Professional Documents
Culture Documents
Date
15.09.12
Package
Manpower
10
16.09.12
12
17.09.12
No work
18.09.12
12
19.09.12
10
20.09.12
Shuttering: Size
2.024*2.024*.4(3Nos),8Nos bar
binding(size 1*1*.4)
15
21.09.12
Construction
ress Report
Problems at site
Tomorrow plan
Vishwakram Pooja
Site Inchage
Cement TESTING
As per IS:4031(part-1,4,5 & 6)
SUMPP
Date :-
Cement
Qty 1m3
Slump Record
Initial Slump :After 30 Minuts :After 60 Minuts :After 90 Minuts :-
Cube
Weight
6
1
2
3
4
Sign.
Concrete Grade :-
Qty 0.025m3
Cement
20 MM
10 MM
Sand
Water
Admixture
Sl. No.
Week No:-
Finness of Cement . %
Consistency of Cement ...(P) %
Initial Seting Time .Minutes
Final seting Time ..Minutes
Aggregate Source :-
QA/QC (Contractor)
QRF No. :
Rev No :
Page :
REL-STPP- QRFOO
1 of 1
ete Grade :-
Starting Time :Ambient Temp. :Cement Temp. :Concrete Temp. :Water Temp. :-
gate Source :-
h (N/mm2)
28 Days
Sign.
Average
Remarks
QA/QC (Reliance)
OPC 43 GRAD
W-26 & 27
3 GRADE
26 & 27
LL DATE 115 MT