Work: Refurbishing of the existing 2.

5 KVA Generator drive steam Turbine


Turbine details
Make: Hindustan Turbomachinery Ltd, Bangalore
Type: Back pressure & condensing turbines connected as series
Capacity:
Back pressure turbine : 800 KW
Condensing turbine

: 1625 KW

Steam inlet to Back pressure Turbine: 42 kg/sq cm press & 400 deg C
Steam outlet to Back pressure Turbine: 4.5 kg/sq cm press & 400 deg C
Steam inlet to condensing Turbine: 4 kg/sq cm press & 400 deg C
Steam outlet to condensing turbine: 0.1 ATA
Steam flow requirement: 20 T/Hr
Turbine speed
Generator speed

: 6500 RPM
: 1500 RPM

Steam inlet for both Turbines: 6


Steam outlet for Back pressure turbines: 12
Steam outlet for condensing turbine: 14
Turbine history:
The turbine was erected in 2012.Turbine has not been commissioned/taken in to service
since the erection. We have taken a trial run without following facilities. Turbine solo run
taken and found OK. Coupled run with gear box & generator [without load] taken. It has
been found that, up to 4100 RPM the governor is responding. Beyond 4200 RPM the
governor is not responding and the speed is raising over and above the set 4200 RPM.
The following are the observations.
1. Main shut off valve is not there. The connecting flange is dummied.
2. The present governor in line is not taking control(pneumatic actuator)
3. Vibration probe is not there. Unable to monitoring and to give very high vibration
trip.

4. Lube oil low alarm and lube oil trip is not there.
5. Over speed trip mechanism is not there.
6. There is no document evidence for critical speed and minimum governor speed.
Job scope:
A new shut off valve to make and provide.
Governor system to be corrected
Overspeed trip, low LO alarm/ trip, High vibration alarm/trip to be provided.
After providing all these turbine to be run and to be loaded.