Professional Documents
Culture Documents
j.
k.
l.
m.
n.
o.
p.
q.
r.
s.
22. Detail and location of the Power Receptacle Requirements for the entire
Hospital.
23. Special Purpose Task Lighting Requirements.
24. Modular OT / Modular Equipment Details.
25. Working Drawings of all the Utilities for Services Integration.
26. Power Requirements from Rentals / Tenants etc.
5. FEE STRUCTURE:
1.
2.
3.
4.
5.
6. SITE VISITS:
1. Total six Site Visits shall be free and included in this Assignment.
2. Additional Site Visit / day shall be reimbursed by the Owner / Client at
Rs. _______ / Day for Principals and Rs._______ / Day for Engineers.
7. SUBMISSIONS:
1. All deliverables shall be in Soft Copy.
8. SERVICES NOT INCLUDED:
1. Day to day Co-ordination and Supervision of Site and Installations
2. Materials Management and Stores Management
3. Liasioning and Inspection Charges with Authorities having Jurisdiction
such as GSEB / PGVCL and RUDA / Department of Health.
4. Temporary Electrification at Site.
5. Design / Consultations for Rentals / Tenants.