You are on page 1of 6

MAPUA INSTITUTE OF TECHNOLOGY

INTRAMUROS, MANILA

PROPER ALLOCATION OF WASTE


FROM CONSTRUCTION COMPANIES
WITHIN
METRO MANILA

RES100-4/ A1
GROUP 3
CORDANO, HAZEL F.
SEGAYA, KORINA
ZHUANG,YANGSI

METHODOLOGY
This case study provides a review of the waste performance that should been take place
when each work could be a long or short term project. As for this financial sustainment
may require the affected areas may involve amount of money and time but it could be a
data that provides new feedback for the companies and government assessment
strategies
Research Questions:
Are the Companies in the Construction aware for the environment and human
structure (YES or No)?
Is there instances where the government and the companies on the construction
could rather be possible to sustain adequate facilities for the environment and
human resources issues (Yes or No)?
Have you ever went to a construction site? Or visit construction site?
Are you aware when the waste being discharge from the site?
Are you aware where those waste go after being discharge by the site?
What are the effects of those waste to the surrounding in the site?
Participants
The participants involve in this survey was the garbage collector, the people near to the
places of the construction site, the people in the dump site and any personnel in the
construction who were obliged to answer appropriate action for this problem. This
people are aware for knowing this kind of situation, means they were able to answer the
question in a proper way and reliable to the main source of this research. From the
survey, we have consist of a garbage collector of 25, then for the near to the people in
the construction of 47, people from the dump site of 79 and the personnel of 12. It was
conducted to present how they were notified for the possibilities could be encounter
from the waste production that the effects might be putting up to be lower or higher risk
having new allocation of garbage preventing the accumulation of waste or a disapproval
on garbage crisis.
We have this study to show the possible effects that the Metro Manila has been faced
through years were every time as it goes, the waste of the people was guarantee as the
development of destruction. In this way we can inform the people within these cities to
analyse the possibilities which require communication.

Waste Accumulation

11%

1st Qtr
2nd Qtr

41%

3rd Qtr

28%

4th Qtr

20%

DATA ANALYSIS (TRUE COST OF WASTE) IN METRO MANILA


This data is not just as the cost of paying from a waste contractor to remove a skip from
site but a combination of the cost that are generally inform to paid on the client. This
includes the material and the labour cost expense. Most contractors are often to
underestimate the real cost of waste on a project that they are handling which it is not
in explicit cost, but a cost to build every trade package that covers traditional waste
rates.

P U RC H A S E C O S T
( D E L IV E R E D
W A S T E M AT E R I A L
CO ST O F WASTE
( T R E AT M E N T , S T O R A G E
D IS P O S A L )

AND

LO S S O F P R O D U C T IO N
( S A LVA G E O R N O T
R E C YC L I N G )
L ABO UR AND
R E P U TAT I O N C O S T

DATA PROCESS
In our data, we have gathered an information introducing operation that enables to
create an information, education and campaign for every people. This conducted to
view the effects of the waste which its possibilities must be cover up from the
management of the company especially to toxic components and solid materials. All the
participants to the construction must have an important role to reduce the waste from
the construction site. It provides useful guidance on how actively to reduce the waste
project or campaign in respective areas focusing who procure and use the materials. We
ask persons based on our discussion by the group until came up with one decision for
who will be the person to be ask by these following questions primarily the people that
was affected from these problem near to the construction companies sites.

DESIGN STUDY

CLEAN
RESPONSIBILITY
DISCIPLINE
INNOVATIVE

DIRT

ABSENCE
SLOW-COMMUNICATION
UNSEPARATION
INAPPROPRIATE
DISTRIBUTION

THE PERFORMANCE OF THE PEOPLE WITHIN METRO MANILA WITH THEIR SPECIFIC
ATTITUDE DUE TO ITS PROCESS CONCERNING CONNECTION FOR THE CONSTRUCTION
AREAS

CONCEPTUAL FRAMEWORK
STRUCTURE FOR CREATING A PROPER
ALLOCATION OF WASTE IN CONSTRUCTION
COMPANIES WITHIN METRO MANILA

OPERATIO
N

SERVICES

PRACTICES
IMPLEMENTATI

ON
LESSEN OF
GARBAGE
COLLECTION
SUPPORT
IMPROVE

COMPREHENSIVE
PLAN

ACHIEVE
MAKE IT
WORTH
GUIDING TOOL
INCREASE
AWARENESS
GOAL

CHANGE

ACTION

APPROVE
PROGRAMS
QUALITY
BASED
PREPAREDNES
S
PRINCIPLES

DIVERSION
ZERO WASTE
ECONOMIC
PRODUCTION
INITIATIVE
MOVEMENT
ESTABLISHMEN
T

GOVERNMENT

CITIZENS

(ACCOMMODATION AND
DEVELOPMENT)

(ATTITUDE AND PROVISION)

You might also like