Professional Documents
Culture Documents
Projekttrger
Koordination
I d t i l partners:
Industrial
t
Funded by:
GIGAWINDav
TP 2
The working
g packages
p
g
TP 1 - Load modelling for wind and waves and its
TP 3
TP 1
correlation effects
TP 8
TP 2 - Influence of manufacturing aspects on fatigue
resistance
TP 7
TP 3 - Corrosion protection for offshore steel
TP 6
TP 4
structures
TP 4 - Reliable load monitoring at global and local
TP 5
parts of the structure
TP 5 - Development
D
l
t off new scour protection
t ti
systems
t
and local scour monitoring,
TP 6 - Modelling of the load-carrying behaviour for driven offshore
piles
TP 7 - Automated Validation of general structural models
TP 8 - Holistic design
g concept
p for OWEC support
pp
structures
Outline
BIFab
Objectives
Laser measurements
Total station + ultrasonic
ltrasonic
Parameter studies
S f
Surface
modelling
d lli
Summary
Doti
Objectives
j
Jakubowski (2003)
Objectives
j
Ninian Central North Sea Oil Platform Niall
Cotton
Serial production
cn-online.de
Piece production
Manufacturing of a frame
Out-of-roundness of a tube
Actual:
111,44
Actual:
68,48
Set: 68,45
X-node 1, welded,
Check measurement
Actual:
111,50
Actual:
68,50
X1S
X1H
Actual
:
68,41
X-node 1, welded
Burntisland Fabrications
Relative
Hu
h [-][-]
Relative
frufigkeit
requency
Evaluation of measurements:
Determination of centerline
from surface points
Statistical evaluation of inaccuracies:
Expected value =0 known
for , eund L
Use of absolute values and
classification
-Test
Test for normal distribution
not successful
More data needed, in order to
determine statistically assured
distribution
weld
Klassenhufigkeit
Histogram
|e| - |e(n=43)
| - (n=43)
0,5
Messw erte
Measurement
0,4
Half-Normal
Distrib.
halbseitige Normalvert.
0,3
0,2
0,1
0
4,33
8,66
[N/m
mm]
Maximum
allowed
ll
d
imperfection acc.
to Eurocode: 6 cm
80
60
40
20
0
-20
-40
-60
60
0,0
0,1
0,2
0,3
0,4
Imperfection [m]
0,5
Brace 66
0
0.1
1
0
0.2
2
0
0.3
3
Imperfection [m]
0
0.0
0
0
0.1
1
0
0.2
2
0
0.3
3
Imperfection [m]
dB
tA
(SCF/SCF(e=0))
tB
+21,0%
S b A
Strebe
brace
b
S brace
Strebe
b B
+11,7
%
-0,5%
T
L
Gurt
chord
2e/(D-d)
2e/(D
d)
e
+
N2=N1(1/2)
=g/D
3 Configurations:
0: undeformed
1: e
= 100 mm
2: L
= 100 mm
Chord:
m=5
(
(norm.)
)
-1
inwards
inwards
-1
+14%
-1
+84%
0: undeformed
1: e=100mm
2:L=100mm
-1
cut A
cut A
Summaryy
Thank
a You
ou very
e y much
uc for
o your
you
attention!