1st to 5th year


2nd, 3rd, 4th and
5th

15000
15000

90000
90000

1
1
2
For PIA / WDT staffs level

Subtotal
Others
TOT/CRP/CSP/Related
1

Exposure visits
Subtotal
GRAND TOTAL

Terracon Ecotech Pvt. Ltd., Mumbai

6
6

3
3

1st to 5th

126

CHAPTER 7
PHASING OF PROGRAMME AND BUDGETING

S.No

Component

Table 7.1: Phasing of the action plan


Activities

Unit

Unit Cost
(Rs.)

1st year
Phy
Fin (Rs.)
(No)

2nd year
Phy
Fin (Rs.)
(No)

3rd year
Phy
Fin (Rs.)
(No)

4th year
Phy
Fin (Rs.)
(No)

5th year
Phy
Fin (Rs.)
(No)

Total
Phy (No)
Fin (Rs.)

1 Entry Point Activities (4%)


1

Books for School Library

brick channel for water


distribution to agricultural
field(R.M)

Books for School Library

Pasture Development

Percolation tank

Repairing common well

Water storage tank

Roof rain water harvesting

Furniture for school

Nos.

10000

ii)

Poor HHs in Watersheds to


be covered under SHGs
SC
ST
BC
OC
Awareness
Generation
(events) to be conducted
Pamphlets distribution

Terracon Ecotech Pvt.Ltd.Mumbai

10000

rm

Nos.
ha
Nos.
Nos.
Nos.
Nos.
Nos.

680

240

163200

10000

10000

11200

17.75

198800

68000

408000

17440

26

453440

38500

346500

275

120

33000

45000

45000

Sub Total of Entry Point


Activity
2 Institution & Capacity Building (5%)

i)

421.75 1667940

10000

240

163200

10000

17.75

198800

408000

26

453440

346500

120

33000

45000

421.75

1667940

4160

41600

810
No.
No.
No.
No.

No.

10

390

3900

390

3900

390

3900

390

3900

2600

26000

127

Wall posters
Wall writings
Rallies

No.
No.
No.

5000

30000

30000

30000

30000

24

120000

1000
8000

26
6

26000
48000

26
6

26000
48000

26
6

26000
48000

26
6

26000
48000

104
24

104000
192000

Kalajatha

No.

Small Group meetings

No.

Others (specify-----------)

No.

175000

57

57000

6000

25000

iii)

Orientation programs to GP,


WC,UG, SHG,VO, VSS, WUA,
Societies, Elected reps.

No.

iv)

Formation of UGs

No.

1000

v)

Formation of LGs
Formation of Watershed
Committee
Regular Meetings to be
conducted

No.

1000

Watershed Committee
UGs/LGs

No.
No.

VO/SHGs

No.

1000
1000

No.

1000

vi)
vii)

Gram Panchayat
viii) No. of Planning events
ix) Registration of WC
x)

xi)

xii)
xiii)

1000

No.
No.
No.

Social Audit events


Trainings & Exposures

No.

b) On Gender
On Natural Resource
c) Management
d) On Enterprise Promotion
On Productivity
e) Enhancement
f)
Exposure Visits

Terracon Ecotech Pvt.Ltd.Mumbai

75000

50000

57

57000

50000

6000

No.

Self Monitoring events


(planning, review of
activities through tool)
Convergence meetings with
LDs/other institutions

a) On Institutional Building

No.

1000

3000

1000

6000

6000

6000

6000

6000

30

30000

57
162

57000
162000

57
79

57000
79000

57
83

57000
83000

12

12000

183
324

183000
324000

18000

2000

8000

0
0
60000

18000

2000

2000

1000

1000

No.Trgs

10000

30000

10000

10000

10000

0
0
6

No. trgs

5000

5000

5000

5000

5000

20000

No. trgs

20000

60000

20000

40000

20000

140000

No. trgs
No. trgs

20000
20000

5
7

100000
140000

2
4

40000
80000

3
3

60000
60000

3
3

60000
60000

13
17

260000
340000

Nos

15000

30000

15000

15000

15000

90000

15000

128

Sub Total IB & CB {Do not sum Men


& Women under CB events (a to
f)}[1]
3

229900

735

806900

583

470900

586

444900

2630

216000

4986

2168600

116000

80000

80000

24150

1.5

24150

123552

4.992

123552

4.992
5

60000

60000

30000

30000

2
1

162000
25000

718200

1.596

718200

300000

300000

0.13

46540

108000

Productivity Enhancement (10%)

Aggroforestry

Bee Keeping

Crop Demonstration Rice


Crop Demonstration
Vegetable

4
5

Duck Rearing Scheme


Eri food plant with supply
of Start Up tools
Eri Rearing House
Establishment of Goat
Farming
Fish Pond Development
(Pisiculture)

10

Fruit Processing Unit

11
12

Horticulture nursery
Muga food plant with
supply of farming tools

13
14

6
7
8

15
16
17
4

1262

116000
116000
20000

16100

1.5

Nos.

12000

Nos.
Nos.

30000
81000

24750

Nos.
Area
(ha)

1.596

50000

6
0.13

46540

358000
108000
100000

Poultry

Nos.

10000

Terracon Ecotech Pvt.Ltd.Mumbai

25000

450000

Nos.

Aromatic Plantation
Assam Lemon Papaya

162000

25000

Piggery

Vermi Compost
Sub-Total PE

2
1

Nos.
Area
(ha)

36000

Rice Processing Unit


(Individual)
Sufari Processing Unit
(Individual)

Nos.
Area
(ha)
Area
(ha)

Nos.

Natural Resource Management


(56%)
Afforestation
1
2

Area
(ha)

Nos.

95000

Nos.

63000

Nos.

3
3

300000

300000

22

220000

22

220000

665000

665000

693000

11

693000

190000

20

190000

94.218

3861442

48300

11

9500
0

17.622

389242

48300

8.596

1134200

32

1185000

20
36

1153000

ha

16100

ha
ha

94600

12.49

1181554

12.49

1181554

51000

14.5

739500

14.5

739500

129

4
5

Bamboo Plantation
Fuel wood Plantation

ha
ha

42770
27200

6
7
8
9

Ginger Plantation
Horticultural Plantation
Medicinal Plantation
Pasture Development

ha
ha
ha
ha

10

Road Side Development

Nos.

157900
144500
109000
16200
1800

11

Rubber Plantation

ha

94810

12

Turmeric Plantation

ha

148900

13

Pond Repairing

sq. m.

163

330.9

14

Earthen bund

543

1400

17

Boulder Pitching

sq. m.

1477

20

Well

21

Bandh Repairing

22
23

Check Dam
Check Dam Repairing

24
25

m Depth

5.5

776788.74

18.162
5.5
11.035

776789
149600
1742427

9.398
6.364
28.1
1540

1358011
693676
455220
2772000

663670

9.879

1470983

53946.02

330.93

53946

759559.15

1400

759559

540

715942

900000

3365

265084

12821.72

1505702

149600
11.035 1742426.5
9.398
6.364

28.1

1358011
693676

455220
1540
7

9.879

540

79

cum
m

118

Drain Cleaning

246

Surface Pond

cum

Fishery Repairing
Sub Total NRM:
5 Administration

3365

2772000

663670
1470983.1

715942.32
15
wells
each 18

3333

26

18.16

265083.5
12822

900000

1505702

1247

52732.98

1246.88
2700

52733
674685

61

3822

216989.3

3822.02

216989

181

766

138646

766

138646

28657.978

17335016

42
2700

674685

2308830.82

6635073.19

3248128.5

5142983.1

WC office expenditure

Month

4000

72

288000

72

288000

72

345600

72

345600

72

403200

72

403200

432

2073600

WS Secretary Salary

Month

1500

72

108000

72

108000

72

144000

72

144000

72

180000

72

180000

432

864000

c
d

Stationary & miscellaneous


TA/DA

Rs.
Month

1500
800

1
144

1500
115200

1
144

1500
115200

1
144

1700
172800

1
144

1700
172800

1
144

2000
230400

1
144

2000
230400

6
864

10400
1036800

Contingency (10%)
Sub Total Admin

1734

398480
4383280

10

750000

160000

192000

108000

108000

125000

125000

6 Livelihood
1
Bamboo Craft

7800

Nos.

75000

Bee Keeping

Nos.

20000

Carpentry

Nos.

24000

Duck Rearing Scheme


Establishment of Goat
Farming

Nos.

12000

Terracon Ecotech Pvt.Ltd.Mumbai

289

512700

289

289

664100

10

750000

160000
8

25000
Nos.

512700

192000

289

664100

289

815600

241

815600

130

Fruit Processing Unit

Nos.

50000

Handloom and Weaving

Nos.

50000

11

Mat / Jute/ Pati Making

Nos.

50000

Mobile repairing

Nos.

30000

9
3

10

Nos.

75000

11

Pottery
Rural Backyard Poultry
Rearing

12

Wood Craft making

Nos.

75000

13

Cycle Repairing

Nos.

40000

Sub Total Livelihood


Grand Total (sum of all
sub-totals 1 to 6)

Terracon Ecotech Pvt.Ltd.Mumbai

250000

250000

550000

11

550000

450000

450000

90000

90000

75000

50000

525000

240000

87

3565000

10000

75000

50000

Nos.
7
0

0
2410540

22

393000
4410672.82

240000

34

1482000
10386273

23

1090000
6632128.5

525000
600000
7927583.1

0
815600

32981278

131

Table 7.2: Estimated Benefit Cost Ratio


SN

Name of the activity


1 EPA

2 NRM

Total Cost
(Rs.) lakhs
16.67940

173.35016

Terracon Ecotech Pvt. Ltd., Mumbai

Total Benefit expected *(Rs.) lakhs


-Pasture development: Increase in grazing land,
Increase in soil moisture retention, increase in
milk production
-Repairing common well, Storage tank,
percolation tank, roof water harvesting, brick
channel for water distribution : Increase in water
storage (> 1000 cum), Enhancing agricultural
productivity and irrigable area, ground water
recharge, water availability during lean months,
better health and hygiene,
-Building for School, books for library, furniture:
Improved educational facilities, increase in
literacy rate and social and economic well being.
-Improved irrigation facilities and agricultural
production
-To augment the ground water recharge
-Will reduce top soil erosive activity
-Reduction in runoff & Increase soil moisture
-Reduced soil nutrient loss
-Boost economic activity eg. Fish farming
-Stabilize banks of streams
-Plantation activities like fuel wood, aromatic,
rubber etc. will create new markets for local
people
-Enhanced transportation facilities/accessibility by
causeways and culverts
-Creating culturable land by leveling parcels of
land by earth filling
-Alleviate poverty
-Motivate local farmers

BCR

Remarks
-

Non quantifiable in
monetary terms

Economic analysis is not


feasible for Small
irrigation structures and
has many intangible
benefits

132

3 Production
Enterprise

38.61442

79.76115

2.07

Reduction in
migration
Social economic
security
Additional income
apart from
agriculture

4 Livelihood for Asset


less

35.65000

84.91570

2.38

Reduction in
migration
Social economic
security
Additional income
apart from
agriculture

5 Institution and
Capacity building

21.68600

Non quantifiable in
monetary terms

6 Overall

355.73277

Beneficial

Awareness and skill development

Source:
State institute for Rural Development (SIRD), Assam.
1. Websites:
a. www.assamagribusiness.nic.in
b. www.ecostatassam.nic.in
c. www.rkmp.co.in
d. www.irrigassam.nic.in
e. www.db.nedfi.com
f. www.agricultureinformation.com
g. www.nabard.org

Terracon Ecotech Pvt. Ltd., Mumbai

133

CHAPTER 8
CONSOLIIDATIION AND COMPLETIION OF VARIIOUS WORKS
Table 8.1: Consolidation of Action Plan
1

S. No

Implementation Phase
st

Component
Phy
(No)
1 Entry Point Activities (4%)

1 year
Fin (Rs.)

421.8

2 DPR Preparation by PIA (1%)


3 Institution & Capacity
Building (5%)
SLNA-.3%
DWDU-.9%
PIA-3.8%
4 Productivity Enhancement
(10%)
5 Livelihoods for Assetless (9%)
6 Natural Resource
Management (56%)
7 Monitoring (1%)

nd

2 year
Phy (No) Fin (Rs.)

Phy
(No)

3 year
Fin (Rs.)

th

Phy
(No)

4 year
Fin (Rs.)

th

Phy
(No)

5 year
Fin (Rs.)

1667940
216000

Total
Phy (No)

Fin (Rs.)

421.75

1667940

216000

432000

1262

229900

735

806900

583

470900

586

444900

2630

216000

4986

2168600

17.622

389242

8.596

1134200

32

1185000

36

1153000

94.218

3861442

22

393000

34

1482000

23

1090000

600000

87

3565000

2308831

6635073.19

3248128.5

5142983.1

8 Evaluation (1 %)
9 Consolidation phase (3%)
10 Administration (10%)

rd

Consolidation/
exit Phase
6th year
Phy Fin (Rs.)
(No)

289

512700

289

28657.978 17335016

216000

108000

108000

432000

216000

108000

108000

432000

1296000

1296000

512700

289

664100

289

664100

289

815600

241

815600

1734

4383280

Terracon Ecotech Pvt.Ltd.Mumbai


134

CHAPTER 9
EXPECTED OUTCOMES
The aim of this project is to improve the economy and ecology of watershed. Benefit cost ratio is the simple method of evaluating the
economic performance of the projects. The analysis has been done by the primary data collected from the project area and using Net
Present Value (NPV), Benefit-Cost Ratio (BCR) and sensitivity analyses. The study shows that the expected full benefits are realized, the
benefits derived from the watershed project are quite high. The benefits can be ascertained based on employment generated, area
irrigated, increase in production, area under cultivation etc. However it is difficult to convert this information into quantitative and
monetary evaluation involved through the CBA. The formula used for quantifiable activities is B/C, i.e. benefits/ costs.
For livelihood activities and production activities, the calculated BC ratio is based on total project cost, maintenance and operation cost
and benefits are based on annual production and market prices. The BC ratio however does not includes certain non measurable benefits
like increased earning power of locals, increase in social capital, health improvement etc. The overall benefit cost ratio of production
activities and livelihood activity proposed was found to be approx 2.07 and 2.38 respectively.
For NRM (Natural resource management), the structures proposed are in small scale and therefore the benefits are difficult to be
quantified in monetary terms. However there will be high benefits that range from increased productivity, water availability to reduction
in migration.

Ground Water:
The overall terrain condition of the district can be divided into two categories i.e. flat and somewhere undulating land. The average
rainfall is about 1900 mm per annum of which 75% is received during June and September. During Monsoon the climate is normally wet
and dry during winter. Both pre and post-monsoon months have unpredictable and erratic rainfall. Most of the terrain is flat thereby
surface water will be percolate in the ground. Groundwater is around 7.00 m, reflecting very fluctuating ground water level. During winter
this needs be replenished for better productivity.
Proper water harvesting structure check dam, percolation tank, opens well, diversion drain and surface pond are proposed in project area
for water harvesting thereby we can maintain or increase the water level. It is expected to raise 3 to 4 m after proper implementation and
maintenance of proposed structures.

Terracon Ecotech Pvt. Ltd., Mumbai

135

Vegetative/Crop:
There is negligible area under forest cover area. Types of vegetation are also proposed in project area such as bamboo plantation,
horticultural, rubber plantation and pasture development. Vegetation is an important role in soil conservation process. Vegetation will
enhance the water table in the area and restore the ecological balance of the area. They play an important role in soil conservation and
moisture retention process. From the studies, we can say the Benefit cost ratio ranges from 2.35 to 3.73 for different agro forestry
projects.

Migration:
Employment is an important problem in the watershed area at all times. The main occupations of the people of the watershed area are
agriculture, animal husbandry and casual labour work. In most of the areas in the watershed, it is observed that only single crop
cultivation has done, which keeps the workers partially engaged for about 8 months and for another 4 months the peoples are migrated
to other cities or towns. The activities identified for the watershed area are mainly focused on making of both wage employment and self
employment opportunities. The watershed work has increase more availability of works like construction of earthen bunds, farm bunds,
village pond, plantation, etc. and self employment would be created by livelihood and production activities. More employments shall be
generated after the proper implementation of the proposed interventions.

Terracon Ecotech Pvt. Ltd., Mumbai

136

Table 9.1: Expected outcome: Quantifiable indicators


1

1
2
3
4
5
6

Status of water table (Depth to Ground water level)


Ground water structures repaired/ rejuvenated
Quality of drinking water
Availability of drinking water
Increase in irrigation potential
Change in cropping/ land use pattern

3
Unit of
measurement
Meters
No.
Description
Description
Hec.
Description

Area under agricultural crop


I
Area under single crop
Ii
Area under double crop
iii
Area under multiple crop
Net increase in crop production area
Increase in area under Vegetation/Forest

Hec.
Hec.
Hec.
Hec.
Hec.
Hec.

10
11
12
13
14

Increase in area under horticulture


Increase in area under fuel
Increase in area under Fodder
Increase in milk production
Environmental Impact
Change in Soil Loss
Perenniality of flow and change in Run-off
Recharge of ground water

Hec.
Hec.
Hec.
Liters/day

14

No. of SHGs Promoted

No.

S.No. Item

8
9

Terracon Ecotech Pvt. Ltd., Mumbai

4
Pre-project
Status
6.9
268/242
Not safe
Shortage

5
Expected Post-project
Status
3 to 4

Present land
used in paddy
and potato.

Along with paddy


Vegetable would be
promoted.

6
Remarks

WHS proposed
Safe
Adequate Available

It is expected by 20 %
more

Information not
available
0
sufficient
4650
Runoff=
1329 mm/year
Average soil
loss=54.25
Mt/ha/yr

79.43
5.464
9.398
5.5
28.1
sufficient
With soil conservation
measures, expected to
reduce by 80 %

137

15
16
17

Increase in no. of livelihoods


Increase in income
Status of Migration

No.
Rs.
No.

18
19
20
21
22

SHG Federations formed


Credit linkage with banks
Resource use agreements
WDF collection & management
Summary of lessons learnt

No.
Rs.
Rs.
Description

205

Migration will be
decrease

As per the guidelines

Table 9.2: Backward and Forward Linkages


1
Type of Marketing Facility
(A) Backward linkages
(i) Seed certification
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
(xii)
(B)

Seed supply system


Fertilizer supply system
Pesticide supply system
Credit institutions
Water supply
Extension services
Nurseries
Tools/machinery suppliers
Price Support system
Labour
Any other (please specify)
Forward linkages

Terracon Ecotech Pvt. Ltd., Mumbai

2
Name of the institution

3
Pre-project (no.)

4
Expected post project status

As per scheme

As per scheme

Assam state seed certification


company
Through Govt.Channel
Private store
Bank
Govt. Service

Govt. on subsidy

138

(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)

Harvesting/threshing machinery
Storage (including cold storage)
Road network
Transport facilities
Markets / Mandis
Agro and other Industries
Milk and other collection centres

Walk able
Poor
Nil
Nil
No any remarkable
information

Carable
Average
Weekly
Household basis
20% milk will be increased

(viii) Labour
(ix) Any other (please specify)

Terracon Ecotech Pvt. Ltd., Mumbai

139

CHAPTER 10
M A PS

Terracon Ecotech Pvt. Ltd., Mumbai

140

Terracon Ecotech Pvt. Ltd., Mumbai

141

Terracon Ecotech Pvt. Ltd., Mumbai

142

Terracon Ecotech Pvt. Ltd., Mumbai

143

Terracon Ecotech Pvt. Ltd., Mumbai

144

Terracon Ecotech Pvt. Ltd., Mumbai

145

Terracon Ecotech Pvt. Ltd., Mumbai

146

Terracon Ecotech Pvt. Ltd., Mumbai

147

ANNEXURE A
ENGINEERING ESTIMATES
BETNAPARA
EARTH BANDH REPAIRING
BANDH DIMENSIONS
LENGTH
BREADTH
HEIGHT
SLANT HEIGHT
BOTTOM WIDTH
Sr. No.
1
2

Description Of Item
Site clearance
Earth work in excavation including removing the up
to a distance of 100m including dressing, cambering
gradingthe surface etc all completed as per direction.
deduct 12.5% shrinkage
TOTAL
Furnishing & laying of the live sods of perennial
turfing forming grass on embankment slope, verges
or other locations preparation of ground fetching of
rods and watering etc.on the drawing or as directed
by the engineering including shown

CONSIDERING REPAIRING COST = 1/3rd of CONSTRUCTION COST

Terracon Ecotech Pvt.Ltd.Mumbai

800
2.14
1.22
1.73
4.58

IDEAL DIMENSIONS
TOP WIDTH
1
BOTTOM WIDTH 3
HEIGHT
1
SLANT HEIGHT 1.4

m
m
m
m
m

Item No.

Length

2.2/201

800

2.14

3.1 (301)

800

3.36

3.22/307

800

Breadth Depth

1.73

1.22

m
m
m
m

Quantity

Unit

Rate in Rs.

Amount

1712

Sq.m.

0.72

1232.64

3279.36

cu.m

409.92
2869.44

cum
cu.m

54

154949.8

1380.27

sq. m

24

33126.54

TOTAL
HENCE REPAIRING COST = Rs.

189308.9
63103

A-1

BETNAPARA
DRAINCLEANING

No.
1

CHANNELDIMENSIONS
LENGTH
BOTTOMWIDTH
HEIGHT
TOPWIDTH

1200
3.6
1
7.2

Description

Item

Excavationinordinarysoilbyheadload
infillingthebankofpondwithalllift
3.1/301(a)
1.5mandleadupto100min
accordancewithrequirementlinesand

Terracon Ecotech Pvt.Ltd.Mumbai

m
m
m
m
No.

Length Breadth

1200

5.4

Depth

Quantity

Rate

unit

Amount

0.5

3240

99

cum

320760

TOTAL

320760

A-2

BETNAPARA
EARTHENCHECKDAM
LENGTH
BREADTH
DEPTH
SOILSEPTH
LOWERBREADTH
(CONSIDERINGSLOPE2.5:1)
S.No.

Item
Earth work in excavation
including removing the spoil as
directed up to a distance of 100m
including dressing, cambering
grading the surface etc all
completed as per direction.
Earthworkinfittingforcoreof
embankmentbyheadloadwithsoil
ofapprovedqualitywithaleadupto
30mandliftupto1.5minlayersnot
exceeding20cmthickincluding
breakingclods,dressing,gradingto
requiredshapeandcompactingto
meetrequirementetc

Terracon Ecotech Pvt.Ltd.Mumbai

30
4.6
4.0
0.6
22.6

m
m
m
m
m

COREWALLDIMENSIONS
TOPWIDTH
1
BOTTOMWIDTH
3
HEIGHT
1

No.

ItemNo. Length Breadthepth/Thickne Quantity

m
m
m

Unit

Rate

Amount

3.1(301)

30

2.50

0.5

37.5

m3

54

2025

17.48

30

2.0

0.5

30

m3

81

2430

A-3

Earthworkbyheadloadfittingin
layersnotexceeding20cmthick
includingbreakingclods,dressing
andsectioningcamberingand
rammingwithinaleadupto30m
andliftupto1.5mincluding
paymentoflandcompensationfor
obtainingearthetc.(b)&(c)extra
leadbeyond30mandextraliftfor
each1.5m
Providingandlayingpitchingon
slopeslaidinwirecratesmadewith
4mmdiaGI4826in100mmx
100mmmesh(Weaveddiagonally)
including10%extraforlapsand
jointslaidwithstoneboulders
(weightingnotlessthan40Kgeach)
U/Sside
Furnishing&layingofthelivesodsof
perennialturfingforminggrasson
embankmentslope,vergesorother
locationsshownonthedrawingoras
directedbytheengineeringincluding
preparationofgroundfetchingof
rodsandwateringetc.
U/Sside
D/Sside
Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

17.47/(II)

30

13.6

4.0

1632

m3

62

101184

30

4.0

0.3

36

m3

2085

75060

30
30

7.8
8.94
Total

233.11
268.33
501.44

m2
m2
m2
LS

24
500
TOTAL

12034.51
500
193233.51

15.2(2503

3.22/307

1
1

A-4

CHOTOLATONGURI 1
SURFACE POND

Sr. No.

TOP LENGTH
36.52
BOTTOM LENGTH
30.424
TOP WIDTH
36.52
BOTTOM WIDTH
30.424
DEPTH
3.048
SLANT HEIGHT
4.311
AVG. LENGTH
33.472
AVG. WIDTH
33.472
Description Of Item
Item No.
Earth work in excavation
including removing the spoil as
directed for excavated pondup to
3.1
a distance of 100m including
(301)(b)
dressing , cambering, grading the
surface etc all

m
m
m
m
m
m
m
m

Considering slope of pond 1:1

Depth

3.048

Area

Quantity

Unit

Rate

Amount

1117.278 3405.463

cum.

54

183895

Planting of trees in the


embankments 4 Nos. in each
embankment

16

nos.

300

4800

Cost of signboard, publicity etc.

LS

500

500

TOTAL

189195

Terracon Ecotech Pvt.Ltd.Mumbai

A-5

NO 2 DAGARPARA
EARTHEN CHECK DAM REPAIRING
LENGTH
BREADTH
DEPTH
SOIL SEPTH
LOWER BREADTH
(CONSIDERING SLOPE 2.5:1)
S. No.

30
4
3.5
0.6
19.75

Item
Earth work in excavation including removing
the spoil as directed up to a distance of 100m
including dressing, cambering grading the
surface etc all completed as per direction.

Earth work in fitting for core of embankment by


head load with soil of approved quality with a
lead up to 30m and lift up to 1.5 m in layers not
exceeding 20cm thick including breaking clods,
dressing, grading to required shape and
compacting to meet requirement etc
2

m
m
m
m
m

CORE WALL DIMENSIONS


TOP WIDTH
1
BOTTOM WIDTH
3
HEIGHT
1

No.

Item No.

3.1 (301)

30

17.48

17.47 /(II)

Earth work by head load fitting in layers not


exceeding 20cm thick including breaking clods,
dressing and sectioning cambering and ramming
within a lead up to 30m and lift up to 1.5m
including payment of land compensation for
obtaining earth etc. (b) & (c) extra lead beyond
30m and extra lift for each 1.5m

Length Breadth

Depth

Quantity

Unit

2.50

0.5

37.5

30

2.0

0.5

30

30

11.9

3.5

1246.875

30

3.5

0.3

31.5

m
m
m

Rate

Amount

54

2025

81

2430

62

77306.25

m3

2085

65677.5

Providing and laying pitching on slopes laid in wire


crates made with 4mm dia GI 4826 in 100mm x
100mm mesh (Weaved diagonally) including 10%
extra for laps and joints laid with stone boulders
(weighting not less than 40 Kg each)
U/S side

Terracon Ecotech Pvt.Ltd.Mumbai

15.2 (2503)

A-6

Furnishing & laying of the live sods of perennial


turfing forming grass on embankment slope,
verges or other locations shown on the drawing
or as directed by the engineering including
preparation of ground fetching of rods and
watering etc.

3.22/307

U/S side
D/S side

30
30

1
1

6.42
7.83
Total

m
m2

427.51

m2
LS

Cost of signboard, publicity etc.

CONSIDERING REPAIRING COST = 1/3rd of CONSTRUCTION COST

192.72
234.79

24
500
TOTAL

10260.20
500
158198.949
52733

HENCE REPAIRING COST = Rs.

NO 2 DAGARPARA
EARTHEN CHECK DAM
LENGTH
BREADTH
DEPTH
SOIL SEPTH
LOWER BREADTH
(CONSIDERING SLOPE 2.5:1)
S. No.

Item
Earth work in excavation including removing
the spoil as directed up to a distance of 100m
including dressing, cambering grading the
surface etc all completed as per direction.

Terracon Ecotech Pvt.Ltd.Mumbai

35
4
4.5
0.6
24.25

m
m
m
m
m

No.

Item No.

3.1 (301)

CORE WALL DIMENSIONS


TOP WIDTH
1
BOTTOM WIDTH
3
HEIGHT
1

Length Breadth
Depth/Thickness
Quantity

35

2.50

0.5

43.75

Unit

m
m
m

Rate

Amount

54

2362.5

A-7

Earth work in fitting for core of embankment by


head load with soil of approved quality with a
lead up to 30m and lift up to 1.5 m in layers not
exceeding 20cm thick including breaking clods,
dressing, grading to required shape and
compacting to meet requirement etc
2

Earth work by head load fitting in layers not


exceeding 20cm thick including breaking clods,
dressing and sectioning cambering and ramming
within a lead up to 30m and lift up to 1.5m
including payment of land compensation for
obtaining earth etc. (b) & (c) extra lead beyond
30m and extra lift for each 1.5m

17.48

35

2.0

0.5

35

m3

81

2835

17.47 /(II)

35

14.1

4.5

2224.69

62

137930.625

35

4.5

0.3

47.25

m3

2085

98516.25

35
35

9.12
10.06

319.08
352.18

m
m2

671.26

m2
LS

24
500
TOTAL

16110.30
500
258254.6734

Providing and laying pitching on slopes laid in wire


crates made with 4mm dia GI 4826 in 100mm x
100mm mesh (Weaved diagonally) including 10%
extra for laps and joints laid with stone boulders
(weighting not less than 40 Kg each)

15.2 (2503)

U/S side
Furnishing & laying of the live sods of perennial
turfing forming grass on embankment slope,
verges or other locations shown on the drawing
or as directed by the engineering including
preparation of ground fetching of rods and
watering etc.

U/S side
D/S side

1
1

3.22/307

Total
5

Cost of signboard, publicity etc.

NO 2 DAGARPARA
EARTHEN CHECK DAM
Terracon Ecotech Pvt.Ltd.Mumbai

A-8

S. No.

LENGTH
BREADTH
DEPTH
SOIL SEPTH
LOWER BREADTH
(CONSIDERING SLOPE 2.5:1)

30
3.5
4.0
0.6
21.5

Item
Earth work in excavation including removing
the spoil as directed up to a distance of 100m
including dressing, cambering grading the
surface etc all completed as per direction.

No.

Item No.

3.1 (301)

30

2.50

0.5

37.5

17.48

30

2.0

0.5

30

17.47 /(II)

30

12.5

4.0

1500

30

4.0

0.3

36

Earth work in fitting for core of embankment by


head load with soil of approved quality with a
lead up to 30m and lift up to 1.5 m in layers not
exceeding 20cm thick including breaking clods,
dressing, grading to required shape and
compacting to meet requirement etc
2

Earth work by head load fitting in layers not


exceeding 20cm thick including breaking clods,
dressing and sectioning cambering and ramming
within a lead up to 30m and lift up to 1.5m
including payment of land compensation for
obtaining earth etc. (b) & (c) extra lead beyond
30m and extra lift for each 1.5m

m
m
m
m
m

CORE WALL DIMENSIONS


TOP WIDTH
1
BOTTOM WIDTH
3
HEIGHT
1

Length Breadth
Depth/Thickness
Quantity

Unit

m
m
m

Rate

Amount

54

2025

81

2430

62

93000

m3

2085

75060

Providing and laying pitching on slopes laid in wire


crates made with 4mm dia GI 4826 in 100mm x
100mm mesh (Weaved diagonally) including 10%
extra for laps and joints laid with stone boulders
(weighting not less than 40 Kg each)
U/S side

Terracon Ecotech Pvt.Ltd.Mumbai

15.2 (2503)

A-9

Furnishing & laying of the live sods of perennial


turfing forming grass on embankment slope,
verges or other locations shown on the drawing
or as directed by the engineering including
preparation of ground fetching of rods and
watering etc.

3.22/307

U/S side

30

7.77033

233.11

m2

D/S side

30

8.94427

268.33
501.44

m2

Total
5

Cost of signboard, publicity etc.

m2
LS

24
500
TOTAL

12034.51
500
185049.5131

NO 2 DAGARPARA
REPAIR OF FISHERY BANK
COST OF REPAIR OF FISHERY BANK PER R.M. = Rs.
181
LENGTH
766 m
TOTAL REPAIRING COST
138646 Rs.
S. No.

Item
Earth work in excavation including removing the
spoil as directed up to a distance of 100m
including dressing, cambering grading the surface
etc all completed as per direction.

Earth work in fitting for core of embankment by


head load with soil of approved quality with a
lead up to 30m and lift up to 1.5 m in layers not
exceeding 20cm thick including breaking clods,
dressing, grading to required shape and
compacting to meet requirement etc

Terracon Ecotech Pvt.Ltd.Mumbai

25 Bigha Area = 33250 sq. m. Assuming a Fishery pond of 133 X 250 sq. m.

Item No.

No.

Length Breadth

Depth

3.1 (301)

150

0.3

17.48

150

0.5

Quantity

Unit

Rate

Amount

45

m3

54

2430

75

m3

81

6075

A-10

Earth work by head load fitting in layers not


exceeding 20cm thick including breaking clods,
dressing and sectioning cambering and ramming
within a lead up to 30m and lift up to 1.5m
including payment of land compensation for
obtaining earth etc. (b) & (c) extra lead beyond
30m and extra lift for each 1.5m
Furnishing & laying of the live sods of perennial
turfing forming grass on embankment slope,
verges or other locations shown on the drawing
or as directed by the engineering including
preparation of ground fetching of rods and
watering etc.
Cost of signboard, publicity etc.

Terracon Ecotech Pvt.Ltd.Mumbai

17.47/(II)

150

3.22/307

150

3.5

0.3

LS

90

m3

62

5580

525

24

12600

500
TOTAL
COST PER R.M.

500
27185
181

A-11

NO 2 DAGARPARA
EARTH BANDH/ EARTH BUND
BANDH DIMENSIONS
LENGTH
BREADTH
HEIGHT
SLANT HEIGHT
BOTTOM WIDTH
Sr. No.
1
2

Description Of Item

800
3
2
2.83
7
Item No.

Site clearance
2.2/201
Earth work in excavation including removing the
up to a distance of 100m including dressing,
3.1 (301)
cambering gradingthe surface etc all completed as
per direction.
deduct 12.5% shrinkage
TOTAL
Furnishing & laying of the live sods of perennial
turfing forming grass on embankment slope,
verges or other locations preparation of ground
3.22/307
fetching of rods and watering etc.on the drawing
or as directed by the engineering including shown

Terracon Ecotech Pvt.Ltd.Mumbai

m
m
m
m
m
Length

Breadth

800

800

800

2.83

Depth

Quantity

Unit

Rate in Rs.

Amount

2400

Sq.m.

0.72

1728

8000

cu.m

1000
7000

cum
cu.m

54

378000

2262.74

sq. m

24

54305.8

TOTAL

434033.8

A-12

DEOTARI
COSTESTIMATEFOREARTHENCHECKDAM

S.No.
1

LENGTH
BREADTH
DEPTH
SOILSEPTH
LOWERBREADTH
(CONSIDERINGSLOPE2.5:1)

30
5
3.0
0.6
18.5

Item
Earthworkinexcavationincludingremovingthe
spoilasdirecteduptoadistanceof100m
includingdressing,camberinggradingthe
surfaceetcallcompletedasperdirection.

No.

ItemNo.

3.1(301)

30

2.50

0.5

17.48

30

2.0

17.47/(II)

30

30

Earthworkinfittingforcoreofembankmentby
headloadwithsoilofapprovedqualitywitha
leadupto30mandliftupto1.5minlayersnot
exceeding20cmthickincludingbreakingclods,
dressing,gradingtorequiredshapeand
compactingtomeetrequirementetc
Earthworkbyheadloadfittinginlayersnot
exceeding20cmthickincludingbreakingclods,
dressingandsectioningcamberingandramming
withinaleadupto30mandliftupto1.5m
includingpaymentoflandcompensationfor
obtainingearthetc.(b)&(c)extraleadbeyond
30mandextraliftforeach1.5m
Providingandlayingpitchingonslopeslaidin
wirecratesmadewith4mmdiaGI4826in
100mmx100mmmesh(Weaveddiagonally)
including10%extraforlapsandjointslaidwith
stoneboulders(weightingnotlessthan40Kg
each)
U/Sside
Terracon Ecotech Pvt.Ltd.Mumbai

m
m
m
m
m

COREWALLDIMENSIONS
TOPWIDTH
m
1
m
BOTTOMWID
3
HEIGHT
m
1

Length Breadth Depth/Thicknes Quantity

Unit

Rate

Amount

37.5

m3

54

2025

0.5

30

m3

81

2430

11.8

3.0

1057.5

m3

62

65565

3.0

0.3

27

m3

2085

56295

15.2(2503)

A-13

Furnishing&layingofthelivesodsofperennial
turfingforminggrassonembankmentslope,
vergesorotherlocationsshownonthedrawing
orasdirectedbytheengineeringincluding
preparationofgroundfetchingofrodsand
wateringetc.

3.22/307

U/Sside

30

5.08

152.33

m2

D/Sside

30

6.71

201.25

m2

353.58

m2
LS

Total
5

Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

24
500
TOTAL

8485.88
500
135300.9

A-14

DEOTARI
COSTESTIMATEFOREARTHENCHECKDAM
LENGTH
BREADTH
DEPTH
SOILSEPTH
LOWERBREADTH
(CONSIDERINGSLOPE2.5:1)
S.No.

Item
Earth work in excavation including
removing the spoil as directed up to a
distance of 100m including dressing,
cambering grading the surface etc all
completed as per direction.
Earthworkinfittingforcoreofembankmentby
headloadwithsoilofapprovedqualitywitha
leadupto30mandliftupto1.5minlayersnot
exceeding20cmthickincludingbreakingclods,
dressing,gradingtorequiredshapeand
compactingtomeetrequirementetc
Earthworkbyheadloadfittinginlayersnot
exceeding20cmthickincludingbreakingclods,
dressingandsectioningcamberingandramming
withinaleadupto30mandliftupto1.5m
includingpaymentoflandcompensationfor
obtainingearthetc.(b)&(c)extraleadbeyond
30mandextraliftforeach1.5m
Providingandlayingpitchingonslopeslaidin
wirecratesmadewith4mmdiaGI4826in
100mmx100mmmesh(Weaveddiagonally)
including10%extraforlapsandjointslaidwith
stoneboulders(weightingnotlessthan40Kg
each)

Terracon Ecotech Pvt.Ltd.Mumbai

30
8
3.0
0.6
21.5

m
m
m
m
m

COREWALLDIMENSIONS
TOPWIDTH
m
1
m
BOTTOMWID
3
HEIGHT
m
1

Length Breadth Depth/Thicknes Quantity

Unit

Rate

Amount

37.5

m3

54

2025

0.5

30

m3

81

2430

3.0

1327.5

m3

62

82305

No.

ItemNo.

3.1(301)

30

2.50

0.5

17.48

30

2.0

17.47/(II)

30

14.8

15.2(2503)

A-15

27

m3

5.08

152.33

m2

6.71

201.25

m2

353.58

m2
LS

30

3.0

30

30

U/Sside
Furnishing&layingofthelivesodsofperennial
turfingforminggrassonembankmentslope,
vergesorotherlocationsshownonthedrawing
orasdirectedbytheengineeringincluding
preparationofgroundfetchingofrodsand
wateringetc.

U/Sside
D/Sside

0.3

Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

56295

24
500
TOTAL

8485.88
500
152040.9

3.22/307

Total
5

2085

A-16

GELASUGAON
EARTHENCHECKDAM
LENGTH
BREADTH
DEPTH
SOILSEPTH
LOWERBREADTH
(CONSIDERINGSLOPE2.5:1)
S.No.

27
7.7
3.1
0.6
21.551

Item
Earth work in excavation including removing
the spoil as directed up to a distance of 100m
including dressing, cambering grading the
surface etc all completed as per direction.
Earthworkinfittingforcoreofembankmentby
headloadwithsoilofapprovedqualitywitha
leadupto30mandliftupto1.5minlayersnot
exceeding20cmthickincludingbreakingclods,
dressing,gradingtorequiredshapeand
compactingtomeetrequirementetc

Earthworkbyheadloadfittinginlayersnot
exceeding20cmthickincludingbreakingclods,
dressingandsectioningcamberingandramming
withinaleadupto30mandliftupto1.5m
includingpaymentoflandcompensationfor
obtainingearthetc.(b)&(c)extraleadbeyond
30mandextraliftforeach1.5m

m
m
m
m
m

COREWALLDIMENSIONS
TOPWIDTH
1
BOTTOMWIDTH
3
HEIGHT
1

No.

ItemNo.

Length

Breadth

Depth

Quantity

Unit

Rate

Amount

3.1(301)

27

2.50

0.5

33.75

m3

54

1822.5

17.48

27

2.0

0.5

27

81

2187

17.47/(II)

27

14.6

3.1

1215.4668

m3

62

75358.94179

27

3.1

0.3

24.9318

2085

51982.803

27
27

5.29
6.88

142.77
185.83

m
2
m

328.60

m
LS

24
500
TOTAL

7886.410046
500
139737.6548

Providingandlayingpitchingonslopeslaidinwire
cratesmadewith4mmdiaGI4826in100mmx
100mmmesh(Weaveddiagonally)including10%
extraforlapsandjointslaidwithstoneboulders
(weightingnotlessthan40Kgeach)

15.2(2503)

U/Sside
Furnishing&layingofthelivesodsofperennial
turfingforminggrassonembankmentslope,
vergesorotherlocationsshownonthedrawing
orasdirectedbytheengineeringincluding
preparationofgroundfetchingofrodsand
wateringetc.

U/Sside
D/Sside

1
1

Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

3.22/307

Total
5

m
m
m

A-17

GELASUGAON
EARTHENCHECKDAM

S.No.

LENGTH
BREADTH
DEPTH
SOILSEPTH
LOWERBREADTH
(CONSIDERINGSLOPE2.5:1)
Item
Earth work in excavation including removing
the spoil as directed up to a distance of 100m
including dressing, cambering grading the
surface etc all completed as per direction.
Earthworkinfittingforcoreofembankmentby
headloadwithsoilofapprovedqualitywitha
leadupto30mandliftupto1.5minlayersnot
exceeding20cmthickincludingbreakingclods,
dressing,gradingtorequiredshapeand
compactingtomeetrequirementetc

Earthworkbyheadloadfittinginlayersnot
exceeding20cmthickincludingbreakingclods,
dressingandsectioningcamberingandramming
withinaleadupto30mandliftupto1.5m
includingpaymentoflandcompensationfor
obtainingearthetc.(b)&(c)extraleadbeyond
30mandextraliftforeach1.5m

25
6
3.7
0.6
22.65

m
m
m
m
m

COREWALLDIMENSIONS
TOPWIDTH
1
BOTTOMWIDTH
3
HEIGHT
1

No.

ItemNo.

Length

Breadth

Depth

Quantity

Unit

Rate

Amount

3.1(301)

25

2.50

0.5

31.25

m3

54

1687.5

17.48

25

2.0

0.5

25

81

2025

17.47/(II)

25

14.3

3.7

1325.1

62

82153.875

25

3.7

0.3

27.75

2085

57858.75

25
25

6.96
8.27

174.06
206.84

m
2
m

380.90

m
LS

24
500
TOTAL

9141.60
500
153366.73

Providingandlayingpitchingonslopeslaidinwire
cratesmadewith4mmdiaGI4826in100mmx
100mmmesh(Weaveddiagonally)including10%
extraforlapsandjointslaidwithstoneboulders
(weightingnotlessthan40Kgeach)

15.2(2503)

U/Sside
Furnishing&layingofthelivesodsofperennial
turfingforminggrassonembankmentslope,
vergesorotherlocationsshownonthedrawing
orasdirectedbytheengineeringincluding
preparationofgroundfetchingofrodsand
wateringetc.

U/Sside
D/Sside

1
1

3.22/307

Total
5

Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

m
m
m

A-18

GELASUGAON
EARTHENCHECKDAM
LENGTH
BREADTH
DEPTH
SOILSEPTH
LOWERBREADTH
(CONSIDERINGSLOPE2.5:1)
S.No.

Item
Earth work in excavation including removing
the spoil as directed up to a distance of 100m
including dressing, cambering grading the
surface etc all completed as per direction.
Earthworkinfittingforcoreofembankmentby
headloadwithsoilofapprovedqualitywitha
leadupto30mandliftupto1.5minlayersnot
exceeding20cmthickincludingbreakingclods,
dressing,gradingtorequiredshapeand
compactingtomeetrequirementetc

Earthworkbyheadloadfittinginlayersnot
exceeding20cmthickincludingbreakingclods,
dressingandsectioningcamberingandramming
withinaleadupto30mandliftupto1.5m
includingpaymentoflandcompensationfor
obtainingearthetc.(b)&(c)extraleadbeyond
30mandextraliftforeach1.5m
Providingandlayingpitchingonslopeslaidin
wirecratesmadewith4mmdiaGI4826in
100mmx100mmmesh(Weaveddiagonally)
including10%extraforlapsandjointslaidwith
stoneboulders(weightingnotlessthan40Kg
each)
U/Sside
Furnishing&layingofthelivesodsofperennial
turfingforminggrassonembankmentslope,
vergesorotherlocationsshownonthedrawing
orasdirectedbytheengineeringincluding
preparationofgroundfetchingofrodsand
wateringetc.

Terracon Ecotech Pvt.Ltd.Mumbai

27
7.7
3.1
0.6
21.551

m
m
m
m
m

COREWALLDIMENSIONS
TOPWIDTH
1
BOTTOMWIDTH
3
HEIGHT
1

m
m
m

No.

ItemNo.

Length

Breadth

Depth

Quantity

Unit

Rate

Amount

3.1(301)

27

2.50

0.5

33.75

m3

54

1822.5

17.48

27

2.0

0.5

27

m3

81

2187

17.47/(II)

27

14.6

3.1

1215.4668

m3

62

75358.94179

27

3.1

0.3

24.9318

m3

2085

51982.803

15.2(2503)

3.22/307

A-19

U/Sside
D/Sside

1
1

27
27

5.29
6.88
Total

Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

142.77
185.83

m2
m2

328.60

m2
LS

24
500
TOTAL

7886.410046
500
139737.6548

A-20

GELASUGAON
EARTHENCHECKDAM
LENGTH
BREADTH
DEPTH
SOILSEPTH
LOWERBREADTH
(CONSIDERINGSLOPE2.5:1)
S.No.

25
6
3.7
0.6
22.65

Item
Earth work in excavation including removing
the spoil as directed up to a distance of 100m
including dressing, cambering grading the
surface etc all completed as per direction.
Earthworkinfittingforcoreofembankmentby
headloadwithsoilofapprovedqualitywitha
leadupto30mandliftupto1.5minlayersnot
exceeding20cmthickincludingbreakingclods,
dressing,gradingtorequiredshapeand
compactingtomeetrequirementetc

Earthworkbyheadloadfittinginlayersnot
exceeding20cmthickincludingbreakingclods,
dressingandsectioningcamberingandramming
withinaleadupto30mandliftupto1.5m
includingpaymentoflandcompensationfor
obtainingearthetc.(b)&(c)extraleadbeyond
30mandextraliftforeach1.5m

Terracon Ecotech Pvt.Ltd.Mumbai

COREWALLDIMENSIONS
TOPWIDTH
1
BOTTOMWIDTH
3
HEIGHT
1

m
m
m

No.

ItemNo.

Length

Breadth

Depth

Quantity

Unit

Rate

Amount

3.1(301)

25

2.50

0.5

31.25

m3

54

1687.5

17.48

25

2.0

0.5

25

m3

81

2025

17.47/(II)

25

14.3

3.7

1325.1

m3

62

82153.875

25

3.7

0.3

27.75

m3

2085

57858.75

Providingandlayingpitchingonslopeslaidin
wirecratesmadewith4mmdiaGI4826in
100mmx100mmmesh(Weaveddiagonally)
including10%extraforlapsandjointslaidwith
stoneboulders(weightingnotlessthan40Kg
each)
U/Sside

m
m
m
m
m

15.2(2503)

A-21

Furnishing&layingofthelivesodsofperennial
turfingforminggrassonembankmentslope,
vergesorotherlocationsshownonthedrawing
orasdirectedbytheengineeringincluding
preparationofgroundfetchingofrodsand
wateringetc.

3.22/307

U/Sside

25

6.96

174.06

m2

D/Sside

25

8.27

206.84

m2

380.90

m2
LS

Total
5

Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

24
500
TOTAL

9141.60
500
153366.73

A-22

KUMARSALI(PATHAR)
SURFACEPOND
TOPLENGTH

Sr.No.

2
3

10

BOTTOMLENGTH

TOPWIDTH

10

BOTTOMWIDTH

20

DEPTH

3.048

SLANTHEIGHT

4.31

AVG.LENGTH
9
m
AVG.WIDTH
15
m
DescriptionOfItem
ItemNo. Depth
Earthworkinexcavationincluding
removingthespoilasdirectedfor
3.1
excavatedponduptoadistanceof100m
3.048
(301)(b)
includingdressing,cambering,gradingthe
surfaceetcall
Plantingoftreesintheembankments4
Nos.ineachembankment
Costofsignboard,publicityetc.

Area

Quantity

Unit

Rate

Amount

136.67

416.56

cum.

54

22494.24

16

nos.

300

4800

LS

500
TOTAL

500
27794.24

Depth

Quantity

Rate

KUMARSALI(PATHAR)
DRAINCLEANING

No.

DRAINDIMENSIONS
LENGTH
BOTTOMWIDTH
HEIGHT
TOPWIDTH

800
4
1
6

Description

Item

Terracon Ecotech Pvt.Ltd.Mumbai

m
m
m
m
No.

Length

Breadth

unit

Amount

A-23

Excavationinordinarysoilbyheadload
infillingthebankofpondwithalllift
1.5mandleadupto100min
3.1/301(a)
accordancewithrequirementlinesand
crosssection.

Terracon Ecotech Pvt.Ltd.Mumbai

800

0.5

2000

99

cum

198000

TOTAL

198000

A-24

KUMARSALI
COSTESTIMATEFOREARTHENCHECKDAM

S.No.
1

LENGTH
BREADTH
DEPTH
SOILSEPTH
LOWERBREADTH
(CONSIDERINGSLOPE2.5:1)

30
8
3.0
0.6
21.5

Item
Earth work in excavation including removing the spoil as
directed up to a distance of 100m including dressing,
cambering grading the surface etc all completed as per
direction.

No.

ItemNo.

Length

Breadth

Depth

Quantity

Unit

Rate

Amount

3.1(301)

30

2.50

0.5

37.5

m3

54

2025

17.48

30

2.0

0.5

30

m3

81

2430

17.47/(II)

30

14.8

3.0

1327.5

m3

62

82305

30

3.0

0.3

27

m3

2085

56295

30
30

5.08
6.71
Total

152.33
201.25
353.58

m2
m2
m2
LS

24
500
TOTAL

8485.88
500
152040.88

Earthworkinfittingforcoreofembankmentbyheadloadwithsoil
ofapprovedqualitywithaleadupto30mandliftupto1.5min
layersnotexceeding20cmthickincludingbreakingclods,dressing,
gradingtorequiredshapeandcompactingtomeetrequirementetc

m
m
m
m
m

COREWALLDIMENSIONS
TOPWIDTH
1
BOTTOMWIDTH
3
HEIGHT
1

m
m
m

Earthworkbyheadloadfittinginlayersnotexceeding20cmthick
includingbreakingclods,dressingandsectioningcamberingand
rammingwithinaleadupto30mandliftupto1.5mincluding
paymentoflandcompensationforobtainingearthetc.(b)&(c)
extraleadbeyond30mandextraliftforeach1.5m
Providingandlayingpitchingonslopeslaidinwirecratesmadewith
4mmdiaGI4826in100mmx100mmmesh(Weaveddiagonally)
including10%extraforlapsandjointslaidwithstoneboulders
(weightingnotlessthan40Kgeach)
U/Sside
Furnishing&layingofthelivesodsofperennialturfingforminggrass
onembankmentslope,vergesorotherlocationsshownonthe
drawingorasdirectedbytheengineeringincludingpreparationof
groundfetchingofrodsandwateringetc.
U/Sside
D/Sside

Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

15.2(2503)
1

3.22/307
1
1

A-25

KUMARSALI
OPENWELL
DIAMETER
DEPTH
Sr.No. DescriptionOfItem

Sitepreparationincludinguprootingwildvegetation,grass,bushes
andshrubs,removalofrubbishanddisposalofunserviceable
materials.
i)ByManualMeans
A)Inareaofnonthornyjungle

Earthworkinexcavationforfoundationetc.includingbailingout
waterwherenecessaryasdirectedandspecifieduptoadepthof
5.00m(i)Inhard/densesoil

Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

10 m
20 m
Item
No.

Length

Breadth

Depth

Quantity

Unit

LS

1.1(b)

78.5

20

L.S.

1570

cu.m

Rate

Amount

550

550

82.03

128787

500
TOTAL

500
129837

A-26

CHOTOLATONGURI 1
SURFACE POND

Sr. No.

TOP LENGTH
36.52
BOTTOM LENGTH
30.424
TOP WIDTH
36.52
BOTTOM WIDTH
30.424
DEPTH
3.048
SLANT HEIGHT
4.311
AVG. LENGTH
33.472
AVG. WIDTH
33.472
Description Of Item
Item No.
Earth work in excavation
including removing the spoil as
directed for excavated pondup to
3.1
a distance of 100m including
(301)(b)
dressing , cambering, grading the
surface etc all

m
m
m
m
m
m
m
m

Considering slope of pond 1:1

Depth

3.048

Area

Quantity

Unit

Rate

Amount

1117.278 3405.463

cum.

54

183895

Planting of trees in the


embankments 4 Nos. in each
embankment

16

nos.

300

4800

Cost of signboard, publicity etc.

LS

500

500

TOTAL

189195

Terracon Ecotech Pvt.Ltd.Mumbai

A-27

MALIPARA2
BOULDERPITCHING
LENGTH
BREADTH
DEPTH
SOILDEPTH
S.No.
1
2

100
3
3.0
0.6

Item
Easingofbankforboulderpitching

Providingandlayingofsandgravelas
filtermediabelowpitching
Providing&layingbouldersapronon
riverbedforprotectionagainstscour
withstoneboulders
weighingnotlessthan40KGeach
completeasperdrawingand
technicalspecification.

m
m
m
m

Itemno.

No.

Length

Breadth

Depth

Quantity

Unit

Rate

Amount

3.1(301)(b)

100

1.20

360

cum

54

19440

15.5/2504

100

2.9

0.1

28.87

cum

1263

36459.67

1
1
1

100
100
100

2.9
0.75
2

0.3
1
0.45

86.60
75
90
251.60

cum
cum
cum
cum

15.1/2403

Forslopingbank
Fornoseportion
Forriverbankportion

Total

Terracon Ecotech Pvt.Ltd.Mumbai

1154
TOTAL

290349.3316
346249.0011

A-28

MALIPARA2
BOULDERPITCHING
LENGTH
BREADTH
DEPTH
SOILDEPTH
S.No.
1
2

60
3
2.0
0.6
Item

Easingofbankforboulderpitching
Providingandlayingofsandgravelas
filtermediabelowpitching

m
m
m
m

Itemno.

No.

Length

Breadth

Depth

Quantity

Unit

Rate

3.1(301)(b)

60

0.87

104.00

cum

54

15.5/2504

60

1.7

0.1

10.39

cum

1263

Amount
5616

13125.48

Providing&layingbouldersapronon
riverbedforprotectionagainstscour
withstoneboulders
weighingnotlessthan40KGeach
completeasperdrawingand
technicalspecification.
Forslopingbank
Fornoseportion
Forriverbankportion

15.1/2403

Terracon Ecotech Pvt.Ltd.Mumbai

1
1
1

60
60
60

1.7
0.75
2

0.3
1
0.45
Total

31.18
45
54
130.18

cum
cum
cum
cum

1154
TOTAL

150224.1594
168965.6404

A-29

MALIPARA2
EARTHBANDHREPAIRING
BANDHDIMENSIONS
LENGTH
BREADTH
HEIGHT
SLANTHEIGHT
BOTTOMWIDTH
Sr.No.

DescriptionOfItem

35
2.13
1.22
1.73
4.57

IDEALDIMENSIONS
TOPWIDTH
BOTTOMWIDTH
HEIGHT
SLANTHEIGHT

m
m
m
m
m

ItemNo.

Length

Breadth

Siteclearance

2.2/201

35

2.13

Earthworkinexcavationincluding
removingtheuptoadistanceof
100mincludingdressing,cambering
gradingthesurfaceetcallcompleted
asperdirection.

3.1(301)

35

3.35

deduct12.5%shrinkage
TOTAL

Furnishing&layingofthelivesodsof
perennialturfingforminggrasson
embankmentslope,vergesorother
locationspreparationofground
fetchingofrodsandwateringetc.on
thedrawingorasdirectedbythe
engineeringincludingshown

3.22/307

CONSIDERINGREPAIRINGCOST=1/3rdofCONSTRUCTIONCOST

Terracon Ecotech Pvt.Ltd.Mumbai

35

1.73

Depth

1.22

1
3
1
1.4

m
m
m
m

Quantity

Unit

RateinRs.

Amount

74.55

Sq.m.

0.72

53.676

143.05

cu.m

17.88
125.16

cum
cu.m

54

6758.88

60.39

sq.m

24

1449.29

TOTAL
HENCEREPAIRINGCOST=Rs.

8261.8383
2754

A-30

MALIPARA2
OPENWELL

DIAMETER
DEPTH
Sr.No.

DescriptionOfItem

10 m
20 m
ItemNo.

Length

Breadth

Sitepreparationincludinguprooting
wildvegetation,grass,bushes
andshrubs,removalofrubbishand
disposalofunserviceablematerials.

Depth

Quantity

Unit

LS

Rate

Amount

550

550

82.03

128787.1

500

500

TOTAL

129837.1

i)ByManualMeans
A)Inareaofnonthornyjungle

Earthworkinexcavationfor
foundationetc.includingbailingout
waterwherenecessaryasdirected
andspecifieduptoadepthof5.00m
(i)Inhard/densesoil

Costofsignboard,publicityetc.

Terracon Ecotech Pvt.Ltd.Mumbai

1.1(b)

78.5

20

L.S.

1570

cu.m

A-31

BANDHDIMENSIONS
LENGTH
BREADTH
HEIGHT
SLANTHEIGHT
BOTTOMWIDTH
Sr.No.
1

DescriptionOfItem

600
3
2
2.83
7
ItemNo.

Siteclearance
2.2/201
Earthworkinexcavationincluding
removingtheuptoadistanceof100m
includingdressing,camber8Tj

/C2 _11Tf3.68including

m
m
m
m
m
Length

Breadth

600

Depth

Quantity

Unit

1800

Sq.m.

Ratein
Rs.
0.72

Amount
1296

SUBAIJHAR
COSTESTIMATEFOREARTHENCHECKDAM
LENGTH
BREADTH
DEPTH
SOILSEPTH
LOWERBREADTH
(CONSIDERINGSLOPE2.5:1)
S.No.

20
6.15
4.0
0.6
24.15

Item
Earth work in excavation including removing the
spoil as directed up to a distance of 100m
including dressing, cambering grading the
surface etc all completed as per direction.
Earthworkinfittingforcoreofembankmentbyhead
loadwithsoilofapprovedqualitywithaleadupto
30mandliftupto1.5minlayersnotexceeding20cm
thickincludingbreakingclods,dressing,gradingto
requiredshapeandcompactingtomeetrequirement
etc

Earthworkbyheadloadfittinginlayersnot
exceeding20cmthickincludingbreakingclods,
dressingandsectioningcamberingandramming
withinaleadupto30mandliftupto1.5mincluding
paymentoflandcompensationforobtainingearth
etc.(b)&(c)extraleadbeyond30mandextraliftfor
each1.5m
Providingandlayingpitchingonslopeslaidinwire
cratesmadewith4mmdiaGI4826in100mmx
100mmmesh(Weaveddiagonally)including10%
extraforlapsandjointslaidwithstoneboulders
(weightingnotlessthan40Kgeach)

ItemNo.

Length

Breadth

Depth

Quantity

Unit

3.1(301)

20

2.50

0.5

25

17.48

20

2.0

0.5

17.47/(II)

20

15.2

20

4.0

20
20

7.77
8.94

m
m
m

Rate

Amount

54

1350

20

m3

81

1620

4.0

1212

62

75144

0.3

24

m3

2085

50040

Total

155.41
178.89
334.29

m2
2
m
2
m
LS

24
500
TOTAL

8023.008732
500
136677.0087

15.2(2503)

U/Sside
D/Sside

1
1

Terracon Ecotech Pvt.Ltd.Mumbai

COREWALLDIMENSIONS
TOPWIDTH
1
BOTTOMWIDTH
3
HEIGHT
1

No.

U/Sside
Furnishing&layingofthelivesodsofperennial
turfingforminggrassonembankmentslope,verges
orotherlocationsshownonthedrawingoras
directedbytheengineeringincludingpreparationof
groundfetchingofrodsandwateringetc.

Costofsignboard,publicityetc.

m
m
m
m
m

3.22/307

A-33

SUBAIJHAR
BOULDERPITCHING
LENGTH
BREADTH
DEPTH
SOILDEPTH
S.No.
1
2

30
2.5
2.0
0.6

Item
Itemno.
Easingofbankforboulderpitching
3.1(301)(b)
Providingandlayingofsandgravelasfiltermedia
15.5/2504
belowpitching
Providing&layingbouldersaprononriverbedfor
protectionagainstscourwithstoneboulders
15.1/2403
weighingnotlessthan40KGeachcompleteasper
drawingandtechnicalspecification.
Forslopingbank
Fornoseportion
Forriverbankportion

Terracon Ecotech Pvt.Ltd.Mumbai

m
m
m
m
No.
1

Length
30

Breadth
0.87

Depth
2

Quantity
52

Unit
cum

Rate
54

Amount
2808

30

1.7

0.1

5.20

cum

1263

6562.74051

1
1
1

30
30
30

1.7
0.75
2

0.3
1
0.45
Total

15.59
22.5
27
65.09

cum
cum
cum
cum

1154
TOTAL

75112.07969
84482.8202

A-34

SUBAIJHAR
BANDHREPARING
BANDHDIMENSIONS
LENGTH
BREADTH
HEIGHT
SLANTHEIGHT
BOTTOMWIDTH
Sr.No.
1

DescriptionOfItem
Siteclearance
Earthworkinexcavationincludingremovingtheup
toadistanceof100mincludingdressing,cambering
gradingthesurfaceetcallcompletedasper
direction.
deduct12.5%shrinkage
TOTAL
Furnishing&layingofthelivesodsofperennial
turfingforminggrassonembankmentslope,verges
orotherlocationspreparationofgroundfetchingof
rodsandwateringetc.onthedrawingorasdirected
bytheengineeringincludingshown

800
2.14
1.22
1.73
4.58

m
m
m
m
m

ItemNo.
2.2/201

Length
800

Breadth
2.14

Depth

Quantity
1712

Unit
Sq.m.

3.1(301)

800

3.36

1.22

3279.36

cu.m

409.92
2869.44

1380.27

3.22/307

800

1.73

RateinRs.
0.72

Amount
1232.64

cum
cu.m

54

154949.76

sq.m

24

33126.53849

Total
CONSIDERINGREPAIRINGCOST=1/3rdofCONSTRUCTIONCOST

Terracon Ecotech Pvt.Ltd.Mumbai

HENCEREPAIRINGCOST=Rs.

189308.9385
63103

A-35

No.2 UTTARPARA
DRAIN CLEANING

No.

CHANNEL DIMENSIONS
LENGTH
BOTTOM WIDTH
HEIGHT
TOP WIDTH

700
2.5
1
6.5

Description

Item

No.

Length

Breadth

Depth

Quantity

Rate

unit

Amount

3.1/301(a)

700

4.5

0.5

1575

99

cum

155925

TOTAL

155925

Excavation in ordinary soil by


head load in filling the bank of
pond with all lift 1.5m and lead
up to 100m in accordance with
requirement lines and cross
section.

m
m
m
m

No.2 UTTARPARA
EARTH BANDH REPAIRING
BANDH DIMENSIONS
LENGTH
BREADTH
HEIGHT
SLANT HEIGHT
BOTTOM WIDTH
Sr. No.
1

Description Of Item

100
2.13
1.22
1.73
4.57
Item No.

Site clearance
2.2/201
Earth work in excavation including
removing the up to a distance of
100m including dressing, cambering
3.1 (301)
gradingthe surface etc all
completed as per direction.
deduct 12.5% shrinkage

Terracon Ecotech Pvt.Ltd.Mumbai

m
m
m
m
m
Length

Breadth

100

2.13

100

3.35

Depth

1.22

Quantity

Unit

213

Sq.m.

408.7

cu.m

51.09

cum

Rate in
Rs.
0.72

Amount
153.36

A-36

TOTAL
Furnishing & laying of the live sods
of perennial turfing forming grass
on embankment slope, verges or
other locations preparation of
ground fetching of rods and
watering etc.on the drawing or as
directed by the engineering
including shown

3.22/307

100

CONSIDERING REPAIRING COST = 1/3rd of CONSTRUCTION COST

Terracon Ecotech Pvt.Ltd.Mumbai

1.73

357.6125

cu.m

54

19311.08

172.53

sq. m

24

4140.82

TOTAL

23605.25

HENCE REPAIRING COST = Rs.

7868

A-37

ANNEXURE B
MICRO-WATERSHEDWISE ACTION PLAN-PRODUCTION & MICROENTERPRISE
Name of the Micro-Watershed
Village

Kumarsali Pathar

Kumarsali

Chotoladanguri No.1

Poultry
Fruit Processing Unit
Vermi Compost
Fruit Processing Unit
Poultry
Supari Processing Unit (Individual)
Fish Pond Development (Pisiculture)
Crop Demonstration Vegetable
Poultry

Name of the Micro-Watershed


Village

Chotoladanguri No.2

Dimajhora

Boroladanguri No.1

Terracon Ecotech Pvt.Ltd.Mumbai

Activities

Activities

Poultry
Rice Processing Unit (Individual)
Rice Processing Unit (Individual)
Duck Rearing Scheme
Poultry
Bee Keeping
Crop Demonstration Rice
Fish Pond Development (Pisiculture)
Vermi Compost
Poultry

Unit

Unit Cost
(Rs.)

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Area (ha)

10000
50000
9500
50000
10000
63000
450000
24750
10000

Area (ha)
Nos.

Unit

Unit Cost
(Rs.)

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Area (ha)
Area (ha)
Nos.
Nos.

10000
95000
95000
12000
10000
20000
16100
450000
9500
10000

Kumarsali MWS
Phy (No)
Fin (Rs.)

1
1
1
1
1
1
0.266
1
2

10000
50000
9500
50000
10000
63000
119700
24750
20000

Ladanguri MWS
Phy (No)
Fin (Rs.)

2
1
1
2
1
2
0.5
0.1995
2
2

20000
95000
95000
24000
10000
40000
8050
89775
19000
20000

Year of Implementation
1st/2nd/3rd/4th/5th
Year
4th Year
3rd Year
5th Year
3rd Year
4th Year
5th Year
5th Year
2nd Year
4th Year

Year of Implementation
1st/2nd/3rd/4th/5th
Year
4th Year
5th Year
5th Year
5th Year
4th Year
5th Year
2nd Year
5th Year
5th Year
4th Year

B-1

Name of the Micro-Watershed


Village

Uttarpara No.1
Uttarpara No.2

Rice Processing Unit (Individual)


Vermi Compost
Supari Processing Unit (Individual)
Vermi Compost

Name of the Micro-Watershed


Village

Deotori

Saraikhusra

Betnapara

Golapara

Katuribari

Terracon Ecotech Pvt.Ltd.Mumbai

Activities

Activities

Fish Pond Development (Pisiculture)


Supari Processing Unit (Individual)
Fruit Processing Unit
Eri Rearing House
Vermi Compost
Poultry
Duck Rearing Scheme
Fish Pond Development (Pisiculture)
Supari Processing Unit (Individual)
Piggery
Aggroforestry
Fruit Processing Unit
Supari Processing Unit (Individual)
Eri Rearing House
Crop Demonstration Vegetable
Fish Pond Development (Pisiculture)
Rice Processing Unit (Individual)
Crop Demonstration Vegetable
Eri food plant with supply of Start Up tools

Unit

Unit Cost
(Rs.)

Nos.
Nos.
Nos.
Nos.

95000
9500
63000
9500

Unit

Unit Cost
(Rs.)

Area (ha)
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Area (ha)
Nos.
Nos.
Area (ha)
Nos.
Nos.
Nos.
Area (ha)
Area (ha)
Nos.
Area (ha)
Nos.

450000
63000
50000
81000
9500
10000
12000
450000
63000
100000
116000
50000
63000
81000
24750
450000
95000
24750
30000

Uttarpara MWS
Phy (No)
Fin (Rs.)

1
1
1
1

95000
9500
63000
9500

Deotari MWS
Phy (No)
Fin (Rs.)

0.3325
1
1
1
2
1
1
0.133
1
1
0.5
1
1
1
1
0.133
1
0.133
1

149625
63000
50000
81000
19000
10000
12000
59850
63000
100000
58000
50000
63000
81000
24750
59850
95000
3291.75
30000

Year of Implementation
1st/2nd/3rd/4th/5th
Year
5th Year
5th Year
5th Year
5th Year

Year of Implementation
1st/2nd/3rd/4th/5th
Year
5th Year
5th Year
3rd Year
5th Year
5th Year
4th Year
5th Year
5th Year
5th Year
5th Year
3rd Year
3rd Year
5th Year
5th Year
2nd Year
5th Year
5th Year
2nd Year
5th Year

B-2

Name of the Micro-Watershed


Village

Dagarpara No.1

Dagarpara No.2

Subaijhar

Malipara

Silbari

Monakosha

Bashbari Ambari 1

Terracon Ecotech Pvt.Ltd.Mumbai

Activities

Supari Processing Unit (Individual)


Piggery
Poultry
Crop Demonstration Vegetable
Poultry
Vermi Compost
Supari Processing Unit (Individual)
Rice Processing Unit (Individual)
Crop Demonstration Vegetable
Piggery
Aggroforestry
Poultry
Crop Demonstration Rice
Bee Keeping
Vermi Compost
Fish Pond Development (Pisiculture)
Supari Processing Unit (Individual)
Vermi Compost
Fruit Processing Unit
Supari Processing Unit (Individual)
Vermi Compost
Poultry
Muga food plant with supply of farming tools
Supari Processing Unit (Individual)
Vermi Compost
Poultry
Fish Pond Development (Pisiculture)

Unit

Unit Cost
(Rs.)

Nos.
Nos.
Nos.
Area (ha)
Nos.
Nos.
Nos.
Nos.
Area (ha)
Nos.
Area (ha)
Nos.
Area (ha)
Nos.
Nos.
Area (ha)
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Area (ha)

63000
100000
10000
24750
10000
9500
63000
95000
24750
100000
116000
10000
16100
20000
9500
450000
63000
9500
50000
63000
9500
10000
36000
63000
9500
10000
450000

Dagarpara MWS
Phy (No)
Fin (Rs.)

1
1
3
1.862
2
1
1
1
1
1
0.5
1
1
2
2
0.266
1
2
1
1
4
2
1
1
2
1
0.133

63000
100000
30000
46084.5
20000
9500
63000
95000
24750
100000
58000
10000
16100
40000
19000
119700
63000
19000
50000
63000
38000
20000
36000
63000
19000
10000
59850

Year of Implementation
1st/2nd/3rd/4th/5th
Year
5th Year
5th Year
4th Year
2nd Year
4th Year
5th Year
5th Year
5th Year
2nd Year
5th Year
3rd Year
4th Year
2nd Year
2nd Year
5th Year
5th Year
5th Year
5th Year
3rd Year
5th Year
5th Year
4th Year
5th Year
5th Year
5th Year
4th Year
5th Year

B-3

Name of the Micro-Watershed


Village

Gelasugaon

Majrabari

Chorapat No.1

Terracon Ecotech Pvt.Ltd.Mumbai

Activities

Fish Pond Development (Pisiculture)


Rice Processing Unit (Individual)
Muga food plant with supply of farming tools
Poultry
Vermi Compost
Muga food plant with supply of farming tools
Rice Processing Unit (Individual)
Fruit Processing Unit
Poultry
Horticulture nursery

Unit

Unit Cost
(Rs.)

Area (ha)
Nos.

450000
95000

Nos.

36000

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

10000
9500
36000
95000
50000
10000

Area (ha)

358000

Amguri MWS
Phy (No)
Fin (Rs.)

0.133
1
1
1
2
1
1
1
1
0.133

59850
95000
36000
10000
19000
36000
95000
50000
10000
47614

Year of Implementation
1st/2nd/3rd/4th/5th
Year
5th Year
5th Year
5th Year
4th Year
5th Year
5th Year
5th Year
3rd Year
4th Year
5th Year

B-4

ANNEXURE C
MICRO-WATERSHEDWISE ACTION PLAN-LIVELIHOOD ACTIVITIES
Name of the Micro-Watershed
Village

Kumarsali Pathar

Kumarsali

Chotoladanguri No.1

Bee Keeping
Establishment of Goat Farming
Carpentry
Cycle Repairing
Handloom and Weaving
Bee Keeping
Rural Backyard Poultry Rearing
Handloom and Weaving
Mat / Jute/ Pati Making

Name of the Micro-Watershed


Village

Chotoladanguri No.2

Dimajhora
Boroladanguri No.1

Terracon Ecotech Pvt.Ltd.Mumbai

Activities

Activities

Bamboo Craft
Duck Rearing Scheme
Bee Keeping
Wood Craft making
Mat / Jute/ Pati Making
Rural Backyard Poultry Rearing
Cycle Repairing
Bamboo Craft

Unit

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

Unit

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

Kumarsali MWS
Unit Cost Phy (No) Fin (Rs.)
(Rs.)

20000
25000
24000
40000
50000
20000
10000
50000
50000

1
1
1
1
1
1
2
1
1

20000
25000
24000
40000
50000
20000
20000
50000
50000

Ladanguri MWS
Unit Cost Phy (No) Fin (Rs.)
(Rs.)

75000
12000
20000
75000
50000
10000
40000
75000

1
1
1
1
1
1
1
1

75000
12000
20000
75000
50000
10000
40000
75000

Year of
Implementation
1st/2nd/3rd/4th/5th
Year
2nd Year
2nd Year
3rd Year
3rd Year
4th Year
2nd Year
3rd Year
4th Year
4th Year

Year of
Implementation
1st/2nd/3rd/4th/5th
Year
3rd Year
2nd Year
2nd Year
5th Year
4th Year
3rd Year
3rd Year
3rd Year

C-1

Name of the Micro-Watershed


Village

Uttarpara No.1

Uttarpara No.2

Carpentry
Handloom and Weaving
Mobile repairing
Carpentry
Rural Backyard Poultry Rearing
Mobile repairing

Name of the Micro-Watershed


Village

Deotori

Saraikhusra

Betnapara

Golapara

Katuribari

Terracon Ecotech Pvt.Ltd.Mumbai

Activities

Activities

Cycle Repairing
Wood Craft making
Handloom and Weaving
Bee Keeping
Bamboo Craft
Bee Keeping
Duck Rearing Scheme
Bamboo Craft
Pottery
Goat Farming
Fruit Processing Unit
Mat / Jute/ Pati Making
Bamboo Craft
Handloom and Weaving
Cycle Repairing
Bamboo Craft
Handloom and Weaving
Fruit Processing Unit
Duck rearing scheme

Unit

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

Unit

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

Uttarpara MWS
Unit Cost Phy (No) Fin (Rs.)
(Rs.)

24000
50000
30000
24000
10000
30000

1
1
1
1
1
1

24000
50000
30000
24000
10000
30000

Deotari MWS
Unit Cost Phy (No) Fin (Rs.)
(Rs.)

40000
75000
50000
20000
75000
20000
12000
75000
75000
25000
50000
50000
75000
50000
40000
75000
50000
50000
12000

1
1
2
1
1
1
2
1
1
2
2
1
1
1
1
1
1
1
1

40000
75000
100000
20000
75000
20000
24000
75000
75000
50000
100000
50000
75000
50000
40000
75000
50000
50000
12000

Year of
Implementation
1st/2nd/3rd/4th/5th
Year
3rd Year
4th Year
4th Year
3rd Year
3rd Year
4th Year

Year of
Implementation
1st/2nd/3rd/4th/5th
Year
3rd Year
5th Year
4th Year
2nd Year
3rd Year
2nd Year
2nd Year
3rd Year
5th Year
2nd Year
3rd Year
4th Year
3rd Year
4th Year
3rd Year
3rd Year
4th Year
3rd Year
2nd Year

C-2

Name of the Micro-Watershed


Village

Gelasugaon
Majrabari
Chorapat No.1

Terracon Ecotech Pvt.Ltd.Mumbai

Activities

Wood Craft making


Fruit Processing Unit
Bamboo Craft
Mat / Jute/ Pati Making
Goat Farming
Handloom and Weaving
Wood Craft making
Carpentry

Unit

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

Amguri MWS
Unit Cost Phy (No) Fin (Rs.)
(Rs.)

75000
50000
75000
50000
25000
50000
75000
24000

1
1
1
1
1
1
1
1

75000
50000
75000
50000
25000
50000
75000
24000

Year of
Implementation
1st/2nd/3rd/4th/5th
Year
5th Year
3rd Year
3rd Year
4th Year
2nd Year
4th Year
5th Year
3rd Year

C-4

You might also like