DAFTAR HARGA SATUAN BAHAN BIDANG JALAN DAN JEMBATAN

KABUPATEN WAJO
TAHUN ANGGARAN 2019

NO NAMA BARANG SATUAN KODE HARGA 2019 KET.


1 Batu Gunung M3 M. 010 Rp 574.300,00
2 Batu Kali M3 M. 013 Rp 389.700,00
3 Tanah Timbunan M3 M. 015 Rp 125.500,00
4 Kerikil Ayak Beton M3 M. 016 Rp 365.300,00
5 Batu Belah 10 - 15 Cm M3 M. 020 Rp 578.900,00
6 Batu Belah 7 - 10 Cm M3 M. 021 Rp 667.000,00
7 Batu Pecah 5 - 7 Cm M3 M. 022 Rp 755.100,00
8 Batu Pecah 3 - 5 Cm (Crusher) M3 M. 023 Rp 604.400,00
9 Batu Pecah 2 - 3 Cm (Crusher) M3 M. 024 Rp 704.300,00
10 Batu Pecah 1 - 2 Cm (Crusher) M3 M. 025 Rp 733.400,00
11 Batu Pecah 0,5 - 1 Cm (Crusher) M3 M. 026 Rp 733.400,00
12 Abu Batu (Filler) Kg M. 027 Rp 1.000,00
13 Gorong-gorong Beton Dia 60 Cm (Bertulang) M' M. 031 Rp 360.000,00
14 Gorong-gorong Beton Dia 80 Cm (Bertulang) M' M. 032 Rp 530.000,00
15 Gorong-gorong Beton Dia 100 Cm (Bertulang) M' M. 033 Rp 740.000,00
16 Gorong-gorong Beton Dia 60 Cm M' M. 034 Rp 170.000,00
17 Gorong-gorong Beton Dia 80 Cm M' M. 035 Rp 250.000,00
18 Gorong-gorong Beton Dia 100 Cm M' M. 036 Rp 330.000,00
19 Pasir Urug M3 M. 039 Rp 179.200,00
20 Pasir Pasangan M3 M. 040 Rp 283.500,00
21 Pasir Beton M3 M. 041 Rp 339.100,00
22 Sirtu / Kerikil Sungai M3 M. 042 Rp 323.100,00
23 Material Timbunan Pilihan M3 M. 051 Rp 296.400,00
24 Aspal Bitumen (Drum) Kg M. 061 Rp 16.000,00
25 Aspal Bitumen (Curah) Kg M. 062 Rp 15.000,00
26 Minyak Flux Liter M. 063 Rp 3.800,00
27 Minyak Tanah (Industri) Liter M. 065 Rp 15.100,00
28 Kayu Bakar M3 M. 070 Rp 188.200,00
29 Kawat Bronjong (Pabrikasi Uk. 2x1x0,5 M') bh M. 162 Rp 483.800,00
30 Baut + Mour (Dia. 14 mm, P=15 cm) bh M. 163 a Rp 4.300,00
31 Baut + Mour (Dia. 17 mm, P=15 cm) bh M. 163 b Rp 5.400,00
32 Baut + Mour (Dia. 19 mm, P=30 cm) bh M. 163 c Rp 10.800,00
33 Besi Tulangan (Polos) Kg M. 167 Rp 17.600,00
34 Besi Tulangan (Ulir) Kg M. 167 Rp 19.600,00
35 Alat-alat Bantu @ 3 Set Set M. 170 Rp 275.000,00
36 Kayu Untuk Perancah (Kapok, Kemiri, Piawing) M3 M. 180 Rp 2.154.100,00
37 Kayu Kelas I (Bayam) M3 M. 181 A Rp 12.654.100,00
38 Kayu Kelas I (Kumia, Kalapi) M3 M. 181 B Rp 7.654.100,00
39 Kayu Kelas II ( Baramming, Batau,Nato) M3 M. 181 C Rp 4.154.100,00
40 Kayu Kelas III (Lapi Lapi) M3 M. 181 D Rp 3.644.500,00
41 Minyak Diesel / Solar Liter M. 183 a Rp 9.800,00
42 Solar (Industri) Liter M. 183 b Rp 10.700,00
43 Bensin / Premium Liter M. 184 Rp 7.000,00
44 Minyak Pelumas Liter M. 185 Rp 57.100,00
45 Kuku Macan Dia. 1.5" Bh M. 200 Rp 46.300,00
46 Kuku Macan Dia. 1.0" Bh M. 201 Rp 22.100,00
47 Kuku Macan Dia. 0.5" Bh M. 202 Rp 15.100,00
48 Kabel / Tali Sling Baja Dia 36 mm M' M. 203 Rp 181.700,00
49 Kabel / Tali Sling Baja Dia 28 mm M' M. 204 Rp 85.000,00
50 Kabel / Tali Sling Baja Dia 24 mm M' M. 205 Rp 67.200,00
51 Kabel Pengaku Dia 16 mm M' M. 207 Rp 48.600,00
52 Jarum Keras 1.5" Bh M. 208 Rp 1.494.300,00
53 Jarum Keras 1.0" Bh M. 209 Rp 662.200,00
54 Beugel Plat Baja M' M. 210 Rp 88.200,00
55 Sadle Kabel Bh M. 211 Rp 881.500,00
55 Besi UNP 10 (P = 6 m') Btg M. 212 Rp 450.000,00
56 Besi UNP 8 (P = 6 m') Btg M. 213 Rp 350.000,00
57 Besi UNP 6 (P = 6 m') Btg M. 214 Rp 325.000,00
58 Besi Siku ( P = 6 m , T = 3 mm ) Btg M. 215 Rp 90.000,00
59 Besi Siku (P = 6 m , T = 5 mm) Btg M. 216 Rp 200.000,00
60 Plastik Alas M2 M. 217 Rp 3.500,00
Catatan : a. Harga tersebut belum termasuk ; PPn serta biaya umum dan keuntungan
penyedia jasa. Sengkang, Januari 2019
b. Khusus batu pecah, merupakan harga maksimal untuk pekerjaan beton dengan KEPALA DINAS BMCKJK-PR KAB. WAJO
volume kecil, sedangkan untuk pekerjaan beton dan jalan (jalan beton, campuran
hotmix / lapen) dengan volume besar dianalisa sebagai produksi sendiri.

Drs. HAIRIL AMRI WAWO


NIP.19620713 199303 1 005
DAFTAR HARGA SATUAN BAHAN / MATERIAL
PROPINSI : SULAWESI SELATAN
KABUPATEN : WAJO
TAHUN ANGGARAN : 2019
BIDANG : CIPTA KARYA

NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

A. BAHAN DASAR
1 Semen PC 50 Kg Zak Rp 70.970,00
2 Semen Warna (lemkra) Kg Rp 25.310,00
3 Batu bata Merah Bh Rp 910,00

B. BAHAN BESI
1 Kawat Ikat Beton Kg Rp 25.090,00
2 Paku Biasa 5-10 Cm Kg Rp 19.470,00
3 Paku Biasa 2,5 - 4 Cm Kg Rp 29.340,00
4 Paku Seng Kg Rp 45.340,00
5 Paku beton Persegi 5 - 10 Cm Doz Rp 23.580,00

C. BAHAN LANTAI DAN DINDING


1 Tegel Keramik 30 x 30 Polos M2 Rp 54.880,00
2 Tegel Keramik 40 x 40 Polos M2 Rp 65.604,17
3 Tegel Keramik 20 x 25 Polos M2 Rp 68.410,00
4 Tegel Keramik 20 x 20 Polos Doz Rp 67.300,00
5 Tegel Granit Warna 60 x 60 cm M2 Rp 186.730,00

D. BAHAN ATAP
1 Atap Spandek Zincalium 0,35 mm silver Lbr Rp 50.810,00
2 Nok Spandek 45 cm, 0,30 M' Rp 35.360,00
3 Genteng Metal (sakura roof) 2 x 4 (0,77 x 0,80) t = 0,35 cm Lbr Rp 41.360,00
4 Nok Genteng Metal Lbr Rp 36.300,00
5 Seng Gelombang BWG 33" BjLs 0,3 KK Rp 9.910,00
6 Seng Plat BjLs 0,30 M' Rp 81.020,00
7 Kanal metal C 75/75 Setara "TASO" Btg Rp 96.140,00
8 Reng 0,45 Panjang 6 M Setara "TASO" Btg Rp 59.190,00
9 D y n a b o l t 10 x 5 mm Bh Rp 2.870,00
10 Karet Pelapis L 55 mm M' Rp 74.430,00
11 Talang Air Plastik P = 4 M Bh Rp 99.210,00

E. BAHAN KACA
1 Kaca Bening 3 mm M2 Rp 139.100,00
2 Kaca Bening 5 mm M2 Rp 161.150,00
3 Kaca Ryben 3 mm M2 Rp 162.500,00
4 Kaca Ryben 5 mm M2 Rp 163.000,00
5 Ce rmin M2 Rp 138.630,00
6 Silicone Sealant Ultraglaze ex GE tube Rp 15.250,00

F. BAHAN KUNCI DAN PENGGANTUNG


1 Kunci Tanam "SES" setara Bh Rp 268.250,00
2 Kunci Tanam Biasa 2 Slag Bh Rp 180.940,00
3 Kunci Lemari Mutu Baik Bh Rp 18.250,00
4 Handle Pintu Bh Rp 200.380,00
5 Engsel Pintu Biasa Bh Rp 20.920,00
6 Engsel Jendela Bh Rp 13.630,00
7 Grendel Pintu Bh Rp 45.920,00
8 Grendel Jendela Bh Rp 25.380,00
9 Hak Angin / Kait - kait Bh Rp 12.160,00
NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

G. BAHAN CAT
1 Meni 1 Kg "PERAHU" Klg Rp 48.610,00
2 Cat Kayu "AVIAN" (1 Kg) Klg Rp 60.290,00
3 Minyak Cat "AVIAN" Klg Rp 47.140,00
4 Plamur Tembok Alcaplast 20 kg Klg Rp 199.430,00
5 Plamur Kayu Kucing Kg Rp 42.240,00
6 Cat Tembok Setara "METROLITE" (3 Ltr) Klg Rp 107.790,00
7 Cat Tembok Setara "MOWILEX" (2,5 Ltr) Luar Klg Rp 270.570,00
8 Cat Tembok Setara "MOWILEX" (2,5 Ltr) Dalam Klg Rp 250.730,00
9 Cat Seng/Genteng 4 Kg Klg Rp 160.040,00
10 Bahan Anti Rayap Kg/ltr Rp 190.730,00
11 Lem Kayu 800 gr Kg Rp 49.070,00
12 Cat Water Proofing Merk " Dulux watershield" 2,5 Ltr Klg Rp 275.570,00
13 Ter Residu 1 Kg Klg Rp 59.540,00
14 Kertas Gosok (Amplas) M Rp 12.650,00
15 Kuas 1" Bh Rp 5.590,00
16 Kuas 2,5" Bh Rp 10.970,00
17 Kuas 3" Bh Rp 13.840,00

H. BAHAN SANITASI
1 Floor Drain "Plastik" Bh Rp 12.650,00
2 Kloset Duduk "TOTO" Bh Rp 3.000.000,00
3 Kloset Jongkok "TOTO" Bh Rp 427.150,00
4 Wastafel "TOTO" set Rp 851.600,00
5 Wastafel Lengkap "TOTO" set Rp 2.301.150,00
6 Urinoir 1 Set Lengkap Bh Rp 3.047.150,00
7 Stop Kran 1/2 " Biasa Bh Rp 13.620,00
8 Stop Kran 3/4 " Biasa Bh Rp 19.190,00
9 Kran Air Double + Shower Bh Rp 220.850,00
10 Kran Air Shower Bh Rp 118.350,00
11 Kran Air 1/2" "ONDA" Bh Rp 34.190,00
12 Kran Air 3/4" "ONDA" Bh Rp 36.500,00
13 Jet Washer "TOTO" Bh Rp 277.050,00
14 Seal Tape Bh Rp 5.200,00
15 Bak Penampungan Air Kap. 1,2 M3 Bh Rp 1.347.290,00
16 Bak Penampungan Air Kap. 2,2 M3 Bh Rp 2.761.540,00

I. BAHAN LISTRIK
1 Skring Box 1 lubang Bh Rp 50.130,00
2 Panel MCB Bh Rp 30.130,00
3 MCB 6A - 10A Bh Rp 62.650,00
4 Stop Kontak "PANASONIC" setara Bh Rp 18.900,00
5 Saklar Ganda "PANASONIC" setara Bh Rp 26.360,00
6 Saklar Tunggal "PANASONIC" setara Bh Rp 18.650,00
7 Lampu CPL Kapsul 8 Watt "PHILIPS Bh Rp 30.340,00
8 Lampu CPL Kapsul 15 Watt "PHILIPS Bh Rp 40.340,00
9 Lampu CPL Kapsul 18 Watt "PHILIPS Bh Rp 47.840,00
10 Lampu CPL Kapsul 23 Watt "PHILIPS Bh Rp 41.500,00
11 Kap Industri HDK 55 cm + Lampu HPLN 80 watt Bh Rp 85.470,00
12 Kap Industri HDK 55 cm + Lampu HPLN 150 watt Bh Rp 50.470,00
13 Lampu Down Light Plafond Bh Rp 62.840,00
14 Fitting Lampu Bh Rp 12.650,00
15 Stand Lampu Tanam Bh Rp 130.370,00
16 Lampu TL 20 Watt Bh Rp 71.680,00
17 Pipa PVC diameter 5/8" - 4 M M' Rp 10.360,00
18 Kabel NYY 2 x 2,5 mm Roll Rp 148.820,00
19 Kabel NYY 2 x 1,5 mm Roll Rp 96.570,00
20 Panel Box Bh Rp 500.130,00
21 Inbuw Duz Bh Rp 5.150,00
22 Sekring 16 A Bh Rp 60.110,00
NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

J. BAHAN LANGIT - LANGIT


1 Gypsum Board 122 x 244 x 0,9 mm Lbr Rp 85.110,00
2 Calsiboard 35 mm 122 x 244 x 0,35 mm Lbr Rp 80.110,00
3 List Profil Kayu 0,03 x 0,03 x 4 M Bh Rp 48.000,00
4 Sekrup Gypsum Bh Rp 82.700,00
5 Plaster Gypsum Roll Rp 15.200,00
6 Besi Hollow 40 x 40 mm Btg Rp 39.300,00
7 Besi Hollow 20 x 40 mm Btg Rp 28.800,00
8 Lem Gypsum 20 Kg (Comice Aplus) Bh Rp 85.230,00
9 Paku Gypsum Doz Rp 27.700,00
10 Tripleks 122 x 244 x 0,3 mm Lbr Rp 59.760,00
11 Tripleks 122 x 244 x 0,4 mm Lbr Rp 74.920,00
12 Tripleks 122 x 244 x 0,6 mm Lbr Rp 84.230,00
13 Multipleks 122 x 244 x 0,9 mm Lbr Rp 116.780,00
14 Teakwood 122 x 244 x 0,3 mm Lbr Rp 153.730,00

K. PAVING BLOK
1 Paving Blok (Kotak) K. 300 T = 8 Cm (44 buah / M2) M2 Rp 101.400,00
2 Paving Blok (Kotak) K. 300 T = 6 Cm (44 buah / M2) M2 Rp 100.100,00
3 Paving Blok (Kotak) K. 225 T = 8 Cm (44 buah / M2) M2 Rp 98.800,00
4 Paving Blok (Kotak) K. 225 T = 6 Cm (44 buah / M2) M2 Rp 97.500,00

Sengkang, Januari 2019


Kepala Dinas BMCKJK-PR Kab. Wajo

Drs. HAIRIL AMRI WAWO


Nip 19620713 199303 1 005
DAFTAR HARGA SATUAN BAHAN / MATERIAL
PROPINSI : SULAWESI SELATAN
KABUPATEN : WAJO
TAHUN ANGGARAN : 2019
BIDANG : CIPTA KARYA
KABUPATEN : WAJO

NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

L. PIPA

1 PIPA GIP ( 6 meter )


(Sekelas Med.A)
- Dia 50 mm (1 1/2") tebal 2 mm Btg Rp 474.800,00
- Dia 63 mm (2") tebal 2 mm Btg Rp 658.500,00
- Dia 75 mm (2 1/2") tebal 2 mm Btg Rp 818.200,00
- Dia 90 mm (3") tebal 2 mm - 2,9 mm Btg Rp 1.321.100,00
- Dia 110 mm (4") tebal 2 mm - 2,9 mm Btg Rp 1.594.000,00
- Dia 125 mm (5") tebal 2,9 mm Btg Rp 2.297.100,00
- Dia 160 mm (6") tebal 2,9 mm Btg Rp 2.806.300,00

2 PIPA GIP ( 6 meter )


(Sekelas Med.B)
- Dia 50 mm (1 1/2") tebal 1,5 mm Btg Rp 460.800,00
- Dia 63 mm (2") tebal 1,5 mm Btg Rp 494.500,00
- Dia 75 mm (2 1/2") tebal 2,0 mm Btg Rp 600.000,00
- Dia 90 mm (3") tebal 4,0 mm Btg Rp 1.093.100,00
- Dia 110 mm (4") tebal 4,5 mm Btg Rp 1.594.000,00

3 PIPA HDPE ( 6 meter )


(Sekelas Med.B)
Dia 2' Btg Rp 193.500,00
Dia 2 1/2' Btg Rp 269.200,00
Dia 3' Btg Rp 387.600,00
Dia 4' Btg Rp 582.000,00
Dia 6' Btg Rp 776.300,00
Dia 8' Btg Rp 1.281.700,00

4 PIPA PVC
- Dia 1/2" - 4,00 M Btg Rp 37.000,00
- Dia 3/4" - 4,00 M Btg Rp 44.000,00
- Dia 1" - 4,00 M - AW Btg Rp 193.500,00
- Dia 1 1/2" - 4,00 M - AW Btg Rp 269.200,00
- Dia 2" - 4,00 M - AW Btg Rp 387.600,00
- Dia 3" - 4,00 M - AW Btg Rp 582.000,00
- Dia 4" - 4,00 M - AW Btg Rp 776.300,00
- Dia 6" - 4,00 M - AW Btg Rp 1.281.700,00

5 PIPA PVC SNI T.12,5 bar - S.10 (Pemyambungan Lem)


- Dia 63 mm (2") - 6 M Btg Rp 175.000,00
- Dia 90 mm (3") - 6 M Btg Rp 334.100,00
- Dia 110 mm (4") - 6 M Btg Rp 509.000,00
- Dia 160 mm (6") - 6 M Btg Rp 1.076.300,00
- Dia 160 mm (8") - 6 M Btg Rp 1.736.700,00
NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

6 PIPA PVC SNI T.12,5 bar - S.10 ( Pemyambungan Ring karet)


- Dia 63 mm (2") - 6 M Btg Rp 180.000,00
- Dia 90 mm (3") - 6 M Btg Rp 345.600,00
- Dia 110 mm (4") - 6 M Btg Rp 523.000,00
- Dia 160 mm (6") - 6 M Btg Rp 1.101.300,00
- Dia 200 mm (8") - 6 M Btg Rp 1.774.200,00

7 PIPA PVC SNI T.10 bar - S.12,5 (Pemyambungan Lem)


- Dia 50 mm (1 1/2") - 6 M Btg Rp 103.100,00
- Dia 63 mm (2") - 6 M Btg Rp 146.800,00
- Dia 90 mm (3") - 6 M Btg Rp 284.100,00
- Dia 110 mm (4") - 6 M Btg Rp 419.000,00
- Dia 160 mm (6") - 6 M Btg Rp 896.300,00
- Dia 200 mm (8") - 6 M Btg Rp 1.306.400,00

8 PIPA PVC SNI T.10 bar - S.12,5 (Pemyambungan Ring karet)


- Dia 50 mm (1 1/2") - 6 M Btg Rp 160.000,00
- Dia 63 mm (2") - 6 M Btg Rp 290.000,00
- Dia 90 mm (3") - 6 M Btg Rp 400.000,00
- Dia 110 mm (4") - 6 M Btg Rp 815.000,00
- Dia 160 mm (6") - 6 M Btg Rp 1.340.000,00
- Dia 200 mm (8") - 6 M Btg Rp 1.471.700,00

M. ACCESSORIES PIPA

9 FLANGE GIP/STEEL (sist. Las)


- Flange Gip/Steel f 2" Bh Rp 77.000,00
- Flange Gip/Steel f 3" Bh Rp 99.000,00
- Flange Gip/Steel f 4" Bh Rp 121.000,00
- Flange Gip/Steel f 6" Bh Rp 203.500,00
- Flange Gip/Steel f 8" Bh Rp 302.500,00

10 TEE GIP/STEEL (sist. Las)


- Tee Gip/Steel f 2" Bh Rp 96.250,00
- Tee Gip/Steel f 3" Bh Rp 214.500,00
- Tee Gip/Steel f 4" Bh Rp 302.500,00
- Tee Gip/Steel f 6" Bh Rp 657.800,00
- Tee Gip/Steel f 8" Bh Rp 1.375.000,00

11 BEND GIP/STEEL (sist. Las)


- Bend Gip/Steel 90o f 2" Bh Rp 44.000,00
o
- Bend Gip/Steel 90 f 3" Bh Rp 115.500,00
o
- Bend Gip/Steel 90 f 4" Bh Rp 170.500,00
o
- Bend Gip/Steel 90 f 6" Bh Rp 439.670,00
- Bend Gip/Steel 90o f 8" Bh Rp 856.350,00

12 BEND GIP/STEEL (sist. Las)


- Bend Gip/Steel 45o f 2" Bh Rp 38.500,00
o
- Bend Gip/Steel 45 f 3" Bh Rp 71.500,00
- Bend Gip/Steel 45o f 4" Bh Rp 104.500,00
o
- Bend Gip/Steel 45 f 6" Bh Rp 272.525,00
o
- Bend Gip/Steel 45 f 8" Bh Rp 490.545,00
NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

13 FLANGE TEE GIP


- Flange Tee GIP f 4" x 4" Bh Rp 666.050,00
- Flange Tee GIP f 6" x 6" Bh Rp 1.006.500,00
- Flange Tee GIP f 8" x 8" Bh Rp 1.825.615,00
- Flange Tee GIP f 10" x 10" Bh Rp 2.920.500,00

14 FLANGE BEND GIP


- Flange Bend Gip/Steel 90o f 2" Bh Rp 324.500,00
- Flange Bend Gip/Steel 90o f 3" Bh Rp 379.500,00
o
- Flange Bend Gip/Steel 90 f 4" Bh Rp 533.500,00
o
- Flange Bend Gip/Steel 90 f 6" Bh Rp 797.500,00
o
- Flange Bend Gip/Steel 90 f 8" Bh Rp 1.085.150,00

15 FLANGE BEND GIP


- Flange Bend Gip/Steel 45o f 2" Bh Rp 302.500,00
- Flange Bend Gip/Steel 45o f 3" Bh Rp 368.500,00
o
- Flange Bend Gip/Steel 45 f 4" Bh Rp 522.500,00
o
- Flange Bend Gip/Steel 45 f 6" Bh Rp 679.250,00
o
- Flange Bend Gip/Steel 45 f 8" Bh Rp 1.064.250,00

16 STUB END / STUB FLANGE PE 100


- Stub End / Stub Flange PE 100 f 63 mm (2") Bh Rp 115.500,00
- Stub End / Stub Flange PE 100 f 90 mm (3") Bh Rp 231.000,00
- Stub End / Stub Flange PE 100 f 110 mm (4") Bh Rp 280.500,00
- Stub End / Stub Flange PE 100 f 160 mm (6") Bh Rp 445.500,00
- Stub End / Stub Flange PE 100 f 200 mm (8") Bh Rp 836.000,00

17 FLANGE SPIGOT
- Flange Spigot Ǿ 2" Bh Rp 207.350,00
- Flange Spigot Ǿ 3" Bh Rp 278.850,00
- Flange Spigot Ǿ 4" Bh Rp 350.350,00
- Flange Spigot Ǿ 6" Bh Rp 693.550,00
- Flange Spigot Ǿ 8" Bh Rp 1.215.500,00

18 FLANGE SOCKET
- Flange Socket Ǿ 2" (63 mm SC) Bh Rp 115.500,00
- Flange Socket Ǿ 3" (90 mm SC) Bh Rp 247.500,00
- Flange Socket Ǿ 4" (110 mm SC) Bh Rp 302.500,00
- Flange Socket Ǿ 6" (160 mm SC) Bh Rp 467.500,00
- Flange Socket Ǿ 2" (63 mm RR) Bh Rp 126.500,00
- Flange Socket Ǿ 3" (90 mm RR) Bh Rp 258.500,00
- Flange Socket Ǿ 4" (110 mm RR) Bh Rp 313.500,00
- Flange Socket Ǿ 6" (160 mm RR) Bh Rp 522.500,00
- Flange Socket Ǿ 8" (200 mm RR) Bh Rp 1.265.000,00

19 ELBOW PVC SNI - Socket 90º


- Elbow PVC Socket Ø 1 1/2" Bh Rp 38.500,00
- Elbow PVC Socket Ø 2" Bh Rp 63.415,00
- Elbow PVC Socket Ø 21/2" Bh Rp 92.950,00
- Elbow PVC Socket Ø 3" Bh Rp 115.500,00
- Elbow PVC Socket Ø 4" Bh Rp 163.350,00
- Elbow PVC Socket Ø 6" Bh Rp 464.750,00
NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

20 ELBOW PVC SNI - Socket 45º


- Elbow PVC Socket Ø 1 1/2" Bh Rp 50.050,00
- Elbow PVC Socket Ø 2" Bh Rp 64.350,00
- Elbow PVC Socket Ø 21/2" Bh Rp 78.650,00
- Elbow PVC Socket Ø 3" Bh Rp 95.150,00
- Elbow PVC Socket Ø 4" Bh Rp 165.000,00
- Elbow PVC Socket Ø 6" Bh Rp 324.500,00

21 TEE PVC SNI - 3 x Socket (Rubber Ring)


- Tee PVC Ø 2" x 2" Bh Rp 109.450,00
- Tee PVC Ø 3" x 3" Bh Rp 371.800,00
- Tee PVC Ø 3" x 2" Bh Rp 328.900,00
- Tee PVC Ø 4" x 4" Bh Rp 614.900,00
- Tee PVC Ø 4" x 3" Bh Rp 529.100,00
- Tee PVC Ø 4" x 2" Bh Rp 500.500,00
- Tee PVC Ø 6" x 6" Bh Rp 554.334,00
- Tee PVC Ø 6" x 4" Bh Rp 993.850,00

22 TEE PVC SNI - Socket


- Tee PVC Socket Ø 8" x 8" Bh Rp 1.287.000,00
- Tee PVC Socket Ø 8" x 6" Bh Rp 1.573.000,00
- Tee PVC Socket Ø 8" x 4" Bh Rp 786.500,00
- Tee PVC Socket Ø 8" x 3" Bh Rp 786.500,00

23 Bend HDPE PE 100 45 o Ø 2" Bh Rp 121.000,00


24 - Bend HDPE PE 100 90 o Ø 2" Bh Rp 134.200,00

25 LONG BEND DOUBLE SOCKET (solvent cament}


- Ø 2" (63 mm) x 45º Bh Rp 51.480,00
- Ø 3" (90 mm) x 45º Bh Rp 112.750,00
- Ø 2" (63 mm) x 90º Bh Rp 67.650,00
- Ø 3" (90 mm) x 90º Bh Rp 140.800,00

26 LONG BEND DOUBLE SOCKET (rubber ring}


- Ø 2" (63 mm) x 45º Bh Rp 102.850,00
- Ø 2" (63 mm) x 90º Bh Rp 126.500,00

27 LONG BEND SOCKET / SPIGOT (rubber ring}


- Ø 2" (63 mm) x 45º Bh Rp 185.900,00
- Ø 3" (90 mm) x 45º Bh Rp 286.000,00
- Ø 4" (110 mm) x 45º Bh Rp 398.750,00
- Ø 6" (160 mm) x 45º Bh Rp 806.850,00
- Ø 8" (200 mm) x 45º Bh Rp 1.401.400,00

28 LONG BEND SOCKET / SPIGOT (rubber ring}


- Ø 2" (63 mm) x 90º Bh Rp 185.900,00
- Ø 3" (90 mm) x 90º Bh Rp 286.000,00
- Ø 4" (110 mm) x 90º Bh Rp 398.750,00
- Ø 6" (160 mm) x 90º Bh Rp 806.850,00
- Ø 8" (200 mm) x 90º Bh Rp 1.685.750,00
NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

29 REDUCER PE 100
- Reducer PE 100 Ø 3" x 2" Bh Rp 148.500,00
- Reducer PE 100 Ø 4" x 2" Bh Rp 192.500,00
- Reducer PE 100 Ø 4" x 3" Bh Rp 209.000,00
- Reducer PE 100 Ø 6" x 3" Bh Rp 374.000,00
- Reducer PE 100 Ø 6" x 4" Bh Rp 401.500,00

30 REDUCER PVC SNI - Socket Solvent Cement


- Reducer PVC Ø 3" x 1 1/2" Bh Rp 71.500,00
- Reducer PVC Ø 3" x 2" Bh Rp 77.000,00
- Reducer PVC Ø 4" x 2" Bh Rp 92.950,00
- Reducer PVC Ø 4" x 3" Bh Rp 107.250,00

31 REDUCER PVC SNI - Rubber Ring


- Reducer PVC Ø 4" x 3" Bh Rp 171.600,00
- Reducer PVC Ø 6" x 4" Bh Rp 291.500,00
- Reducer PVC Ø 8" x 6" Bh Rp 500.500,00
- Reducer PVC Ø 10" x 6" Bh Rp 803.000,00
- Reducer PVC Ø 10" x 8" Bh Rp 918.500,00

32 DOP PE 100
- Dop PE Ø 2" Bh Rp 52.250,00
- Dop PE Ø 3" Bh Rp 82.500,00
- Dop PE Ø 4" Bh Rp 115.500,00
- Dop PE Ø 6" Bh Rp 181.500,00
- Dop PE Ø 8" Bh Rp 797.500,00

33 DOP/CAP PVC SNI (Slovent Cement)


- Dop PVC Ø 1 1/2" Bh Rp 28.600,00
- Dop PVC Ø 2" Bh Rp 35.750,00
- Dop PVC Ø 3" Bh Rp 42.900,00
- Dop PVC Ø 4" Bh Rp 100.100,00
- Dop PVC Ø 6" Bh Rp 137.500,00

34 DOP/CAP PVC SNI (Rubber Ring)


- Dop PVC Ø 2" Bh Rp 27.500,00
- Dop PVC Ø 3" Bh Rp 38.500,00
- Dop PVC Ø 4" Bh Rp 60.500,00
- Dop PVC Ø 6" Bh Rp 137.500,00

35 CLAMP SADDLE GIP/STELL


- Clamp Saddle Ø 2" x 3/4" Bh Rp 38.500,00
- Clamp Saddle Ø 2" x 1 1/2" Bh Rp 46.750,00
- Clamp Saddle Ø 4" x 3/4" Bh Rp 71.500,00
- Clamp Saddle Ø 6" x 3/4" Bh Rp 107.250,00
- Clamp Saddle Ø 6" x 1 1/2" Bh Rp 104.500,00
- Clamp Saddle Ø 6" x 2" Bh Rp 104.500,00
NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

36 STOP KRAN KUNINGAN


- Stop Kran Ǿ 1 1/2" Bh Rp 302.500,00
- Stop Kran Ǿ 2" Bh Rp 412.500,00
- Stop Kran Ǿ 3" Bh Rp 1.155.000,00

37 AIR VALVE
- Air Valve Ǿ 2" Bh Rp 654.500,00
- Air Valve Ǿ 3" Bh Rp 984.500,00
- Air Valve Ǿ 4" Bh Rp 1.284.250,00
- Air Valve Ǿ 6" Bh Rp 2.442.000,00

38 GATE VALVE
- > Gate Valve Ǿ 2" Bh Rp 999.900,00
- > Gate Valve Ǿ 3" Bh Rp 1.384.350,00
- > Gate Valve Ǿ 4" Bh Rp 2.663.650,00
- > Gate Valve Ǿ 6" Bh Rp 3.245.000,00

39 CHECK VALVE
> Check Valve Ǿ 1 1/2" Rp 398.200,00
- > Check Valve Ǿ 2" Bh Rp 3.712.500,00
- > Check Valve Ǿ 3" Bh Rp 1.802.900,00
- > Check Valve Ǿ 4" Bh Rp 3.608.000,00
- > Check Valve Ǿ 6" Bh Rp 3.575.000,00

40 GILBOUT JOIN CAST IRON PN 10


- Gibeoul Joint Cast Iron PN 10 Ǿ 3" Bh Rp 250.250,00
- Gibeoul Joint Cast Iron PN 10 Ǿ 4" Bh Rp 350.350,00
- Gibeoul Joint Cast Iron PN 10 Ǿ 6" Bh Rp 672.100,00
- Gibeoul Joint Cast Iron PN 10 Ǿ 8" Bh Rp 1.215.500,00

41 KARET PACKING
- Karet Packing Ǿ 2" Bh Rp 15.950,00
- Karet Packing Ǿ 3" Bh Rp 18.150,00
- Karet Packing Ǿ 4' Bh Rp 22.000,00
- Karet Packing Ǿ 6" Bh Rp 33.000,00
- Karet Packing Ǿ 8" Bh Rp 34.650,00

42 - Bout/Moer 5/8 x 3" Bh Rp 11.000,00


43 - Bout/Moer 3/8 x 3" Bh Rp 16.500,00
44 - Lem Pipa Kg Rp 82.500,00
NO BAHAN / MATERIAL SAT HARGA BAHAN 2019 KET

44 PEMASANGAN SAMBUNGAN RUMAH


- Kran Ǿ 1/2" Bh Rp 22.000,00
- Stop Kran Ǿ 1/2" Bh Rp 77.000,00
- Knee GIP Ǿ 1/2" Bh Rp 11.000,00
- Katup Searah (Check Valve) Ǿ 1/2" Bh Rp 89.650,00
- Water Meter Ǿ 15 MM 1/2 (Setara Bestini, AMNB,ONDA) Bh Rp 286.000,00
- Plung Kran Ǿ 1/2" (Setara YUTA) Bh Rp 144.100,00
- Tee GIP Ǿ 1/2" Bh Rp 9.900,00
- Pipa GIP Ǿ 1/2" 2 mm Btg Rp 221.100,00
- Clamp Saddle Ø 3" x 1/2" Bh Rp 57.200,00
- Clamp Saddle Ø 2" x 1/2" Bh Rp 38.500,00
- Seal Tape Bh Rp 3.300,00
Double Nipple Ǿ 1/2" Bh Rp 7.700,00
HQ Female Thread Adaptor PE Ǿ 1/2" X 1/2" Bh Rp 19.800,00
HQ Male Thread Adaptor PE Ǿ 1/2" X 1/2" Bh Rp 19.800,00
Box Meter (Biru) Bh Rp 71.500,00
Plug PVC Ø 1/2" Bh Rp 3.300,00
Clamp Saddle Ø 1 1/2" x 1/2" GIP Bh Rp 27.500,00

Sengkang, Januari 2019


KEPALA DINAS BMCKJK-PR KAB. WAJO

Drs. HAIRIL AMRI WAWO


NIP : 19620713 199303 1 005
DAFTAR TARIF SEWA PERALATAN KAB. WAJO
UNTUK ANALISA HARGA SATUAN PEKERJAAN (ANALISA BINA MARGA)
TAHUN ANGGARAN 2019
BIAYA SEWA
NO. URAIAN KODE HP KAPASITAS KET.
ALAT/JAM
1 ASPHALT MIXING PLANT E01 290 60.0 Ton/Jam Rp 6.759.600,00
2 ASPHALT FINISHER E02 50 10 Ton/Jam Rp 338.200,00
3 ASPHALT SPRAYER E03 15 850 Liter Rp 77.200,00
4 BULLDOZER E04 140 140 HP Rp 600.100,00
5 AIR COMPRESSOR E05 80 400 M2/Jam Rp 220.300,00
6 CONCRETE MIXER E06 10 250 Liter Rp 44.908,00
7 CRANE MAKS 80 TON E07 150 80 Ton Rp 660.300,00
8 DUMP TRUCK ( K ) E08 50 6 Ton Rp 167.700,00
9 DUMP TRUCK E09 100 10 Ton Rp 380.700,00
10 EXCAVATOR E10 100 0.5 M3 Rp 492.800,00
11 FLAT BED TRUCK E11 125 10 Ton Rp 346.500,00
12 GENERATOR SET E12 120 100 KVA Rp 514.000,00
13 MOTOR GRADER E13 125 125 HP Rp 509.100,00
14 TRACK LOADER E14 95 1.5 M3 Rp 479.000,00
15 WHEEL LOADER E15 95 1.5 M3 Rp 503.700,00
16 THREE WHEEL ROLLER E16 50 8 Ton Rp 219.400,00
17 TANDEM ROLLER E17 50 8 Ton Rp 219.100,00
18 PNEUMATIC TYRE ROLLER E18 60 10 Ton Rp 238.700,00
19 VIBRATORY ROLLER E19 50 8 Ton Rp 254.000,00
20 CONCRETE VIBRATOR E20 3 3 HP Rp 33.000,00
21 STONE CRUSHER E21 220 100 Ton/Jam Rp 1.141.000,00
22 WATER PUMP E22 6 10 M3/Jam Rp 36.500,00
23 WATER TANK TRUCK E23 125 4 M3 Rp 347.900,00
24 VIBRATORY COMPACTOR E24 3 3 HP Rp 33.800,00
25 STAMPER E25 5 0.2 Ton Rp 33.400,00
26 JACK HAMMER E26 3 3 HP Rp 52.600,00
27 FULVI MIXER E27 75 75 HP Rp 206.300,00
28 CONCRETE PUMP E28 120 60 M3 Rp 333.600,00
29 TRAILER 20 TON E29 175 20 Ton Rp 567.700,00
30 PILE DRIVER + DIESEL HAMMER E30 25 2.5 Ton Rp 105.600,00
31 CRANE ON TRACK (35 Ton) E31 125 35 Ton Rp 503.700,00
32 WELDING SET E32 40 250 Amp Rp 113.900,00
33 PEDESTRIAN ROLLER E33 11 1 Ton Rp 79.600,00
34 ASPHALT LIQUID MIXER E34 5 1000 Liter Rp 34.700,00
35 MESIN LIER E35 80 10 Ton Rp 213.000,00
36 FLAT BED TRUCK + CRANE E36 125 15 Ton Rp 469.200,00
37 SCREENING PLANT E37 150 20 T/Jam Rp 406.100,00
38 DROP HAMMER / PANC. KAYU E40 75 1 Ton Rp 295.300,00
39 HAND COMPACTOR E41 10 0,1 Ton Rp 66.500,00
40 CONRETTE PAVING MACHINE (SLIP FORM PAVER)
E42 105 2,5 M Rp 559.300,00
41 VIBRATING SCREED E43 18 20,0 HP Rp 69.300,00
42 CONCRETE CUTTER E45 23 25 HP Rp 80.500,00
43 PONTON ANGKUT E46 50 50,0 Ton Rp 163.200,00
44 PONTON PANCANG E47 100 100 Ton Rp 284.700,00
45 BORE PILE MACHINE E48 150 2000 Meter Rp 1.504.900,00
46 BATCHING PLANT E49 150 8000Liter Rp 640.300,00
47 TRONTON E52 220 15 Ton Rp 735.000,00
BIAYA SEWA
NO. URAIAN KODE HP KAPASITAS KET.
ALAT/JAM
48 COLD MILLING MACHINE E53 248 1000 Meter Rp 1.761.000,00
49 ROCK DRILL BREAKER E54 30 30 HP Rp 375.800,00
50 COLD RECYCLER E55 900 2,2 M Rp 7.458.000,00
51 HOT RECYCLER E56 900 3M Rp 9.561.800,00
52 AGGREGAT (CHIP) SPREADER E57 135 3,5 M Rp 650.800,00
53 ASPHALT DISTRIBUTOR E58 135 4000 Liter Rp 470.200,00
54 CONCRETE PAN MIXER E60 125 500 Liter Rp 584.100,00
55 CONCRETE BREAKER E61 290 20 M3/Jam Rp 928.100,00
56 ASPAHLT TANKER E62 190 4000 Liter Rp 586.000,00
57 CEMENT TANKER E63 190 4000 Liter Rp 586.000,00
58 CONCRETE MIXER (350) E64 20 350 Liter Rp 82.600,00
59 VIBRATING RAMMER E65 4,2 80 Kg Rp 41.400,00
60 TRUCK MIXER (AGITATOR) E66 220 5 M3 Rp 704.700,00
61 CRANE ON TRACK 75-100 TON E68 200 75 Ton Rp 704.600,00
62 BLENDING EQUIPMENT E69 50 30 Ton Rp 261.500,00
63 CHAIN SAW E71 10 10 HP Rp 48.200,00

Catatan :
- Harga tersebut belum termasuk PPn, Biaya Umum dan Keuntungan.
- Sudah termasuk Upah Operator dan Pembantu Operator
Sengkang, Januari 2019
KEPALA DINAS BMCKJK-PR KAB. WAJO
16

Drs. HAIRIL AMRI WAWO


NIP.19620713 199303 1 005
DAFTAR HARGA SATUAN UPAH

PROVINSI : SULAWESI SELATAN


KABUPATEN : WAJO
TAHUN ANGGARAN : 2019

HARGA SATUAN HARGA SATUAN


NO. URAIAN KODE 2019 2019 KET
(Rp/Jam) (Rp/Hari)

1 Pekerja L.01 16.300 114.100

2 Tukang L.02. 18.400 147.200


3 Mandor L.03 18.400 161.920
4 Operator Terampil L.04 19.100 152.800
5 Pembantu Operator L.05 16.600 132.800
6 Sopir Terampil L.06 18.400 147.200
7 Pembantu Sopir L.07 16.300 130.400

8 Mekanik Terampil L.08 19.100 152.800

9 Pembantu Mekanik L.09 16.600 132.800


10 Kepala Tukang L.10 19.100 152.800
11 Buruh Tak Terampil L.01.1 16.300 130.400

12 Buruh Semi Terampil L.01.2 16.500 132.000

13 Buruh Terampil L.01.3 16.600 132.800

14 Tukang Batu L.02.1 18.400 147.200

15 Tukang Cat L.02.2 18.400 147.200

16 Tukang Kayu L.02.3 18.400 147.200


17 Tukang Besi L.02.4 18.400 147.200
18 Operator Semi Terampil L.04.1 18.400 147.200
19 Sopir Pribadi L.06.1 18.400 147.200

Catatan :
Harga tersebut belum termasuk PPn, Biaya Umum dan Keuntungan

Sengkang, Januari 2019


KEPALA DINAS BMCKJK-PR KAB. WAJO

Drs. HAIRIL AMRI WAWO


NIP.19620713 199303 1 005