REPAIR OPERATIONAL
PROCEDURE
NO.:
ATN-DCC-013
EDITION:
REVISION:
PAGE:
1 of 5
ATN Fabricaciones SA de CV
ATN-DCC-013
REV. NO.
0
Prepared by:
Enrique Gonzlez.
MODIFICATION
REVIEWED
INITIAL EMISION
Appoved by:
Ing. Leticia Hernndez Hdez.
DATE
Fabricaciones SA de CV
REPAIR OPERATIONAL
PROCEDURE
NO.:
ATN-DCC-013
EDITION:
REVISION:
PAGE:
2 of 5
1.0 SCOPE
1.1 These instructions establish the requirements, which must be met when repairing
material and welds in accordance with the below referenced Codes.
2.0 REFERENCED CODE AND PARAGRAPHS
2.1
PARAGRAPHS:
UG-90 (b) (8) CONCURRENCE OF AUTHORIZED INSPECTOR PRIOR TO
ANY REPAIRS [ UG78, UW-34, UW-38, UF-37 and UF-38 ].
Fabricaciones SA de CV
REPAIR OPERATIONAL
PROCEDURE
NO.:
ATN-DCC-013
EDITION:
REVISION:
PAGE:
3 of 5
(e) For liquid quenched and tempered steels, other than austenitic steels, welding
repairs shall be in accordance with UF-37 (b) (3).
Fabricaciones SA de CV
REPAIR OPERATIONAL
PROCEDURE
NO.:
ATN-DCC-013
EDITION:
REVISION:
PAGE:
4 of 5
(1) Material Having Carbon Content over 0.35% (By Ladle Analysis):
(a) Welding repairs shall conform with UF-32(b) except that if the maximum
weld depth exceeds 1/4in (6mm), radiography, in addition to magnetic
particle or liquid penetrant, shall be used.
(b) For liquid quenched and tempered steels, other than austenitic steel, welding
repair shall be in accordance with (b) (3) below.
(3) Welding repairs of materials which are to be or have been liquid quenched
and tempered, regardless of depth or area of repairs shall be have the repaired
area radiographed and examined by magnetic particle or liquid penetrant
examination.
UF-38 REPAIRS OF WELD DEFECTS.
The repair of welds of forgings having carbon content not exceeding 0.35%
by ladle analysis shall follow the requirements of UW-38.
3.0 PERSONNEL QUALIFICATION
3.1 All personnel shall be trained and qualified in compliance with the Quality
Control Manual requirements for ASME Code activity prior to performing
any of the inspections required by this procedure.
3.2
REPAIR OPERATIONAL
PROCEDURE
Fabricaciones SA de CV
6.0
NO.:
ATN-DCC-013
EDITION:
REVISION:
PAGE:
5 of 5
WELDING
All welding shall be performed in accordance with the requirements of
the applicable Code Section used for construction and Section IX. All
welding shall be done in compliance with qualified welding procedure
specification [WPS] assigned by the Quality Control Manager and
qualified welders assigned as described in the Quality Control Manual.
The Production Manager and the Quality Control Manager must
consider that the cavity to be repaired may differ in contour and
dimension from a normal joint preparation and may present different
restraint conditions.
7.0
RECORDS
7.1
7.2
For defects, such as cracks and repairs that exceed 20% off the material
thickness or 3/8 in (10 mm) depth, shall be reported and disposition for
correction using a Nonconformance Report per Section 6 of the Quality
Control Manual.
APPROVED BY:
AUTHORIZED INSPECTOR
DATE
DATE
REPAIR OPERATIONAL
PROCEDURE
Fabricaciones SA de CV
NO.:
ATN-DCC-013
EDITION:
REVISION:
PAGE:
1 of 1
ANNEX 9
DEPARTAMENTO DE CONTROL DE CALIDAD
QUALITY CONTROL DEPARTMENT
REPORTE DE REPARACION
REPORTE NO.:
REPORT Nr:
MATERIAL (MATERIAL):
ORDEN DE TRABAJO:
SOLDADURA (WELD):
No. DE SERIE DEL RECIPIENTE:
JOB NUMBER:
DEFICIENCIA ENCONTRADA:
INSPECCION VISUAL:
DEFICIENCY FOUND:
NDE
VISUAL INSPECTION:
ACEPTADA / ACCEPTED:
ACEPTADA / ACCEPTED:
PRUEBA DE PRESION:
[(PRESSURE TEST)]:
OBSERVACIONES/ REMARKS:
CONTROL DE CALIDAD:
QUALITY CONTROL
FECHA / DATE: