Evergreen Construction

Daily Progress Report


S No.

Date

15.09.12

Package

Description of today work

Manpower

Intermediate Ash Silo

it was heavy raining today

10

16.09.12

Intermediate Ash Silo

it was heavy raining today

12

17.09.12

Intermediate Ash Silo

No work

18.09.12

Intermediate Ash Silo

it was heavy raining today

12

19.09.12

Intermediate Ash Silo

it was heavy raining today

10

20.09.12

Intermediate Ash Silo

Shuttering: Size
2.024*2.024*.4(3Nos),8Nos bar
binding(size 1*1*.4)

15

21.09.12

Intermediate Ash Silo

Size: 1*1*.4(07 Nos Bar


binding)

Construction

ress Report
Problems at site

Tomorrow plan

it was heavy raining today

4 Nos. RCC footing


(size2.024*2.024*.4)

it was heavy raining today

4 Nos. RCC footing


(size2.024*2.024*.4)

Vishwakram Pooja

it was heavy raining today

4 Nos. RCC footing


(size2.024*2.024*.4)

4 Nos. RCC footing


(size2.024*2.024*.4)
it was heavy raining today
and 04 Nos. RCC footing
Size 1*1*.4
4 Nos. RCC footing
Working hours: 08:00am to
(size2.024*2.024*.4)
02:00pm, 3 labour was dead at
and 04 Nos. RCC footing
Boiler area.
Size 1*1*.4
4 Nos. RCC footing
so, today is close civil work all over
(size2.024*2.024*.4)
Plant.because accedent mater.
and 04 Nos. RCC footing
Size 1*1*.4

Site Inchage

Cement TESTING
As per IS:4031(part-1,4,5 & 6)

Contractor: Evergreen Conctruction

SUMPP
Date :-

Cement
Qty 1m3

Slump Record
Initial Slump :After 30 Minuts :After 60 Minuts :After 90 Minuts :-

Admixture Source :Batch No:Date of


Casting

Cement Source :Week No:Date of


Testing

Cube
Weight

6
1
2
3
4
Sign.

Concrete Grade :-

Qty 0.025m3

Cement
20 MM
10 MM
Sand
Water
Admixture

Sl. No.

Week No:-

Finness of Cement . %
Consistency of Cement ...(P) %
Initial Seting Time .Minutes
Final seting Time ..Minutes

Aggregate Source :-

compressive strength (N/mm2)


Load in
K/N
By (ACT)
3 Days
7 Days

QA/QC (Contractor)

QRF No. :
Rev No :
Page :

REL-STPP- QRFOO
1 of 1

ete Grade :-

Starting Time :Ambient Temp. :Cement Temp. :Concrete Temp. :Water Temp. :-

gate Source :-

h (N/mm2)
28 Days

Sign.

Average

Remarks

QA/QC (Reliance)

OPC 43 GRAD
W-26 & 27

STOCK TILL DATE 115 M

3 GRADE

26 & 27

LL DATE 115 MT