You are on page 1of 12

Harga Paket

Dinding Panjat Fiberglass 3 x 15 Meter


..
LEAD
No.
I.

ITEM PEKERJAAN

Satuan Volume Harga/Unit Jumlah Harga

Pekerjaan Persiapan
1
2
3
4
5
6
7

II.

Design & Gambar


Administrasi
Survai & Pengukuran
Pembersihan Lokasi
Soilt Test / Sondir
Pemasangan Bouwplank
Mobilisasi & Demobilisasi

Ls
Ls
Ls
Ls
Ls
Ls
Ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,150,000
575,000
1,725,000
1,725,000
4,025,000
1,725,000
1,150,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,150,000
575,000
1,725,000
1,725,000
4,025,000
1,725,000
1,150,000

M3
M
M3
Ls
M3
M3
M3
M3
M3
Bh
Bh
Bh
M3
M3

6.00
8.80
3.08
1.00
1.08
0.20
0.72
0.72
0.39
16.00
4.00
4.00
15.36
3.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

57,500
633,000
87,000
98,000
1,725,000
1,725,000
1,725,000
1,725,000
1,725,000
29,000
230,000
575,000
35,000
575,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

345,000
5,570,400
267,960
98,000
1,863,000
345,000
1,242,000
1,242,000
672,750
464,000
920,000
2,300,000
537,600
1,725,000

Kg
Kg
Kg
Bh
Bh
Bh
Bh
Klg
Klg
Kg
Kg

450.00
555.00
655.00
32.00
156.00
96.00
128.00
6.00
5.00
1660.00
1660.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

22,000
22,000
22,000
22,000
4,100
3,500
3,000
110,000
75,000
5,000
1,500

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,900,000
12,210,000
14,410,000
704,000
639,600
336,000
384,000
660,000
375,000
8,300,000
2,490,000

8.00 Rp

110,000

Rp

880,000

Pekerjaan Pondasi

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Galian tanah Pondasi


Galian tanah Bor Pile/Stross f 30 c
Uruggan tanah bawah pondasi
Lantai kerja adukan beton 1:3:5
Beton bor pile/Stross f 30 cm
Pondasi batu kali camp 1:5
Kolom beton 20/20
Sloof beton 15/20
Poor beton 20/20
Baut mur Anchor f 24mm
Besi plat landas 10mm
Besi plat sepatu 10mm
Uruggan & pemadatan tanah
Lantai rabat beton 1:2:3

III. Rangka Utama


1
2
3
4
5
6
7
8
9
10
11

Tiang utama besi siku 7


Pengikat horizontal besi siku 6
Pengikat diagonal besi siku 5
Plat simpul besi 5mm
Mur baut f 14mm
Mur baut f 12mm
Mur baut f 10mm
Tower painting zinkromate by ICI inc
Thiner
Erection
Setting & Sortir

IV. Pengerjaan Pengecatan


1 Tower painting primer by ICI incl

Klg

2 Thiner
3 Pengecatan

V.

Klg
M2

8.00 Rp
135.00 Rp

75,000
11,500

Rp
Rp

600,000
1,552,500

1,300
600

Rp
Rp

2,216,500
1,023,000

42.00 Rp 1,725,000
3.00 Rp 2,015,000

Rp
Rp

72,450,000
6,045,000

Transport
1 Delivery material
2 Bongkar muat

Kg
Kg

1705.00
1705.00

Rp
Rp

VI. Panel Imprin's Fiberglass


1 Flat, S25, S50, Logo
2 Roof

Bh
Bh

Total
Solo, Januari 2010
Hormat Kami,

PT CARTENZ INDONESIA

Keterangan :
1. Harga belum termasuk akomodasi pemasangan, survey lokasi, penginapan, transportasi dan makan se
2. Harga belum termasuk pajak (apabila dikenakan)
3. Biaya transport delivery material dan bongkar muat diluar JABAR akan diperhitungkan menurut jauh-de

15 Meter
..
Sub Total

Keterangan

###
Gambar, Maket
Schedule & Laporan

###

###
Sambungan dengan
baut & mur

Rp 3,032,500
Pengecatan tegak

Rp 3,239,500
Lokasi Jawa Barat

###

###

ansportasi dan makan selama pengerjaan

ungkan menurut jauh-dekatnya lokasi

Harga Paket
Dinding Panjat Panel Imprin's Fiberglass 4 x 15 Meter
No.
I.

ITEM PEKERJAAN

Satuan Volume Harga/Unit Jumlah Harga

Pekerjaan Persiapan
1
2
3
4
5
6
7

Design & Gambar


Administrasi
Survai & Pengukuran
Pembersihan Lokasi
Soilt Test / Sondir
Pemasangan Bouwplank
Mobilisasi & Demobilisasi

Ls
Ls
Ls
Ls
Ls
Ls
Ls

1.00
1.00
1.00
1.00
1.00
1.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,150,000
575,000
1,725,000
1,725,000
4,025,000
1,725,000
1,150,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,150,000
575,000
1,725,000
1,725,000
4,025,000
1,725,000
1,150,000

M3
M3
M3
Ls
M3
M3
M3
M3
M3
M3
Bh
Bh
Bh
M3
M3

12.00
1.89
4.03
1.00
1.08
0.35
2.69
1.08
1.26
0.67
24.00
6.00
6.00
26.88
4.20

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

57,500
633,000
87,000
98,000
1,725,000
1,725,000
1,725,000
1,725,000
1,725,000
1,725,000
29,000
69,000
230,000
35,000
575,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

690,000
1,196,370
350,610
98,000
1,863,000
603,750
4,640,250
1,863,000
2,173,500
1,155,750
696,000
414,000
1,380,000
940,800
2,415,000

Kg
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Klg
Klg
Kg
Kg

475.00
325.00
655.00
725.00
24.00
148.00
168.00
142.00
7.00
4.00
2180.00
2180.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

22,000
22,000
22,000
22,000
22,000
4,100
3,500
2,900
110,000
75,000
5,000
1,500

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

956,000
7,150,000
14,410,000
15,950,000
528,000
606,800
588,000
411,800
770,000
300,000
10,900,000
3,270,000

II. Pekerjaan Pondasi


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Galian tanah Pondasi


Galian tanah Bor Pile f 30 cm
Uruggan tanah bawah pondasi
Lantai kerja adukan beton 1:3:5
Beton bor pile f 30 cm
Pondasi batu kali camp 1:5
Plat beton 15/20
Kolom beton 20/20
Sloof beton 15/20
Poor beton 20/20
Baut mur Anchor f 24mm
Besi plat landas 10mm
Besi plat sepatu 10mm
Uruggan & pemadatan tanah
Lantai rabat beton 1:2:3

III. Rangka Utama


1
2
3
4
5
6
7
8
9
10
11
12

Tiang utama besi siku 8


Tiang utama besi siku 7
Pengikat horizontal besi siku 6
Pengikat diagonal besi siku 5
Plat simpul besi 5mm
Mur baut f 14mm
Mur baut f 12mm
Mur baut f 10mm
Zinkromate by Kansai
Thiner
Erection
Setting & Sortir

IV. Pengerjaan Pengecatan

1 Tower painting primer by ICI incl


2 Thiner
3 Pengecatan

Klg
Klg
M2

8.00 Rp
8.00 Rp
180.00 Rp

110,000
75,000
11,500

Rp
Rp
Rp

880,000
600,000
2,070,000

Kg
Kg

2240.00 Rp
2240.00 Rp

1,200
600

Rp
Rp

2,688,000
1,344,000

56.00 Rp 1,725,000
4.00 Rp 2,015,000

Rp
Rp

96,600,000
8,060,000

V. Transport
1 Delivery material
2 Bongkar muat

VI. Panel Imprin's Fiberglass


1 Flat, S25, S50
2 Roof

Bh
Bh

Total
NILAI JADI PEMBULATAN
Solo, Januari 2010
Hormat Kami,

PT CARTENZ INDONESIA

Keterangan :
1. Harga belum termasuk akomodasi pemasangan, survey lokasi, penginapan, transportasi dan makan sela
2. Harga belum termasuk pajak (apabila dikenakan)
3. Biaya transport delivery material dan bongkar muat diluar JABAR akan diperhitungkan menurut jauh-dek

glass 4 x 15 Meter
Sub Total

Keterangan

###
Gambar, Maket
Schedule & Laporan

###
-

###
Sambungan dengan
baut & mur

Rp 3,550,000

Pengecatan tegak

Rp 4,032,000
Lokasi Jawa Barat

###

###

, transportasi dan makan selama pengerjaan

rhitungkan menurut jauh-dekatnya lokasi

Harga Paket
Dinding Panjat Multiplek 3 x 15 Meter
..
No.
I.

ITEM PEKERJAAN

Volume

Harga/Unit

Pekerjaan Persiapan
1
2
3
4
5
6

II.

III.

Ls
Ls
Ls
Ls
Ls
Ls

1.00
1.00
1.00
1.00
1.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp

575,000
575,000
575,000
575,000
575,000
575,000

Galian tanah Pondasi


Galian tanah Bor Pile/Stross f 30 c
Uruggan tanah bawah pondasi
Lantai kerja adukan beton 1:3:5
Beton Bor Pile/Stross f 30 cm
Pondasi batu kali camp 1:5
Sloof beton 15/20
Poor beton 20/20
Baut mur Anchor f 22mm
Besi plat landas 4mm
Besi plat sepatu 10mm
Lantai rabat beton 1:2:3

M
M
M3
Ls
M3
M3
M3
M3
Bh
Bh
Bh
M3

3.60
12.00
3.08
1.00
1.08
0.20
0.72
0.39
16.00
4.00
4.00
3.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

69,000
87,000
87,000
98,000
1,725,000
1,725,000
1,725,000
1,725,000
29,000
57,500
405,000
405,000

Kg
Kg
Kg
Bh
Bh
Bh
Bh
Klg
Klg
Kg

390.50
491.40
662.40
32.00
156.00
96.00
128.00
12.00
3.00
1544.30

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

22,000
22,000
22,000
22,000
4,100
3,500
3,000
52,000
52,000
6,000

Klg
Klg
M2

8.00 Rp
8.00 Rp
135.00 Rp

52,000
52,000
11,500

Kg

1558.30 Rp

3,500

Rangka Utama

1
2
3
4
5
6
7
8
9
10

IV.

Design & Gambar


Administrasi
Survai & Pengukuran
Pembersihan Lokasi
Pemasangan Bouwplank
Mobilisasi & Demobilisasi

Pekerjaan Pondasi

1
2
3
4
5
6
7
8
9
10
11
12

Tiang utama besi siku 7


Pengikat horizontal besi siku 6
Pengikat diagonal besi siku 5
Plat simpul besi 4mm
Mur baut f 14mm
Mur baut f 12mm
Mur baut f 10mm
Tower painting zinkromate
Thiner
Erection

Pengerjaan Pengecatan
1 Tower painting primer
2 Thiner
3 Pengecatan

V.

Satuan

Transport
1 Delivery material

2 Bongkar muat

Kg

1558.30 Rp

1,500

VI. Panel Imprin's Fiberglass


1 Multiplek 18mm labur resin
2 Roof

Bh
Bh

14.00 Rp
632,500
0.00 Rp 2,015,000

Total
Solo, Januari 2010
Hormat Kami,

PT CARTENZ INDONESIA

Keterangan :
1. Harga belum termasuk akomodasi pemasangan, survey lokasi, penginapan, transportasi dan makan se
2. Harga belum termasuk pajak (apabila dikenakan)
3. Biaya transport delivery material dan bongkar muat diluar JABAR akan diperhitungkan menurut jauh-de

aket
plek 3 x 15 Meter
..
Jumlah Harga

Sub Total

Keterangan

###
Rp
Rp
Rp
Rp
Rp
Rp

575,000
575,000
575,000
575,000
575,000
575,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

248,400
1,044,000
267,960
98,000
1,863,000
345,000
1,242,000
672,750
464,000
230,000
1,620,000
1,215,000

Gambar, Maket
Schedule & Laporan

###
-

###
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,591,000
10,810,800
14,572,800
704,000
639,600
336,000
384,000
624,000
156,000
9,265,800

Sambungan dengan
baut & mur

###
Rp
Rp
Rp

416,000
416,000
1,552,500

Rp

5,454,050

Pengecatan tegak

###
Lokasi Dalam Kota

Rp

2,337,450

Rp
Rp

8,855,000
-

###

###