PROJECT
Date
Capacity
Design
Item
Design Class
Class 1
Class 2
Class 3
Instrument air
capacity
Compressor sparing
No spares
Sparing= N+1
Sparing=N+2
<5mins
5 mins
Nitrogen generation
capacity
Nitrogen Normal
operating demand +
10% margin
Nitrogen Normal
operating demand + 30%
margin
ASU sparing
1 x 100%
2 x 50%
Back up supply
2 x 100%
Back up supply
N+0
N+1
N+1
On site liquid
storage
Based on maximum of
a. 1 week normal
demand
b. 8Hrs of peak
consumption
1x100% tank
Based on maximum of
a. 1 week normal
demand
b. 24Hrs of peak
consumption
2x50% tanks
Based on maximum of
a. 1 week normal
demand
b. 24Hrs of peak
consumption
N+1 tanks
Page 1 of
PROJECT
Date
Capacity
Design
Item
Vaporiser capacity
and sparing
Design Class
Class 1
Steam heated
based on class 1 flow
N+0
Or
Atmospheric vaporizer
N+0 with one spare
section/module (to
facilitate periodic
defrosting)
Class 2
based on class 2 flow
N+1
Class 3
based on class 3 flow
N+1
Page 2 of
PROJECT
Date
Design Class
Class 1
Class 2
Class 3
Instrument air
quality monitoring.
Instrument Air
Compressor type
Segregation
Instrument air
supply header
Single header
Nitrogen facility
No on line O2 analysers
Nitrogen quality
monitoring
Page 3 of
PROJECT
Date
Energy Efficiency
Design
Item
Design Class
Class 1
Class 2
Class 3
Heatless regeneration
Heated regenerationElectric
Not considered.