You are on page 1of 11

Method of Statement

for
CT
PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

DOCUMENT NO.

: KP-00+++-CY712-B7209

TITLE

: Instrument Cabinet and Junction Box

OWNER

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

01.11.2015

Rev.
No.

DATE

Owner

For Approval

Purpose
For Information

U.K.

DESCRIPTION

TOTAL 5 PAGES
(Including Cover)

For Review
For Approval
For Construction
As-Built

C.A.

M.E.K.

M..

PREPARED CHECKED REVIEWED APPROVED


GAMA POWER SYSTEMS ENG
&CONTRACTING,INC.

Ministry of Electricity (MOE)


of Kurdistan Regional Government
Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING &
CONTRACTING,INC.

SUMMARY:

1.

PURPOSE OF TESTS..............................................................................................................3

2.

REFERENCE DOCUMENT...................................................................................................3

3.

SCOPE......................................................................................................................................3

4.

TERMINOLOGY.....................................................................................................................3

5.

EQUIPMENT UNDER TEST..................................................................................................3

6.

TEST EQUIPMENT REQUIRED..........................................................................................3

7.

GENERAL INSPECTION.......................................................................................................4

7.1.

MECHANICAL CHECKS...................................................................................................4

7.2.

ELECTRICAL CHECKS....................................................................................................4

8.

INSULATION RESISTANCE TEST FOR CT.......................................................................4

9.

CIRCUIT RESISTANCE MEASURES FOR CT..................................................................6

10.

PRIMARY CURRENT TEST FOR CT..............................................................................6

10.1.

TRANSFORMERS TURNS RATIO & POLARITY TESTS............................................7

10.2.

CONSUMPTION POWER (BURDEN) FOR CT...........................................................8

11.

SATURATION CURVE FOR CT......................................................................................10

12.

SPECIAL SAFETY PRECAUTION.................................................................................11

13.

INSULATION RESISTANCE TEST FOR VT.................................................................12

14.

POLARITY TEST FOR VT...............................................................................................13

15.

TRANSFORMER TURNS RATIO TEST FOR VT.........................................................14

16.

RECORDING OF INSPECTION AND TEST DATA......................................................15

KHABAT TPP UNITS 1&2

Method Statement for

Electrical and I&C Panels Installation

Doc. No
Rev. No.

KP-00+++-CY712-B7204

Page

A
Sayfa 3 / 11

1. PURPOSE OF TESTS
Before testing the relaying, metering and measuring equipment, it is necessary to check the
associated Grounding Resistor Panel.

2. REFERENCE DOCUMENT
Electrical drawing N

3. SCOPE
All working sites

4. TERMINOLOGY
No applicable.

5. EQUIPMENT UNDER TEST


The concerned equipment are all types of current transformers.

6. TEST EQUIPMENT REQUIRED


-

Bidirectional miliammeter
RS polarity test set
Voltmeters
Ammeters
Clamp-on-ammeter
1 primary test supply
1 miliohmmeter or digital volt-ohm-miliammeter
Autotransformer
1 step-up transformer
1 Megohmmeter 500 V. - 5 kV

7. GENERAL INSPECTION
7.1. MECHANICAL CHECKS
-

General visual inspection (porcelain insulators, etc...)


Check the connections for looseness and stressed terminals
Check the oil level and inspect for leakage (where applicable)
Check terminal markings and nameplate ratings
Check that primary terminals P1 and P2 are directed in compliance with the
drawing

7.2. ELECTRICAL CHECKS


-

Check the coupling strips (if applicable) for correct positioning

Check the ground system on secondary side

KHABAT TPP UNITS 1&2

Method Statement for

Electrical and I&C Panels Installation

Doc. No
Rev. No.

KP-00+++-CY712-B7204

Page

Check for phase identification and secondary circuit continuity

Check the assignment of the measuring and relaying secondaries

A
Sayfa 4 / 11

8. INSULATION RESISTANCE TEST FOR CT


Between primary winding and ground
Perform the test using a Megger set for the appropriate range.
Performs the test on the primary winding of each phase, with the primary windings of the other
phases temporarily connected to ground
The secondary windings are connected together and to ground.
Apply the test voltage for 1 minute. The test voltage varies with the ratings of the equipment
under test
LV: 6 to 100 volts (direct current)
MV: 100 to 1000 volts (direct current)
HV : 1000 to 5000 volts (direct current)

Between secondary winding and ground


Successively measure the insulation resistance between each winding and the other
windings connected to ground. Apply 500 VDC for one minute.

KHABAT TPP UNITS 1&2

Method Statement for

Electrical and I&C Panels Installation

Doc. No
Rev. No.

KP-00+++-CY712-B7204

Page

A
Sayfa 5 / 11

9. CIRCUIT RESISTANCE MEASURES FOR CT


Concerning some types of relays such as differential relays, high impedance relays, the
secondary side and loop resistance measures must be done.

10. PRIMARY CURRENT TEST FOR CT


The measurements are performed with single-phase current, with the secondary loops in
final condition (relays, meters, etc...) and grounded.
For current measurement, use a clamp-on-ammeter to avoid opening the secondary
circuits.
Measure the voltage (mV) across the primary winding as a check that the primary winding
is in correct operating condition and that the connections are correct (very low contact
resistance).

KHABAT TPP UNITS 1&2

Doc. No
Rev. No.

Method Statement for

Electrical and I&C Panels Installation

KP-00+++-CY712-B7204

Page

A
Sayfa 6 / 11

The following checks can be performed.

10.1.

TRANSFORMERS TURNS RATIO & POLARITY TESTS

Measure the primary and secondary currents. Test equipment compares primary and secondary
current values and also checks polarity itself.

How to check The Turn Ratio & Polarity by CPC 100

CPC 100 Result Monitoring

10.2.

CONSUMPTION POWER (BURDEN) FOR CT


Check the secondary loop consumption using the same set-up.
Use a clamp-on-ammeter to measure the current. Measure the voltage directly
across the secondary winding.

KHABAT TPP UNITS 1&2

Method Statement for

Electrical and I&C Panels Installation

Doc. No
Rev. No.
Page

KP-00+++-CY712-B7204
A
Sayfa 7 / 11

The power can thus be established:


P(VA) = U(V) x I(A)

With three-phase current and for a similar circuit, the readings should be almost
identical for each phase. If the readings show excessive differences, check all the
circuit connections to eliminate contact resistance.
The loop resistance can be calculated or measured using a milliohmmeter.
NOTE:
The primary current tests are performed following the current transformer,
relaying, metering and measuring equipment tests. These tests are the last tests
performed on secondary windings. Check that the unused windings are shorted.

11. SATURATION CURVE FOR CT


Determine the knee voltage.
This test performs an automatic injection of a exciting voltage of up to 2 kV to the current
transformers secondary side. Test equipment increases voltage slowly and at the same time the
exciting current also increases. The saturation point is defined at the point that voltage cant
increase as fast as the exciting current still increases.
The saturation point is obtained when the current varies by 50 % for a 10 % voltage variation. It is
not necessary to perform numerous readings of the straight portion of the curve. Perform
measurements especially near the knee. Then make the voltage very slowly while the current
increases fast.
CPC 100 draws the curve by itself and defines the saturation point and displays.

KHABAT TPP UNITS 1&2

Doc. No
Rev. No.

Method Statement for

Electrical and I&C Panels Installation

KP-00+++-CY712-B7204

Page

A
Sayfa 8 / 11

CPC 100 Connection

CPC 100 Display

12. SPECIAL SAFETY PRECAUTION


ACCEPTANCE TESTING, STORAGE and INSPECTION before and after start-up of
72.5 to 765 kV current transformer of all types
Connections
When work is performed on an operating substation bay, a rather high current can be
induced by the adjacent bays in the loop made up by the ground connections, which can
flow through the current transformer primary windings.
Opening a CT secondary winding in the above configuration may cause over-voltages
greater than the normally permissible values, which can damage insulation.
Therefore, care should be taken to avoid opening secondary circuits and especially:

KHABAT TPP UNITS 1&2

Method Statement for

Electrical and I&C Panels Installation

Doc. No
Rev. No.

KP-00+++-CY712-B7204

Page

A
Sayfa 9 / 11

when connecting a CT to an operating substation, connect the secondary circuits and


check for continuity before connecting the primary winding

when performing work on the secondary circuits of a CT of an operating substation


bay, short out the CT secondary windings upstream the point of intervention before
opening the circuit.

13. INSULATION RESISTANCE TEST FOR VT


To obtain values as close as possible to the manufacturers specifications, the insulators
must be very clean.
Select the Megger range corresponding to the ratings of the equipment under test :
LV: 6 to 100 volts (direct current)
MV: 100 to 1000 volts (direct current)
HV: 1000 to 5000 volts (direct current)
The theoretical values are furnished by the manufacturer.

Measurements between primary and secondary

Measurements between primary and ground

Measurement between secondaries and between secondary and ground

KHABAT TPP UNITS 1&2

Method Statement for

Electrical and I&C Panels Installation

Doc. No
Rev. No.
Page

KP-00+++-CY712-B7204
A
Sayfa 10 / 11

14. POLARITY TEST FOR VT


The polarity is checked using the kick method (application of direct current) and check of
deflection on a bidirectional milliammeter.
This test is also used to check primary and secondary circuit continuity.
- When switch K is closed, the milliammeter pointer deflects upscale.
- When the circuit is opened, the milliammeter pointer deflects in the negative direction.

15. TRANSFORMER TURNS RATIO TEST FOR VT


A variable AC source is applied on the primary side. The primary and secondary voltages
are measured to determine the ratio V2 / V1.

KHABAT TPP UNITS 1&2

Doc. No
Rev. No.

Method Statement for

Electrical and I&C Panels Installation

Page

KP-00+++-CY712-B7204
A
Sayfa 11 / 11

CPC 100 Display

16. RECORDING OF INSPECTION AND TEST DATA


The results of the checks and measurements made during the field tests shall be recorded
on the test forms: