DIRECTORATE GENERAL OF WATER RESOURCES

MINISTRY OF PUBLIC WORKS AND PUBLIC HOUSING

Weekly Work Done Report

Please, mo

QA/QC Dept.
NO.
1

date
18th April ~ 30th April, 2016

DESCRIPTION

Pouring 16 march 2016


Pouring 1 April 2016

100
100

100
50

Pouring 4 April 2016


Pouring 7 April 2016

100
50

50
50

Pouring 12 April 2016


Pouring 16 April 2016
Outlet

50
50

50
50

50

50

100
100

100
100

50
50

50
50

CONCRETE TYPE C
Trial Mix (BBI / 22 February 2016)
Trial Mix (JB / 9 April 2016)

100
50

100
50

MERAH PUTIH CEMENT


Factory visit & sampling material

100

100

50

30

2
3

Trial Mix (11 April 2016)


CONCRETE TYPE B
Trial Mix (BBI / 14 January 2016)
Trial Mix (SGG / 20 January 2016)
Trial Mix (JB / 11 April 2016)
Slope Protection EL56.50 at Intake Tower (22 April 2016)

18

19

Last Week
April
20 21 22

23

24

25

26

This Week
April
27 28 29

30

Remarks

SHOTCRETE
Inlet

Tunnel
CONCRETE TYPE A

PROGRESS
%
Plan
Actual

Independent test
Result & Approval Letter

Completed on 13 April
50% Completed on 8 April

50% Completed on 11 April

Completed on 11 February
Completed on 17 February

Completed on 21 March 2016

*line mean
dotted line
plan

SOIL TEST
Borrow Area 1
Grading
Atterberg limit
Specific gravity
Proctor
CBR
Result & Approval Letter
Borrow Area 2
Grading

100

Atterberg limit
Specific gravity

100
100

0
100

Proctor
CBR
Result & Approval Letter

100
100

0
0

Borrow Area 3
Grading
Atterberg limit
Specific gravity
Proctor
CBR
Result & Approval Letter