Prepared by Gopala Krishna Palepu Ade/Mrt (Protection)
Prepared by Gopala Krishna Palepu Ade/Mrt (Protection)
BUSBAR ARRANGEMENTS
BAY2
T/F-2
MAIN BUSBAR
BAY5
BAY1
BAY3
FEEDER1
FEEDER2
BAY4
FEEDER3
BAY6
FEEDER4
2-89
3-89
4-89
1-52 CB
2-52 CB
3-52 CB
4-52 CB
3 1-CT
3 2-CT
1-89 L
2-89 T
LINE-1
3 3-CT
3 4-CT
3-89 L
4-89 T
LINE-2
T/F-1
T/F-2
Simple in Design
Easy Maintenance
Less Expenditure
Good Appearance
DISADVANTAGES
1.
2.
BAY2
T/F-2
CB SECTIONALISER
BAY1
BAY3
FEEDER1
FEEDER2
MAIN BUSBAR
BAY5
BAY4
FEEDER3
BAY6
FEEDER4
3-89 A
3A-CT
3-52 CB
BUS-2
3-89 B
BUS-1
3B-CT
1-89
2-89
4-89
5-89
1-52 CB
2-52 CB
4-52 CB
5-52 CB
3 1-CT
3 2-CT
1-89 L
2-89 T
LINE-1
3 4-CT
3 5-CT
4-89 L
5-89 T
LINE-2
T/F-1
T/F-2
T/F-1
TRANSFER BUS
BUS-1
BAY1
FEEDER1
BAY2
FEEDER2
BAY3
BAY4
BAY5
BAY6
FEEDER3
BAY7
FEEDER4
2-89 B
1-89 L
2-89 T
3-89 B
3-CT3
2-52 CB
1-52 CB
3-52 CB
2-89A
1-89A
1-CT 3
3-89A
2-CT 3
AUX BUS
4-89 B
5-89 B
4-89 L
5-89 T
4-52 CB
5-52 CB
4-89A
MAIN BUSBAR
5-89A
4-CT 3
5-CT 3
LINE-2
LINE-1
T/F-1
T/F-2
BAY2
BAY3
BAY4
BAY5
BAY7
BAY8
BUS-1
BUS COUPLER
BAY1
T/F-2
BUS-2
FEEDER1 FEEDER2
FEEDER3 FEEDER4
2-89 B
1-89 A
2-89 A
3-89 B
3B-CT3
BUS COUPLER
BUS -2
BUS -1
4-89 B
5-89 B
4-89 A
5-89 A
3-89 A
1-52 CB
1-CT3
1-89 L
2-52 CB
2-CT 3
2-89 T
3-52 CB
3A-CT
4-52 CB
4-CT 3
4-89 L
5-52 CB
5-CT 3
5-89 T
LINE-2
LINE-1
T/F-1
T/F-2
BAY1
BAY2
T/F-2
BAY6
BAY4
BUS COUPLER
BUS-1
BAY7
BUS-2
BAY3
FEEDER1
FEEDER2
BAY5
FEEDER3
FEEDER4
T/F-2
BUS-2
BAY3
BAY1
BAY2
FEEDER1 FEEDER2
BAY4
TRANSFER BUS
BAY5
TRANSFER BUS
COUPLER
BUS COUPLER
BUS-1
BAY6
BAY7
BAY8
FEEDER3 FEEDER4
2-89 B
1-89 A
2-89 A
3-89 B
3B-CT3
BUS COUPLER
BUS -2
BUS -1
1-52 CB
1-89 L
1-89 C
2-52 CB
2-89 T
2-89 C
1-CT3
LINE-1
5-89 B
6-89 B
4-89 A
5-89 A
6-89 A
3-89 A
4-52 CB
3-52 CB
3A-CT
4-89 B
4-CT3
4-89 C
5-52 CB
6-52 CB
5-89 L
6-89 T
5-89 C
2-CT3
T/F-1
AUX BUS
6-89 C
TRANSFER
5-CT3
BUS COUPLER
LINE-2
1-CT 3
T/F-2
BAY3
BAY4
BUS
SECTIONALISER
BAY6
BAY7
BAY5
FEEDER1
BAY8
BUS-1
BUS COUPLER
BAY2
BUS COUPLER
BAY1
T/F-2
BUS-2
FEEDER2
1-89 A
2B-CT 3
BUS -1
2-89 A
1-52 CB
1-CT3
1-89 L
3-89 B
3-89 A
4A-CT
3-52 CB
2-52 CB
2A-CT
BUS -4
3-CT3
3-89 T
6-89 B
2-89 B
4-89 D
4D-CT
5-89 B
BUS SECTIONALISER
5-89 A
4-89 A 4A-52 CB 4-89 C
1-89 B
4B-CT
4B-52 CB
4-89 B
BUS -2
4C-CT
5-52 CB
7-89 B
6B-CT 3
7-89 A
6-89 A
BUS -3
7-52 CB
6-52 CB
5-CT3
5-89 L
6A-CT
7-CT3
7-89 T
LINE-2
LINE-1
T/F-1
T/F-2
DIA5
BAY15
BAY16
BAY17
BAY13
DIA6
BAY14
BAY11
BAY8
BAY9
BAY6
FEEDER11
BAY18
DIA4
BAY10
DIA3
BAY5
BAY2
BAY3
FEEDER9
FEEDER7
BAY12
DIA2
BAY1
BUS-1 DIA1
FEEDER5
BAY7
FEEDER3
BAY4
FEEDER1
(I-CONFIGUARATION)
BUS-2
FEEDER2
FEEDER4
FEEDER6
FEEDER8
FEEDER10
FEEDER12
FEEDER10
BAY14
BAY13
BAY7
DIA1
FEEDER9
BAY8
BAY3
BAY1
BAY2
FEEDER6
DIA3
BAY15
FEEDER2
BAY9
FEEDER1
DIA5
BUS-1
BAY5
FEEDER3
BAY11
FEEDER4
FEEDER7
FEEDER8
DIA6
BAY18
BAY16
DIA4
BAY12
BAY10
DIA2
BAY6
BAY4
BUS-2
BAY17
FEEDER11
FEEDER12
CB
LINE
CB
LINE
CB
LINE
CB
CB
4 CTs METHOD
CB
CB
CB
AT/F
AT/F
CB
CB
6 CTs METHOD
CB
LINE
CB
5 CTs METHOD
LINE
LINE
CB
3 CTs METHOD
CB
CB
6 CTs METHOD
CB
CB
6 CTs METHOD
CB
AT/F
AT/F
AT/F
AT/F
FEEDER3
FEEDER1
FEEDER3
BAY6
BAY5
BAY2
BAY1
BAY7
BAY5
BAY3
BAY1
BUS-1
BUS-1
BAY8
BAY7
BAY4
BAY3
BAY8
BAY6
BAY4
BAY2
BUS-2
BUS-2
FEEDER2
FEEDER4
FEEDER2
FEEDER4
FEEDER 8
FEEDER 1
1-52 CB
FEEDER 2
2-52 CB
3-52 CB
8-52 CB
FEEDER 7
MESH / RING
LAYOUT
4-52 CB
7-52 CB
5-52 CB
6-52 CB
FEEDER 6
FEEDER 3
FEEDER 5
FEEDER 4
1.
2.
220KV SIVARAMPALLY
220KV NARKETPALLY
220KV BUS
220KV BUS
1.
2.
220KV SHAPURNAGAR
220KV CHANDRAYANA GUTTA
220KV BUS
220KV BUS
220KV YEDDUMAILARAM
220KV GHANAPUR
132 KV BUS
132 KV BUS
1.
2.
220KV GACHIBOWLI
220KV GHANAPUR
220KV BUS
220KV BUS
1.
2.
220KV MALKARAM
220KV TALLAPALLY
220KV BUS
220KV BUS
1.
2.
400KV MAMIDIPALLY
400KV KALAPAKA
220KV BUS
220KV BUS
1.
400KV KALAPAKA
400KV BUS
1.
2.
1.
400KV NELLORE
Engineered
items
Civil
Auxiliary
Equipment
Structure
Auxiliary
System
Main Equipment
UUU
WT CVT
LIGHTENING/SURGE ARRESTOR
89
CT
LINE ISOLATOR
BUS
CURRENT TRANSFORMER
CIRCUIT BREAKER
52
89
UUU
BUS ISOLATOR
Main Equipment
LA
Engineered
items
Civil
Auxiliary
Equipment
Structure
Auxiliary
System
Engineered items
1. Busbar Materials
A.
B.
C.
D.
2. Earthing Materials
A. Main Earthing Materials (Rod or Flat).
B. Earth Pits.
Engineered
items
Civil
Auxiliary
Equipment
Structure
Auxiliary
System
Auxiliary Equipment
LTAC Switchgear Panel
AC Distribution Board
Battery & Battery Charger
DC Distribution Board
Auxiliary LT Transformer
Lighting Transformer
Main Lighting Distribution Board
Emergency Lighting Distribution Board
Diesel Generator
UPS
Engineered
items
Civil
Auxiliary
Equipment
Structure
Auxiliary
System
Auxiliary System
1.
Illumination system
A.
B.
2.
3.
Indoor
I. Control Room Building
II. Diesel Generator Building
III.Fire Fighting Pump House Building.
IV. Store Room Building
V. Repair Bay
Outdoor Switchyard
Engineered
items
Civil
Auxiliary
Equipment
Structure
Auxiliary
System
Substation Structures
Substation Civil
6%6%
13%
13%
4%
4%
16%
16%
5%5%
7%7%
27
27%
22%
22%
A > Transformer / Reactor----------------------------------------27%
B > EHV Circuit Breaker, CT, CVT, LA, Isolator, BPI------- 22%
C > Control, Protection & PLCC----------------------------------- 7%
D > Medium Voltage Switchgear---------------------------------- 5%
E > Cables, AC/DC Aux., Lighting, Busbar etc.--------------- 16%
F > Structures---------------------------------------------------------- 6%
G > Civil------------------------------------------------------------------ 13%
H > Erection------------------------------------------------------------- 4%
Sr.No
1.
2.
3.
4.
5.
6.
7.
VOLTAGE
11 KV LINES
33 KV LINES
66 KV LINES
132 KV LINES
MAIN- 1 PROTECTION
IF MAIN-1 & MAIN-2 ARE NUMERICAL RELAYS, BOTH SHOULD BE SEPARATE MEASURING PRINCIPLES (CHARECTERESTICS), MODELS
AND ALGORITHAMS (SHOULD NOT BE DUPLICATED) AND ALL FEATURES SHOULD BE AVAILABLE IN BOTH SCHEMES AND BOTH RELAYS
SHOULD BE 100% REDENDENCY IN ALL ASPECTS ( COMPLEMENTARY TO EACH OTHER ) . DISSIMILAR CARRIER SCHEMES ARE TO BE
SELECTED ( POTT & PUTT or BLOCK & UNBLOCK). OTHER WISE MAIN-2 MAY BE DIFFERENT MAKE OR PHASE COMPARISION
PROTECTION/LINE DIFFERENTIAL PROTECTION WITH BACKUP DISTANCE PROTECTION IS TO BE ADOPTED. BOTH M1 & M2 SHOULD
CONTAIN DIRECTIONAL EARTH FAULT PROTECTION (67N) WITH DIRECTIONAL COMPARISION PICKUP SCHEME AS INBUILT FUNCTION.
ZONE-1: 80% OF MAIN LINE
ZONE-2: 100% OF MAIN LINE + 50% OF SHORTEST LINE AT OTHER END
ZONE-3: 100% OF MAIN LINE + 100% OF SHORTEST LINE AT OTHER END
ZONE-4: 100% OF MAIN LINE + (100% OF SHORTEST LINE + 20% OF LONGEST LINE) AT
OTHER END.
CAPACITY
IN
MVA
220 / 33
220 / 66
31.5, 50 &
100
100, 200 &
250
400 / 132
220 / 132
400 / 220
630, 750,
765 / 400
10
HV & LV
REF 64
3 DIR OL
(HIGHSET)
1 DIR EL
(HIGHSET)
BUCHHOLZ,
OLTC OSR
OIL TEMP
WDNG TEMP
31.5, 50
3OL+1 EL
(51)
132 / 33
87 TH / 64 REF
132 / 11
HV REF (64)
66 / 33
NIL
7.5 , 16 &
25
7.5 , 16 ,
25 & 31.5
16 , 31.5 50 &
80
87 TL DIFFERENTIAL RELAY
66 / 11
7.5 & 16
SPECIAL
PROTECTION
BUCHHOLZ
OVER FLUX
OLTC OSR
3 OL +
PRV/PRD
1 DIR EL
OVER LOAD
(51P + 67N) OIL TEMP
WDNG TEMP ALARM RELAY
3 DIR OL
(HIGHSET)
1 DIR EL
(HIGHSET)
NEUTRAL
CURRENT E/F
RELAY