DESIGN AND CONSTRUCT SERVICE ROAD ENHANCEMENT TO NORTH ROAD

PROJECT (059)

AGGREGATE TEST RESULT

0 to 5 mm WASHED SAND
Sieve Analysis
I.R No

Sampling
Date

Tested
By

Location and Sample


Description

8.0

6.3

4.0

100

95-100

85-99

2.00

1.00

Chemical Analysis

Lightweight
Particles

Material Finer
Than 63
microns sieve
by washing

Organic
Impurities

Clay Lumps
&
Friable
Particles

Oven Dry
Basis

SSD Basis

Apparent

Water
Absorptio
n

Particle Density

0.5

0.063

CL (%)

SO3 (%)

30-70

0-3

Nax
0.06%

Max 0.04%

<0.5%

Max.%3

Free from
Organic
Impurities

Max. 2%

(Mg/m3)

(Mg/m3)

(Mg/m3)

Sand
Drying
Soundness Equivalen
Shrinkage
t

Methylene Blue
Absor. Value

(%)

(%)

(%)

<12

>55

Max
0.075%

Washed Sand

EXW/P059/000/QM/TEK/IR/00650

7-Apr-13

Arab Center

KM 28 Concrete PLANT STOCK

100

98

0.32

1.50

0.33

2.74

2.77

2.84

1.35

EXW/P059/000/QM/TEK/IR/00708

5-May-13

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

97

91

85

41

0.1

1.5

0.90

2.60

2.63

2.68

0.90

8.4

60

EXW/P059/000/QM/TEK/IR/00801

1-Jul-13

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

98

94

87

46

0.01

0.30

0.1

1.0

0.40

2.58

2.61

2.66

1.00

7.4

67

0.008

EXW/P059/000/QM/TEK/IR/00894

17-Aug-13

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

96.0

91.0

78.0

49.0

1.3

0.04

0.30

0.1

1.3

0.70

2.62

2.66

2.70

1.00

7.3

58

0.010

EXW/P059/000/QM/TEK/IR/00940

3-Sep-13

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

98.0

92.0

82.0

56.0

1.0

0.03

0.30

0.1

0.9

0.20

2.59

2.62

2.67

1.00

7.2

62

0.011

EXW/P059/000/QM/TEK/IR/00962

12-Sep-13

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

99

92

82

54

0.03

0.30

0.1

1.0

0.30

2.60

2.62

2.67

1.00

7.0

60

0.013

EXW/P059/000/QM/TEK/IR/01021

5-Oct-13

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

99

91

81

49

0.03

0.30

0.1

1.1

0.30

2.63

2.65

2.68

0.80

7.5

59

0.010

EXW/P059/000/QM/TEK/IR/01097

22-Oct-13

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

97.0

91.0

79.0

47.0

1.0

0.03

0.3

0.1

1.0

0.40

2.63

2.66

2.69

0.90

7.0

61

0.012

3.3

EXW/P059/000/QM/TEK/IR/01172

5-Nov-13

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

97.0

91.0

82.0

40.0

1.0

0.03

0.3

0.1

1.0

0.10

2.61

2.63

2.67

0.90

7.0

69

0.011

3.3

EXW/P059/000/QM/TEK/IR/01466

5-Jan-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

100

98

92

83

42

0.9

0.01

0.3

0.1

0.9

0.10

2.61

2.63

2.67

0.9

5.5

61

0.012

3.0

EXW/P059/000/QM/TEK/IR/01517

19-Jan-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

100

97

91

81

41

1.1

0.03

0.1

0.1

1.1

0.30

2.62

2.63

2.67

0.9

61

0.011

3.3

EXW/P059/000/QM/TEK/IR/01594

2-Feb-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100.0

100

94

91

81

41

0.03

0.3

0.1

0.7

0.40

2.62

2.64

2.68

0.90

6.6

59

0.013

3.1

EXW/P059/000/QM/TEK/IR/01649

15-Feb-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100.0

100

97

91

81

41

0.03

0.3

0.1

1.0

0.20

2.61

2.63

2.67

0.90

5.7

60

0.011

3.2

EXW/P059/000/QM/TEK/IR/01750

2-Mar-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100.0

100

97

91

81

41

0.02

0.3

0.1

1.1

0.20

2.61

2.63

2.67

0.90

6.2

58

0.015

3.3

EXW/P059/000/QM/TEK/IR/01830

16-Mar-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100.0

100

97

91

81

41

0.02

0.4

0.1

1.3

0.30

2.61

2.63

2.68

0.90

6.3

61

0.013

3.2

EXW/P059/000/QM/TEK/IR/01923

1-Apr-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

100

98

92

60

60

0.03

0.4

0.1

0.9

0.3

2.6

2.6

2.7

0.9

6.1

62

0.012

3.3

EXW/P059/000/QM/TEK/IR/02012

15-Apr-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

98

94

87

76

50

0.03

0.4

0.1

1.1

0.2

2.61

2.63

2.67

0.9

58

0.012

3.3

EXW/P059/000/QM/TEK/IR/02118

4-May-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

98

94

87

76

50

0.03

0.4

0.1

1.3

0.2

2.61

2.63

2.67

0.5

5.9

61

0.016

3.3

EXW/P059/000/QM/TEK/IR/02234

19-May-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

98

94

87

76

50

0.02

0.4

0.1

1.3

0.3

2.61

2.63

2.67

0.9

5.2

58

0.011

3.4

EXW/P059/000/QM/TEK/IR/02359

2-Jun-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

98

94

87

76

50

0.02

0.4

0.1

1.4

0.2

2.61

2.64

2.68

0.9

58

0.018

3.3

EXW/P059/000/QM/TEK/IR/02700

3-Jul-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

98

94

87

76

50

0.02

0.04

0.1

0.9

0.2

2.61

2.63

2.67

0.9

6.1

62

0.014

3.3

EXW/P059/000/QM/TEK/IR/02819

16-Jul-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

100

99

98

85

60

0.02

0.04

0.1

0.2

2.61

2.64

2.68

0.9

6.8

59

0.013

3.3

EXW/P059/000/QM/TEK/IR/02987

4-Aug-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

100

99

94

84

55

0.02

0.4

0.1

1.4

0.3

2.61

2.63

2.67

0.9

7.2

58

0.012

3.5

EXW/P059/000/QM/TEK/IR/03129

18-Aug-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

100

100

95

88

43

0.02

0.3

0.1

0.3

2.61

2.63

2.67

0.9

7.3

57

0.012

3.4

EXW/P059/000/QM/TEK/IR/03311

2-Sep-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

100

99

95

87

60

0.02

0.3

0.1

2.62

2.65

2.68

0.9

5.6

59

0.011

3.2

EXW/P059/000/QM/TEK/IR/03508

17-Sep-14

Qatar Eng.

KM 28 Concrete PLANT STOCK

100

100

99

96

90

66

1.5

0.03

0.3

0.1

1.5

0.2

2.62

2.65

2.69

0.9

6.3

59

0.014

3.5