You are on page 1of 4

APEX SYSTEMS

Project

PROPOSED WATER TANK STAND

Client

MR. PATRICK MWENDA

Member

Bar Mark

Type & Size

Job No.
271

Drg. No.

Date

No. of
Mbrs

Serial

9/11/2015

Prepared by
AM
Length of
No. in Total
Each Bar
Shape
Each
No.
(mm)
Code

Date

Rev.
O1
10-Sep-2015

CheckedPK
*A

*B

*C

*D

*E/r

Total Length Total Adjusted


(m)
Length (m)

Pieces

Weight kg.

footing
B2

Y32

36

36

11,100

21

300

5,100

300

399.60

440

37

2,517

(1 No.)
T2

Y32

36

36

11,100

21

300

5,100

300

399.60

440

37

2,517

B1

Y32

26

26

12,300

21

300

5,700

300

319.80

352

29

2,015

T1

Y32

26

26

12,300

21

300

5,700

300

319.80

352

29

2,015

0.00

O9-B1

Y32

36

36

5,100

21

2,100

900

2,100

183.60

202

17

1,157

10-B2

Y25

5,800

21

300

5,200

300

29.00

32

113

10-B2

Y25

5,800

21

300

5,200

300

23.20

26

90

0.00

TOE
0
(1 No.)

WALLING
NF1

Y25

41

164

4,746

21

300

4146

300

778.34

856

71

3,036

O1-B2

Y16

48

0
192

0
6,400

21

300

5800

300

0.00
1,228.80

0
1,352

0
113

1,966

03- T2

Y25

29

29

4,746

21

300

4146

300

137.63

151

13

537

04- T2

Y25

29

29
0

4,746
0

21

300

4146

300

137.63
0.00

151
0

13
0

537

04- T2

Y16

29

29

5,100

21

300

4500

300

147.90

163

14

237
16,737

0.00

0.00

0.00

TOTAL WEIGHT

*specified to the nearest 5mm

1/4

*specified to the nearest 25mm

APEX SYSTEMS
Project

PROPOSED WATER TANK STAND

Client

MR. PATRICK MWENDA

Member

*specified to the nearest 5mm

Bar Mark

Type & Size

Job No.
271

Drg. No.

Date

No. of
Mbrs

Serial

9/11/2015

Prepared by
AM
Length of
No. in Total
Each Bar
Shape
Each
No.
(mm)
Code

2/4

Date

Rev.
O1
10-Sep-2015

CheckedPK
*A

*B

*C

*D

*E/r

Total Length Total Adjusted


(m)
Length (m)

Pieces

Weight kg.

*specified to the nearest 25mm

APEX SYSTEMS
Project

PROPOSED WATER TANK STAND

Client

MR. PATRICK MWENDA

Member

*specified to the nearest 5mm

Bar Mark

Type & Size

Job No.
271

Drg. No.

Date

No. of
Mbrs

Serial

9/11/2015

Prepared by
AM
Length of
No. in Total
Each Bar
Shape
Each
No.
(mm)
Code

3/4

Date

Rev.
O1
10-Sep-2015

CheckedPK
*A

*B

*C

*D

*E/r

Total Length Total Adjusted


(m)
Length (m)

Pieces

Weight kg.

*specified to the nearest 25mm

APEX SYSTEMS
Project

PROPOSED WATER TANK STAND

Client

MR. PATRICK MWENDA

Member

*specified to the nearest 5mm

Bar Mark

Type & Size

Job No.
271

Drg. No.

Date

No. of
Mbrs

Serial

9/11/2015

Prepared by
AM
Length of
No. in Total
Each Bar
Shape
Each
No.
(mm)
Code

4/4

Date

Rev.
O1
10-Sep-2015

CheckedPK
*A

*B

*C

*D

*E/r

Total Length Total Adjusted


(m)
Length (m)

Pieces

Weight kg.

*specified to the nearest 25mm

You might also like