4.1
4.1.8
Code
293
295
2206
2202
982
2203
367
2209
155
114
101
2
12
9999
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Description
Details of cost for 1 cum
Stone Aggregate(single size): 40 mm nominal size - nominal size
(0.70 cum -7.5% for voids i.e. 0.05 =0.65 cum)
Stone Aggregate(single size):20 mm nominal size - nominal size
Carriage of Stone aggregate 40 mm nominal size and above
Carriage of Stone aggregate below 40 mm nominal size
Coarse sand (zone III)
Carriage of Coarse sand
Portland Cement
Carriage of Cement - LABOUR:
Mason (average)
Beldar
Bhisti
Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper
Vibrator (Needle type 40 mm)
Sundries
Unit
Quantity Rate
Amount
cum
cum
cum
cum
cum
cum
tonne
tonne
Day
Day
Day
0.65
0.24
0.65
0.24
0.47
0.47
0.17
0.17
0.1
1.63
0.7
1550
1700
0
0
4950
0
8800
0
900
240
760
1007.5
408
0
0
2326.5
0
1496
0
90
391.2
532
Day
Day
0.07
0.07
2400
500
168
35
L.S
13.52
27.04
TOTAL
Add Water Charges @ 1.0
Cost of 1.0 cum
Say
6481.24
64.81
6546.05
6546.05
Skilled
Un Skilled
Semi Skilled
Materials
Total
0
456.01
622
5265.04
6546.05