Professional Documents
Culture Documents
Project Inventory - Proyecto Sijuaya2
Project Inventory - Proyecto Sijuaya2
wtg
Title
Engineer
Company
Date
Notes
Proyecto Final
Ing. Roberto Nina Garcia
Municipalidad Distrital de San Cristobal - Calacoa
09/07/2016
Scenario Summary
ID
Label
Notes
Active Topology
Physical
Demand
Initial Settings
Operational
Age
Constituent
Trace
Fire Flow
Energy Cost
Transient
Pressure Dependent Demand
Failure History
SCADA
User Data Extensions
Steady State/EPS Solver Calculation
Options
Transient Solver Calculation Options
1
Base
Base Active Topology
Base Physical
Base Demand
Base Initial Settings
Base Operational
Base Age
Base Constituent
Base Trace
Base Fire Flow
Base Energy Cost
Base Transient
Base Pressure Dependent Demand
Base Failure History
Base SCADA
Base User Data Extensions
Base Calculation Options
Base Calculation Options
Network Inventory
Pipes
12
Junctions
Hydrants
10
0
PROYECTO SIJUAYA2.wtg
10/07/2016
0
2
0
0
1
0
0
0
0
PBV's
FCV's
TCV's
GPV's
Isolation Valves
Spot Elevations
0
0
0
0
0
0
Turbines
Periodic Head-Flows
Air Valves
Hydropneumatic Tanks
0
0
0
0
0
0
0
Surge Valves
Check Valves
0
0
Rupture Disks
Discharges to Atmosphere
Orifices Between Pipes
Valves With Linear Area
Change
Surge Tanks
0
0
PROYECTO SIJUAYA2.wtg
10/07/2016
2,123 m
259 m
110.0 (mm)
All Diameters
775 m
3,157 m