Professional Documents
Culture Documents
The Jazz
2 masks
2 suits
2 guns
Sportshall
Deck case with teddy in it
Planning board
Directors Cut:
This will take place
after the final product. We will
duplicate the film file, and talk
over the film, and explain how
certain soundscapes and
songs were executed. We can
talk about camera angles and
justify them. We will also
provide our opinion on the
final project, and how it could
have been improved.
Timeline
Week 1 (26th 1st)
During this week we will spend the time to think of the topic for our short film. This will take time as we
want to make sure we are comfortable and fully capable to ensure that our execution will be the best
it could possibly be. Once we come up with an idea, we will be able to design a plan, such as a story
board and necessary items and locations.
Week 2 (4th 8th)
By now we are ready to start recording, we will take a few days out of college to go of and record, it
should take some time as we want to make sure we get it perfect and that there are no mess ups. We
will edit our scenes that we filmed and put them into a film. It is important that we have good
transitions between scenes.
Week 3 (11th 15th)
We can then put the film into Logic, and start to design the audio. The vocals will probably be the
hardest part of the audio, so we will tackle that first. Once we do that, we will do the sound effects,
with as much Foley as possible. We can then go on to designing the music. We will mix and master
the track and export the audio to the movie. While Sam Mix and Masters, Mat will be able to start on
the script for the directors cut, enabling us to record, mix and bounce in the following week.
Week 4 (18th 20th)
We will record our Directors Cut, mix, master, and then upload.